A-10.1 Supplemental Specs.pdf
PDF 641 KB Posted
- Attached to
- Trinity Center Boat Ramp, Phase II, Trinity Lake Federal contract opportunity
- Solicitation number
- 127EAW21B0001
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-11 Q and A Version 3 - 110420.docx | DOCX document | |
| A-11 Q and A Version 2 - 110320.docx | DOCX document | |
| A-11 Q and A Version 1 - 103020.docx | DOCX document | |
| A-10 127EAW21B0001.pdf | ||
| A-10 127EAW21B0001.pdf | ||
| A-10.3 Fire Plan 030613.pdf | ||
| A-10.2 Project Plans.pdf | ||
| A-10.4 WD CA20200007, Mod 22, dated 10.09.2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page - 1 - of 54
Table of Contents
Table of Contents ................................................................................................................................... .- 3 - Preface.....................................................................................................................................................- 5 -
101 - Terms, Format, and Definitions.....................................................................................................- 7 -
101.01 Meaning of Terms...................................................................................................................- 7 -
101.03 Abbreviations. .........................................................................................................................- 7 -
101.04 Definitions...............................................................................................................................- 7 -
102 - Bid, Award, and Execution of Contract ......................................................................................- 10 -
102 Bid, Award, and Execution of Contract.....................................................................................- 10 -
103 - Scope of Work .............................................................................................................................- 11 -
Deletions ...........................................................................................................................................- 11 -
104 - Control of Work...........................................................................................................................- 12 -
Deletions ...........................................................................................................................................- 12 -
104.06 Use of Roads by Contractor..................................................................................................- 12 -
105 - Control of Material ......................................................................................................................- 13 -
105.02 Material Sources. ..................................................................................................................- 13 -
105.02(a) Government-provided sources..........................................................................................- 13 -
105.05 Use of Material Found in the Work. .....................................................................................- 13 -
106 - Acceptance of Work ....................................................................................................................- 14 -
106.07 Delete ....................................................................................................................................- 14 -
107 - Legal Relations and Responsibility to the Public........................................................................- 15 -
107.05 Responsibility for Damage Claims. ......................................................................................- 15 -
107.06 Contractor’s Responsibility for Work...................................................................................- 15 -
107.09 Legal Relationship of the Parties. .........................................................................................- 15 -
107.10 Environmental Protection. ....................................................................................................- 15 -
107.02 Protection and Restoration of Property and Landscape....................................................- 16 -
108 - Prosecution and Progress.............................................................................................................- 17 -
108 Delete. ........................................................................................................................................- 17 -
109 - Measurement and Payment..........................................................................................................- 18 -
109 Deletions ....................................................................................................................................- 18 -
Page - 2 - of 54
109.02 Measurement Terms and Definitions .................................................................................. .- 18 -
151 - Mobilization.................................................................................................................................- 18 -
151.01 Description............................................................................................................................- 18 -
155 - Schedules for Construction Contracts .........................................................................................- 19 -
155 Delete. ........................................................................................................................................- 19-
301 - Untreated Aggregate Courses ......................................................................................................- 20 -
301.05 Compacting ...........................................................................................................................- 20 -
301.09 Measurement.........................................................................................................................- 20 -
552 - Structural Concrete ......................................................................................................................- 21 -
SPECIAL PROJECT SPECIFICATION..........................................................................................- 22 -
SPECIAL PROJECT SPECIFICATION..........................................................................................- 26 –
628 – Cofferdams and Dewatering…………….………………………………………………….…-27-29
SECTION 01061 - REGULATORY REQUIREMENTS GENERAL..............................................-30 -31-
SECTION 01300 – SUBMITTALS..................................................................................................- 32 -34
SECTION 02220 - STRUCTURAL EXCAVATION AND BACKFILL........................................- 35-36-
SECTION 03100 – CONCRETE FORMWORK ............................................................................- 37-38
SECTION 03200 – REINFORCING STEEL....................................................................................- 39 -41
SECTION 03300 – CONCRETE…………………………………………………………………..- 42 -43
SECTION 05501 – METAL FABRICATED RAIL SYSTEM.........................................................- 44-49
SECTION 06100 – CARPENTRY...................................................................................................- 50 -54
Page - 3 - of 54
Preface
Delete all but the first paragraph and add the following:
Preface_wo_03_15_2004_m
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
Page - 4 - of 54
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
http://www.nist.gov/
Page - 5 - of 54
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Page - 6 - of 54
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Page - 7 - of 54
Figure 101-1—Illustration of road structure terms.
Page - 8 - of 54
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
Delete Section 102 in its entirety.
Page - 9 - of 54
103 - Scope of Work
Deletions
Delete all but subsection 103.01 Intent of Contract.
103.00_nat_us_02_16_2005
Page - 10 - of 54
104 - Control of Work
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.00_nat_us_06_16_2006
Add the following subsection:
104.06 Use of Roads by Contractor
104.06_nat_us_02_17_2005
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Page - 11 - of 54
105 - Control of Material
105.02 Material Sources.
105.02_nat_us_01_18_2007
105.02(a) Government-provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
Page - 12 - of 54
106 - Acceptance of Work
106.07 Delete
Delete subsection 106.07.
106.07_nat_us_05_11_2004
Page - 13 - of 54
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.05_nat_us_05_11_2004
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.09_nat_us_06_16_2006
107.10 Environmental Protection.
107.10_nat_us_06_16_2006
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures.
• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
Page - 14 - of 54
107.10_05_us_05_04_2007
Page - 15 - of 54
107.02 Protection and Restoration of Property and Landscape
Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for National Forest System Lands in California Best Management Practices” dated September 2000
Page - 16 - of 54
108 - Prosecution and Progress
108 Delete.
Delete Section 108 in its entirety.
108.00_nat_us_02_16_2005
Page - 17 - of 54
109 - Measurement and Payment
109 Deletions Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.00_nat_us_02_17_2005
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
109.02_nat_us_06_16_2006
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
Page - 18 - of 54
151 - Mobilization
151.01 Description
Add the following at the end of the last sentence:
151.01_0105_us_05_04_2007
“Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in.
Clean truck beds and dump boxes hauling to the project site prior to entering the work area.”
Page - 19 - of 54
155 - Schedules for Construction Contracts
155 Delete.
Delete Section 155 in its entirety.
155.00_nat_us_05_11_2004
Page - 20 - of 54
301 - Untreated Aggregate Courses
301.05 Compacting
Delete and replace with the following:
301.05_nat_us_05_17_2005
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.09_nat_us_07_07_2005
301.09 Measurement.
Replace the second paragraph with the following:
Measure aggregate by cubic yard compacted in place when payment is by contract quantities.
Page - 21 - of 54
552 - Structural Concrete
SPECIAL PROJECT SPECIFICATION
Section 552. — STRUCTURAL CONCRETE
552.11_05_14_06_01_2005
552.11 Handling and Placing Concrete.
NOTE: This is The Department of Boating and Waterways recommended procedure to produce the required concrete finish. It is up to the Contractor themselves to determine the best way to produce the required concrete finish.
(f) V-Groove Construction Procedure The consistent experience of the engineering staff of the Department of Boating and Waterways is that the successful accomplishment of satisfactory V-grooves by contractors is a continuing problem. It is not a difficult task, but contractors are consistently overconfident of their skills, abilities, and past experience of finishing concrete on level ground. However, finishing V-grooves on a 12%-15% slope is another matter.
Consequently, it is strongly advised that contractors involved in V-groove finish work on launching ramps pay close attention to the following recommendations:
a. Use a concrete crew of not less than 5 workers including at least 2 finishers.
b. All tools, supplies, equipment and materials are to be on site before beginning placement of concrete.
c. Place concrete and finish one launching lane at a time, maximum width of 15' (up to 20' on single lane ramps).
d. Start early in the day with attention to:
time of year altitude haul distance temperature winds design mix weather forecast climate size of crew
e. Start concrete placement at bottom and work uphill. Some contractors insist on starting at the top and workingdownhill.
f. Limit placement of concrete to the following maximum rates perhour:
8-10 cu.yd./hour for 6” thick sections
11-13 cu.yd/hour for 8” thick sections
This will result in a production rate of about 30-35 linear feet of 15’ wide launching lane per hour, or an area of about 450-525 square feet.
Page - 22 - of 54
g. Adequately vibrate the concrete every 12” on centers with internal vibrators to eliminate air pockets and to insure full contact with the rebar and construction forms.
Do not over-vibrate as the aggregate will settle to the bottom and waken the launching ramp slab.
h. Screed the wet concrete to the top of the forms using a vibratory power screed, working uphill via hand or gasoline powered winches. Do not attempt to manually drag the screed uphill!
i. Beginning at the appropriate lower corner, begin forming V-grooves at 60° from the longitudinal axis of the ramp. Initially, there will be a triangular area at the very bottom of the ramp within which it will be awkward to use the V-groove tool. However, after progressing up the ramp to the point where the V-groove tool can be used over the full width of the launching lane, the grooving operation will be much easier. Care must be taken to insure the 60° angles on the front and rear of the V- groove tool fit snugly against the forms on each pass of the tool across the wt concrete. It is often helpful to fabricate a couple of smaller V-groove hand tools to use in the tight corners at the top and bottom of the ramp. The offset from side to side of a 15’ wide lane will be about 8’-8”. The use of a straight 20’ length of 2”x6” lumber will be of great assistance in maintaining the correct alignment and provides a guide for running the V-groove tool across the wet concrete. The diagonal distance across the launching lane will be about 17’-4”. When done properly, crisp V-grooves can be formed with only one or two passes of the tool.
j. Vibrate, screed and V-groove one hourly placement of concrete before allowing the next placement. If unexpected delays occur between hourly placements due to equipment problems, traffic, etc., leave the rough edge along the upper side ofthe last placement generally along the same 60° alignment of the V-grooves. This will eliminate most of the problems of trying to finish both “old” and “new” concrete on the same pass of the finishtool.
SPECIAL PROJECT SPECIFICATION
Section 552. — STRUCTURAL CONCRETE
552.16_05_14_06_01_2005
552.16 Finishing Formed Concrete Surfaces.
(h) Class 8 — V-Groove Launching Ramp Finish.
NOTE: This is The Department of Boating and Waterways recommended procedure to produce the required concrete finish. It is up to the Contractor themselves to determine the best way to produce the required concrete finish.
1. V-grooves are to be 1" x 1", and aligned at 60o to the longitudinal axis of the launching ramp. Larger grooves are sometimes used but are more difficult to walk on. Underno
Page - 23 - of 54 circumstances shall the grooves exceed 1-1/2".
2. A V-groove finish will not only provide good traction, but will also assist in "cleaning" the launching ramp surface in response to boat wakes, wind and storm waves, and rainwater running down the ramp. Sand, soil and other debris will tend to be carried down and off the sides of the launching lanes and launching ramp.
V-Groove Detail
V-Groove Alignment
Herringbone V-Grooves
3. On wide, multiple lane launching ramps, it is advantageous to alternate the direction of the V-grooves from lane to lane, thus forming a "herringbone" pattern. This provides a distinct permanent delineation of the launching lanes. Changes in the direction of the
Page - 24 - of 54
V-grooves should never be made except at launching lane lines.
B. V-groove tool design varies in size, shape, weight, and material used for fabrication. Steel, aluminum and wood tools have been used successfully. However, it appears that aluminum is perhaps the best choice in consideration of the tool's size, weight, and the ease and speed with which a finisher can produce crisp, straight V-grooves in wetconcrete.
1. V-Groove Tool Design , for a tool to be used to finish large areas of cast-in-place concrete.
a. Weight: 22# to 25#
b. Length: 24" to30"
c. Width: 20" to 24"
d. Material:1"x 1" x 3/16" aluminum angle
e. Fabrication: Cut, shape, weld and grind smooth one end (see commentary below) of
14 to 17 pieces of aluminum angle to resemble the bow of a boat. Assemble the pieces to form a tool 20" to 24" wide. Fit them snugly together, slightly staggering each piece so as to form a 60o angle on both the leading and following edges so that the tool will fit snugly against the forms on each side of the launching lane. Weld the angles to cross pieces of larger angle or channel to hold the tool together. Provide an appropriate means of attaching a handle. The handle assembly for a "Fresno" float works well. If a "herringbone" finish is required on a multiple lane launching ramp, a second "mirror image" tool must be made in order to form V-grooves in alternatingdirections.
f. Commentary: Contractors have suggested cutting the trailing edge of the tool square rather than bow shaped. They claim that the wet concrete breaks free of the trailing edge much sharper and cleaner than it does from the gradual release from a bow shape. Also, some contractors prefer to build lighter tools and add
Page - 25 - of 54 field weights as required to get the best results and production.
552.02_nat_us_06_20_2007 Material
552.02 Add the following:
Anchor bolts 717.01 Dowels 717.17 Epoxy resin adhesives 725.21 High strength non-shrink grout 701.02 Mortar 701.02 Portland cement 701.01 Sealants, fillers, seal, and sleeves 712.01
Construction Requirements
552.03 Composition (Concrete Mix Design).
Specifications for launching ramp concrete should include the following:
6 sack concrete 3/4”maximum aggregate 4,000 psi compressive strength 5% air entrainment Type II cement 3” to 4” slump
These specifications have been developed over a period of 20 years and are based on actual construction experience on dozens of launching ramp projects. They provide a concrete mix that is easy to work, will readily take and hold a V-groove finish, and will result in a strong, durable, functional launching ramp with a long service life. Therefore, any deviation from these specifications should be done carefully and thoughtfully.
Note: For more information on Boat Ramp construction refer to the Handbook: Layout, Design and Construction For Small Craft Boat Launching Facilities at the following address:
www.dbw.ca.gov/PDF/LaunchFac/LRamps.pdf
Delete the first paragraph and replace with the following:
Submit written concrete mix designs for approval at least 30 calendar days before production.
Add the following under the list of items to be included in the mix design submittal:
(y) Evaluation of potential aggregate reactivity http://www.dbw.ca.gov/PDF/LaunchFac/LRamps.pdf
Page - 26 - of 54
552.08 Delivery.
(a) Truck mixer/agitator.
Add the following:
Do not exceed 130 total revolutions at mixing speed, including both initial mixing and remixing.
Do not exceed 300 total revolutions, including both mixing and agitating speed.
552.09 Quality Control of Mix.
Add the following after the first paragraph:
At least 2 weeks prior to the start of concrete placement operations, arrange a pre-concrete placement conference. Coordinate attendance with the CO and any applicable subcontractors. Be prepared to discuss and/or submit the following:
(1) Proposed concrete placement schedule.
(2) Review approved concrete mix design and determination of batch weights.
(3) Discuss Section 153, Contractor Quality Control, minimum frequency schedule for process control sampling and testing (to be performed by the Contractor).
(4) Discuss batching, mixing, placing, and curing requirements.
(5) Discuss Subsections 106.03, Certification, and 106.05, Statistical Evaluation of Material for Acceptance.
552.11 Handling and Placing Concrete.
Add the following after the forth paragraph:
Use an approved form release agent to produce a minimum of staining, air holes, and hydration discoloration.
552.12 Construction Joints.
Add the following at the end of the first paragraph:
Provide form cleanout ports at construction joints.
552.18 Loads on New Concrete Structures.
Add the following paragraph:
Do not allow public traffic on the bridge until approaches, curbs, and bridge rail are completed and in-place. Erect barricades at each end of bridge spans when road approaches allow vehicles to drive directly onto the structure.
628 – Cofferdams and Dewatering Description
This work consists of designing, constructing, maintaining, dewatering, removing and disposing of cofferdams, which are necessary for construction of the structure. A four foot maximum depth will be required.
Construction Requirements
General. At locations where proposed construction work is at a lower elevation than the elevation of the lake or ground water at the time of performing the work, suitable cofferdams (protection dikes or other such measures) and a dewatering system, shall be constructed by the Contractor. The locations of the cofferdams and the dewatering system shall be selected by the Contractor and presented in a plan submitted to the Government for review. The construction area shall be dewatered prior to commencement of the work and the water level shall be kept below all proposed construction work during construction operations. The cofferdams shall be constructed of materials that will provide a safe and reasonably dry work area.
The Contractor shall submit a Cofferdam and Dewatering Plan to the Government at least 30 days prior to the start of dewatering for the Governments review. Review by the Government does not constitute any liability by the Government. The cofferdam and dewatering plan shall present, at a minimum, the following information:
1. The locations of cofferdams and details concerning the cofferdams’ materials and method of installation.
2. Locations and details regarding the dewatering system including, but not limited to, pumps, sumps, well points, dewatering wells, ditches, piping, electrical sources, and discharge points.
3. The Contractor’s dewatering system shall approximately uniformly draw down the groundwater level across the site. As such, well points or dewatering wells shall be spaced at no more than 35-foot center-center spacing (less as required to develop an approximate uniform drawdown).
4. Dewatering calculations, well screen sizes, and filter pack gradation sizes. Well screens and filter pack material shall be properly sized so as to prevent piping or removal of embankment materials during dewatering operations. Gradation results from soil borings performed at the site are attached to this specification section for Contractor reference.
5. Testing means for discharge water to ensure that piping or removal of embankment materials during dewatering operations is not occurring.
6. Backup power generating devices (e.g. diesel generators) as required to operate dewatering pumps in the event that electrical service becomes unavailable (e.g. during power outages).
7. Equipment and procedures necessary to promptly notify the Contractor if electrical service becomes unavailable. Notification shall be required regardless of the time of day.
8. Means, methods, and procedures necessary to switch over to the backup power generating devices in a timely manner as required to prevent damage to the embankment in the event that the dewatering system should fail to operate.
9. Erosion and Sediment Control structures to prevent any erosion on any adjacent areas.
Responsibility for Damage or Destruction as Result of Flooding.
The Contractor shall be responsible for any and all damage that may occur at the site as a result of floods, and shall replace or restore damaged structures or features of work, either of a permanent or temporary character, at no additional cost to the Government. The Contractor shall have no basis of claims because floods occurring during the construction period were unprecedented in magnitude or frequency.
The design, construction, and performance of the cofferdams are the sole responsibility of the Contractor. By designing the cofferdams and submitting the Dewatering Plans for the project, the Contractor has indicated that he has observed the sites, has reviewed the subsurface conditions, and has accounted for those conditions in the design and performance of the cofferdams and the dewatering systems. Any and all damages associated with the installation, performance, or removal of the cofferdams and dewatering systems are the responsibility of the Contractor and shall be repaired by the Contractor at no cost to the Government.
During dewatering operations the Contractor shall maintain, on-site, backup power generating devices (e.g. diesel generators) as required to operate dewatering pumps in the event that electrical service becomes unavailable (e.g. during power outages). The Contractor shall also have in-place the means, methods, and procedures necessary to switch over to the backup power generating devices in a timely manner as required to prevent damage to the embankment in the event that the dewatering system should fail to operate.
Upon completion of dewatering operations, all dewatering equipment shall be removed from the site.
Measurement
628.03 Measure the Section 628 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Payment
628.04 The accepted quantities will be paid at the contract price per unit of measurement for the Section 628 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this section. See subsection 109.05.
Page - 30 - of 54
DIVISION 1 - GENERAL REQUIREMENTS
DIVISION 1 – GENERAL REQURIEMENTS
SECTION 01061 - REGULATORY REQUIREMENTS GENERAL
1.01 SCOPE
A. This section describes the codes and standards which apply to the work in this contract.
Additional codes and standard may be cited in sections to which they apply.
1.02 CODES AND STANDARDS
A. The following codes and standards shall apply to the work in this contract:
1. Uniform Building Code (UBC), 1997 Edition
2. Uniform Plumbing Code (UPC), 1997 Edition
3. Uniform Mechanical Code (UMC), 1997 Edition
4. National Electrical Code (NEC), 1999 Edition
5. Uniform Federal Accessibility Standards (UFAS), 1999 Edition.
6. American Institute of Steel Construction (AISC) 9th Edition.
7. American Iron and Steel Institute (AISI) 1986 Edition.
8. American Society for Testing and Materials (ASTM) latest edition.
9. Metal Buildings Manufacturers Association (MBMA).
10. Underwriter's Laboratories, (UL)
11. Architectural Aluminum Manufacturers Association (AMMA)
12. Steel Door Institute, Standard 100
13. American Water Works Association (AWWA)
14. National Fire Protection Association (NFPA)
15. Uniform Fire Code (UFC) 2005 Edition
16. American Gas Association (AGA)
B. Unless otherwise specified in this contract, reference to a specific standard or specification shall mean the latest edition or amendment in affect on the date of the invitation to bid.
1.03 DEFINITIONS
A. Administrative Authority as used in the Uniform Mechanical Code, the Uniform Plumbing Code and the National Electrical Code will be the Government.
B. Building Official as used in the Uniform Fire Code, Uniform Building Code and the Uniform Building Code Standards will be the Government.
Page - 31 - of 54
PRODUCTS
NOT APPLICABLE
EXECUTION
NOT APPLICABLE
END OF SECTION
01061
Page - 32 - of 54
DIVISION 1 – GENERAL REQUIREMENTS
SECTION 01300 – SUBMITTALS
GENERAL
1.01 SCOPE: This work consists of furnishing samples, shop drawings, pertinent data, and the submittal of technical information, including requests for substitutions. It describes the review time for submittals, shop drawings, and substitutions.
MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.
REQUIREMENTS:
A. It will be the Contractor's responsibility to submit all information necessary to insure compliance. The Contractor shall submit information at least ten business days prior to beginning the associated work.
The following submittal is required following award of contract for review and/or approval pursuant to contract provisions:
Item Description Copies Required References
Cost breakdown schedule listing main types of work and total amount of contract.
1 FAR 52.232-05
PRODUCTS
Not Applicable
EXECUTION
3.01 MANUFACTURER’S LITERATURE AND SHOP DRAWINGS
Submit (2) two copies to the C.O. for approval on the items required herein.
Samples: Provide samples, unless otherwise specified or directed by the Government, identical to the article proposed and of sufficient size to demonstrate design, color, texture and finish. Submit (2) two samples of each color, style, etc.
Shop Drawings: Provide blueline or blackline prints, including one reproducible, as required elsewhere herein. Make drawings accurately and to a scale large enough to show all pertinent aspects of the item and its connection to the work. Shop drawing, specifications and construction drawings shall be
Page - 33 - of 54 submitted as specified and shall show any revision date.
Catalog Data: Provide catalog cuts, data, pertinent information and other items specified or as directed by the Government. Clearly indicate by circling or highlighting each Item.
Information must be adequate to determine compliance with specifications.
3.02 APPROVALS: Approval of satisfactory samples, substitutions and shop drawings will be made within 14 calendar days of the receipt of the submittal. Upon approval two copies of the approved shop drawings, samples and other items will be returned to the contractor. The Government will retain the reproducible.
3.03 RESUBMITTAL: When a resubmittal is required, one print so indicating will bereturned to the Contractor. After revisions of the original, five new copies including one reproducible shall be submitted for approval.
3.04 TIMING: Make submittals far enough In advance of the scheduled dates of installation to provide time for reviews, for securing necessary approvals, for possible revisions and resubmittals and for placing orders and securing delivery.
3.05 No portion of the work requiring a shop drawing, sample, or catalog data shall be started nor shall any materials be fabricated or installed prior to the approval of such Item.
01300
Page - 34 - of 54
DIVISION 2 – SITE WORK
DIVISION 2 SITE WORK
DIVISION 2 - SITEWORK
SECTION 02220 - STRUCTURAL EXCAVATION AND BACKFILL
GENERAL
1.01 SCOPE: This Section covers excavation and backfilling for the installation of all structures.
1.02 PAYMENT: No separate payment will be made for work specified in this Section. Payment for this work will be included as part of the bid price for the parent items.
PRODUCTS
2.01 Backfill material shall be approved by the Government. Excavated materials from the site may be used, if approved. Imported fill, where required, shall be a non-expansive predominantly granular soil or soil-rock mixture, which is free from organic matter and deleterious substances. Backfill material shall not contain materials over 6 inches in greatest dimension. Material having a dimension greater than 4 inches shall not be used in the upper 6 inches of fill.
EXECUTION
3.01 Clearing and Grubbing: Clearing and grubbing shall be accomplished in accordance with Section 201 for all areas which require structural excavation. Clearing limits shall be as SHOWN ON THE DRAWINGS or staked on the ground.
3.02 Excavation:
A. Trenches or foundation pits for structure footings shall be excavated to the lines and grades or elevations shown on the plans or as staked by the Government. The elevations of the bottoms of footings, as shown on the plans, shall be considered as approximate only. Boulders, logs, or any other objectionable material encountered shall be removed. All rock or other hard foundation material shall be cleaned of all loose material and cut to a firm surface, either level, stepped, or serrated, as shown on the drawings or specified herein. All seams or crevices shall be cleaned out and grouted. All loose and disintegrated rock and thin strata shall be removed.
B. Excavation for formed concrete shall be of sufficient width to allow for convenient construction and removal of forms.
C. Excavation for on-grade slabs shall be sufficient to allow for gravel bedding material as indicated on the drawings or specified herein.
D. Where subgrade soils, which are expansive in nature, occur beneath foundations and on-grade
Page - 35 - of 54 slabs, they shall be maintained in a moist condition and not allowed to dry out and crack prior to covering with foundation or slab. Where necessary, such soils shall be slowly and uniformly moistened as required to close any shrinkage cracks and to minimize expansion of soil subsequent toconstruction.
Page - 36 - of 54
E. All material to be excavated shall be unclassified and shall include earth fills, gravels, rock and other materials encountered in excavating and grading operations. The contract price shall include the removal of all materials to the depth and extent indicated on the drawings or specified herein.
F. Excess excavated material and material determined to be unsuitable shall be removed from the site to a disposal area designated as SHOWN ON THE DRAWINGS.
3.03 Approval of Foundation: After each excavation is completed, the Contractor shall notify the Government. No further work shall be performed until the Government has approved the excavation and the character of the foundation material.
3.04 Backfill:
A. After structure has been completed, the areas around the structure shall be filled with select material, in horizontal layers not over 8 inches in depth, and compacted to the level of the original ground surface or to finished grade, as shown on the drawings. Proper precautions shall be used to assure that backfill construction does not cause movement of or undue strain on anystructure.
B. All suitable excavated material shall be utilized as backfill or embankment. Surplus material shall be disposed of in accordance with Section 203. No excavated material shall be deposited at any time so as to endanger the partly finished structure, either by direct pressure or indirectly by overloading bank contiguous to the operation, or other manner.
C. No backfill shall be placed against any structure until permission is given by the Government. In the case of concrete or other masonry, such permission shall not be given until the masonry has been in place 14 days, or until tests made by a laboratory establish that the concrete has attained sufficient strength to withstand any pressure created by the methods used and materials placed on it without damage or strain beyond a safe factor as established by the Government. Adequate provisions shall be made for thorough drainage of the backfill.
D. Compaction: All backfill shall be compacted to 95 percent of the maximum dry density as determined by AASHTO-T-99, Method C.
E. During the progress of the work, the Government will make density tests of compacted material in accordance with AASHTO-T-191, T-205, or other approved field density tests, including the use of nuclear testing devices. If the Government determines, by such tests, that the specified density has not been attained, the Contractor shall perform additional work as may be necessary to attain the specified compaction.
Landscape Rehabilitation: All areas which are disturbed as a result of structural excavation and backfill shall be graded to conform to existing ground.
02220
Page - 37 - of 54
DIVISION 3 - CONCRETE
SECTION 03100 – CONCRETE FORMWORK
GENERAL
1.01 SCOPE: This work shall consist of furnishing and placing all formwork, formwork supports, formwork coating and soaking, screeds and levels required. Work shall also include all formwork removal.
1.02 MEASUREMENT AND PAYMENT: No separate payment will be made for the work of this Section.
PRODUCTS
2.01 FORM COATINGS: Provide commercial formulation form coating compounds that will not bond with, stain, nor adversely affect concrete surface's bond or adhesion, nor impede the wetting of surfaces to be cured with water or curing compunds.
2.02 FORMS: Forms shall consist of plyform grade plywood, or approved equal, for exposed work; and boarding or plywood for concealed work.
2.03 WALERS, STUDS, AND BRACES: Support materials shall be of size and spacing to assure satisfactory alignment and strength of forms.
EXECUTION
3.01 INSTALLATION: All formwork shall be built accurately to the dimensions of the formed structure as shown on the Drawings. Forms shall be of sufficient strength to withstand anyload during construction without undue deflection. Formwork shall be adjusted as required for the installation of work by others.
A. Form Coatings: Coatings shall be applied according to the manufacturer's recommendations.
B. Cleaning Forms: At the time concrete is placed in the forms, the surfaces of the forms shall be free from mortar or grout deposits or other foreign material.
C. Soaking: Forms shall be completely soaked until all joints are tight immedaitely before placement of concrete.
D. Approval of Work: All forms and foundations shall be approved by the Government before placement of concrete.
Page - 38 - of 54
3.02 REMOVAL OF FORMS:
A. General: No form shall be removed until approval from the Government is obtained.
B. Forms: Forms shall not be disturbed for at least seven days after the last concrete is placed, except as authorized by the Government.
03100
Page - 39 - of 54
SECTION 03200 – REINFORCING STEEL
GENERAL
1.01 SCOPE: The work of this Section consists of furnishing and placing the reinforcing steel required for this project As Shown On The Drawings or as specified herein.
1.02 QUALITY ASSURANCE: The fabrication and placement of the reinforcing steel shall be done in accordance with the following:
A. Uniform Building Code (UBC), 1997 edition.
B. Concrete Reinforcing Steel Institute's (CRSI) "Manual of Standard Practice."
C. CRSI "Placing Reinforcing Bars."
D. CRSI "Reinforcement Anchorages and Splices."
E. American Concrete Institute (ACI) "Building Code requirements for Reinforced Concrete" ACI 318-89.
F. ACI 315-89 "Manual of Standard Practice for Detailing Reinforced Concrete Structures."
1.03 SUBMITTALS: Data necessary to prove compliance with the Contract Documents shall be submitted in accordance with Section 01300.
1.04 PRODUCT HANDLING:
A. Comply with Section 01640.
B. Store reinforcing steel on timbers on the ground in such a manner as to prevent excessive rusting and to keep the steel free of mud dirt, grease, oil and other bond-reducing coatings.
C. Maintain bundle identification after bundles are broken.
1.05 MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this Section.
Page - 40 - of 54
PRODUCTS
2.01 REINFORCING MATERIALS AND ACCESSORIES:
A. Bars: Provide deformed billet steel bars meeting the requirements of ASTM A 615-81a, Grade 40.
B. Steel Wire: Shall meet the requirements of ASTM A 82-79. The wire shall be No. 16 gauge minimum, black, soft-annealed steel.
C. Welded Wire Fabric (If Shown on The Drawings): Shall meet the requirements of ASTM A 185-79.
D. Bolsters, chairs, spacers and other devices for spacing, supporting, and fastening reinforcement in place: Shall be in accordance with CRSI recommendations.
2.02 FABRICATION: Fabricate reinforcing bars to the required shapes and dimensions AS SHOWN ON THE DRAWINGS or specified herein.
EXECUTION
3.01 INSTALLATION:
A. General:
1. Comply with the specified standards for detail and method of placing reinforcement and supports, except as may be modified herein.
2. Clean reinforcement to remove loose rust and mill scale, earth, and other materials which reduce or destory bond with concrete.
3. Position, support, and secure reinforcement against displacement byformwork, construction, and concrete placing operations.
4. Locate and support reinforcement by metal chairs, runners, bolsters, spacers, and hangers as required.
5. Place reinforcement to obtain minimum coverages for concrete protection.
6. Arrange, space, and securely tie bars and bar supports together with the specified tie wire.
7. Set wire ties so twisted ends are directed away from exposed concrete surfaces.
Page - 41 - of 54
B. Install welded wire fabric in the longest lengths practicable, lapping adjoining pieces at least onefull mesh.
C. Provide sufficient numbers of supports, and of sufficient strength to carry the reinforcement.
D. Do not place reinforcing bars more than two inches beyond last leg of any continuous bar support.
E. Do not use supports as bases for runways for concrete conveying equipment and similar construction loads.
3.02 SPLICES:
A. Lap Splices: Tie securely with the specified wire to prevent displacement ofsplices during placement of concrete.
B. Splice Devices:
1. Obtain the Government's approval prior to using splice devices.
2. Install in accordance with manufacturer's written instructions.
3. Splice in a manner developing at least 125 percent of the yielding strength of the bar.
C. Do not splice bars except at locations Shown On The Drawings, except as otherwise specifically approved by the Contracting.
03200
Page - 42 - of 54
SECTION 03300 – CONCRETE
GENERAL
1.01 SCOPE: The work specified in this section is to install concrete flat work and footings.
The work shall include but not be limited to excavation for slabs and footings; forming, reinforcing and installation of new concrete slabs and footings and installing embedded items and incidentals AS SHOWN ON THE DRAWINGS and herein specified. See drawings for additional boat ramp concrete requirements.
QUALITY ASSURANCE:
A. The work shall be done in accordance with the following:
American Concrete Institute’s (ACI) Standards 318-89, ACI 117-90, ACI 305R-78, ACI 306R-78, ACI304-78, ACI 308-71, ACI 309-72, ACI “Slabs on Grade”.
Concrete Reinforcing Steel Institute’s (CRSI) Manual of Standard Practice #MSP-2-81.
Portland Cement Association’s Design and Control of Concrete Mixtures.
Provide test reports and mill certificates and other technical data showing cement provided meets the requirements AS SHOWN ON THE DRAWINGS and herein specified.
1.03 SUBMITTALS: Submit in accordance with Section 01300 a concrete mix design to be used for the concrete on the project for review and approval by the Government. Mix design shall show maximum permissible job site addition of water.
This is the start of the file's text. The full file is on GovTribe.