A-05. pacpcodechart.pdf

PDF 60 KB Posted

Attached to
Sewer Main Cleaning and Inspection
Solicitation number
RFQ22004TRS
Issued by

View the file

Other files

File Type Posted
A-01. Pryor Sewer Investigation-Technical Specs.docx DOCX document
A-03. WD_2015-5397.pdf PDF
A-02. Bid sheet.pdf PDF
A-04. working drawing.pdf PDF
RFQ22004TRS_ Sewer Main Cleaning Inspection..pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RP POINT REPAIR 5-71

RPR Pipe Replaced 5-69 RPR - D -Defective 5-69

RPP Patch Repair 5-69

RPP - D -Defective 5-69

S SURFACE

DAMAGE 5-31

SMW Missing Wall 5-32 SMW - M - Mechanical SMW - C - Chemical Attack SMW - Z - Not Evident

S SURFACE

DAMAGE 5-31

SRI Roughness Increased 5-31 SRI - M - Mechanical SRI - C - Chemical SRI - Z - Not Evident

C CRACK 5-1

CL Longitudinal 5-2 CC Circumferential 5-2 CM Multiple 5-2 CS Spiral 5-2 CH Hinge 5-2

H HOLE 5-17

HSV -Soil Visible 5-17 Beyond Defect

HV V -Void Visible 5-17

BRICKWORK 5-77

MM Missing Mortar 5-75

S -Small 5-75 M -Medium 5-75 L -Large 5-75

SCP Corrosion 5-32 (metal pipe) *no modifiers used

S SURFACE

DAMAGE 5-31

SAM Aggregate Missing 5-31 SAM - M - Mechanical SAM - C - Chemical Attack SAM - Z - Not Evident

B BROKEN 5-15

BSV -Soil Visible 5-15

BV V -Void Visible 5-15 Beyond Defect

S SURFACE

DAMAGE 5-31

SAP Aggregate Projecting 5-31 SAP - M - Mechanical SAP - C - Chemical SAP - Z - Not Evident

SZ Other 5-32 SZ - M - Mechanical SZ - C - Chemical Attack SZ - Z - Not Evident

BRICKWORK 5-77

DB Displaced 5-75 MB Missing 5-75 DI Dropped Invert 5-75

F FRACTURE 5-7

FL Longitudinal 5-7 FC Circumferential 5-7 FM Multiple 5-7 FS Spiral 5-7 FH Hinge 5-7

S SURFACE

DAMAGE 5-31

SAV Aggregate Visible 5-31 SAV - M - Mechanical SAV - C - Chemical SAV - Z - Not Evident

SSS Surface Spalling 5-32 SSS - M - Mechanical SSS - C - Chemical Attack SSS - Z - Not Evident

RP POINT REPAIR 5-71

RPL Localized Pipeliner 5–69

RPL - D -Defective 5-69 RPZ Other 5-69

RPZ - D -Defective 5-69

X COLLAPSE 5-23

XP Pipe Collapse 5-23 XB Brick Collapse 5-23

LF LINING

FAILURE 5-49

(continued)

LFOC Overcut Service 5-49 LFUC Undercut Service 5-49 LFBK Buckled Lining 5-49 LFW Wrinkled Lining 5-49 LFAS Annular Space 5-49

S SURFACE

DAMAGE 5-31

SRP Reinforcement Projecting 5-31 SRP - M - Mechanical SRP - C - Chemical Attack SRP - Z - Not Evident

D DEFORMED 5-19

DV Deformed 5-19 Vertically (brick)

DH Deformed 5-19 Horizontally (brick)

LF LINING

FAILURE 5-49

LFD Detached Lining 5-49 LFDE Defective End 5-49 LFB Blistered Lining 5-49 LFCS Service Cut Shifted 5-49 LFAC Abandoned Connection 5-49

S SURFACE

DAMAGE 5-31

SRV Reinforcement Visible 5-31 SRV - M - Mechanical SRV - C - Chemical Attack SRV - Z - Not Evident

J JOINT 5-26

JO Joint Offset 5-26 (Displaced) JS Joint Separated 5-26 (Open) JA Joint Angular 5-26

S SURFACE

DAMAGE 5-31

SRC Reinforcement Corroded 5-31 SRC - M - Mechanical SRC - C - Chemical Attack SRC - Z - Not Evident

WF WELD

FAILURE 5-67

WFL Longitudinal 5-67 WFC Circumferential 5-67 WFM Multiple 5-67 WFS Spiral 5-67 WFZ Unidentified 5-67

NASSCO’S PIPELINE ASSESSMENT & CERTIFICATION PROGRAM (PACP)©

“TRULY” 4-1

“Truly” continuous defects run along the sewer without any interruption for more than three feet (1 meter).

Examples:

- Longitudinal Fractures

- Longitudinal Cracks

“REPEATED” 4-1

“Repeated” continuous defects occur at regular intervals along the sewer.

These occur at pipe joints and include:

-Encrustation -Open Joints -Circumferential Fractures

Updated November

LF LINING

FAILURE 5-50

LFBU Bulges 5-50 LFDC Discoloration 5-50 LFDL Delamination 5-50 LFRS Resin Slug 5-50 LFPH Pinholes 5-50 LFZ Other 5-50

Code Changes in Version 6.0.1 Added:

Buckling Wall (KW), Buckling Dimpling (KD), and Buckling Inverse Curvature (KI)

K BUCKLING 5-45

KW Wall 5-45 KD Dimpling 5-45 KI Inverse Curvature 5-45

M MISCELLANEOUS FEATURES 8-1

MCU Camera Underwater 8-1 MGO General Observation 8-1 MGP General Photograph 8-1 MSC Shape/Size Change 8-1 (Sewer Dimension/Vertical/ Horizontal)

MJL Joint Length Change 8-1

A ACCESS POINT 7-13

AMH Manhole 7-13 AWA Wastewater Access 7-13 ADP Discharge Point 7-13 ATC Tee Connection 7-13

T TAP 7-1

TF Factory Made 7-1

TFI -Intruding 7-2

TFA -Active 7-2 TFC -Capped 7-2 TFB -Abandoned 7-2 TFD -Defective 7-2

IS INTRUDING SEALING

MATERIAL 7-9

ISSR Sealing Ring 7-9 ISSRH -Hanging 7-9 ISSRB -Broken 7-9 ISSRL -Loose 7-9

M MISCELLANEOUS FEATURES 8-1

MWM Water Mark 8-2 MY Dye Test 8-2 MYV -Dye Visible 8-3 MYN -Not Visible 8-3

T TAP 7-1

TS Saddle 7-2 TSI -Intruding 7-2 TSA -Active 7-2 TSC -Capped 7-2 TSB -Abandoned 7-2 TSD -Defective 7-2

ACO Clean Out 7-14 ACOM -Mainline 7-14 ACOP -Property 7-14 ACOH -House 7-14

M MISCELLANEOUS FEATURES 8-1

MLC Lining Change 8-2 MMC Material Change 8-2 MSA Survey Abandoned 8-2 MWL Water Level 8-2 MWLS -Sag 8-2

T TAP 7-1

TB Break In/Hammer 7-2 TBI -Intruding 7-2 TBA -Active 7-2 TBC -Capped 7-2 TBB -Abandoned 7-2 TBD -Defective 7-2

AOC Other Special Chamber 7-13 AM Meter 7-13 AWW Wet Well 7-14 AJB Junction Box 7-14

L LINE 7-11

(of sewer)

LL Left 7-11 LLU Left Up 7-11 LLD Left Down 7-11 LR Right 7-11

IS INTRUDING SEALING

MATERIAL 7-9

ISGT Grout 7-9 ISZ Other 7-9

L LINE 7-11

(of sewer)

LRU Right Up 7-11 LRD Right Down 7-11 LU Up 7-11 LD Down 7-11

D DEPOSITS 6-1

DA Attached 6-1 DAE -Encrustation 6-2 DAGS -Grease 6-2 DAR -Ragging 6-2 DAZ -Other 6-2

DS Settled 6-1 DSF -Fine 6-2 DSGV -Gravel 6-2 DSC -Hard/Compacted 6-2 DSZ -Other 6-2

R ROOTS 6-7

RB Ball 6-7 RBB -Barrel 6-7 RBL -Lateral 6-7 RBC -Connection 6-8

RM Medium 6-7 RMB -Barrel 6-7 RML -Lateral 6-7 RMC -Connection 6-8

RT Tap 6-7

RTB -Barrel 6-7 RTL -Lateral 6-7 RTC -Connection 6-8

RF Fine 6-7 RFB -Barrel 6-7 RFL -Lateral 6-7 RFC -Connection 6-8

(continued)

DN Ingress 6-1 DNF -Fine 6-3 (silt & sand) DNGV -Gravel 6-3 DNZ -Other 6-3

I INFILTRATION 6-13

IS Stain 6-13 IW Weeper 6-13 ID Dripper 6-13 IR Runner 6-13 IG Gusher 6-13

OB OBSTACLES/

OBSTRUCTIONS 6-19

OBB Brick or Masonry 6-19 OBM Pipe Material in Invert 6-19 OBI Object protruding through wall 6-19

OBJ Object wedged in joint 6-19 OBC Object through connection/junction 6-19 OBP External Pipe Cable 6-19

OBS Built into structure 6-20 OBN Construction Debris 6-20 OBR Rocks 6-20 OBZ Other 6-20

G GROUT TEST

& SEAL 6-33

GTP Grout Test Passed 6-33 GTP - J - Joint 6-33 GTP - L - Lateral 6-33

GTF Grout Test Failed 6-33

ACB Catch Basin 7-14 AEP End of Pipe 7-14

NASSCO’S PIPELINE ASSESSMENT & CERTIFICATION PROGRAM (PACP)©

Updated November 2010

T TAP 7-1

TR Rehabilitated 7-2 TRI -Intruding 7-2 TRA -Active 7-2 TRC -Capped 7-2 TRB -Abandoned 7-2 TRD -Defective 7-2

G GROUT TEST

& SEAL 6-33

GTU Grout Test Unable 6-33 GTU - J - Joint 6-33 GTU - L - Lateral 6-33

GRT Grout Test Location 6-33

V VERMIN 6-31

VR Rat 6-31 VC Cockroach 6-31 VZ Other 6-31

File details come from the government source that posted it. Updated .