A-05. pacpcodechart.pdf
PDF 60 KB Posted
- Attached to
- Sewer Main Cleaning and Inspection Federal contract opportunity
- Solicitation number
- RFQ22004TRS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-02. Bid sheet.pdf | ||
| A-03. WD_2015-5397.pdf | ||
| RFQ22004TRS_ Sewer Main Cleaning Inspection..pdf | ||
| A-04. working drawing.pdf | ||
| A-01. Pryor Sewer Investigation-Technical Specs.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RP POINT REPAIR 5-71
RPR Pipe Replaced 5-69 RPR - D -Defective 5-69
RPP Patch Repair 5-69
RPP - D -Defective 5-69
S SURFACE
DAMAGE 5-31
SMW Missing Wall 5-32 SMW - M - Mechanical SMW - C - Chemical Attack SMW - Z - Not Evident
S SURFACE
DAMAGE 5-31
SRI Roughness Increased 5-31 SRI - M - Mechanical SRI - C - Chemical SRI - Z - Not Evident
C CRACK 5-1
CL Longitudinal 5-2 CC Circumferential 5-2 CM Multiple 5-2 CS Spiral 5-2 CH Hinge 5-2
H HOLE 5-17
HSV -Soil Visible 5-17 Beyond Defect
HV V -Void Visible 5-17
BRICKWORK 5-77
MM Missing Mortar 5-75
S -Small 5-75 M -Medium 5-75 L -Large 5-75
SCP Corrosion 5-32 (metal pipe) *no modifiers used
S SURFACE
DAMAGE 5-31
SAM Aggregate Missing 5-31 SAM - M - Mechanical SAM - C - Chemical Attack SAM - Z - Not Evident
B BROKEN 5-15
BSV -Soil Visible 5-15
BV V -Void Visible 5-15 Beyond Defect
S SURFACE
DAMAGE 5-31
SAP Aggregate Projecting 5-31 SAP - M - Mechanical SAP - C - Chemical SAP - Z - Not Evident
SZ Other 5-32 SZ - M - Mechanical SZ - C - Chemical Attack SZ - Z - Not Evident
BRICKWORK 5-77
DB Displaced 5-75 MB Missing 5-75 DI Dropped Invert 5-75
F FRACTURE 5-7
FL Longitudinal 5-7 FC Circumferential 5-7 FM Multiple 5-7 FS Spiral 5-7 FH Hinge 5-7
S SURFACE
DAMAGE 5-31
SAV Aggregate Visible 5-31 SAV - M - Mechanical SAV - C - Chemical SAV - Z - Not Evident
SSS Surface Spalling 5-32 SSS - M - Mechanical SSS - C - Chemical Attack SSS - Z - Not Evident
RP POINT REPAIR 5-71
RPL Localized Pipeliner 5–69
RPL - D -Defective 5-69 RPZ Other 5-69
RPZ - D -Defective 5-69
X COLLAPSE 5-23
XP Pipe Collapse 5-23 XB Brick Collapse 5-23
LF LINING
FAILURE 5-49
(continued)
LFOC Overcut Service 5-49 LFUC Undercut Service 5-49 LFBK Buckled Lining 5-49 LFW Wrinkled Lining 5-49 LFAS Annular Space 5-49
S SURFACE
DAMAGE 5-31
SRP Reinforcement Projecting 5-31 SRP - M - Mechanical SRP - C - Chemical Attack SRP - Z - Not Evident
D DEFORMED 5-19
DV Deformed 5-19 Vertically (brick)
DH Deformed 5-19 Horizontally (brick)
LF LINING
FAILURE 5-49
LFD Detached Lining 5-49 LFDE Defective End 5-49 LFB Blistered Lining 5-49 LFCS Service Cut Shifted 5-49 LFAC Abandoned Connection 5-49
S SURFACE
DAMAGE 5-31
SRV Reinforcement Visible 5-31 SRV - M - Mechanical SRV - C - Chemical Attack SRV - Z - Not Evident
J JOINT 5-26
JO Joint Offset 5-26 (Displaced) JS Joint Separated 5-26 (Open) JA Joint Angular 5-26
S SURFACE
DAMAGE 5-31
SRC Reinforcement Corroded 5-31 SRC - M - Mechanical SRC - C - Chemical Attack SRC - Z - Not Evident
WF WELD
FAILURE 5-67
WFL Longitudinal 5-67 WFC Circumferential 5-67 WFM Multiple 5-67 WFS Spiral 5-67 WFZ Unidentified 5-67
NASSCO’S PIPELINE ASSESSMENT & CERTIFICATION PROGRAM (PACP)©
“TRULY” 4-1
“Truly” continuous defects run along the sewer without any interruption for more than three feet (1 meter).
Examples:
- Longitudinal Fractures
- Longitudinal Cracks
“REPEATED” 4-1
“Repeated” continuous defects occur at regular intervals along the sewer.
These occur at pipe joints and include:
-Encrustation -Open Joints -Circumferential Fractures
Updated November
LF LINING
FAILURE 5-50
LFBU Bulges 5-50 LFDC Discoloration 5-50 LFDL Delamination 5-50 LFRS Resin Slug 5-50 LFPH Pinholes 5-50 LFZ Other 5-50
Code Changes in Version 6.0.1 Added:
Buckling Wall (KW), Buckling Dimpling (KD), and Buckling Inverse Curvature (KI)
K BUCKLING 5-45
KW Wall 5-45 KD Dimpling 5-45 KI Inverse Curvature 5-45
M MISCELLANEOUS FEATURES 8-1
MCU Camera Underwater 8-1 MGO General Observation 8-1 MGP General Photograph 8-1 MSC Shape/Size Change 8-1 (Sewer Dimension/Vertical/ Horizontal)
MJL Joint Length Change 8-1
A ACCESS POINT 7-13
AMH Manhole 7-13 AWA Wastewater Access 7-13 ADP Discharge Point 7-13 ATC Tee Connection 7-13
T TAP 7-1
TF Factory Made 7-1
TFI -Intruding 7-2
TFA -Active 7-2 TFC -Capped 7-2 TFB -Abandoned 7-2 TFD -Defective 7-2
IS INTRUDING SEALING
MATERIAL 7-9
ISSR Sealing Ring 7-9 ISSRH -Hanging 7-9 ISSRB -Broken 7-9 ISSRL -Loose 7-9
M MISCELLANEOUS FEATURES 8-1
MWM Water Mark 8-2 MY Dye Test 8-2 MYV -Dye Visible 8-3 MYN -Not Visible 8-3
T TAP 7-1
TS Saddle 7-2 TSI -Intruding 7-2 TSA -Active 7-2 TSC -Capped 7-2 TSB -Abandoned 7-2 TSD -Defective 7-2
ACO Clean Out 7-14 ACOM -Mainline 7-14 ACOP -Property 7-14 ACOH -House 7-14
M MISCELLANEOUS FEATURES 8-1
MLC Lining Change 8-2 MMC Material Change 8-2 MSA Survey Abandoned 8-2 MWL Water Level 8-2 MWLS -Sag 8-2
T TAP 7-1
TB Break In/Hammer 7-2 TBI -Intruding 7-2 TBA -Active 7-2 TBC -Capped 7-2 TBB -Abandoned 7-2 TBD -Defective 7-2
AOC Other Special Chamber 7-13 AM Meter 7-13 AWW Wet Well 7-14 AJB Junction Box 7-14
L LINE 7-11
(of sewer)
LL Left 7-11 LLU Left Up 7-11 LLD Left Down 7-11 LR Right 7-11
IS INTRUDING SEALING
MATERIAL 7-9
ISGT Grout 7-9 ISZ Other 7-9
L LINE 7-11
(of sewer)
LRU Right Up 7-11 LRD Right Down 7-11 LU Up 7-11 LD Down 7-11
D DEPOSITS 6-1
DA Attached 6-1 DAE -Encrustation 6-2 DAGS -Grease 6-2 DAR -Ragging 6-2 DAZ -Other 6-2
DS Settled 6-1 DSF -Fine 6-2 DSGV -Gravel 6-2 DSC -Hard/Compacted 6-2 DSZ -Other 6-2
R ROOTS 6-7
RB Ball 6-7 RBB -Barrel 6-7 RBL -Lateral 6-7 RBC -Connection 6-8
RM Medium 6-7 RMB -Barrel 6-7 RML -Lateral 6-7 RMC -Connection 6-8
RT Tap 6-7
RTB -Barrel 6-7 RTL -Lateral 6-7 RTC -Connection 6-8
RF Fine 6-7 RFB -Barrel 6-7 RFL -Lateral 6-7 RFC -Connection 6-8
(continued)
DN Ingress 6-1 DNF -Fine 6-3 (silt & sand) DNGV -Gravel 6-3 DNZ -Other 6-3
I INFILTRATION 6-13
IS Stain 6-13 IW Weeper 6-13 ID Dripper 6-13 IR Runner 6-13 IG Gusher 6-13
OB OBSTACLES/
OBSTRUCTIONS 6-19
OBB Brick or Masonry 6-19 OBM Pipe Material in Invert 6-19 OBI Object protruding through wall 6-19
OBJ Object wedged in joint 6-19 OBC Object through connection/junction 6-19 OBP External Pipe Cable 6-19
OBS Built into structure 6-20 OBN Construction Debris 6-20 OBR Rocks 6-20 OBZ Other 6-20
G GROUT TEST
& SEAL 6-33
GTP Grout Test Passed 6-33 GTP - J - Joint 6-33 GTP - L - Lateral 6-33
GTF Grout Test Failed 6-33
ACB Catch Basin 7-14 AEP End of Pipe 7-14
NASSCO’S PIPELINE ASSESSMENT & CERTIFICATION PROGRAM (PACP)©
Updated November 2010
T TAP 7-1
TR Rehabilitated 7-2 TRI -Intruding 7-2 TRA -Active 7-2 TRC -Capped 7-2 TRB -Abandoned 7-2 TRD -Defective 7-2
G GROUT TEST
& SEAL 6-33
GTU Grout Test Unable 6-33 GTU - J - Joint 6-33 GTU - L - Lateral 6-33
GRT Grout Test Location 6-33
V VERMIN 6-31
VR Rat 6-31 VC Cockroach 6-31 VZ Other 6-31