A-05. pacpcodechart.pdf

PDF 60 KB Posted

Attached to
Sewer Main Cleaning and Inspection Federal contract opportunity
Solicitation number
RFQ22004TRS
Issued by
Department of Health and Human Services Indian Health Service

View the file

Other files for this federal contract opportunity

Other files attached to Sewer Main Cleaning and Inspection, newest first.
File Type Posted
A-02. Bid sheet.pdf PDF
A-03. WD_2015-5397.pdf PDF
RFQ22004TRS_ Sewer Main Cleaning Inspection..pdf PDF
A-04. working drawing.pdf PDF
A-01. Pryor Sewer Investigation-Technical Specs.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RP POINT REPAIR 5-71

RPR Pipe Replaced 5-69 RPR - D -Defective 5-69

RPP Patch Repair 5-69

RPP - D -Defective 5-69

S SURFACE

DAMAGE 5-31

SMW Missing Wall 5-32 SMW - M - Mechanical SMW - C - Chemical Attack SMW - Z - Not Evident

S SURFACE

DAMAGE 5-31

SRI Roughness Increased 5-31 SRI - M - Mechanical SRI - C - Chemical SRI - Z - Not Evident

C CRACK 5-1

CL Longitudinal 5-2 CC Circumferential 5-2 CM Multiple 5-2 CS Spiral 5-2 CH Hinge 5-2

H HOLE 5-17

HSV -Soil Visible 5-17 Beyond Defect

HV V -Void Visible 5-17

BRICKWORK 5-77

MM Missing Mortar 5-75

S -Small 5-75 M -Medium 5-75 L -Large 5-75

SCP Corrosion 5-32 (metal pipe) *no modifiers used

S SURFACE

DAMAGE 5-31

SAM Aggregate Missing 5-31 SAM - M - Mechanical SAM - C - Chemical Attack SAM - Z - Not Evident

B BROKEN 5-15

BSV -Soil Visible 5-15

BV V -Void Visible 5-15 Beyond Defect

S SURFACE

DAMAGE 5-31

SAP Aggregate Projecting 5-31 SAP - M - Mechanical SAP - C - Chemical SAP - Z - Not Evident

SZ Other 5-32 SZ - M - Mechanical SZ - C - Chemical Attack SZ - Z - Not Evident

BRICKWORK 5-77

DB Displaced 5-75 MB Missing 5-75 DI Dropped Invert 5-75

F FRACTURE 5-7

FL Longitudinal 5-7 FC Circumferential 5-7 FM Multiple 5-7 FS Spiral 5-7 FH Hinge 5-7

S SURFACE

DAMAGE 5-31

SAV Aggregate Visible 5-31 SAV - M - Mechanical SAV - C - Chemical SAV - Z - Not Evident

SSS Surface Spalling 5-32 SSS - M - Mechanical SSS - C - Chemical Attack SSS - Z - Not Evident

RP POINT REPAIR 5-71

RPL Localized Pipeliner 5–69

RPL - D -Defective 5-69 RPZ Other 5-69

RPZ - D -Defective 5-69

X COLLAPSE 5-23

XP Pipe Collapse 5-23 XB Brick Collapse 5-23

LF LINING

FAILURE 5-49

(continued)

LFOC Overcut Service 5-49 LFUC Undercut Service 5-49 LFBK Buckled Lining 5-49 LFW Wrinkled Lining 5-49 LFAS Annular Space 5-49

S SURFACE

DAMAGE 5-31

SRP Reinforcement Projecting 5-31 SRP - M - Mechanical SRP - C - Chemical Attack SRP - Z - Not Evident

D DEFORMED 5-19

DV Deformed 5-19 Vertically (brick)

DH Deformed 5-19 Horizontally (brick)

LF LINING

FAILURE 5-49

LFD Detached Lining 5-49 LFDE Defective End 5-49 LFB Blistered Lining 5-49 LFCS Service Cut Shifted 5-49 LFAC Abandoned Connection 5-49

S SURFACE

DAMAGE 5-31

SRV Reinforcement Visible 5-31 SRV - M - Mechanical SRV - C - Chemical Attack SRV - Z - Not Evident

J JOINT 5-26

JO Joint Offset 5-26 (Displaced) JS Joint Separated 5-26 (Open) JA Joint Angular 5-26

S SURFACE

DAMAGE 5-31

SRC Reinforcement Corroded 5-31 SRC - M - Mechanical SRC - C - Chemical Attack SRC - Z - Not Evident

WF WELD

FAILURE 5-67

WFL Longitudinal 5-67 WFC Circumferential 5-67 WFM Multiple 5-67 WFS Spiral 5-67 WFZ Unidentified 5-67

NASSCO’S PIPELINE ASSESSMENT & CERTIFICATION PROGRAM (PACP)©

“TRULY” 4-1

“Truly” continuous defects run along the sewer without any interruption for more than three feet (1 meter).

Examples:

- Longitudinal Fractures

- Longitudinal Cracks

“REPEATED” 4-1

“Repeated” continuous defects occur at regular intervals along the sewer.

These occur at pipe joints and include:

-Encrustation -Open Joints -Circumferential Fractures

Updated November

LF LINING

FAILURE 5-50

LFBU Bulges 5-50 LFDC Discoloration 5-50 LFDL Delamination 5-50 LFRS Resin Slug 5-50 LFPH Pinholes 5-50 LFZ Other 5-50

Code Changes in Version 6.0.1 Added:

Buckling Wall (KW), Buckling Dimpling (KD), and Buckling Inverse Curvature (KI)

K BUCKLING 5-45

KW Wall 5-45 KD Dimpling 5-45 KI Inverse Curvature 5-45

M MISCELLANEOUS FEATURES 8-1

MCU Camera Underwater 8-1 MGO General Observation 8-1 MGP General Photograph 8-1 MSC Shape/Size Change 8-1 (Sewer Dimension/Vertical/ Horizontal)

MJL Joint Length Change 8-1

A ACCESS POINT 7-13

AMH Manhole 7-13 AWA Wastewater Access 7-13 ADP Discharge Point 7-13 ATC Tee Connection 7-13

T TAP 7-1

TF Factory Made 7-1

TFI -Intruding 7-2

TFA -Active 7-2 TFC -Capped 7-2 TFB -Abandoned 7-2 TFD -Defective 7-2

IS INTRUDING SEALING

MATERIAL 7-9

ISSR Sealing Ring 7-9 ISSRH -Hanging 7-9 ISSRB -Broken 7-9 ISSRL -Loose 7-9

M MISCELLANEOUS FEATURES 8-1

MWM Water Mark 8-2 MY Dye Test 8-2 MYV -Dye Visible 8-3 MYN -Not Visible 8-3

T TAP 7-1

TS Saddle 7-2 TSI -Intruding 7-2 TSA -Active 7-2 TSC -Capped 7-2 TSB -Abandoned 7-2 TSD -Defective 7-2

ACO Clean Out 7-14 ACOM -Mainline 7-14 ACOP -Property 7-14 ACOH -House 7-14

M MISCELLANEOUS FEATURES 8-1

MLC Lining Change 8-2 MMC Material Change 8-2 MSA Survey Abandoned 8-2 MWL Water Level 8-2 MWLS -Sag 8-2

T TAP 7-1

TB Break In/Hammer 7-2 TBI -Intruding 7-2 TBA -Active 7-2 TBC -Capped 7-2 TBB -Abandoned 7-2 TBD -Defective 7-2

AOC Other Special Chamber 7-13 AM Meter 7-13 AWW Wet Well 7-14 AJB Junction Box 7-14

L LINE 7-11

(of sewer)

LL Left 7-11 LLU Left Up 7-11 LLD Left Down 7-11 LR Right 7-11

IS INTRUDING SEALING

MATERIAL 7-9

ISGT Grout 7-9 ISZ Other 7-9

L LINE 7-11

(of sewer)

LRU Right Up 7-11 LRD Right Down 7-11 LU Up 7-11 LD Down 7-11

D DEPOSITS 6-1

DA Attached 6-1 DAE -Encrustation 6-2 DAGS -Grease 6-2 DAR -Ragging 6-2 DAZ -Other 6-2

DS Settled 6-1 DSF -Fine 6-2 DSGV -Gravel 6-2 DSC -Hard/Compacted 6-2 DSZ -Other 6-2

R ROOTS 6-7

RB Ball 6-7 RBB -Barrel 6-7 RBL -Lateral 6-7 RBC -Connection 6-8

RM Medium 6-7 RMB -Barrel 6-7 RML -Lateral 6-7 RMC -Connection 6-8

RT Tap 6-7

RTB -Barrel 6-7 RTL -Lateral 6-7 RTC -Connection 6-8

RF Fine 6-7 RFB -Barrel 6-7 RFL -Lateral 6-7 RFC -Connection 6-8

(continued)

DN Ingress 6-1 DNF -Fine 6-3 (silt & sand) DNGV -Gravel 6-3 DNZ -Other 6-3

I INFILTRATION 6-13

IS Stain 6-13 IW Weeper 6-13 ID Dripper 6-13 IR Runner 6-13 IG Gusher 6-13

OB OBSTACLES/

OBSTRUCTIONS 6-19

OBB Brick or Masonry 6-19 OBM Pipe Material in Invert 6-19 OBI Object protruding through wall 6-19

OBJ Object wedged in joint 6-19 OBC Object through connection/junction 6-19 OBP External Pipe Cable 6-19

OBS Built into structure 6-20 OBN Construction Debris 6-20 OBR Rocks 6-20 OBZ Other 6-20

G GROUT TEST

& SEAL 6-33

GTP Grout Test Passed 6-33 GTP - J - Joint 6-33 GTP - L - Lateral 6-33

GTF Grout Test Failed 6-33

ACB Catch Basin 7-14 AEP End of Pipe 7-14

NASSCO’S PIPELINE ASSESSMENT & CERTIFICATION PROGRAM (PACP)©

Updated November 2010

T TAP 7-1

TR Rehabilitated 7-2 TRI -Intruding 7-2 TRA -Active 7-2 TRC -Capped 7-2 TRB -Abandoned 7-2 TRD -Defective 7-2

G GROUT TEST

& SEAL 6-33

GTU Grout Test Unable 6-33 GTU - J - Joint 6-33 GTU - L - Lateral 6-33

GRT Grout Test Location 6-33

V VERMIN 6-31

VR Rat 6-31 VC Cockroach 6-31 VZ Other 6-31