This is a Scope of Work for HVAC replacement services at the Caliente Crew Quarters in Caliente, Nevada (1400 Front St #1, Caliente, NV 89008). The contractor must replace two non-functioning split system air conditioning units—a 4-ton unit (48,000 BTU/14.064 KW) and a 2.5-ton unit (30,000 BTU/8.8 KW)—along with two propane gas furnaces (Bryant Plus 80 and Bryant Plus 80v models). The existing ground-mounted units on concrete pads must be replaced with equivalent or in-kind equipment meeting the same specifications and energy capacity. The contractor shall remove and dispose of existing defective units in accordance with applicable regulations, install new thermostats similar to existing units, provide new gas and electrical connections, install new condensation drain lines, and obtain necessary permits. All work must comply with the 2023 National Electrical Code and 2024 International Building Code.
Labor rates are governed by the Davis-Bacon Act (WD# NV20260032), with the contractor responsible for meeting all licensing requirements. The contractor must submit a new HVAC system recommendation and proposal with manufacturer specifications for government review (allowing four business days), provide manufacturer operation and maintenance manuals, complete final installation and operation inspections with testing results provided to the Contracting Officer's Representative (COR), and deliver a technical demonstration of system operations. Warranty requirements include one-year parts and labor coverage, three-year heat exchanger warranty, and five-year compressor warranty. The HVAC unit must be Energy Star compliant. The period of performance is 45 calendar days from contract award, with work scheduled Monday through Friday, 7:00 a.m. to 4:00 p.m., requiring five working days' written advance approval from the COR. All services, supplies, materials, labor, and travel are included in a lump sum price, with payment due upon completion and successful verification of operation and approved deliverables.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L3926Q0005_Amd_0001.pdf | ||
| Caliente_Quarters_Questions_Answers_0001.pdf | ||
| Sol_140L3926Q0005.pdf | ||
| A_06_Caliente_Quarters_HVAC_Repair_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B_03_NV20260032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
January 28, 2026
CALIENTE CREW QUARTERS HVAC REPAIR
Caliente, Nevada
I. General Project Statement
A. The Government intends to award a contract to provide all labor, materials, and equipment necessary to replace an existing Heating, Ventilation and Air Conditioning (HVAC) unit at the Caliente Crew Quarters in Caliente, Nevada. The existing HVAC systems are not functioning properly and need to be replaced. The contractor shall provide all resources necessary to accomplish the tasks described in this statement of work.
B. The Caliente Crew Quarters is located at 1400 Front St #1, Caliente, NV 89008.
II. Scope of Services
A. HVAC Replacement
a. Provide new HVAC units equivalent to existing units and compatible with the existing HVAC system components in the existing crew quarters building.
i. Existing HVAC unit Information:
a. 4-ton and 2.5-ton Split system air conditioner Unit. Note: See pictures for model and serial number (contractor to check for accuracy). The existing units are mounted on ground level on a concrete pad. Replace ground mounted units using existing mounting infrastructure.
b. BTU/HR (KW): 48,000 (14.064) and 30,000 (8.8) respectively.
c. Existing units are propane.
d. Dimensions of units:
i. Cooling unit dimensions:
1. Unit 1: 2.5’x2.5’x2.2
2. Unit 2: 2.5’x2.5x’3.21’
ii. Gas furnace unit dimensions (Contractor to field verify all dimensions):
1. Bryant Plus 80: 2.71’x1.17’x2.57’
2. Bryant Plus 80v: 2.71’x1.43’x2.5’
e. See section VII for additional manufacture information and pictures for reference.
b. Remove and dispose of the existing defective units; dispose off-site in accordance with all applicable laws and regulations.
c. Provide and install two new Thermostats similar to existing.
d. Provide new gas and electrical connections
e. Provide and install new condensation drain lines
f. Provide and obtain any necessary permits
g. Labor rate will be in accordance with Davis-Bacon Act WD# NV20260032
h. Contractor is responsible to meet the requirements for any licenses required
i. Provide one-year parts and labor warranty
j. Provide three-year heat exchanger warranty
k. Provide five-year warranty on the compressor
l. Replace unit with the in kind or equivalent equipment. All parts shall be installed per HVAC unit manufacturer’s recommendations. Miscellaneous materials and equipment for installation to be provided by contractor. Contractor may need to install new connections to mount and attach the units.
m. Use existing mounting infrastructure and concrete pad. Contractor may have to adjust framing or connections in order to mount the units successfully.
n. Start up and verify operations of systems. Provide a technical demonstration of system operations to the COR and any other representatives.
o. HVAC Unit must be Energy Star compliant.
III. Requirements
A. All work performed shall be in accordance with the 2023 edition of the National Electrical Code, 2024 International Building Code and any other applicable codes and industry standards.
B. Deliverables:
a. Submit new HVAC system recommendation and proposal along with manufacture specification for government review (allow Government four business days for review). Unit and components shall not have less capacity than existing unit.
b. Provide manufacture’s operation and maintenance manual.
c. Complete the final HVAC system’s installation and operation inspection. After completion of the installation, test the system and verify HVAC unit functions properly as installed. Provide the test/inspection results to the COR.
IV. Contractual
A. Period of Performance
a. Total time of performance shall be 45 calendar days from the date of award.
B. Site Visit
a. A pre-bid site visit is highly recommended by all contractors desiring to bid on the project. A site visit will be scheduled, time and date will be in the solicitation document.
Fees and Payment:
b. All services, supplies, materials, labor, and travel necessary to perform the work and render the service documents required under this contract are to be included in the lump sum price of this contract.
c. Payment shall be made upon completion of work and successful verification of operation and successful submission of approved deliverables.
C. Use of Premises:
a. Site is currently occupied & accessible.
b. The Contractor and his sub-contractor(s) shall have full use of premises for preparatory work. Contractor’s use of premises is limited only by Government right to perform work.
c. Work schedules shall be 7:00 am to 4:00 pm, Monday through Friday. Any alternative work schedule shall be approved by Contracting Officer’s Representative prior to commencing. No work will be done on a Holiday.
d. Schedule and sequence preparatory operations necessary to complete the work. Schedule work in such a manner as to avoid delays.
e. The Contractor shall contact in writing and have the approval of the COR two (5) working days in advance prior to any preparatory operations to be conducted on the premises.
VI. Vicinity Map and Project Location
Vicinity Map
Project Location
Project is located at 1400 Front St, Caliente NV 89008
VIII. Other photos for reference
Condensing Unit 1
Condensing Unit 2
| b. All services, supplies, materials, labor, and travel necessary to perform the work and render the service documents required under this contract are to be included in the lump sum price of this contract. |
| c. Payment shall be made upon completion of work and successful verification of operation and successful submission of approved deliverables. |
| C. Use of Premises: |
| a. Site is currently occupied & accessible. |
| b. The Contractor and his sub-contractor(s) shall have full use of premises for preparatory work. Contractor’s use of premises is limited only by Government right to perform work. |
| c. Work schedules shall be 7:00 am to 4:00 pm, Monday through Friday. Any alternative work schedule shall be approved by Contracting Officer’s Representative prior to commencing. No work will be done on a Holiday. |
| d. Schedule and sequence preparatory operations necessary to complete the work. Schedule work in such a manner as to avoid delays. |