This is a Questions and Answers document for the Caliente HVAC Replacement solicitation (140L3926Q0005). Quotes are due by 11:59 PM PST on February 23, 2026, and must be submitted via email to MBernard@blm.gov and MBMerritt@blm.gov. Award will be made on a best value, trade-off basis using technical merit, past performance, and price as evaluation factors. The period of performance runs from February 27, 2026, through April 17, 2026, with all work to be completed by the latter date. While only one CLIN exists on the SF 1442, a detailed cost breakdown using the A_06_Caliente_Quarters_HVAC_Repair_Bid_Schedule.xlsx attachment is requested but not required.
The replacement equipment specifications require propane-fired furnaces and air conditioning units meeting or exceeding the performance of existing equipment, with refrigerant compliant to current codes and a minimum Annual Fuel Utilization Efficiency (AFUE) rating of 90 percent. New units must be single-stage or equivalent and considered high-efficiency. No performance or payment bonds are required, and insurance must meet only standard FAR requirements. FAR 52.225-9 Buy American Act requirements apply to construction materials. The contractor is responsible for permit acquisition and protection of in-place fire suppression systems during work. Optional replacement of oversized electrical disconnect boxes may be included as separate line items but does not guarantee selection. The site visit was optional. Model numbers for existing thermostats are unavailable; pictures of the units were provided showing Bryant-brand thermostats with associated wiring diagrams.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L3926Q0005_Amd_0001.pdf | ||
| Sol_140L3926Q0005.pdf | ||
| A_06_Caliente_Quarters_HVAC_Repair_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B_03_NV20260032.pdf | ||
| A_04_Caliente_Quarters_HVAC_Repair__SOW_Revised_1-28-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L3926Q0005 00001
Caliente HVAC Replacement
Questions and Answers:
1. Bid Due Date & Submission Method o Please confirm the exact quote due date and time (including time zone).
1. Quotes are due by 11:59pm PST on February 23, 2026 as mentioned on the SF 1442 and page 4 of the solicitation package.
o Please confirm the submission method (email address, SAM.gov, or other portal).
1. On the SF 1442, it states that quotes are to be emailed to both:
1. MBernard@blm.gov
2. MBMerritt@blm.gov
2. Evaluation & Award Basis o Please confirm whether the award will be made on a price-only, LPTA, or best-value basis.
1. Award decision will be made using Best Value, Trade Off as mentioned on page 4 of the solicitation package.
2. Pages 26 and 27 of the solicitation package explain that the quotes will be evaluated based on:
1. Technical,
2. Past Performance, and
3. Price o Please confirm whether schedule or delivery timing is considered in award determination.
1. The SF 1442 explains that the Period of Performance starts on Feb 27, 2026 and that work is to be completed no later than April 17, 2026.
2. Quotes received should confirm that work is expected to be completed by April 17, 2026.
3. Pricing Structure o Should pricing be submitted strictly as a single lump-sum total, or are separate line items / CLIN-level pricing required?
1. There is only one (1) CLIN on the SF 1442
2. There is also an attachment to the solicitation that asks for a breakdown.
A_06_Caliente_Quarters_HVAC_Repair_Bid_Schecule.xlsx mailto:MBernard@blm.gov mailto:MBMerritt@blm.gov o Is a detailed cost breakdown required, or will a lump-sum price be sufficient?
1. A breakdown on the A_06 spreadsheet is requested but not required.
4. Bonding & Insurance Requirements o Are performance and payment bonds required for this project?
1. No bonds are required o Are there any specific insurance coverage limits beyond standard FAR requirements?
1. Not beyond the FAR requirements.
5. Equipment Approval & Equivalency o For “in-kind or equivalent” HVAC equipment, is pre-approval required prior to bid submission, or only post-award during the submittal review period?
1. Include the Make and Model information and performance specifications in the quotes.
o Is the intent to install like-for-like replacements (i.e. LP gas fired furnaces and R454B A/C?
1. The intent is to replace the old HVAC systems with new, modern, equipment that meets or exceeds the performance of the old units when originally installed.
2. The new units are to be propane
3. Refrigerant meeting current codes is required.
6. Is an economizer required as part of this replacement?
o No, there is no request or requirement for an Economizer.
7. Is a new in-line filter mounting system required within the ductwork?
o Use the existing filter box and ductwork.
8. Will the units run as single stage or two stage, or fully modulating? What will the efficiency requirements be (i.e. 90%+, 96%+, or 98%)?
o The current units are believed to be single stage. Units quoted must meet or exceed capabilities of the equipment being replaced.
o We do not know the efficiency rating of the current units. Units quoted must be considered high efficiency with an AFUE at or above 90%.
9. Site Visit o Is the Site Visit required?
1. The Site Visit was optional.
10. Buy American / Country of Origin o Please confirm whether Buy American Act or other country-of-origin requirements apply to HVAC equipment and components.
1. On page 20 of the solicitation, it does identify the FAR 52.225-9 Buy American – Construction Materials is to be applied
11. Permitting Authority o Please confirm whether local or state permits are required and whether the Government has any specific jurisdictional preferences.
1. The contractor awarded this work is responsible for checking permit requirements and obtaining any permits as needed.
12. Can a picture or model number be provided for existing thermostats?
o We do not have model numbers for the thermostats o Pictures of the fronts and backs (with wires) are below:
o
13. There are currently enormous 3phase boxes mounted to the wall which are unnecessary as they're only wired for single phase. Do you want/need them to stay, or are we ok replacing them with the correct disconnect boxes (60 amp)?
o We are not requesting that the large boxes be replaced, o However, contractors may include replacement as a separate line item. This does not guarantee quote selection or that we will choose to have them replaced.
14. Should the existing safety switch disconnect be replaced?
o Please see Question 13, above.
15. There appears to be a fire sprinkler in at least one (1) of the closets by a heating unit. Will it be relocated prior to the work being performed?
o No, it will not be relocated. Contractor will need to protect in place during the HVAC work.