A 03 SOW Raft Inspection Recertification.docx

DOCX document 27 KB Posted

Attached to
Life Raft Hard 7’s (FLO 3330-AD) 5-year inspection
Solicitation number
W912LM-25-R-A005
Issued by

About this file

This document is a Statement of Work (SOW) for the five-year overhaul inspection and recertification of 8 Life Rafts (Hard 7's, FLO 3330-AD) for the Minnesota Army National Guard.

The SOW outlines the required tasks for the 5-year inspection, including incoming inspection, case visual inspection, functional testing, inflation system overhaul, CO2 cylinder inspection and rebuild, markings inspection, leakage testing, survival kit inspection, and final packaging. The work will be performed in 4 phases over a 12-month period, with 2 rafts serviced every 3 months. The contractor is required to furnish all materials and equipment, and provide the recertified rafts within 4 weeks of receipt. The shipping address is provided.

This SOW is associated with a Request for Quote (RFQ) solicitation from the Department of the Army Minnesota Army National Guard for the 5-year inspection and recertification of 30 Life Rafts. The contractor will service 2 rafts per quarter until all 30 are completed. The RFQ provides the same schedule details as the SOW.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

1. General: Life Raft Inspection & Recertification

2. Background: Advanced Air Striking Force (AASF) #1 Life Raft inspection and recertifications are required to maintain life rafts due to the nature of their missions. AR 95-1 states the following. Life rafts sufficient for all persons on board (see TM 1 – 1500 – 204 – 23 – 1) are required on all Army aircraft during flights made more than 30 minutes flying time or 100 nautical miles from the nearest shoreline. Life rafts are required to be inspected and recertified periodically in order for them to maintain their air worthiness.

3. Objective: Five-year overhaul inspections of thirty (8) Life Raft. Vendor will service 2ea Life Rafts each period (every 3 months) until all life-rafts are inspected and recertified. Vendor will apply fee that should include shipping, parts, and labor.

4. Tasks. Work will be accomplished in (4) phases over a 12-month period.

5. Phase Inspections:

a. Contractor will perform 5-year overhaul inspections of 8ea Hard 7’s (FLO 3330-AD), Life Support International. 5 Year inspection will include the following:

· Incoming Receiving Inspection

· Case Visual Inspection

· Life Raft Functional Inspection in accordance with NAVAIR Manual 13-1-6-1

· Inflation system overhaul

· Mirada Inflation Valve Overhaul

· CO2 Cylinder Inspection

· CO2 Hydrostatic Test

· CO2 Cylinder Rebuild and Recharge

· Markings Inspection

· Life Raft Leakage Test

· Survival Kit Inspection + LIRSH replacements

· Fabricate Outer Bag

· Fabricate Inner Bag

· Folding and Preparation of Life Raft

· Vacuum Package of Life Raft

· Final Packing and Rigging

· Update Records

6. Schedule:

2ea - January
Complete recertification & return within 4 Weeks of receipt.
2ea - April
Complete recertification & return within 4 Weeks of receipt.
2ea - August
Complete recertification & return within 4 Weeks of receipt.
2ea - December
Complete recertification & return within 4 Weeks of receipt.

7. Contractor will furnish all materials and equipment required for work.

8. Shipping address: 206 Airport Road, St. Paul, MN 55107-1006.