D2d JOFOC redacted.pdf
PDF 3 MB Posted
- Attached to
- Notice of Intent to Sole Source CAS
- Solicitation number
- 98361
About this file
This document is a PDF viewer error message, not a federal contract opportunity file. The document contains only technical instructions for upgrading Adobe Reader software and does not contain any solicitation, proposal, statement of work, pricing information, agency details, or other contract-related content. No contract summary can be provided as the actual contract document failed to load properly.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Template for Justification and Approval for Other Than Full and Open Competition Completion Instructions: The Department of Health and Human Services (HHS) has established a standard template for the preparation of a J&A for Other Than Full and Open Competition. If this is an 8(a) set-aside, please note this form is not required unless the acquisition is valued (including all options) at greater than $22 million. This template is NOT applicable for actions using simplified acquisition procedures (FAR Part 13), Federal Supply Schedule orders (FAR 8.4) or task or delivery orders subject to fair opportunity (FAR 16.505).
Tailor all aspects of this template to the individual acquisition. Consult FAR Subpart 6.3 for guidance. An addendum may be added in case additional space is needed.
When this document is printed, the blue italic instructions are automatically deleted on the printed version.
JUSTIFICATION AND APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION
2. Description of Action:
Nature:
Pricing:
Funds:
3. Description of Services or Supplies:
Basis for Approval (FAR 6.303-1(d)):
As applicable, briefly describe the services or supplies required to meet the agency's needs, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. If the action is a modification to an existing contract, distinguish clearly between the work covered by the original contract and the work to be obtained by the proposed modification.
4. Authority and Rationale: Identify the statutory authority, FAR title and FAR citation permitting other than full and open competition. It may be one of the following most commonly used citations by the operating divisions of the Department of Health and Human Services (HHS), but other exceptions may apply per FAR Subpart 6.3.
Actions other than simplified acquisition procedures (select only one and provide an explanation):
Explain why the intended contractor is the only responsible source who can provide the required supplies or services. Discuss the unique capabilities, expertise, etc. that support the lack of competition/why no other type of supplies or services will satisfy agency requirements. Explain factors/unique qualifications such as proprietary data or exclusive licensing rights, if applicable. When competition is limited to items particular to one manufacturer, this justification must explain why the particular brand name, product, or feature is essential to the Government's requirements, and that market research indicates other companies' similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet the agency's needs in accordance with FAR 11.105. If in connection with a follow-on contract for continued development or production of highly specialized equipment, detail the substantial duplication of cost or unacceptable delays. May not Exceed one year, including all options, unless the head of the agency (Secretary of HHS) determines that exceptional circumstances apply.
If unusual and compelling urgency is the basis for the justification, explain the chronological events leading up to the requirement and explain why time constraints cannot permit even a limited competition. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved. Describe impact of required delivery/performance date. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source contractor. Failure to plan for expiring funds is not a valid reason for citing this exception. May not exceed one year, including all options, unless the head of the agency determines that exceptional circumstances apply.
Provide a citation to the statutory authorization and a brief description of its content, or identify the specified source or other agency.
Provide the authority and citation to the applicable section of FAR 6.3.
Provide a full explanation to justify use of the exception.
5. Agency Actions to Take or Remove Barriers That Led to Other Than Full and Open Competition (If applicable):
Describe the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration prior to any subsequent acquisition for the supplies of services is made. If no such actions have been taken, explain why.
6. Bridge Contracts:
For contract extensions or bridge contracts when a competitive follow-on is in the process of being developed, summarize history of current contract and explain the reasons for any delays in the acquisition. Include discussion of the milestones for the follow-on action; the milestones should be as efficient as possible. Discuss why it would be neither cost effective nor realistic to expect another contractor to perform during the brief interim period; include issues such as start-up costs, phase-in, transfer of GFP, recruitment and staffing, etc. If the action is because of a protest, provide a brief discussion of the protest including the date the protest was filed and the basis of the protest. Explain that the action will provide the minimum quantity or performance period.
7. Actions to Increase Competition:
Describe efforts made to compete the action, including whether a notice was or will be publicized as required by FAR Subpart 5.2 or which exception under FAR 5.202 applies. If a notice was publicized, discuss the number of written responses to the synopsis and the results of the assessment of the written responses. List sources, if any, that expressed, in writing, an interest in the acquisition. Provide rationale if interested sources were rejected. If applicable, state that no other sources have expressed interest, but all offers received shall be considered. Describe what actions will be taken to increase competition before subsequent acquisition of the supplies or services is required. You may state that an action is a one-time requirement, but if a similar requirement arises, every effort will be made to compete it to the maximum extent possible. If action is sole source because of proprietary data or licensing rights and there will be a continuing need for the requirement, there must be evidence that advanced planning has been initiated to overcome the barriers to competition, or there should be documentation to support an analysis that replacement costs/licensing purchase costs outweigh the benefits of competition. If the action is a contract extension or bridge, explain actions to compete the follow-on. If action is an urgent new requirement and a competitive follow-on is anticipated, explain that efforts are underway to facilitate a full and open competition.
8. Market Research:
Describe the extent of the market research conducted to identify all qualified sources and the results thereof. “Market Research” is defined as those attempts you made to ascertain whether other qualified sources exist, and can include contact with knowledgeable experts regarding similar or duplicate requirements, contact with industry, results of a sources sought synopsis, or draft solicitations. Research of the marketplace may consist of written, electronic (i.e. email) telephonic, or world wide web inquiries. Lack of advanced planning is not an acceptable reason for the lack of market research, but true urgency may necessitate abbreviated market research that is limited to readily available historical and commercial information. If action is a contract extension or bridge contract, describe the market research efforts underway or completed for the follow-on. See FAR 10.002(b)(2).
9. Procurement History:
Was action competed?
If action was not competed, state the cited authority, summarize rationale, and describe the actions that were supposed to be taken to increase competition and the results thereof:
10. Additional Information to support the justification:
If applicable, explain why technical packages or specifications to facilitate competition were not developed or available; describe actions taken to remedy the situation.
11. Technical / Requirements Certification: By my signature below, I certify that the supporting data included in this J&A is accurate and complete.
Program Manager Name:
Position Title:
Email address:
Phone:
Program Manager Supervisor (or one level above Program Manager) Name:
Position Title:
Email address:
Signature:
Date:
12. Fair and Reasonable Price/Cost Determination: As Contracting Officer, by my signature below, I hereby determine that the anticipated price/cost to the Government for this contract action will be fair and reasonable.
Provide the basis for this determination, e.g., describe techniques to be used to determine fair and reasonable price (FAR Subpart 15.402), such as price analysis, cost analysis, cost realism. Per FAR Subpart 15.403-4(a)(1), the threshold for obtaining cost or pricing data is $750,000.
Name:
Phone:
Signature:
Date:
13. Contracting Officer's Approval (Required for proposed contract not to exceed $700,000 (value calculated including all options)): I hereby certify that this justification is accurate and complete to the best of my knowledge. I approve this justification subject to availability of funds, and provided that the services and supplies herin describe have otherwise been authorized for acquisition.
Name:
Phone:
Signature:
Date:
14. Legal Review:
All J&As greater than $68 million must have a legal review from the General Law Division of the Office of the General Counsel prior to sending it to the Department.
15. OPDIV Competition Advocate Approval (Required for proposed contract over $700,000 but not exceeding $13.5 million value calculated including all options)):
I have reviewed this justification and find that it adequately supports other than full and open competition.
Name:
Phone:
Signature:
Date:
16. Office of Small and Disadvantaged Business Utilization:
I have reviewed this justification and find that it adequately supports other than full and open competition.
Name:
Phone:
Signature:
Date:
17. OPDIV HCA Approval (Required for proposed contract over $13.5 million but not exceeding $68 million value calculated including all options)):
Name:
Phone:
Signature:
Date:
18. Department Competition Advocate:
Concur:
Non-Concur:
Name:
Phone:
Signature:
Date:
(The below approval paragraph is required if the cumulative contract value, including all options, exceeds $68 million.)
19. HHS Senior Procurement Executive (SPE) Approval:
Based on the foregoing justification, I hereby approve other than full and open competition for the above stated procurement, subject to the availability of funds, and provided that the services herein described have otherwise been authorized for acquisition.
State supplies/services being procured:
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304:
State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304 Name:
Phone:
Signature:
Date:
11.0.0.20130303.1.892433.887364 Justification & Approval - Other Than Full and Open Competition Health and Human Services Justification & Approval - Other Than Full and Open Competition
| AcquisitionTitle: P20160718 - Building 28 High Containment Continuity Laboratory (HCCL) - Roybal Campus |
| Agency: CDC |
| NIHDrop: |
| PSCDrop: |
| PSCOther: |
| AcqusitionYear: 2026 |
| Author: Carl Sandra Ulysse |
| CheckBox4: 0 |
| CheckBox5: 0 |
| CheckBox1: 1 |
| Purchase order/contract number: 75D30119C06664 |
| CheckBox8: 1 |
| CheckBox7: 0 |
| CheckBox6: 0 |
| CheckBox9: 0 |
| Agency Actions to Take or Remove Barriers That Led to Fair Opportunity Exception (If applicable): No actions are planned to remove the barriers to competition, as they are inherent to the specialized nature of construction period services for biocontainment facilities. The A/E responsible for design, also being the party responsible for design interpretation is standard and best practice due both to their superior familiarity with the design as well as to maintain legal responsibility. The requirement for detailed knowledge of the design, regulatory compliance, and complex system integration cannot be mitigated without compromising safety and effectiveness. For future acquisitions, the Government will include construction period services in the original A-E solicitation to promote competition at the outset. |
| CheckBox10: 0 |
| CheckBox11: 0 |
| Other funds: |
| TextField5: Flad /Page Design Partnership |
| TextField5: 999 Peachtree St NE Ste 1200 |
| TextField5: Atlanta, GA 30309-4471 |
| CheckBox2: 1 |
| CheckBox3: 0 |
| TextField7: Redacted |
| As applicable, briefly describe the services or supplies required to meet the agency's needs, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. If the action is a modification to an existing contract, distinguish clearly between the work covered by the basic order and the work to be obtained by the proposed modification.: ***Note: The Revolutionary FAR Overhaul (RFO) changed the Basis for Approval to FAR 6.104-1*** |
The modification adds construction oversight services to the existing B28 HCCL design contract with Flad/Page. Services include construction administration, shop drawings review, submittal review, field inspection, testing, and commissioning oversight of specialized biocontainment systems.
The original contract provided for complete facility design through construction documents. This modification adds construction oversight services for the duration of the construction phase, estimated at 44 months from the contract modification execution through facility substantial completion.
| CheckBox12: 1 |
| State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: ***Note: The Revolutionary FAR Overhaul (RFO) changed the Authority to FAR 6.103-1*** |
The proposed modification is for construction oversight services by the original A-E firm, Flad/Page that developed the design for the B28 HCCL project. Due to the highly specialized and technical nature of bio-containment facilities, including complex HVAC systems, pressure relationships, and bio-safety compliance requirements, only the original designer possesses the detailed knowledge necessary to ensure design integrity during construction. In addition, award to another firm would increase the legal risk in the event of an incident since both the designer of record and the A/E firm responsible for construction administrative services would have the incentive to blame the other party for any design issues. The A/E responsible for design, also being the party responsible for design interpretation, avoids these issues.
Award to another firm would introduce unacceptable risks, including potential misinterpretation of design intent that could lead to containment system failures with serious public health consequences. Additionally, the learning curve for a new firm would result in construction delays and increased potential for costly change orders due to design clarification needs.
Therefore, FAR 6.103-1, Only One Responsible Source, is applicable.
| State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Not applicable. This is not a bridge action, no protest or follow-on acquisition milestones are applicable. |
| State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: There will be a notice publicized for this requirement since that is required under FAR 5.101(a) and no exceptions applies. However, the same A/E firm that is responsible for design, also being the party responsible for design interpretation is standard and best practice due both to their superior familiarity with the design as well as to maintain legal responsibility. This is a one-time requirement specific to the B28 HCCL construction phase and not an ongoing barrier to future competition. For future similar projects, the agency will include construction period services in the original A-E solicitation to promote competition. The barriers to competition are project-specific and will no longer exist upon completion of the B28 HCCL construction phase. |
| State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Market research was conducted through consultation with technical personnel familiar with B28 HCCL project and review of firms with experience in A-E services for high containment laboratory design. While multiples firms possess general A-E qualifications, the research determined that no other source, other than Flad/Page, has the project-specific knowledge of the B28 HCCL design and highly specialized BSL-3/4 requirements necessary to perform construction period services without duplication of cost, schedule delays, and increased risk. These findings support the use of FAR 6.103-1. |
| State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: Technical packages to facilitate competition were not developed because the B28 HCCL construction oversight requires project-specific design knowledge and system integration understanding that cannot be adequately documented. The complexity of the containment systems presents unacceptable safety risks if misinterpreted during construction. For future projects, the Government will consider including construction period services in the original A-E solicitation to promote competition. |
| State the full statutory authority and FAR cite and title, consistent with paragraph 4, e.g. 41 U.S.C. 3304: The price of this work will be determined to be fair and reasonable prior to award using comparison to the Independent Government Estimate as well as cost analysis as required. |
| CheckBox13: 0 |
| CheckBox14: 0 |
| CheckBox15: 0 |
| TextField9: 75D30119C06664 |
| CheckBox16: 1 |
| CheckBox17: 0 |
| Program Manager name: Carl Sandra Ulysse |
| Program Manager position title: COR |
| Program Manager email address: |
| Program Manager phone: |
| Program Manager Supervisor name: Michael S. Tarr |
| Program Manager Supervisor position title: Director PCMSO |
| Program Manager Supervisor email address: |
| HHS Senior Procurement Executive (SPE) signature: |
| Program Manager Supervisor date: |
| Contract Officer's Approval name: Mike Davis |
| Contract Officer's Approval name: Mike Davis |
| HHS Senior Procurement Executive (SPE) phone: 770-488-2427 |
| HHS Senior Procurement Executive (SPE) phone: 770-488-2427 |
| HHS Senior Procurement Executive (SPE) phone: 770-488-8424 |
| Contract Officer's Approval date: 04/27/2026 |
| Contract Officer's Approval date: 04/27/2026 |
| HHS Senior Procurement Executive (SPE) name: Terrance Perry |
| DateField6: |
| Office of Small Business date: |
| OPDIV HCA date: |
| Concur with Acquisition: 0 |
| Non-Concur with Acquisition: 0 |
| HHS Senior Procurement Executive (SPE) date: |
| State supplies/services being procured: |
File details come from the government source that posted it. Updated .