98-20260916165034 MCBS.pdf
PDF 2 MB Posted
- Attached to
- 98-20260916165034 MCBS
- Solicitation number
- 3170036753
- Issued by
- Mississippi
About this file
This is a contract document and specifications package for the Reunion Parkway Ditch Improvement Project issued by the Madison County Board of Supervisors in Mississippi. The project consists of improving the capacity of approximately 2,750 linear feet of existing ditch between Reunion Parkway and I-55. Bids will be received until 11 A.M. on Thursday, October 15, 2026, with public opening and reading of all submitted bids. Bidders may submit sealed bids at the Madison County Chancery Clerk's office in Canton, Mississippi, or electronically via PDF through Madison County's website. The contract requires the contractor to commence work within ten calendar days after receiving written Notice to Proceed and complete the project within 70 consecutive calendar days. Bid items include clearing and grubbing (5.50 acres), channel excavation (8,800 cubic yards), topsoil and ground preparation (24,700 square yards), grassing and landscaping materials (5 acres, 11 tons of agricultural limestone, 6 tons of mulch), erosion control measures including silt fence (5,500 linear feet) and wattles (170 linear feet), riprap work (340 tons), maintenance of traffic as a lump sum item, mobilization, and unclassified excavation. Award of contract shall be made within 60 days of bid receipt, and the Notice to Proceed shall be issued within 30 days after contract execution.
Bidders must submit a bid bond or certified check equal to five percent of the base bid amount as bid security, which will be forfeited as liquidated damages if the successful bidder fails to execute the contract and bonds within ten days of receipt. The contractor must furnish Performance and Payment Bonds in amounts equal to 100 percent of the total base bid amount. The contract is subject to liquidated damages of $1,000 per calendar day for each day the work remains incomplete beyond the specified completion date. All bid prices must include labor, materials, bonding, shoring, removal, overhead, profit, insurance, and applicable taxes. Unit prices shall govern in cases of discrepancies between unit prices and extensions. The project is not subject to any stated set-asides, incumbent contractor preferences, or identified funding restrictions beyond standard contract requirements. Contractors must possess a valid Mississippi Certificate of Responsibility unless the bid amount does not exceed $50,000 for public projects or $100,000 for private projects. Nonresident bidders must comply with Mississippi's preference laws regarding resident contractor treatment, and all bidders must submit non-collusion affidavits in duplicate as a condition of bid acceptance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
“REUNION PARKWAY DITCH IMPROVEMENT”
MADISON COUNTY BOARD OF SUPERVISORS
August 2026
WAGGONER ENGINEERING, INC.
143-A LeFleurs Square
Jackson, Mississippi 39211
WEI # 101.0022315.000
08/10/2026
(THIS PAGE LEFT BLANK INTENTIONALLY)
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
MADISON COUNTY, MISSISSIPPI
“REUNION PARKWAY DITCH IMPROVEMENT”
TABLE OF CONTENTS
SECTION A ADVERTISEMENT FOR BIDS
SECTION B INFORMATION FOR BIDDERS
SECTION C BID FORM AND BIDDERS CERTIFICATES
SECTION D BID BOND
SECTION E CONTRACT
SECTION F PERFORMANCE BOND
SECTION G PAYMENT BOND
SECTION H CERTIFICATE OF SUFFICIENCY
SECTION I. STANDARD GENERAL CONDITIONS
I.1 Standard General Condition of the Construction Contract I.2 Supplementary Condition of the Contract Waggoner
Engineering Inc.
I.3 SUPPLEMENTARY CONDITIONS FOR SLFRF
PROJECTS
SECTION J PROJECT SUPPLEMENTAL GENERAL CONDITIONS
J.1 Project Special Conditions J.2 Instructions for Bonds J.3 Special Provisions J.4 Insurance Requirements J.5 Shop Drawings, Product Data and Samples J.6 Record Documents J.7 Contract Closeout J.8 Schedule of Values Lump Sum Bid Items
SECTION K TECHNICAL SPECIFICATIONS
K.1 General Instructions K.2 General Notes K.3 Notice to Bidders K4.1 Agricultural Limestone K4.2 Combination Fertilizer 13-13-13 K4.3 Superphosphate
SECTION A
ADVERTISEMENT FOR BIDS
ADVERTISEMENT FOR BIDS
MADISON COUNTY, MISSISSIPPI
REUNION PARKWAY DITCH IMPROVEMENT PROJECT
Bids will be received by the Madison County Board of Supervisors until 11 A.M. Thursday, October 15, 2026, for the Reunion Parkway Ditch Improvement Project. All bids so received will be publicly opened and read aloud.
The project generally consists of improving the capacity of approximately 2750 LF of existing ditch between Reunion Parkway and I-55.
Bids may be submitted by either of the following methods:
1. Sealed bids will be received until 11 A.M. Thursday, October 15, 2026, at the Madison County Chancery Clerk’s office, Room 225-228, 146 West North Street, Canton, MS 39046. All sealed bids submitted to the Chancery Clerk’s office shall be marked on the outside face of the envelope “REUNION PARKWAY DITCH IMPROVEMENT PROJECT,” and shall have the bidder’s Certificate of Responsibility Number written on the outside of the envelope. If any envelope is not so marked, said bid shall not be opened and considered.
2. Electronic bids will be received until 11 A.M. Thursday, October 15, 2026, as a PDF file via Madison County’s website at http://www.madison-co.com/bids. Each bidder submitting a bid electronically as a PDF file shall include its Certificate of Responsibility Number as part of its PDF electronic bid submittal. Any electronic PDF bid that does not include the bidder’s Certificate of Responsibility Number shall not be considered.
Plans, specifications, and contract documents are on file and can be viewed and downloaded at https://www.madison-co.com/bids. Questions regarding plans and specifications should be sent to Tim Bryan, P.E. with the Madison County Engineer’s Office at tim.bryan@madison-co.com or 601- 790-2520.
Madison County Board of Supervisors reserves the right to reject any and all bids.
Madison County Board of Supervisors
By: (s) Kesha Jackson, Purchase Clerk
Publication Dates:
September 17 & 24, 2026 Madison County Journal
SECTION B
INFORMATION TO BIDDERS
B-1
INFORMATION FOR BIDDERS
1. Receipt and Opening of Bids: Bids will be received by Madison County, no later than 2:00 p.m. local time on September 16, 2026, at the Madison County Tax Collector’s Office, 146 W
Center St, Canton, MS 39046.
2. Bids:
A. Shall be made on the forms provided and all applicable blank spaces filled in.
Alterations, erasures or changes of any kind must be initialed by the BIDDER and shall not contain any recapitulation of the work to be done. No oral, telephonic or telegraphic proposals will be considered.
B. BIDDERS ARE HEREBY NOTIFIED THAT ANY PROPOSAL ACCOMPANIED BY LETTERS,
QUALIFYING IN ANY MANNER, THE CONDITION UNDER WHICH THE PROPOSAL IS
TENDERED, WILL BE CONSIDERED AS AN IRREGULAR BID AND SHALL NOT BE
CONSIDERED IN MAKING THE AWARD.
C. Bids may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Bids received after the time and date specified shall not be considered.
D. Submit bids (in duplicate) in an opaque sealed envelope marked in the lower left hand corner as follows:
1. Bid for construction of: “REUNION PARKWAY DITCH IMPROVEMENT”
2. Certificate of Responsibility No. __________________________________.
E. Any addenda issued during the bidding shall be noted on the Bid Form and shall become a part of the executed Contract.
3. Method of Bidding:
A. The bid will consist of a base bid amount in accordance with the totals bid per various items and schedules of the project Bid Form with various additive and/or deductive alternatives.
B. The Madison County Board of Supervisors reserves the right to reject any or all bids and to waive any or all informalities.
B-2
C. The Madison County Board of Supervisors reserves the right to award the base bid and any additive or deductive alternatives which are in the best interest of the Commission.
4. Addenda and Interpretations
A. Should a BIDDER find discrepancies in, or omissions from, the drawings or specifications or should they be in doubt as to their written meaning, they should at once notify the ENGINEER, who will send a written instruction or interpretation to all known holders of the documents. The ENGINEER will not be responsible for any oral instructions.
B. Addenda to specifications or drawings that may be issued before or during the time of bidding shall be included in the bid form and will become a part of the Contract.
5. Certificate of Responsibility Number:
A. Each CONTRACTOR submitting a bid must show on the face of the envelope containing the bid, their State of Mississippi Certificate of Responsibility Number unless there appears a statement on the face of the envelope that the enclosed bid does not exceed $50,000.00 with respect to public projects or $100,000.00 with respect to private projects.
B. No bids will be accepted, opened or considered unless the above information is given as specified.
C. Sufficient evidence that said Certificate of Responsibility Number has been issued and is in effect at the time of receiving bids, and that BIDDER’S Certificate of Responsibility work classification(s) qualifies them to perform the type(s) of work required for this project, must be submitted when required by OWNER or ENGINEER.
6. Notice to Nonresident Bidders:
A. A nonresident BIDDER domiciled in a state having laws granting preference to local contractors shall be awarded Mississippi public contracts only on the same basis as the nonresident BIDDERS’s state awards contracts to Mississippi contractors bidding under similar circumstances; and resident contractors actually domiciled in Mississippi, be they corporate, individuals or partnerships, are to be granted preference over nonresidents in awarding of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident.
This preference, if it is a percentage of the bid or other monetary amount, is not to be added to the nonresident BIDDER’s bid by the nonresident BIDDER. The ENGINEER will add a line to the bid tabulation report that shows the amount of the
B-3 nonresident BIDDER premium when the bids are tabulated for the sole purpose of determining the order of the BIDDERs.
B. When a nonresident CONTRACTOR submits a bid for a public project, he shall attach thereto a copy of his resident state’s current bid law pertaining to such state’s treatment of nonresident CONTRACTORS.
C. Nonresident BIDDERS Certificate: CONTRACTOR must complete the Nonresident
BIDDERS Certificate included in the Contract Documents (Section C) and submit same as part of their bid.
D. As used in this section, the term “resident contractors” includes a nonresident person, firm or corporation that has been qualified to do business in this state and has maintained a permanent full-time office in the State of Mississippi for two (2) years prior to January 1, 1986, and the subsidiaries and affiliates of such a person, firm or corporation.
7. Bid Security: Each bid must be accompanied by a certified check of the BIDDER, or a Bid
Bond prepared on the form of a bid bond as included herein, duly executed by the BIDDER as principal and having as surety thereon a surety company licensed by the State of Mississippi and signed by an agent resident in Mississippi, in the amount of five percent (5%) of the base bid.
8. Liquidated Damages for Failure to Enter into Contract: The successful BIDDER, upon their failure or refusal to execute and deliver the contract and bonds required within ten (10) days after they have received the contract for execution, shall forfeit to the OWNER, as liquidated damages, the bid security deposited with their bid.
9. Security for Faithful Performance: Simultaneously with their delivery of the executed
Contract, the CONTRACTOR shall furnish Contract Performance and Payment Bonds in the full amount of the Contract for the payment of all persons performing labor on this Contract and for furnishing all materials in connection with this Contract. The surety on such Bond or Bonds shall be a duly authorized Surety Company doing business in the State of Mississippi.
10. Law and Regulations: The BIDDERS’S attention is directed to the fact that all applicable state laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract throughout, and they will be deemed to be included in the contract the same as though herein written out in full.
11. Condition of Work: Each BIDDER shall visit the site and inform themselves fully of the conditions at the site relating to the completion of the project. Failure to do so will not relieve a successful BIDDER of their obligation to furnish all material and labor necessary to carry out the provisions of their contract.
B-4
12. Obligation of BIDDER: At the time of the opening of bids, each BIDDER will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Drawings, Specifications and Contract Documents (including addenda issued, if any).
13. Time of Completion: BIDDER must agree to commence work on or before the date specified in a written "Notice to Proceed" from the OWNER and to fully complete the project within the number of consecutive calendar days as set forth in these Contract Documents.
14. Proposal Guarantees: Proposal guarantees will be returned to the unsuccessful BIDDERS as soon as a Contract has been awarded and to the successful bidder after they have executed the Contract and have furnished Contract Performance and Payment Bonds and Certificates of Insurance as required.
15. Non-Collusion Affidavit: CONTRACTOR must complete (in duplicate) the non-collusion affidavits included in the Contract Documents (Section C) and submit same as part of their bid. FAILURE TO DO SO WILL DISQUALIFY THEIR BID.
16. Interpretations: No oral interpretation made to any BIDDER as to the meaning of the
Drawings and Specifications or Contract Documents shall be considered an effective modification of the provisions of the Contract Documents. Written and oral requests for interpretation of the Drawings and Specifications shall be submitted to the ENGINEER for a formal decision which will be given in writing to all Drawing and Specification holders.
17. Subcontractor: The BIDDER is specifically advised that any person, firm or other party to whom it proposes to award a subcontract must be acceptable to the OWNER. The total allowable subcontract amount shall not exceed fifty percent (50%) of contract amount unless otherwise approved by the OWNER.
18. Qualifications of Subcontractors: Material and Equipment Suppliers:
A. Within ten (10) working days after award of contract, the CONTRACTOR will submit to the OWNER and the ENGINEER for acceptance, a list of the names of Subcontractors and such other persons and organizations (including those who are to furnish principal items of materials or equipment) proposed for those portions of the Work as to which the identity of the Subcontractors and other persons and organizations must be submitted as specified in the Contract Documents. Within thirty (30) working days after receiving the list, the ENGINEER will notify the CONTRACTOR in writing if either the OWNER or the ENGINEER, after due investigation, has reasonable objection to any Subcontractor, person or organization on such list. The failure of the OWNER or the ENGINEER to make objection to any Subcontractor, person or organization on the list within thirty (30) working days of receipt shall constitute an acceptance of such Subcontractor, person or organization but shall not constitute a waiver of any right of the OWNER or the ENGINEER to reject
B-5 any Work, Material or Equipment that is not in conformance with the requirements of the Contract Documents.
B. The CONTRACTOR will not employ any Subcontractor, other person or organization, whether initially or as a substitute, against whom the OWNER or the ENGINEER may have reasonable objection, nor will the CONTRACTOR be required to employ a Subcontractor who has been accepted by the OWNER and the ENGINEER, unless the ENGINEER determines that there is good cause for doing so.
C. The CONTRACTOR shall be fully responsible for all acts and omissions of his
Subcontractors and of persons and organizations directly or indirectly employed by them and of persons and organizations for whose acts any of them may be liable to the same extent that he is responsible for the acts and omissions of persons directly employed by him. Nothing in the Contract Documents shall create any obligation on the part of OWNER or ENGINEER to pay or to see to the payment of monies due Subcontractors or other persons or organizations, except as may otherwise be required by law. OWNER or ENGINEER may furnish to Subcontractors or other persons or organizations, to the extent practicable, evidence of amounts paid to the CONTRACTOR on account of specific Work done in accordance with the schedule of values.
D. The divisions and sections of the Specifications and the identifications of Drawings shall not control the CONTRACTOR in dividing the Work among Subcontractors or delineating the Work to be performed by specific trades.
E. The CONTRACTOR agrees to bind specifically every Subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of the OWNER.
F. All Work performed for the CONTRACTOR by a Subcontractor shall be pursuant to an appropriate agreement between the CONTRACTOR and the Subcontractor.
G. The CONTRACTOR shall be responsible for the coordination of the trades and
Subcontractors engaged in the Work.
a. The CONTRACTOR shall cause appropriate provisions to be inserted in all subcontracts relative to the Work to bind Subcontractors to the CONTRACTOR by the terms of these General Conditions and other Contract Documents insofar as applicable to the Work of Subcontractors, and to give the CONTRACTOR the same power as regards terminating subcontracts that the OWNER may exercise over the CONTRACTOR under provisions of the Contract Documents.
b. The OWNER or ENGINEER will not undertake to settle differences between the CONTRACTOR and his Subcontractors or between Subcontractors.
B-6
c. If in the opinion of the ENGINEER, a Subcontractor on the Project proves to be incompetent or otherwise unsatisfactory, he shall be replaced if and when the CONTRACTOR is so directed in writing.
19. Qualifications of BIDDERS: The OWNER may make such investigations as he deems necessary to determine the ability of the BIDDER to perform the Work and the BIDDER shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. The OWNER reserves the right to reject a Bid if the evidence submitted by or investigation of such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the items of Work contemplated therein.
20. Insurance: The CONTRACTOR will be required to carry the types and amounts of insurance specified in the Project Supplemental Conditions, Section J.4, as enclosed herein for the full term of the Contract.
21. Contract Award: Award of Contract, if made, shall be within 60 days of date of Receipt of
Bids.
22. Issuance of "Notice to Proceed": If the Contract is awarded, the OWNER will issue the
"Notice to Proceed" within 30 days after the date of agreement of the Contract.
SECTION C
BID FORM AND BIDDERS CERTIFICATES
C-1
PROPOSAL
Proposal of (hereinafter called "BIDDER"), organized and existing under the laws of the State of doing business as a (corporation, partnership, limited liability company, or individual) to THE
MADISON COUNTY BOARD OF SUPERVISORS, (hereinafter called "OWNER"). In compliance with your advertisement for Bids, BIDDER, hereby proposes to perform all WORK for construction of
“REUNION PARKWAY DITCH IMPROVEMENT”
in strict accordance with the CONTRACT DOCUMENTS, within the time set forth herein, and at the prices stated below. By submission of the BID, each BIDDER certifies, and in the case of a joint BID each party thereto certifies as to his own organization, that this BID has been developed independently, without consultation, communication or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.
BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in a written "NOTICE TO PROCEED" and to fully complete the Project within 70 consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of $1,000 for each consecutive calendar day thereafter as provided for elsewhere in these CONTRACT
DOCUMENTS.
BIDDER ACKNOWLEDGES receipt of the following ADDENDA:
NUMBER: __________________________DATE:_____________________________________
C-2
Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. The failure or omission of any BIDDER to do any of the foregoing shall in no way relieve any BIDDER from any obligation in respect to this bid.
BIDDER understands that the quantities mentioned below are approximate only and are subject to either increase or decrease, and hereby proposes to perform any increased or decreased quantities of work at the Unit Price Bid.
In accordance with the requirements of the Plans, Specifications and Contract Documents, BIDDER proposes to furnish all necessary materials, equipment, labor, tools and other means of construction and to construct the Project in accordance with the Contract Documents within the specified Contract Time for the following Unit Prices specified.
BIDDER further agrees to execute the contract agreement as bound herein within ten (10) days after receipt of contract forms from the OWNER.
BIDDER agrees to pay as liquidated damages the amount provided herein for each consecutive calendar day after the Contract completion date specified in a written "NOTICE TO PROCEED" that he fails to complete the work unless the Contract Time is extended by a written Change Order.
BIDDER also proposes to execute a Performance Bond and a Payment Bond, as shown in the
Specifications, each in an amount of not less than one hundred percent (100%) of the total of the
Base Bid. These Bonds shall not only serve to guarantee the completion of the work on the
BIDDERS part, but also to guarantee the excellence of both workmanship and materials until the work is finally accepted.
BIDDER encloses a Bid Bond or Certified Check for 5% of Base Bid Amount DOLLARS
($ ) and hereby agree that in case of failure to execute the Contract and furnish the required Bonds within (10) days after the Receipt of Contract Forms, the amount
C-3 of this Certified Check or Bid Bond will be forfeited to the OWNER, as liquidated damages arising out of his failure to execute the Contract as proposed.
It is understood that in case BIDDER is awarded the work, the Certified Check or Bid Bond submitted as Bid security will be returned as stipulated in the Specifications.
Further, the BIDDER agrees to abide by the requirements under Executive Order No. 11246, as amended, including specifically the provision of the Equal Opportunity Clause set forth in the
Federal Requirements, if applicable.
The low BIDDER shall supply the names and address of major MATERIAL SUPPLIERS AND
SUBCONTRACTORS when required to do so by the OWNER.
Inspection trips for prospective BIDDERS will be coordinated thru OWNER prior to submission of proposal.
BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following unit prices or base bid amount: SEE PAGE C-5 FOR BID ITEMS.
NOTES:
1. Unit price amounts are to be shown in figures where indicated. Where a discrepancy in the unit price and the extension of any items occurs, the unit price will govern.
2. Unit prices shall include all labor, materials, bonding, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.
3. Any erasure, change or alteration of any kind must be initialed by the BIDDER.
4. Bid prices shall include sales tax and all other applicable taxes and fees.
5. Any item of work not specified on the Proposal as a separate pay item or indicated as an absorbed cost in a pay item but which is incidental to completion of the work shall be considered as an absorbed cost with full compensation included in the unit price bid for the particular item involved.
C-4
6. OWNER reserves the right to award any combination of base and additive alternate bids (if any) it deems advantageous and in the event that all specified bid item units are lump sum (LS), the OWNER reserves the right to delete any such item or combination of such items from the project. The OWNER further reserves the right to delete any item or items desired from the Bid Schedule after the Contract has been awarded. Any deletions, if any made, shall be by Change Order and BIDDER hereby agrees to accept such Change Orders.
MADISON COUNTY BOARD OF SUPERVISORS
REUNION PARKWAY DITCH IMPROVEMENT
JUNE 2026
WEI NO. 2500213.000
ITEM NO. DESCRIPTION UNIT QTY. UNIT COST TOTAL COST
201-B001 CLEARING AND GRUBBING ACRE 5.50
202-B126 REMOVAL OF FENCE, ALL TYPES LF 86
202-B191 REMOVAL OF PIPE, 8" AND ABOVE LF 30
202-B264 REMOVAL OF TREES GREATER THAN 10" EA 52
203-F003 CHANNEL EXCAVATION, FME, AH CY 8,800
211-A001 TOPSOIL FOR SLOPE TREATMENT, FROM RIGHT-OF-WAY SY 24,700
212-B001 STANDARD GROUND PREPARATION SY 24,700
225-A001 GRASSING ACRE 5
225-B001 AGRICULTURAL LIMESTONE TON 11
225-C001 MULCH, VEGETATIVE MULCH TON 6
228-A001 EROSION CONTROL BLANKET, TYPE I SY 14,360
234-A001 TEMPORARY SILT FENCE LF 5,500
237-A002 WATTLES, 20" LF 170
249-A001 RIPRAP FOR EROSION CONTROL TON 340
249-B001 REMOVE AND RESET RIPRAP CY 210
618-A001 MAINTENANCE OF TRAFFIC LS 1
620-A001 MOBILIZATION LS 1
815-A002 LOOSE RIPRAP, SIZE 100 TON 530
815-E001 GEOTEXTILE UNDER RIPRAP SY 1,610
907-203-A001 UNCLASSIFIED EXCAVATION, FM, AH CY 8,800
907-215-C001 MULCH, HAUL ROAD TON 250
907-699-A001 CHANNEL CONSTRUCTION STAKES LS 1
TOTAL BASE BID
RESPECTFULLY SUBMITTED BY:
(PLEASE PRINT)
SIGNATURE:
NAME AND TITLE:
(PLEASE PRINT)
ADDRESS:
PHONE NUMBER:
CERTIFICATE OF RESPONSIBILITY NO. (SEAL) IF BY CORPORATION
BID FORM
C-5
C-6
CORPORATE CERTIFICATE
(To be executed if BIDDER is a Corporation)
I, certify that I am the Secretary of the Corporation named as
CONTRACTOR in the foregoing Proposal; that who signed said
Proposal on behalf of the CONTRACTOR, was then of said Corporation;
that said Proposal was duly signed for and in behalf of said Corporation by authority of its governing body and is within the scope of its corporate powers.
Name:
Title:
Signature:
(CORPORATE SEAL)
C-7
PARTNERSHIP CERTIFICATE
(To be executed if BIDDER is a Partnership)
STATE OF ___________________________________________
COUNTY OF _________________________________________
On this day of , 2026, before me personally appeared
_______________________________, known to be and known by me to be the person who executed the above instrument, who being by me first duly sworn, did depose and say that he is general partner in the firm of:
; That said firm consists of himself and
; and that he executed the foregoing instrument for and on behalf of said firm for the uses and purposes stated herein.
Signature _________________________________________
Title _____________________________________________
(SEAL)
Sworn before me this day of , 2026.
_________________________________, Notary Public
My commission expires
C-8
LIMITED LIABILITY COMPANY CERTIFICATE
(To be executed if BIDDER is a LLC)
I, the undersigned ____________________________, hereby certify that I am the Manager of _________________________________ (the “Company”) or if the Company does not have a
Manager, a Member of the Company with full power and authority to bind the Company; that
___________________________ who executed the Proposal on behalf of the Company is
_______________________________ of the Company with full power and authority to execute same on behalf of the Company, and that the Proposal and the Contract, if awarded to the
Company, are within the powers and authority of the Company.
C-9
NONRESIDENT BIDDER CERTIFICATE
(to be executed if a BIDDER is a nonresident)
I, __________________________________, hereby certify that the CONTRACTOR, ______________________________________, is domiciled in the State of _________________ and (check and complete one):
(____) attached is a copy of the State of ___________________’s current law pertaining to the treatment of nonresident CONTRACTORS. Paragraph _____, page _____ of said law grants resident CONTRACTORS a _____ percent preference over nonresident CONTRACTORS for similar projects.
(____) the State of ___________________ has no current law pertaining to the treatment of nonresident contractors.
(____) I claim “resident contractor” status based upon having been qualified to do business in this state and having maintained a permanent full-time office in the State of Mississippi for two
(2) years prior to January 1, 1986. Proof of such claim must be submitted and approved before contract is signed.
C-10
NON-COLLUSION AFFIDAVIT
(TO BE EXECUTED IN DUPLICATE)
STATE OF MISSISSIPPI
COUNTY OF
I, ____________________________________________________________________ (name of person signing affidavit) individually, and in my capacity as__________________________________________ (title) of ____________________________________________________________________ (name of firm, partnership, limited liability company, or corporation.)
being duly sworn, on oath do depose and say as follows:
(a) That , Bidder on the “REUNION PARKWAY DITCH IMPROVEMENT” for The Madison County Board of Supervisors, has not either directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this contract; nor have any of its officers, partners, employees or principal owners.
(b) further, that neither said legal entity nor any of its directors, officers, partners, principal owners or managerial employees are currently debarred from bidding on public contracts by the State of Mississippi or any of its agencies; or by one or more of the other states or any of their agencies; or by the Federal Highway Administration.
_________________________________, Notary Public
My commission expires
NOTE: FAILURE TO PROPERLY SIGN AND NOTARIZE THIS AFFIDAVIT WILL
DISQUALIFY THE BID.
C-11
NON-COLLUSION AFFIDAVIT
(TO BE EXECUTED IN DUPLICATE)
STATE OF MISSISSIPPI
COUNTY OF
I, ____________________________________________________________________ (name of person signing affidavit) individually, and in my capacity as__________________________________________ (title) of ____________________________________________________________________ (name of firm, partnership, limited liability company, or corporation.)
being duly sworn, on oath do depose and say as follows:
(a) That , Bidder on the “REUNION PARKWAY DITCH IMPROVEMENT” for The Madison County Board of Supervisors, has not either directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this contract; nor have any of its officers, partners, employees or principal owners.
(b) further, that neither said legal entity nor any of its directors, officers, partners, principal owners or managerial employees are currently debarred from bidding on public contracts by the State of Mississippi or any of its agencies; or by one or more of the other states or any of their agencies; or by the Federal Highway Administration.
_________________________________, Notary Public
My commission expires
NOTE: FAILURE TO PROPERLY SIGN AND NOTARIZE THIS AFFIDAVIT WILL
DISQUALIFY THE BID.
SECTION D
BID BOND
D-1
BID BOND
KNOW ALL MEN BY THESE PRESENTS:
That
(Name of Contractor)
(Address of Contractor) a hereinafter called "Principal”, and
(Corporation, Partnership, Limited Liability Company or Individual) hereinafter called "Surety", (Name of Surety) are held and firmly bound unto THE MADISON COUNTY BOARD OF SUPERVISORS, hereinafter called
"OWNER" in the penal sum of 5% of Total Bid, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents. Signed, this the day of , 2026. The Condition of the above obligation is such that whereas the Principal has submitted to CITY OF BRANDON, MISSISSIPPI a certain BID, attached hereto and hereby made a part thereof to enter into a contract in writing, for the construction of:
NOW, THEREFORE,
(a) If said BID shall be rejected, or,
(b) If said BID shall be accepted and the Principal shall execute and deliver a contract on the Contract form as attached hereto (properly completed in accordance with said BID) and shall furnish BONDS for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection herewith, and shall in all other respects perform the agreement created by the acceptance of said BID, then this obligation shall be void, otherwise the same shall remain in effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these present to be signed by their officers, the day and year first set forth above.
D-2
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located.
(L.S.)
Principal Surety
By: By:
SECTION E
CONTRACT
E-1
CONTRACT
THIS AGREEMENT, made this the _________ day of _________________________, 2026, by and between MADISON COUNTY BOARD OF SUPERVISORS hereinafter called "OWNER" and ________________________________________________ doing business as (an Individual), (a Partnership), (a Limited Liability Company), or (a Corporation) hereinafter called "CONTRACTOR".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1. The CONTRACTOR will commence and complete the construction of “REUNION PARKWAY
DITCH IMPROVEMENT” hereinafter called "PROJECT".
2. The CONTRACTOR will furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the PROJECT described herein.
3. The CONTRACTOR will commence the work required by the CONTRACT DOCUMENTS within 10 calendar days after the date of the NOTICE TO PROCEED and will complete the PROJECT within 70 calendar days, unless the period for completion is extended otherwise by the CONTRACT DOCUMENTS.
4. The CONTRACTOR agrees to perform all of the work described in the CONTRACT
DOCUMENTS, and comply with the terms therein for the sum of $ or as shown in the BID Schedule.
5. The term "CONTRACT DOCUMENTS" means and includes the following:
A. This Agreement B. Instruction to Bidders C. Signed Copy of Proposal Form and Bidder's Certificate D. Executed Non-Collusion Form and Compliance Statements E. Executed Performance Bond F. Executed Payment Bond G. NSPE General Conditions H. Special Contract Provisions I. DRAWINGS prepared by Waggoner Engineering, Inc. and dated JANUARY 2026.
J. SPECIFICATIONS prepared or issued by Waggoner Engineering, Inc. and dated
JANUARY 2026.
K. ADDENDA:
No. Dated ____________________ No. Dated ____________________
L. All federal government conditions, specifications, regulations and requirements bound herein.
E-2
6. The CONTRACTOR agrees to abide by the following consequences for failure to complete the project within the time specified in the CONTRACT DOCUMENTS:
A. LIQUIDATED DAMAGES - CONTRACTOR shall pay to OWNER for each and every calendar day that he shall be in default in attaining Completion of the Work within the time stipulated the sum of $ 1,000 as liquidated damages. The CONTRACTOR shall be liable for the continued assessment of liquidated damages of $1,000 for each calendar day that he shall be in default in completing the Work within the stipulated time as provided herein. Since the OWNER’S losses are due to the CONTRACTOR’S delay and are not readily ascertainable, the amount provided herein for liquidated damages constitutes agreed damages and not a penalty.
B. INDEMNIFICATION - In addition to payment of the above liquidated damages, CONTRACTOR shall fully indemnify and hold harmless the OWNER, the ENGINEER and their officers, personnel, and agents from and against: (1) any and all fines, civil penalties, and assessments levied by the State of Mississippi Office of Pollution Control, State of Mississippi Bureau of Environmental Health or any federal or state court for failure to meet, perform, or comply with any part of the time schedule as defined in the Contract Documents, and (2) any and all claims, damages, losses, expenses, liabilities, actions, judgments, and decrees of any and every nature whatsoever in any manner caused by, resulting from, or arising out of such failure.
C. RIGHT OF SET-OFF - The OWNER, in addition to its other remedies under this Contract and in law and in equity, may deduct from monies which become due the CONTRACTOR under this Contract any unpaid amounts which become due to the OWNER under any of the foregoing provisions.
7. The OWNER will pay to the CONTRACTOR in the manner and at such times set forth in the
General Conditions such amount as required by the CONTRACT DOCUMENTS. The OWNER shall retain five percent (5%) of the amount of each payment until final completion and acceptance of all work covered by the CONTRACT DOCUMENTS unless otherwise mutually agreed.
8. The CONTRACTOR agrees to allow the OWNER or a duly authorized representatives thereof, access to books, documents, papers and records of the CONTRACTOR which are directly pertinent to the project which is the subject of this Contract, for the purpose of making audits, examinations, excerpts and transcriptions, and CONTRACTOR agrees to insert an identical access to records clause into all subcontracts.
9. The CONTRACTOR shall be held responsible for forfeiture of monies in the event that an audit indicates his failure to keep adequate records, including change orders, force accounts and payroll records.
10. Attached hereto and made a part of this Contract is a Payment Bond, executed by a Surety
Company doing business in the State of Mississippi, in the sum of:
E-3
(not less than one hundred percent of Contract amount)
11. Attached hereto and made a part of this Contract is a Performance Bond, executed by a
Surety Company doing business in the State of Mississippi, in the sum of:
(not less than one hundred percent of Contract amount)
12. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.
IN WITNESS WHEREOF, the parties hereto have executed or caused to be executed by their duly authorized officials, this Agreement in 5 copies each of which shall be deemed an original on the date first above written.
MADISON COUNTY BOARD OF SUPERVISORS, OWNER
BY:
NAME:
TITLE: MAYOR
ATTEST:
TITLE: (SEAL)
CONTRACTOR
TITLE:
E-4
BY:
TITLE: (SEAL)
SECTION F
PERFORMANCE BOND
F-1
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:
a hereinafter called "PRINCIPAL", and
(Corporation, Partnership, Limited Liability Company or Individual) hereinafter called "SURETY", are held and firmly bound unto MADISON COUNTY BOARD OF SUPERVISORS hereinafter called
"OWNER" in the penal sum of
Dollars ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the PRINCIPAL entered into a certain Contract with the OWNER, dated the day of , 2026, a copy of which is hereto attached and made a part hereof for the construction of:
NOW, THEREFORE, if the PRINCIPAL shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of said Contract during the Original term thereof, and any extensions thereof which may be granted by the OWNER, with or without notice to the SURETY and during the one year guaranty period and if he shall satisfy all claims and demands incurred under such Contract, and shall fully indemnify and save harmless the OWNER from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER of all of outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said SURETY for value received hereby stipulates and sees that no change, extension of time, alteration or addition to the terms of the Contract or to the WORK to be performed hereunder or the SPECIFICATIONS accompanying the same shall in any wise affect
F-2 its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the loans of this Contract or to the WORK or to the SPECIFICATIONS.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may not yet be satisfied.
WITNESS WHEREOF, this instrument is executed in five (5) counterparts, each of which shall be deemed an original, this the day of , 2026.
(Principal) Secretary (Principal)
(SEAL) By
(Address)
Witness as to Principal
(Surety)
By
Attorney-in-Fact
Witness as to Surety (Address)
NOTE: Date of BOND must not be prior to date of CONTRACT. If CONTRACTOR is
Partnership, all partners should execute BOND.
F-3
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the Project is located.
SECTION G
PAYMENT BOND
G-1
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS:
a hereinafter called "PRINCIPAL", and
(Corporation, Partnership, Limited Liability Company or Individual) hereinafter called "SURETY", are held and firmly bound unto the MADISON COUNTY BOARD OF SUPERVISORS hereinafter called "OWNER" in the penal sum of
Dollars ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the PRINCIPAL entered into a certain Contract with the OWNER, dated the day of , 2026, a copy of which is hereto attached and made a part hereof for the construction of:
NOW, THEREFORE, if the PRINCIPAL shall promptly make payment to all persons, firms, SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in such Contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such WORK, and all insurance premiums on said WORK, and for all labor, performed in such WORK whether by SUBCONTRACTOR or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said SURETY for value received hereby stipulates and sees that no change, extension of time, alteration or addition to the terms of the Contract or to the WORK to be performed hereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the loans of this Contract or to the WORK or to the SPECIFICATIONS.
G-2
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may not yet be satisfied.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may not yet be satisfied.
WITNESS WHEREOF, this instrument is executed in five (5) counterparts, each of which shall be deemed an original, this the day of , 2026.
(Principal) Secretary (Principal)
(SEAL) By
Witness as to Principal
(Surety)
By
Attorney-in-Fact
Witness as to Surety (Address)
NOTE: Date of BOND must not be prior to date of CONTRACT. If CONTRACTOR is
Partnership, all partners should execute BOND.
G-3
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the Project is located.
SECTION H
CERTIFICATE OF SUFFICIENCY
H-1
CERTIFICATE OF SUFFICIENCY
I, , Chief Legal Officer for MADISON COUNTY BOARD OF
SUPERVISORS do hereby certify that I have examined the agreement, contract bonds and evidence of insurance offered by the Contractor and I am of the opinion that each of the aforesaid documents is adequate and sufficient and has been duly executed by the proper parties thereto acting through their duly authorized representatives; that said representatives have full power and authority to execute said documents on behalf of the respective parties named thereon; and that the foregoing documents constitute valid and legally binding obligations upon the parties executing the same in accordance with terms, conditions and provisions thereof.
(Signature)
Name:
Date:
SECTION I
STANDARD GENERAL CONDITIONS
SECTION I.1
STANDARD GENERAL CONDITIONS
OF THE
CONSTRUCTION CONTRACT
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the contemplated Project and the controlling Laws and Regulations.
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
Prepared By
Endorsed By
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Copyright© 2018
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882 www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474 www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723 www.asce.org
The copyright for this EJCDC document is owned jointly by the three sponsoring organizations listed above. The National Society of Professional Engineers is the Copyright Administrator for the EJCDC documents; please direct all inquiries regarding EJCDC copyrights to NSPE.
NOTE: EJCDC publications may be purchased at www.ejcdc.org, or from any of the sponsoring organizations above.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Guidelines Page 1 of 2
GUIDELINES FOR USE OF EJCDC® C-700,
STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT
1.0 PURPOSE AND INTENDED USE OF THE DOCUMENT
EJCDC® C-700, Standard General Conditions of the Construction Contract (2018), is the foundation document for the EJCDC Construction Series. The General Conditions define the basic rights, responsibilities, risk allocations, and contractual relationship of the Owner and Contractor, and establish how the Contract is to be administered.
2.0 OTHER DOCUMENTS
EJCDC documents are intended to be used as a system and changes in one EJCDC document may require a corresponding change in other documents. Other EJCDC documents may also serve as a reference to provide insight or guidance for the preparation of this document.
These General Conditions have been prepared for use with either EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price), or EJCDC® C-525, Agreement Between Owner and Contractor for Construction Contract (Cost-Plus-Fee) (2018 Editions). The provisions of the General Conditions and the Agreement are interrelated, and a change in one may necessitate a change in the other.
To prepare supplementary conditions that are coordinated with the General Conditions, use EJCDC® C-800, Supplementary Conditions of the Construction Contract (2018).
The full EJCDC Construction series of documents is discussed in the EJCDC® C-001, Commentary on the 2018 EJCDC Construction Documents (2018).
3.0 ORGANIZATION OF INFORMATION
All parties involved in a construction project benefit significantly from a standardized approach in the location of subject matter throughout the documents. Experience confirms the danger of addressing the same subject matter in more than one location; doing so frequently leads to confusion and unanticipated legal consequences. Careful attention should be given to the guidance provided in EJCDC® N-122/AIA® A521, Uniform Location of Subject Matter (2012 Edition) when preparing documents.
EJCDC® N-122/AIA® A521 is available at no charge from the EJCDC website, www.ejcdc.org, and from the websites of EJCDC’s sponsoring organizations.
If CSI MasterFormat™ is used for organizing the Project Manual, consult CSI MasterFormat™ for the appropriate document number (e.g., under 00 11 00, Advertisements and Invitations), and accordingly number the document and its pages.
4.0 EDITING THIS DOCUMENT
Remove these Guidelines for Use. Some users may also prefer to remove the two cover pages.
Although it is permissible to revise the Standard EJCDC Text of C-700 (the content beginning at page 1 and continuing to the end), it is common practice to leave the Standard EJCDC Text of C-700 intact and unaltered, with modifications and supplementation of C-700’s provisions set forth in EJCDC® C-800, Supplementary Conditions of the Construction Contract (2018). If the Standard Text itself is revised, the
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Guidelines Page 2 of 2 user must comply with the terms of the License Agreement, Paragraph 4.0, Document-Specific Provisions, concerning the tracking or highlighting of revisions. The following is a summary of the relevant License Agreement provisions:
1. The term “Standard EJCDC Text” for C-700 refers to all text prepared by EJCDC in the main body of the document. Document covers, logos, footers, instructions, or copyright notices are not Standard EJCDC Text for this purpose.
2. During the drafting or negotiating process for C-700, it is important that the two contracting parties are both aware of any changes that have been made to the Standard EJCDC Text. Thus, if a draft or version of C-700 purports to be or appears to be an EJCDC document, the user must plainly show all changes to the Standard EJCDC Text, using “Track Changes” (redline/strikeout), highlighting, or other means of clearly indicating additions and deletions.
3. If C-700 has been revised or altered and is subsequently presented to third parties (such as potential bidders, grant agencies, lenders, or sureties) as an EJCDC document, then the changes to the Standard EJCDC Text must be shown, or the third parties must receive access to a version that shows the changes.
4. Once the document is ready to be finalized (and if applicable executed by the contracting parties), it is no longer necessary to continue to show changes to the Standard EJCDC Text. The user may produce a final version of the document in a format in which all changes are accepted, and the document at that point does not need to include any “Track Changes,” redline/strikeout, highlighting, or other indication of additions and deletions to the Standard EJCDC Text.
5.0 LICENSE AGREEMENT
This document is subject to the terms and conditions of the License Agreement, 2018 EJCDC® Construction Series Documents.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .