95332422Q0084 Amendment 0001_Signed.pdf

PDF 162 KB Posted

Attached to
Sierra Leone Compact: Agriculture Productive Use of Energy Consultancy (PUE)
Solicitation number
95332422Q0084
Issued by

About this file

This document provides details for Amendment 0001 to RFQ 95332422Q0084 issued by the Millennium Challenge Corporation. The amendment reduces the period of performance from twelve months to nine months, updates the contract clauses by removing the limitation of government liability clause and adding the accelerated payments to small business subcontractors clause, and replaces the evaluation factors section to evaluate in accordance with FAR Part 13 simplified acquisition procedures based on technical capability, past performance, and price factors. Offerors must submit quotes by July 29, 2022 for the solicitation seeking a consultant to assist in project design of the Sierra Leone Compact agriculture productive use of energy program.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dra ft

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE

DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Ms. Kamille D. Green

June 28, 2022

95332422Q00840001

Summary of Changes

The purpose of this amendment is to incorporate changes as follows:

1. Reduce the anticipated period of performance from twelve (12) months to nine (9) months. As a result, Section F – subsection F.1. Period of Performance has been updated (changes highlighted).

2. Update Section I – Contract Clauses as follows:

- Remove clause 52.216-24 Limitation of Government Liability (APR 1984). The resulting firm fixed price contract will be fully funded.

- Add clause 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Nov 2021) – this clause is hereby incorporated by reference.

3. Replace Section M – evaluation will be conducted in accordance with FAR Part 13 Simplified Acquisition Procedures. This section has been replaced in its entirety.

No other changes, additions, deletions or extensions are made.

Section F - Delivery or Performance

Delivery or Performance Details:

The following changes are made to line item 0001:

Period of Performance End Date is changed from 31-AUG-2023 to 31-MAY-2023.

The following clauses are modified:

Clauses incorporated by full text

Section F - Delivery or Performance

F.1. Period of Performance The work performed under this contract is expected to be completed within nine (9) months, with significant time spent in country.

To maximize the amount of work that can be completed in the allotted timeframe, MCC expects the mobilization timeline for the contractor to be approximately 30 days after contract award. By the end of the program mobilization period (approximately 30 days), contractor staff to be based in-country should be physically located in Sierra Leone and fully engaged in contract performance.

Section I – Contract Clauses

95332422Q00840001

The following clause is added:

Clauses incorporated by reference

Article Number Reference Text

52.232-40 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Nov 2021)

The following clause is deleted:

Clauses incorporated by full text

52.216-24 52.216-24 Limitation of Government Liability (APR 1984)

(a) In performing this contract, the Contractor is not authorized to make expenditures or incur obligations exceeding

_________ dollars.

(b) The maximum amount for which the Government shall be liable if this contract is terminated is _________ dollars.

(End of clause)

Section M - Evaluation Factors for Award

The following clauses are modified:

Clauses incorporated by full text

Section M - Evaluation Factors for Award

SECTION M - Evaluation of Quotations

Evaluations will be conducted in accordance with the FAR Part 13.106-2.

M.1. Basis of Award

The Government will award a contract resulting from this solicitation to the responsible Quoter whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors, shown in descending order of importance, shall be used to evaluate quotes:

(i) Technical Capability;

(ii) Past Performance; and

(iii) Price.

Technical capability and past performance, when combined, are more important than price. Quoters are cautioned that an award may not necessarily be made to the lowest priced Quoter. However, if nonprice factors are evaluated as comparatively equal between two or more Quoters, price may become a determinative factor. The Government reserves the right to award without discussion; therefore, it is incumbent upon all Quoters to submit their best quote.

M.2. Factor 1: Technical Capability

M.2.1. Sub-factor 1: Team and Key Personnel Qualifications

The Government will evaluate the extent to which the Quoter's proposed staffing plan meets the required staffing requirements (per Section H) and generally possesses the required skills to execute each task in Section C – Statement of Work. As part of this evaluation, the Government will also evaluate the extent to which the Quoter proposes key personnel that meet the

95332422Q00840001 requirements stated in Section H of the solicitation.

M.2.2. Sub-factor 2: Technical Approach/Methodology

The Government will evaluate the Quoter's: (i) demonstrated understanding of the country context, how well the Quoter anticipates potential challenges or risks involved in the specific work included in the SOW and realistic mitigation measures for each type of challenge in a way that demonstrates a clear understanding of the requirement; and (ii) proposed approach to conduct assessments and periodic check-ins with MCC to update on the progress of key tasks, activities and deliverables.

M.3. Factor 2: Past Performance

The Government will evaluate reference information and past performance questionnaires provided to ascertain the ability of the Quoter to successfully perform the required tasks. The Quoter shall submit specific reference information demonstrating past experience in all required contract tasks within eight (8) years of the quote submission deadline. In evaluating this factor, the Government will consider the relevance, recency and quality of performance.

M.4. Factor 3: Price

While price will not be assigned a rating during the evaluation, it is a criterion in the overall evaluation of quotes. Price quotes will be analyzed for fairness, reasonableness and completeness. A price quote found to be unrealistically low or unreasonably high may be considered to reflect a lack of understanding of the requirements. Quoters are cautioned that unreasonably high or unrealistically low quoted prices may be grounds for eliminating a quotation from consideration for award.

The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced.

Evaluation of options shall not obligate the Government to exercise the option(s).

[END OF SECTION M]

Text52:
Text54: 1
Check Box91: Yes
Check Box92: Off
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
CUST_PROJ_CODE:
MANUAL_EXTEND_FLAG: N
NO_OF_COPIES: 1
TOTAL_NO_OF_PAGES: 4
Text1: AMENDMENT CONTROL NUMBER :
AMENDMENT_DESCRIPTION: The purpose of Amendment 0001 to RFQ 953324Q0084 is to incorporate changes as detailed on page 2 below.
Text134: SUMMARY OF CHANGES :
SOL_DOCUMENT_NUMBER: 95332422Q0084
Text2: Same As Issuing Office
SOL_OPEN_BID_DATE: 2022-06-22T09:41:42.000-06:00
AMD_ISSUING_OFFICE_LADDR:
AMD_ISSUING_OFFICE_LOCCODE:
DOCUMENT_NUMBER: 95332422Q00840001
HDR_DOCUMENT_NUMBER: 95332422Q0084
EFFECTIVE_DATE:
2022-06-28T13:26:16-0400
Kamille D Green

File details come from the government source that posted it. Updated .