93478634 DD1423-2 FINAL FABRICATION DRAWING (PRE-DELIVERABLE) CDRL DI-SESS-81000E 07-31-2019.pdf

PDF 51 KB Posted

Attached to
Anchor Monitoring System Display Monitor Development and Production
Solicitation number
N4523A20Q5711
Issued by

About this file

This document package contains a Contract Data Requirements List (CDRL) and related federal contract opportunity notice. The CDRL outlines two data items required under the contract: final fabrication drawings and associated certification documentation for an anchor monitoring system display. Deliverables include a final fabrication drawing within 45 days of contract award along with certification that the drawing was accepted by the Naval Sea Systems Command prior to fabrication. Additionally, certification and data reports proving prior acceptance by the Naval Sea Systems Command of the final fabrication drawings are due within 45 days of contract entry and shipment notification.

The related federal contract opportunity is a pre-solicitation notice for engineering design, manufacturing, testing and documentation services for an anchor monitoring system display. The Navy intends to award a firm-fixed-price contract for printed circuit board design, manufacturing, and housing assembly for two internal displays and LED indicators. The contractor must produce an approved first article test procedure and provide drawings, testing, and operational and quality evidence. The pre-solicitation notice lists a anticipated solicitation posting date of March 23, 2020 and award date of April 6, 2020. The regional maintenance center at Puget Sound Naval Shipyard is listed as the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any o ther aspect of th is co l lect ion of in format ion, inc lud ing suggest ions fo r red uc ing the burden, to the Depar tment of Defense, Execut ive Serv ices Di rec torate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM _______ OTHER SESS/MISC________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

3. SUBTITLE

FINAL FABRICATION DRAWING

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000E

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16*

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only.

Administration and operations only, effective 2/28/2020. Other U.S. requests shall be referred to COMNAVSEASYSCOM.

Block 10 - Submit Final Fabrication Drawing unless proof of prior acceptance by NAVSEA Activity.

Block 12 - Allow 45 Days from date of entry in WAWF for certification acceptance prior to any fabrication being performed

Block 14 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite. Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil.

N4523A 0 1 0

15. TOTAL 0 1 0

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

FINAL FABRICATION DRAWING

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16 14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS

Block 4 - Tailored to allow vendor to provide only 10.2.4.

Block 9 - Distribution Statement D. Distribution authorized to DoD and DoD contractors only.

Administration and operations only, effective 2/28/2020. Other U.S. requests shall be referred to COMNAVSEASYSCOM.

Block 10 - Proof of prior acceptance by a NAVSEA Activity shall be submitted in lieu of Final Fabrication Drawing.

Block 12 - Allow 45 Days from date of entry in WAWF for certification acceptance prior to material shipment.

Block 14 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite. Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil.

Document no.: 93478634

N4523A 0 1 0

15. TOTAL

0 1 0

G. PREPARED BY

/S/ C. Shoemaker C/127.2

H. DATE

2/28/2020

I. APPROVED BY

/S/ J. Jordan C/127.2

J. DATE

2/28/2020

17. PRICE GROUP

19. ESTIMATED

TOTAL PRICE

17. PRICE GROUP

19. ESTIMATED

TOTAL PRICE

File details come from the government source that posted it. Updated .