| Instructions for completing the NAEP 2019-24 Cost Proposal Template Workbook |
| 19-24 Bidder Assumptions Tab |
| This tab will be a unifed alliance-wide sumbmission, however contrators shall include this in each of their technical and cost proposal. This will assure that all Alliance members are in agreement and creating individual cost estimates based on common variables. |
| 19-24 ID Assumptions Tab |
| This tab will be a unifed alliance-wide sumbmission, however contrators shall include this in each of their technical and cost proposal. This will assure that all Alliance members are in agreement and creating individual cost estimates based on common variables. |
| 11.1 Anticipated Cost Categories Tab |
| Anticipated required cost categories for contractor monthly cost report to include separate columns for hours and dollars for each task with appropriate task label and a summary column on the right. This will be submitted for each cost proposal based on the individual contract requirements. Technical proposal shall include hours; business proposal to include both hours and cost. |
| 11.2 Reporting Components Tab |
| Summary of reporting categories for contractor monthly cost report by report type to include seperate columns for hours and dollars for each report level with appropriate label and a summary column on the right. This will be submitted for each cost proposal based on the individual contract requirements. Technical proposal shall include hours; business proposal to include both hours and cost. |
| 11.3 Distribution of costs by Cost Component: Assessment Type Tab |
| Summary of cost categories for contractor by assessment for monthly cost report to include separate columns for hours and dollars for each task with appropriate task label and a summary column on the right. This will be submitted for each cost proposal based on the individual contract requirements. |
| 11.4 Distribution of costs by Cost Component: Subject (and session type) Tab |
| Summary of cost categories for contractor by assessment and/or session type for monthly cost report to include separate columns for hours and dollars for each task with appropriate task label and a summary column on the right. This will be submitted for each cost proposal based on the individual contract requirements. |
| 2019-24 Annual Expenditure Summary Tab |
| Offerors shall provide estimated costs for the Period depending on instructions to submit PROPOSAL |
| 2019-24 All Option Summary Tab |
| Offerors shall provide estimated SUMMARY costs ALL OPTIONS for the Period depending on instructions to submit PROPOSAL |
| 2019-24 Option Template Tab |
| Offerors shall provide estimated costs FOR EACH OPTION for the Period depending on instructions to submit PROPOSAL |
| 2019-24 Cost By Quarter Tab |
| Offerors shall provide estimated costs by quarter for each year of the period to submit PROPOSAL |
19-24 Bidder Assumptions
| Year | Grade/Age | Assessment | Estimated Number of Sampled Schools [see note] | Estimated Number of Participating Schools [see note] | Estimated Number of Sampled Students | Estimated Number of Participating Students |
| 2020 | Grade 4 | 2021 Writing Pilot (DBA) | ||||
| 2020 | Grade 8 | 2021 Writing Pilot (DBA) | ||||
| 2020 | Grade 12 | 2021 Writing Pilot (DBA) | ||||
| 2020 | Grade 8 | 2022 U.S History Pilot (DBA) | ||||
| 2020 | Grade 12 | 2022 U.S History Pilot (DBA) | ||||
| 2020 | Grade 8 | 2022 Civics Pilot (DBA) | ||||
| 2020 | Grade 12 | 2022 Civics Pilot (DBA) | ||||
| 2020 | Grade 8 | 2022 Geography Pilot (DBA) | ||||
| 2020 | Grade 12 | 2022 Geography Pilot (DBA) | ||||
| 2020 | Grade 12 | 2022 Economics Pilot (DBA) | ||||
| 2020 | Grade 8 | 2022 Technology Engineering and Literacy Pilot (DBA) | ||||
| 2020 | Grade 12 | 2022 Technology Engineering and Literacy Pilot (DBA) | ||||
| 2020 | Grade 12 | 2020 U. S History (Start Up) | ||||
| 2020 | Grade 12 | 2020 Civics (Start Up) | ||||
| 2020 | Grade 12 | 2020 Geography (Start Up) |
| 2021 | Grade 4 | 2021 Reading Operational |
| 2021 | Grade 8 | 2021 Reading Operational |
| 2021 | Grade 4 | 2021 Mathematics Operational |
| 2021 | Grade 8 | 2021 Mathematics Operational |
| 2021 | Grade 4 | 2021 Writing Operational |
| 2021 | Grade 8 | 2021 Writing Operational |
| 2021 | Grade 12 | 2021 Writing Operational |
| 2021 | Grade 4 | 2023 Reading Pilot |
| 2021 | Grade 8 | 2023 Reading Pilot |
| 2021 | Grade 12 | 2023 Reading Pilot |
| 2021 | Grade 4 | 2023 Mathematics Pilot |
| 2021 | Grade 8 | 2023 Mathematics Pilot |
| 2021 | Grade 12 | 2023 Mathematics Pilot |
| 2021 | Grade 4 | 2023 Science Pilot |
| 2021 | Grade 8 | 2023 Science Pilot |
| 2021 | Grade 12 | 2023 Science Pilot |
| 2022 | Grade 8 | 2024 Arts Pilot |
| 2022 | Grade 12 | 2024 Foreign Language Pilot |
| 2022 | Grade 8 | 2022 U.S History Operational |
| 2022 | Grade 12 | 2022 U.S History Operational |
| 2022 | Grade 8 | 2022 Civics Operational |
| 2022 | Grade 12 | 2022 Civics Operational |
| 2022 | Grade 8 | 2022 Geography Operational |
| 2022 | Grade 12 | 2022 Geography Operational |
| 2022 | Grade 12 | 2022 Economics Operational |
| 2022 | Grade 8 | 2022 Technology Engineering and Literacy Operational |
| 2022 | Grade 12 | 2022 Technology Engineering and Literacy Operational |
| 2023 | Grade 4 | 2023 Reading Operational |
| 2023 | Grade 8 | 2023 Reading Operational |
| 2023 | Grade 12 | 2023 Reading Operational |
| 2023 | Grade 4 | 2023 Mathematics Operational |
| 2023 | Grade 8 | 2023 Mathematics Operational |
| 2023 | Grade 12 | 2023 Mathematics Operational |
| 2023 | Grade 4 | 2023 Science Operational |
| 2023 | Grade 8 | 2023 Science Operational |
| 2023 | Grade 12 | 2023 Science Operational |
| 2023 | Grade 12 | High School Transcript Study |
| 2024 | Grade 4 | 2025 Reading Pilot |
| 2024 | Grade 8 | 2025 Reading Pilot |
| 2024 | Grade 4 | 2025 Mathematics Pilot |
| 2024 | Grade 8 | 2025 Mathematics Pilot |
| 2024 | Grade 4 | 2025 Writing Pilot |
| 2024 | Grade 8 | 2025 Writing Pilot |
| 2024 | Grade 12 | 2025 Writing Pilot |
| 2024 | Grade 8 | 2024 Arts Operational |
| 2024 | Grade 12 | 2024 Foreign Language Operational |
| 2024 | Long-Term Trend Operational | |
| Note-- only include numbers for sampled and participating pilot schools if the assessment pilot will NOT be conducted in the same schools as the operational assessments |
ADD Any other studies that were included in the total 5-year cost submitted with your original proposal
Revised 12/6/18
&"Arial,Bold"&11Estimated Costs for Various Components of NAEP Assessments in 2008-2012
19-24 ID Assumptions
| ` | Year | Grade/Age | Assessment | Number of blocks needed | Final number of MC items needed (to be delivered) | Final number of SCR needed (to be delivered) | Final number of ECR needed (to be delivered) |
| 2019 | Grade 4 | 2023 Reading | |||||
| 2019 | Grade 8 | 2023 Reading | |||||
| 2019 | Grade 12 | 2023 Reading | |||||
| 2019 | Grade 4 | 2023 Mathematics | |||||
| 2019 | Grade 8 | 2023 Mathematics | |||||
| 2019 | Grade 12 | 2023 Mathematics | |||||
| 2019 | Grade 4 | 2023 Science | |||||
| 2019 | Grade 8 | 2023 Science | |||||
| 2019 | Grade 12 | 2023 Science |
| 2020 | Grade 8 | 2024 Arts | |
| 2020 | Grade 12 | 2024 Foreign Language | |
| 0 | |||
| 2022 | Grade 4 | 2025 Reading | |
| 2022 | Grade 8 | 2025 Reading | |
| 2022 | Grade 12 | 2025 Reading | |
| 2022 | Grade 4 | 2025 Mathematics | |
| 2022 | Grade 8 | 2025 Mathematics | |
| 2022 | Grade 12 | 2025 Mathematics | |
| 2022 | Grade 4 | 2025 Writing | |
| 2022 | Grade 8 | 2025 Writing | |
| 2022 | Grade 12 | 2025 Writing |
| 2023 | Grade 8 | 2026 U.S. History |
| 2023 | Grade 12 | 2026 U.S. History |
| 2023 | Grade 8 | 2026 Civics |
| 2023 | Grade 12 | 2026 Civics |
| 2023 | Grade 8 | 2026 Geography |
| 2023 | Grade 12 | 2026 Geography |
| 2023 | Grade 12 | 2026 Economics |
| 2023 | Grade 8 | 2026 Technology and Engineering Literacy |
| 2023 | Grade 12 | 2026 Technology and Engineering Literacy |
| 2024 | Grade 4 | 2027 Reading |
| 2024 | Grade 8 | 2027 Reading |
| 2024 | Grade 12 | 2027 Reading |
| 2024 | Grade 4 | 2027 Mathematics |
| 2024 | Grade 8 | 2027 Mathematics |
| 2024 | Grade 12 | 2027 Mathematics |
| 2024 | Grade 4 | 2027 Science |
| 2024 | Grade 8 | 2027 Science |
| 2024 | Grade 12 | 2027 Science |
ADD Any other studies that were included in the total 5-year cost submitted with your original proposal
Revised 12/6/18
&"Arial,Bold"&11Estimated Costs for Various Components of NAEP Assessments in 2008-2012
11. 1 Anticip. Cost Categories
| Exhibit 11-1. Anticipated Required Cost Categories for Contractor Monthly Cost Report (include separate columns for hours and dollars for each task with appropriate task label) and a summary column on the right. | ||||||||||||||||
| TASK 1 | TASK 2 | TASK 3 | TASK 4 | TASK 5 | Additional tasks as needed | SUMMARY | ||||||||||
| Direct Labor Costs | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | Hours | Cost | ||
| On-site Full-time Staff | ||||||||||||||||
| Staff categories such as | ||||||||||||||||
| Project Director | ||||||||||||||||
| Associate Director/Deputy Project Director | ||||||||||||||||
| Senior Manager/Supervisor | ||||||||||||||||
| Statistician | ||||||||||||||||
| Senior Programmer/Analyst | ||||||||||||||||
| Research Analyst | ||||||||||||||||
| Junior Programmer | ||||||||||||||||
| Research Assistant | ||||||||||||||||
| Other ____________ | ||||||||||||||||
| Other ____________ | ||||||||||||||||
| Other ____________ | ||||||||||||||||
| Admin/Clerical | ||||||||||||||||
| Total On-site Full-time Labor | ||||||||||||||||
| Part Time Staff | ||||||||||||||||
| Staff categories such as | ||||||||||||||||
| Supervisor | ||||||||||||||||
| Field data collector | ||||||||||||||||
| Clerical | ||||||||||||||||
| Research Analyst | ||||||||||||||||
| Senior Programmer/Analyst | ||||||||||||||||
| Research Assistant | ||||||||||||||||
| Admin/Clerical | ||||||||||||||||
| Other _________________ | ||||||||||||||||
| Other _________________ | ||||||||||||||||
| Total Part Time Labor | ||||||||||||||||
| Off-site Staff | ||||||||||||||||
| Staff categories such as | ||||||||||||||||
| Supervisor | ||||||||||||||||
| Field data collector | ||||||||||||||||
| Clerical | ||||||||||||||||
| Research Analyst | ||||||||||||||||
| Senior Programmer/Analyst | ||||||||||||||||
| Research Assistant | ||||||||||||||||
| Other _________________ | ||||||||||||||||
| Other _________________ | ||||||||||||||||
| Other _________________ | ||||||||||||||||
| Total Off-site Labor | ||||||||||||||||
| Total Labor | ||||||||||||||||
| Other Direct Costs | ||||||||||||||||
| Telephone | ||||||||||||||||
| Computing- hardware | ||||||||||||||||
| Computing- peripherals | ||||||||||||||||
| Computing- networks | ||||||||||||||||
| Computing-software development. | ||||||||||||||||
| Computing-COTS | ||||||||||||||||
| Copying | ||||||||||||||||
| Printing | ||||||||||||||||
| Postage/delivery | ||||||||||||||||
| Supplies | ||||||||||||||||
| Travel | ||||||||||||||||
| Consultants | ||||||||||||||||
| Meetings | ||||||||||||||||
| Subcontractors | ||||||||||||||||
| Outside Services | ||||||||||||||||
| Total Other Direct Costs | ||||||||||||||||
| Total Direct Costs |
| Indirect Costs | ||
| Overhead | ||
| Permanent/temp labor (__.00%) | ||
| Permanent/temp labor (__.00%) | ||
| Permanent/temp labor (__.00%) | ||
| Permanent/temp labor (other) | ||
| Field Labor (___%) | ||
| Consultants (___%) | ||
| Fringe Benefits (__%) | ||
| Fringe Benefits (__%) | ||
| Fringe Benefits (__%) | ||
| Total Overhead Costs |
Total Direct + Overhead
G&A (__%)
Total direct + indirect/ overhead, G&A
| Award Fee | |
| Respondent incentive/ reimbursements | |
| TOTAL COST [INCLUDING ALL FEES] |
Revised 12/6/18
11.2 Reporting Components
Exhibit 11-2. Reporting Components for NAEP Contractors
Reporting Component 1: Assessment Types
| TUDA assessments | |
| State assessments (exclusive of TUDA costs) | |
| National-only assessments | |
| Main assessment, including Long Term Trend (Operational) | |
| Pilot tests | |
| Field Tests | |
| Transcript Studies | |
| Special Studies (delineated by individual study*) |
Reporting Component 2: Subjects
| Reading |
| Mathematics |
| Science |
| Writing |
| U.S. History |
| Economics |
| Civics |
| Arts |
| LTT Mathematics |
| LTT Reading |
| Geography |
| TEL |
| Foreign Language |
Reporting Component 3: Grade
| Grade 4 |
| Grade 8 |
| Grade 12 |
Revised 12/6/18
11.3 Distrib. by Assess Type
11.3 Distribution of costs by Cost Component: Assessment Type
| Section A. Use for percentage distribution | ||||||||||
| By Type of Assessment, Percent Attributable to Each | ||||||||||
| Actual Dollars, Current Month | % TUDA Assessment | % State Assessment (minus TUDA) | % National Only, broken out by type | Total National Only | Show Sum to 100% | |||||
| LABOR | % Main | % Pilot | % Field | % Transcript Study | % Special Studies | |||||
| Total Permanent Labor | ||||||||||
| Total Part time Labor | ||||||||||
| Total Off-site Labor | ||||||||||
| TOTAL LABOR |
| Other Direct Costs |
| Travel |
| Computing |
| Consultants |
| Subcontractors |
| All other ODCs |
| TOTAL OTHER DIRECT COSTS |
| Section B. Use only for actual cost input (you may enter actual cost in relevant cell here INSTEAD of entering a percentage in the corresponding cell in Secion A) | |||||||||
| By Type of Assessment, Percent Attributable to Each | |||||||||
| Actual Dollars, Current Month | TUDA Assessment | State Assessment (minus TUDA) | National Only, broken out by type | Total National Only | |||||
| LABOR | Main | Pilot | Field | Transcript Study | Special Studies | ||||
| Total Permanent Labor | |||||||||
| Total Part time Labor | |||||||||
| Total Off-site Labor | |||||||||
| TOTAL LABOR |
| Other Direct Costs |
| Travel |
| Computing |
| Consultants |
| Subcontractors |
| All other ODCs |
| TOTAL OTHER DIRECT COSTS |
Revised 12/6/18
11.4 Distribution by Type Sub2
11.4 Distribution of costs by Cost Component: Subject (and session type)
| Section A. Use for percentage distribution | |||||||||||||||
| By Type of Assessment, Percent Attributable to Each | |||||||||||||||
| Actual Dollars, Current Month | % Arts | % LTT | % Reading | % Math | % Science | % Writing | % U.S. History | % Civics | % Geography | % Economics | % TEL | % Foreign Language | % TBD | Show Sum to 100% | |
| LABOR | |||||||||||||||
| Total Permanent Labor | |||||||||||||||
| Total Part time Labor | |||||||||||||||
| Total Off-site Labor | |||||||||||||||
| TOTAL LABOR |
| Other Direct Costs |
| Travel |
| Computing |
| Consultants |
| Subcontractors |
| All other ODCs |
| TOTAL OTHER DIRECT COSTS |
| Sec B. Use only for actual cost input (you may enter actual cost in relevant cell here INSTEAD of entering a percentage in the corresponding cell in Secion A) | ||||||||||||||
| By Type of Assessment, Percent Attributable to Each | ||||||||||||||
| Actual Dollars, Current Month | Arts | LTT | Reading | Math | Science | Writing | U.S. History | Civics | % Econ | % Geo | % TEL | % Foreign Language | % TBD | |
| LABOR | ||||||||||||||
| Total Permanent Labor | ||||||||||||||
| Total Part time Labor | ||||||||||||||
| Total Off-site Labor | ||||||||||||||
| TOTAL LABOR |
| Other Direct Costs |
| Travel |
| Computing |
| Consultants |
| Subcontractors |
| All other ODCs |
| TOTAL OTHER DIRECT COSTS |
| Revised 12/6/18 |
2019-24 Ann Expenditure Summary
| Offerors shall provide estimated costs for the Period depending on instructions to submit PROPOSAL | Full contract estimated amount here | $0 | ||||||||||||
| Contract Number | ||||||||||||||
| A | B | C | D | E | F | G | H | I | J | K | L | M | N | |
| Estimated Number of Hours for Entire Contract | Estimated Cost of Entire Contract | Budgeted Hours for FY19 | Budgeted Dollars for FY19 | Budgeted Hours for FY20 | Budgeted Dollars for FY20 | Budgeted Hours for FY21 | Budgeted Dollars for FY21 | Budgeted Hours for FY22 | Budgeted Dollars for FY22 | Budgeted Hours for FY23 | Budgeted Dollars for FY23 | Budgeted Hours for FY24 | Budgeted Dollars for FY24 | |
| Permanent staff | ||||||||||||||
| Project Director | 0 | 0 | ||||||||||||
| Associate Directors/Deputy project directors | 0 | 0 | ||||||||||||
| Senior Managers/supervisors | 0 | 0 | ||||||||||||
| Statisticians | 0 | 0 | ||||||||||||
| Senior Programmers/Analysts | 0 | 0 | ||||||||||||
| Research Analysts | 0 | 0 | ||||||||||||
| Junior Programmers | 0 | 0 | ||||||||||||
| Research Assistants | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Secretaries/administrative assistants/other clerical support | 0 | 0 | ||||||||||||
| Total Permanent Labor | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Temporary staff | ||||||||||||||
| Supervisors | 0 | 0 | ||||||||||||
| Field data collectors | 0 | 0 | ||||||||||||
| Clerical | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Total Temporary Labor | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Other Direct Costs | ||||||||||||||
| Telephone | 0 | |||||||||||||
| Computing | 0 | |||||||||||||
| Copying | 0 | |||||||||||||
| Printing | 0 | |||||||||||||
| Postage/delivery | 0 | |||||||||||||
| Supplies | 0 | |||||||||||||
| Travel | 0 | |||||||||||||
| Training/honoraria | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Total Other Direct Costs | 0 | 0 | 0 | 0 | 0 | 0 |
Total Direct Costs 0 0 0 0 0 0
| Overhead | ||||||
| Permanent labor (___%) | 0 | |||||
| Temporary labor (___%) | 0 | |||||
| Field Labor (___%) | 0 | |||||
| Consultants (___%) | 0 | |||||
| _______________ (___%) | 0 | |||||
| Total Overhead | 0 | 0 | 0 | 0 | 0 | 0 |
Total Direct + Overhead 0 0 0 0 0 0
| Total G&A (___%) | 0 | 0 | 0 | 0 | 0 | 0 |
| _______________ (___%) | 0 | |||||
| _______________ (___%) | 0 | |||||
| _______________ (___%) | 0 | |||||
| _______________ (___%) | 0 | |||||
| Total direct + indirect/overhead G&A | 0 | 0 | 0 | 0 | 0 | 0 |
| Fixed Fee (___%) | 0 | |||||
| Award fee (___%) | 0 | |||||
| Respondent incentive/reimbursements | 0 | |||||
| TOTAL COST [INCLUDING ALL FEE] | 0 | 0 | 0 | 0 | 0 | 0 |
Revised 12/6/18
To be submitted at the time of Cost Questions
2019-24 All Options Summary
| Offerors shall provide estimated costs for the Period depending on instructions to submit PROPOSAL | All options estimated amount | $0 | ||||||||||||
| Contract Number | ||||||||||||||
| A | B | C | D | E | F | G | H | I | J | K | L | M | N | |
| Estimated Number of Hours for Entire Contract | Estimated Cost of Entire Contract | Budgeted Hours for FY19 | Budgeted Dollars for FY19 | Budgeted Hours for FY20 | Budgeted Dollars for FY20 | Budgeted Hours for FY21 | Budgeted Dollars for FY21 | Budgeted Hours for FY22 | Budgeted Dollars for FY22 | Budgeted Hours for FY23 | Budgeted Dollars for FY23 | Budgeted Hours for FY24 | Budgeted Dollars for FY24 | |
| Permanent staff | ||||||||||||||
| Project Director | 0 | 0 | ||||||||||||
| Associate Directors/Deputy project directors | 0 | 0 | ||||||||||||
| Senior Managers/supervisors | 0 | 0 | ||||||||||||
| Statisticians | 0 | 0 | ||||||||||||
| Senior Programmers/Analysts | 0 | 0 | ||||||||||||
| Research Analysts | 0 | 0 | ||||||||||||
| Junior Programmers | 0 | 0 | ||||||||||||
| Research Assistants | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Secretaries/administrative assistants/other clerical support | 0 | 0 | ||||||||||||
| Total Permanent Labor | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Temporary staff | ||||||||||||||
| Supervisors | 0 | 0 | ||||||||||||
| Field data collectors | 0 | 0 | ||||||||||||
| Clerical | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Total Temporary Labor | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Other Direct Costs | ||||||||||||||
| Telephone | 0 | |||||||||||||
| Computing | 0 | |||||||||||||
| Copying | 0 | |||||||||||||
| Printing | 0 | |||||||||||||
| Postage/delivery | 0 | |||||||||||||
| Supplies | 0 | |||||||||||||
| Travel | 0 | |||||||||||||
| Training/honoraria | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Total Other Direct Costs | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total Direct Costs
| Overhead | |
| Permanent labor (___%) | 0 |
| Temporary labor (___%) | 0 |
| Field Labor (___%) | 0 |
| Consultants (___%) | 0 |
| _______________ (___%) | 0 |
| Total Overhead |
Total Direct + Overhead
| Total G&A (___%) | |
| _______________ (___%) | 0 |
| _______________ (___%) | 0 |
| _______________ (___%) | 0 |
| _______________ (___%) | 0 |
| Total direct + indirect/overhead G&A | |
| Award fee (___%) | 0 |
| Respondent incentive/reimbursements | 0 |
| TOTAL COST [INCLUDING ALL FEE] |
Revised 08/27/2018
To be submitted at the time of Cost Questions
2019-24 Option Template
| Offerors shall provide estimated costs for the Period depending on instructions to submit PROPOSAL | Option ________ (fill in option title here) | Full option estimated amount | $0 | |||||||||||
| Contract Number | ||||||||||||||
| A | B | C | D | E | F | G | H | I | J | K | L | M | N | |
| Estimated Number of Hours for Entire Contract | Estimated Cost of Entire Contract | Budgeted Hours for FY19 | Budgeted Dollars for FY19 | Budgeted Hours for FY20 | Budgeted Dollars for FY20 | Budgeted Hours for FY21 | Budgeted Dollars for FY21 | Budgeted Hours for FY22 | Budgeted Dollars for FY22 | Budgeted Hours for FY23 | Budgeted Dollars for FY23 | Budgeted Hours for FY24 | Budgeted Dollars for FY24 | |
| Permanent staff | ||||||||||||||
| Project Director | 0 | 0 | ||||||||||||
| Associate Directors/Deputy project directors | 0 | 0 | ||||||||||||
| Senior Managers/supervisors | 0 | 0 | ||||||||||||
| Statisticians | 0 | 0 | ||||||||||||
| Senior Programmers/Analysts | 0 | 0 | ||||||||||||
| Research Analysts | 0 | 0 | ||||||||||||
| Junior Programmers | 0 | 0 | ||||||||||||
| Research Assistants | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Other ____________ | 0 | 0 | ||||||||||||
| Secretaries/administrative assistants/other clerical support | 0 | 0 | ||||||||||||
| Total Permanent Labor | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Temporary staff | ||||||||||||||
| Supervisors | 0 | 0 | ||||||||||||
| Field data collectors | 0 | 0 | ||||||||||||
| Clerical | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Other _________________ | 0 | 0 | ||||||||||||
| Total Temporary Labor | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Other Direct Costs | ||||||||||||||
| Telephone | 0 | |||||||||||||
| Computing | 0 | |||||||||||||
| Copying | 0 | |||||||||||||
| Printing | 0 | |||||||||||||
| Postage/delivery | 0 | |||||||||||||
| Supplies | 0 | |||||||||||||
| Travel | 0 | |||||||||||||
| Training/honoraria | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Other _________________ | 0 | |||||||||||||
| Total Other Direct Costs | 0 | 0 | 0 | 0 | 0 | 0 |
Total Direct Costs 0 0 0 0 0 0
| Overhead | ||||||
| Permanent labor (___%) | 0 | |||||
| Temporary labor (___%) | 0 | |||||
| Field Labor (___%) | 0 | |||||
| Consultants (___%) | 0 | |||||
| _______________ (___%) | 0 | |||||
| Total Overhead | 0 | 0 | 0 | 0 | 0 | 0 |
Total Direct + Overhead 0 0 0 0 0 0
| Total G&A (___%) | 0 | 0 | 0 | 0 | 0 | 0 |
| _______________ (___%) | 0 | |||||
| _______________ (___%) | 0 | |||||
| _______________ (___%) | 0 | |||||
| _______________ (___%) | 0 | |||||
| Total direct + indirect/overhead G&A | 0 | 0 | 0 | 0 | 0 | 0 |
| Fixed Fee (___%) | 0 | |||||
| Award fee (___%) | 0 | |||||
| Respondent incentive/reimbursements | 0 | |||||
| TOTAL COST [INCLUDING ALL FEE] | 0 | 0 | 0 | 0 | 0 | 0 |
| Revised 08/27/2018 |
To be submitted at the time of Cost Questions
2019-24 Cost By Quarter Offerors shall provide estimated costs by quarter and cumulative costs for the Period depending on instructions to submit PROPOSAL
| Alliance | |||||||||||
| Planning and Coordination | Progam Support Management | Design, Analysis and Reporting | Item Development | Sampling and Data Collection | NAEP Support and Service Center | Materials, Distribution, Processing and Scoring | Web/Technology Development, Operations and Maintenance | NAEP Platform Development | NAEP Data Warehouse | Total |
Quarter beginning Estimate Cumulative Estimate Cumulative Estimate Cumulative Estimate Cumulative Estimate Cumulative Estimate Cumulative Estimate Cumulative Estimate Cumulative Estimate Cumulative Estimate Cumulative Estimate Cumulative
43647.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
43739.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
43831.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
43922.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44013.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44105.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44197.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44287.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44378.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44470.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44562.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44652.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44743.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44835.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
44927.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
45017.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
45108.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
45200.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
45292.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
| 45383.0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Jan-08 |
Apr-08
Jul-08
Oct-08
Jan-09
Apr-09
Jul-09
Oct-09
Jan-10
Apr-10
Jul-10
Oct-10
Jan-11
Apr-11
Jul-11
Oct-11
Jan-12
Apr-12
Revised 08/27/2018
&A
File details come from the government source that posted it.