This Addendum No. 1, issued by the Orlando Utilities Commission (OUC) on November 19, 2026, provides clarifications and responses to proposer questions regarding RFP 26-9198 for 2027-2028 Emergency Distribution, Transmission, and Substation Restoration Services. The addendum addresses thirteen substantive questions covering contract administration, pricing, bonding, labor classifications, and compliance requirements. Prospective proposers must acknowledge receipt of this addendum in their submittal to avoid having their proposals deemed non-responsive. The contract covers emergency restoration services for OUC's electrical system following hurricanes, tornadoes, or other disasters, with services encompassing distribution and transmission line repair, pole replacement, transformer replacement, and substation equipment restoration. The solicitation requires proposals to be submitted by December 16, 2026, with a pre-proposal meeting held on November 4, 2026. OUC anticipates awarding multiple contracts to ensure adequate qualified provider availability for emergency response operations. The contract term runs from the last date signed through May 31, 2029, with pricing submitted on a firm fixed-rate basis for both 2027 and 2028 service periods.
The addendum clarifies that proposers should submit both "with fuel" and "without fuel" rate columns, with actual fuel costs to be reimbursed either through direct provision by OUC fleet services or via receipts during final billing. Proposers may bid on one, two, or all three disciplines (Distribution, Transmission, and Substation), with omitted disciplines requiring no exceptions notation. Payment and Performance Bonds will be evaluated at time of service activation based on individual Purchase Order ceiling prices, with OUC reimbursing actual bond costs. Personnel travel time is billable according to the contractor's established pay policies, and equipment must be assigned to crews to be billable; idle equipment will not be reimbursed. OUC anticipates providing all necessary materials, eliminating the need for material pricing submissions. The addendum confirms that the General Terms and Conditions have been posted separately on VendorLink and that anti-lobbying certifications required by FEMA will be executed upon contract signature rather than submitted separately with proposals. All questions and communications regarding the RFP must be directed to the Buyer of Record, Cindy Luttfring, at cluttfring@ouc.com.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Procurementprocuregeneralservices_5.pdf | ||
| ADDENDA_ACKNOWLEDGEMENT.docx | DOCX document | |
| APPROVED___FEMA__Special_Terms_and_Conditions.pdf | ||
| Compliance_forms.pdf | ||
| RFP_26_9198_20272028_Emergency_Distribution_Transmission_and_Substation.pdf | ||
| 9198_Attachment_C.xlsx | XLSX spreadsheet | |
| 9198_Pricing_ScheduleApproved.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
November 19, 2026
To: All Prospective Proposers From: Cindy Luttfring, Buyer of Record Subject: Addenda No. 1
RFP 26-9198 – 2027-2028 Emergency Distribution, Transmission and Substation
The purpose of this Addenda is to address clarifications and questions in response to the subject solicitation.
The original solicitation documents shall remain in full force and effect, except as modified herein, which shall take precedence over any contrary provisions in the prior documents.
Proposer must acknowledge in their submittal that they have received this Addenda, or the offer may be considered non-responsive. If you have questions regarding this Addenda, please contact the buyer of record at cluttfring@ouc.com.
All questions and responses on the attached sheet
Reminder:
You must return the signed Addenda Acknowledgement, or your bid may be considered non-responsive. In other respects, except as specifically stated above, the subject request for Proposal remains unchanged.
Note:
There shall be no communication between the supplier, their employees or subcontractors concerning this RFP to anyone within OUC except the buyer of record.
mailto:cluttfring@ouc.com
Questions Answers
Cover Page / Page Headers (p. 1 and pp. 2–26) Which RFP number should bidders use on the Response Cover Page and in VendorLink: 26-9198 or 9120?
The correct number to use is RFP 26-9198
Attachment B, 2027 Overhead Distribution sheets (PDF pp. 31 and 33; Excel cell A3) What is the correct validity period for the 2027 rates: through May 31, 2028 (PDF) or through May 31, 2029 (Excel)?
as stated in the Pre-Proposal meeting, all contracts will be effective June 1, 2027 until May 31,2029. The 2027 price tab will be June 1, 2027 - May 31, 2028 and the 2028 price tab will be June 1,2028 - May 31,2029
Section 3.18, Payment and Performance Bond (p. 14) Where should the bond cost be stated as a separate line item, given that the price schedule template has no line for it? Would you please elaborate on how you anticipate the acquisition of the Payment and Performance Bond should the crew request be made?
Because storm response activations are event-driven and the scope, contract value, and bonding requirements cannot be determined in advance, the need for a Payment and Performance Bond will be evaluated and pursued at the time of activation. Should a bond be required, the Contractor will obtain the necessary bonding for the specific assignment.
Due to the unknown nature and timing of storm-related deployments, the exact bond cost cannot be established beforehand; therefore, OUC will be responsible for reimbursing the actual cost of the required bond.
Section 3.18, Payment and Performance Bond (p. 14) Will the bond amount be based on each Purchase Order's Ceiling Price?
yes
Attachment B-1, Pricing Requirements, opening bullets and Section C (p. 21), and Attachment B equipment tables. Section C states that "Fuel costs will be reimbursed at cost with receipt, or OUC may choose to provide fuel directly to Supplier." Please confirm that OUC will pay for all fuel used on OUC work, either by providing fuel directly or by reimbursing the Supplier at cost with receipts. If so, please confirm that bidders should complete only the "Hourly Rate without fuel included" column in Attachment B.
OUC fleet services fills all contractors vehicles every night at the host hotel (at OUC cost). Fuel needed to get to and from OUC are typically reimbursed with receipts as part of the final billing process.
Attachment A (p. 19) vs. Section 3.9 Exceptions (p. 11): We intend to propose on the Substation discipline only, using Non-Union labor only. Please confirm (a) that identifying the Substation discipline in Attachment C is sufficient and the omission of Distribution and Transmission does not need to be listed on the Exceptions Form, and (b) that the Union Substation sheets and the Distribution and Transmission sheets may be left blank or marked "N/A" without the proposal being considered non-responsive.
as stated in the Pre-Proposal meeting, you can submit on 1 discipline OR 2 disciplines OR all three.
RFP 26-9198 – 2027-2028 Emergency Distribution, Transmission and Substation
7 Attachment B-1, Section D – Travel: Section D addresses equipment travel en route. Is personnel travel time to and from OUC billable, and at which rate (standard or overtime per the Supplier's pay policy)?
Personnel travel time (to and from) is billable to OUC according to the pay policies outlined in their submission. In the event a contractor sends crews from multiple locations, OUC reserves the right to select which location we will use a point of origin for that utility. (with input from the responding utility)
Attachment A – Scope item J (p. 19): Please confirm the substation voltage classes in scope (69 kV, 115 kV and 230 kV), and whether testing, commissioning, and protection and control work are part of the Substation scope.
OUC has 69kV, 115kV, and 230kV substations. While we anticipate the majority of damage from a hurricane would be structural and making electrical connec
Attachment B-1, bullets and Section C (p. 21): One bullet states fuel is not separately reimbursable when FEMA equipment rates are used, while Section C states fuel will be reimbursed at cost with receipts. The template also includes both "with fuel" and "without fuel" columns. Should bidders complete both columns, and which governs billing?
Respondants should complete both columns.
Attachment A (p. 19) / Attachment B-1 Section C (p. 21): Material rates must be provided in the proposal, but the Price Schedule has no materials section. How and where should material pricing be submitted?
OUC anticipates providing all necessary materials
Sections 1.6 / 1.7 (p. 6) and Section 3.3.2 (p. 8): The General Terms and Conditions link appears broken ("wp-ontent"), and the Contract Sample link is not active. Please provide both documents, including the insurance requirements referenced in Section 3.3.2.
OUC General T/C were added as a separate document to VendoLink.
Attachment D (FEMA), Section X Byrd Anti-Lobbying: Is a separately signed anti-lobbying certification (and SF-LLL, if applicable) required with the proposal?
By executing this Contract, Contractor makes the certification below, which is found at APPENDIX A, 44 C.F.R. PART 18. Thus, we will not require an additional certification for Contracts, Grants, Loans, and Cooperative Agreements. Signature on the issued contract will suffice. If supplier cannot certify, then they need to note it in their exceptions.
Attachment B-1 Pricing Requirements – Can you specify more clearly what is meant by “idle equipment” in the Attachment B-1 Pricing Requirements under Section B.
Equipment?
OUC will not pay for idle equipment. All equipment must be assigned to a crew to be billable.