This is a 100% bid set of architectural and engineering construction documents for the replacement of a rooftop air handling unit (AHU), condenser unit (CU), and exhaust fan (EF-6B) at the Louis Stokes Cleveland VA Medical Center in Cleveland, Ohio. The project is identified as 541-25-504, Building 1, with an issue date of May 14, 2026.
The project scope includes removal of existing PoolPak AHU and condensing equipment, installation of new AHU-1 with associated refrigerant piping and condensate drainage, replacement of the rooftop wet exhaust fan with weatherproofing and structural support, and all necessary ductwork connections to existing systems. Mechanical work encompasses new vibration isolators, supports per manufacturer specifications, pressure testing and system evacuation, and gravity/backdraft dampers. Electrical work requires installation of three new 3R disconnects (100A for AHU, 15A for exhaust fan, 15A for condenser), new GFCI receptacles for wet locations, data outlets with conduit to IT room, new feeder circuits with appropriate wire sizing, and fire alarm duct detectors interconnected to the existing fire alarm system. The construction documents establish phased demolition and new work procedures with infection control risk assessment protocols for Class II construction, including negative air pressure maintenance, HEPA filtration, and barrier containment. All work must comply with VA HVAC, seismic, and fire protection guidelines, with commissioning and performance verification required upon completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Location
Issue Date
Project Number
Building NO.
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEERS:STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
FF
A/E:
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
NOT F
OR
CONSTRUCTIO
N
541-25-504
BLDG 1
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
05/14/2026
FLOOR NO.
ROOF
/1
/2
:3
:2
P
M A u to d e s k D o c s /2
A
E R
E P
L A
C E
R E
H A
B M
E D
IC
IN
E A
H U
C L E
V E
L A
N D
V A
M E
D
IC
A L C
E N
T E
R /2
A E
R E
P L
A C
E R
E H
A B
M E
D
IC
IN
E
A H
U C
L E
V E
L A
N D
V A
M E
D
IC
A L C
E N
T E
R
R
.r v t
GI001
PCMH
CLEVELAND VAMC
10701 EAST BLVD, CLEVELAND, OH 44106
AE REPLACE REHAB MEDICINE
AHU CLEVELAND VA MEDICAL
CENTER
COVER SHEET
Project Director
SHEET DESCRIPTION
GENERAL
GI001 COVER SHEET
ARCHITECTURAL
AD140 ARCHITECTURAL ROOF DEMOLITION PLAN
A140 ROOF PLAN
CLEVELAND , OHIO
NORTH
LOCATION MAP
PROJECT TEAM
ARCHITECTURE:
OWNER:
SEVEN GENERATIONS A+E
CLEVELAND VA
10701 EAST BLVD,
CLEVELAND, OH 44106
AE REPLACE REHAB MEDICINE AHU
CLEVELAND, OHIO
LOUIS STOKES CLEVELAND VA
MEDICAL CENTER
PROJECT LOCATION
MECHANICAL AND ELECTRICAL ENGINEERING:
DAVENERGY SOLUTIONS
STRUCTURAL ENGINEERING:
JUNKER GONZALEZ ENGINEERING GROUP
100% BID SET
MECHANICAL
M-001
MD-101
MH-101
MH-102
M-401
M-501
M-601
M-602
MECHANICAL COVER SHEET
MECHANICAL ROOF DEMOLITION PLAN
MECHANICAL BASEMENT NEW WORK PLAN
MECHANICAL ROOF NEW WORK PLAN
MECHANICAL SCHEDULES
MECHANICAL DETAILS
POOL UNIT CONTROLS DIAGRAM
ROOFTOP EXHAUST FAN CONTROLS DIAGRAM
ELECTRICAL
E-001
ED-101
EP-101
E-501
E-601
E-701
2207 GARNET AVE (I)
SAN DIEGO, CA 92109
PHONE: 619.770.8552
600 E MICHIGAN AVE, SUITE B
KALAMAZOO, MI 49007
PHONE: 269.927.0144
8285 LA MESA BLVD, SUITE C
LA MESA, CA 91942
PHONE: 858.215.3660
ELECTRICAL SYMBOLS, GENERAL NOTES AND ABBREVIATIONS
ELECTRICAL BASEMENT POWER PLANS - DEMO
ELECTRICAL POWER PLANS - DEMO
ELECTRICAL DETAILS
ELECTRICAL SINGLE LINE DIAGRAM
ELECTRICAL SCHEDULES
BID SET SUBMISSION 05/14/2026BID SET SUBMISSION 05/14/2026
Q
M
REMOVE EXISTING EXHAUST FAN
(EF-6B). ROOF CURB TO REMAIN.
REFER TO MECHANICAL DRAWINGS
EXISTING ROOF
DRAIN TO REMAIN
EXISTING POOL CONDENSER(S)
TO BE REMOVED. REFER TO
MECHANICAL DRAWINGS
EXISTING AIR HANDLING UNIT
TO BE REMOVED. REFER TO
MECHANICAL DRAWINGS
EXISTING MECHANICAL EQUIPMENT
CURB TO REMAIN. REMOVE
EXISTING FLASHING COMPLETE.
EXISTING MECHANICAL EQUIPMENT
SUPPORT RAIL CURB TO REMAIN.
REMOVE EXISTING FLASHING
COMPLETE ALL SIDES.
37 38
R
P
N
NOTE: EXISTING ROOF IS PROTECTED BY
ROOF PAVER TILES ON PEDESTALS.
CONTRACTOR TO PROTECT AND REPLACE IN
KIND ANY TILES THAT ARE INADVERTENTLY
DAMAGED WITH THIS PROJECT.
AD140
EXISTING VENT
TO REMAIN
EXISTING VENT TO REMAIN
REMOVE EXISTING FLASHING
COMPLETE.
EXISTING ROOF MOUNTED DUCTWORK (N.IC.)
EXISTING WALKWAY
PAD TO BE REMOVED,
SALVAGED AND
REINSTALLED
EXISTING PIPING TO
BE REMOVED; REFER
TO MECHANICAL
EXISTING ROOF PIPE
SUPPORT BLOCKS (4)
AND HARDWARE TO BE
REMOVED, SALVAGED
AND REINSTALLED WITH
NEW PIPING LAYOUT.
GENERAL DEMO NOTES
1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON
THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS AND ITEMS AS
REQUIRED TO FACILITATE NEW CONSTRUCTION.
2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS. IF CONDITIONS DO NOT REFLECT
WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY THE
ARCHITECT.
3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF CONSTRUCTION
DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING
WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF DUMPSTERS
TO BE DETERMINED BY COR WITH CONTRACTORS INPUT.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS. DO NOT
ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO
ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER.
NO ONSITE SALE OR BURNING OF REMOVED ITEMS IS PERMITTED.
6. CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE
PUBLIC AND/OR WORKERS ON THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY
PERSON ON, ABOUT OR ADJACENT TO THE PREMISES. THE CONTRACTOR SHALL COMPLY
WITH ALL LAWS, ORDINANCES, CODES AND REGULATIONS PERTAINING TO SAFETY AND
THE PREVENTION OF ACCIDENTS.
7. CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION, WATERPROOFING,
EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE
TO REMAIN. PROVIDE TEMPORARY MEASURES TO KEEP THE ELEMENTS OUT OF THE
EXISTING BUILDING
8. OWNER RESERVES THE RIGHT TO ANY REMOVED MATERIALS OR ITEMS. CONTRACTOR TO
COORDINATE WITH OWNER.
9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD
CHANGE THEIR LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.
10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION. PREPARE FOR NEW
CONSTRUCTION AS REQUIRED.
11. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS WITH A
ONE-HOUR FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST BARRIER. TEMPORARILY SEAL
OFF ALL RETURN & SUPPLY AIR DIFFUSERS IN CONSTRUCTION AREA. PROVIDE
RECIRCULATING HEPA FILTER IN CONSTRUCTION AREA. ALL DEMOLISHED MATERIAL IS TO
BE REMOVED FROM SITE IN A COVERED CONTAINER. MAINTAIN NEGATIVE AIR PRESSURE
WITHIN CONSTRUCTION ZONE.
12. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION, CONTRACTOR
SHALL CONTACT OWNER FOR ABATEMENT.
13. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED
DURING DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING
WARRANTIES.
14. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.
15. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL APPLIED FIREPROOFING MATERIAL
IN AREAS LEFT UNPROTECTED DUE TO REMOVAL OF EXISTING ELEMENTS OR AREAS
DAMAGED DURING NEW WORK AND DEMOLITION. MATCH EXISTING FIREPROOFING
MATERIAL TYPE AND THICKNESS TO MAINTAIN EXISTING LEVEL OF PROTECTION.
KEY PLAN
PROJECT
LOCATION
N
INFECTION CONTROL RISK ASSESSMENT NOTES -
CLASS II
DURING CONSTRUCTION PROJECT
UPON COMPLETION OF PROJECT
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS
BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD,
PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH
HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. NEGATIVE PRESSURE MONITORING DEVICES SHOULD BE
VISIBLE FROM OUTSIDE THE WORKSITE AND READINGS SHOULD
BE DOCUMENTED AS LEAST DAILY.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
6. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT OF
WORK AREA.
7. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN
COVERED CONTAINERS
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PROJECT IS INSPECTED BY THE SAFETY
DEPARTMENT AND INFECTION PREVENTION & CONTROL AND
THOROUGHLY CLEANED BY THE ENVIRONMENTAL
MANAGEMENT SERVICE.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
4. WET MOP AREA WITH CLEANER/DISINFECTANT.
5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK
WAS PERFORMED.
REMOVE COMPLETE EXISTING FLASHING
AND ALL ATTACHMENTS IF NEEDED
REMOVE EXISTING SURROUNDING
ROOF TILES AND PLATE STEEL AS
REQUIRED, REINSTALL.
EXISTING ROOF MEMBRANE TO REMAIN
AND BE PROTECTED DURING DEMOLITION
AND INSTALLATION OF EQUIPMENT.
PATCH AND REPAIR AS REQUIRED.
REFER TO MECHANICAL FOR FURTHER
COMPLETE DEMOLITION SCOPE
VIF VIF
FIRE AND SAFETY NOTES
1. MAINTAINING THE INTEGRITY OF THE FIRE AND SAFETY SYSTEMS IN
PLACE IN THE MEDICAL CENTER AND ALL OF ITS OUT BUILDINGS
DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE
GENERAL CONTRACTOR.
2. IN ADDITION TO ALL VA MEDICAL CENTER POLICIES, ALL NATIONAL,
STATE, AND LOCAL CODES AND ORDINANCES SHALL APPLY TO ALL
OF THEIR CONTRACTORS AND SUB-CONTRACTORS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL
PERTINENT OSHA SAFETY REQUIREMENTS.
4. PROVIDE LOCKOUT-TAGOUT AND CONFINED SPACE ENTRY POLICIES
AS APPLICABLE AND AS REQUIRED BY OSHA. THESE POLICIES SHALL
BE SUBMITTED FOR PRIOR APPROVAL BY THE VA SAFETY OFFICER /
COR.
5. SUBMIT APPROPRIATE INTERIM LIFE SAFETY MEASURES. REFER TO
SPECIFICATION 01 01 10 FOR MORE INFORMATION.
6. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS OF NON-
COMBUSTIBLE MATERIALS WHICH PROVIDE A SMOKE TIGHT
SEPARATION BETWEEN THE CONSTRUCTION AREAS AND ALL OTHER
OCCUPIED AREAS. MAINTAIN INTEGRITY OF THE ENCLOSURE DURING
THE CONSTRUCTION. REFER TO SPECIFICATION SECTION 00 01
10-1HR.
7. EXISTING FIRE PROTECTION SYSTEMS, INCLUDING FIRE ALARM
SYSTEMS, SMOKE DETECTION SYSTEMS, AND SPRINKLER SYSTEMS SHALL
NOT BE IMPAIRED DURING CONSTRUCTION. SMOKE DETECTOR
DISABLE REQUESTS: OUTAGE REQUESTS TO BE SUBMITTED TO FM
ENGINEER FOR APPROVAL FOR SPECIFIC DATE AND TIME. ALARMS
WILL ONLY BE TURNED OFF FOR SPECIFIC SHIFTS REQUESTED AND
WHEN CONTRACTORS ARE IN THE CONSTRUCTION AREA. ALARMS
WILL BE RESTORED AT THE END OF THE WORK DAY BY CALLING THE
SAME EXTENSION. AT NO TIME WILL ALARMS REMAIN OFF
OVERNIGHT. SMOKE DETECTORS AND OR SPRINKLER HEADS: DO NOT
COVER BY BAGS, TAPE, AND PLASTIC OR IN ANY OTHER MANNER
THAT WILL DEFEAT THEIR ABILITY TO SENSE SMOKE OR HEAT AND
OPERATE AS DESIGNED.
8. DAILY ACCUMULATIONS OF TRASH, COMBUSTIBLE MATERIALS,
PACKAGING, AND DEBRIS SHALL BE REMOVED FROM THE
CONSTRUCTION AREA ON A DAILY BASIS. FLAMMABLE MATERIALS
MAY BE STORED ON SITE IN AN APPROVED AND APPROPRIATELY
MARKED FLAMMABLE MATERIALS CABINET.
9. THE LOUIS STOKES VA MEDICAL CENTER IS A TOBACCO FREE ZONE.
USE OF TOBACCO PRODUCTS IS PROHIBITED,
1. PATCH AND REPAIR ALL AREAS AFFECTED BY DEMO AND / OR
CONSTRUCTION TO MATCH EXISTING. PATCHED AREAS ARE TO
RECEIVE FINISHES AND TRIM TO MATCH ADJACENT AREA, EXCEPT AS
NOTED IN THE ROOM FINISH SCHEDULE. PATCH CEILINGS AND
FLOORS TO ACHIEVE A CONTINUOUS FINISHED APPEARANCE.
2. ALL EQUIPMENT TO BE DISCONNECTED AND REMOVED BY
CONTRACTOR. VA TO BE NOTIFIED WHEN EQUIPMENT IS AVAILABLE
AND BE GIVEN THE OPTION TO TAKE POSSESSION OF ALL EQUIPMENT.
CONTRACTOR TO DISPOSE OF ALL EQUIPMENT THE VA DOES NOT
WANT AND REMOVE ALL ITEMS WITH EXTREME CARE.
3. REMOVE, RELOCATE, STORE AND REINSTALL PORTABLE EQUIPMENT
WHICH WOULD INTERFERE WITH DEMOLITION WORK.
4. REFER TO SPECIFICATIONS FOR SHORING REQUIREMENTS WHERE
DEMOLITION WORK AFFECTS THE STRUCTURAL INTEGRITY OF WALLS
OR FLOORS. IF NOT SO INDICATED IN SPECIFICATIONS,
CONTRACTOR SHALL SUBMIT SHORING PLAN AND SHOP DRAWINGS
SIGNED BY AN ENGINEER FOR VA APPROVAL. ALL SHORING IS
CONTRACTOR'S RESPONSIBILITY.
5. PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY DAMAGED
SURFACES SHALL BE REPLACED TO MATCH ORIGINAL ITEM OR
REPAIRED TO MATCH EXISTING OR ADJACENT MATERIAL AS
APPROVED BY THE VA COR.
6. VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR TO
SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL NOT RELIEVE THIS
CONTRACTOR FROM PERFORMING THE WORK REQUIRED UNDER THIS
CONTRACT.
7. ALL SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND ATTEND A
PRE-BID WALK THRU TO INSPECT THE EXISTING AREA AND
THOROUGHLY FAMILIARIZE THEMSELVES WITH ACTUAL JOB
CONDITIONS BEFORE SUBMITTING BID.
8. WHILE THE SIZE AND LOCATION OF NEW WORK AND EQUIPMENT IN
THE EXISTING AREA HAS BEEN INDICATED ON THE DRAWINGS AS
ACCURATELY AS POSSIBLE, CONTRACTOR SHALL ADJUST THEIR WORK
AS REQUIRED TO AVOID EXISTING UTILITIES, GAS LINES, SEWER, FIRE
ALARM, ROOF DRAINS, ACCESS COVERS, AND OTHER STRUCTURES
NOT PARTICULARLY SHOWN ON THE PLAN AT NO ADDITIONAL COST.
BEFORE CONSTRUCTION, INSPECT PREMISES MAKE A DETAILED
EXAMINATION OF ALL LOCATIONS WHERE NEW WORK IS TO BE
INSTALLED, EXAMINE EXISTING PIPING, CONDUITS, STRUCTURAL
SUPPORTING BEAMS, AND OTHER CONDITIONS.
9. DISCONNECT AT SOURCE AND REMOVE EXISTING MECHANICAL AND
ELECTRICAL MATERIALS AND EQUIPMENT WHICH ARE RENDERED
OBSOLETE BY THESE ALTERATIONS AND ADDITIONS. VA TO BE GIVEN
THE OPTION TO TAKE POSSESSION OF REMOVED EQUIPMENT AND
MATERIALS. ANY EQUIPMENT THAT THE VA DOES NOT WANT ARE THE
PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE
SITE. NO MECHANICAL, ELECTRICAL, PLUMBING EQUIPMENT, ETC.
SHALL BE ABANDONED IN PLACE.
10. DISCONNECT, REMOVE AND RELOCATE EXISTING MECHANICAL AND
ELECTRICAL MATERIALS AND EQUIPMENT WHICH INTERFERE OR ARE
INTERFERED WITH, OBSTRUCT OR ARE OBSTRUCTED BY, THESE
ALTERATIONS AND ADDITIONS. PERMANENTLY INSTALL SUCH ITEMS IN
NEW LOCATIONS AS DIRECTED. RECONNECT SUCH ITEMS IN PROPER
OPERATING CONDITION AT NEW LOCATIONS.
11. DO NOT INTERFERE WITH EXISTING BUILDING'S MECHANICAL,
ELECTRICAL, AND SECURITY SYSTEMS OPERATIONS. IF IT IS
ABSOLUTELY NECESSARY TO SHUT DOWN FACILITY SYSTEMS AT ANY
TIME, CONSULT COR TO MAKE ARRANGEMENTS TO DO SO ON OFF
WORKING HOUR PERIODS AT THE OWNER'S CONVENIENCE. PRIOR
NOTICE SHALL BE GIVEN TO THE COR IN WRITING (21) DAYS IN
ADVANCE OF THE DESIRED SHUT-DOWN TIME. ANY PREMIUM OR
OVERTIME COSTS NECESSARY TO ACCOMPLISH THE ABOVE SHALL BE
INCLUDED IN THIS BID. FAILURE TO PROCEED WITHOUT PROPER
PRIOR NOTIFICATION MAY RESULT IN THE ASSESSMENT OF A CREDIT
TO THE CONTRACT.
12. IN ALL CONSTRUCTION ZONES AND AREAS, CONTRACTOR
RESPONSIBLE FOR MAINTAINING AN ACTIVE STROBE SPEAKER SYSTEM
AT ALL TIMES. TYPICAL FOR ALL CONSTRUCTION ZONES FOR ALL
BUILDINGS.
GENERAL CONSTRUCTION NOTES
SECURITY NOTES
1. NO TOOLS OR EQUIPMENT TO BE LEFT UNATTENDED.
2. CONTRACTOR TO PROVIDE TEMPORARY SECURITY WALLS IN HIGH
SECURITY AREAS.
3. CONTRACTOR VA IDENTIFICATION TO BE DISPLAYED AT ALL TIMES ON
PERSON.
4. TOOLS AND EQUIPMENT NOT NEEDED FOR TASKS AT HAND TO BE
STORED OFF SITE.
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Location
Issue Date
Project Number
Building NO.
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEERS:STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
FF
A/E:
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
NOT F
OR
CONSTRUCTIO
N
541-25-504
BLDG 1
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
05/14/2026
FLOOR NO.
ROOF
/1
/2
:4
:5
P
M A u to d e s k D o c s /2
A
E R
E P
L A
C E
R E
H A
B M
E D
IC
IN
E A
H U
C L E
V E
L A
N D
V A
M E
D
IC
A L C
E N
T E
R /2
A E
R E
P L
A C
E R
E H
A B
M E
D
IC
IN
E
A H
U C
L E
V E
L A
N D
V A
M E
D
IC
A L C
E N
T E
R
R
.r v t
AD140
PCMH
CLEVELAND VAMC
10701 EAST BLVD, CLEVELAND, OH 44106
AE REPLACE REHAB MEDICINE
AHU CLEVELAND VA MEDICAL
CENTER
ARCHITECTURAL ROOF DEMOLITION PLAN
Approver
NORTH
SCALE: 1/4" = 1'-0"
DEMOLITION ROOF PLANSCALE: 3/4" = 1'-0"1
TYPICAL DEMO SECTION
INSTALL NEW EXHAUST FAN ON
EXISTING ROOF CURB. REFER
TO MECHANICAL DRAWINGS
EXISTING ROOF DRAIN TO REMAIN
NEW MECHANICAL EQUIPMENT.
REFER TO MECHANICAL DRAWINGS
FOR MORE INFORMATION.
Q
M
PATCH AND REPAIR ROOF MEMBRANE AS
NECESSARY AFTER EQUIPMENT
DEMOLITION IS COMPLETE. REFER TO
SPECIFICATIONS FOR FLASHING
COMPONENTS, FASTENERS, AND SEALANTS.
PROVIDE NEW SHEET METAL CAP FLASHING w/ DRIP
EDGE FOR EXISTING-TO-REMAIN SUPPORT RAILS.
ENSURE FLASHING PROVIDES A WATERTIGHT SEAL AT
THE CONNECTION TO THE CURB. REFER TO
MECHANICAL DRAWINGS FOR MORE INFORMATION.
37 38
R
P
N
PROVIDE NEW SHEET METAL CAP FLASHING w/ DRIP
EDGE AND CURB ADAPTER FOR EXISTING-TO-REMAIN
EQUIPMENT CURB. FIELD VERIFY SIZE AND LOCATION OF
DUCT PENETRATIONS PRIOR TO FABRICATION. ENSURE
FLASHING PROVIDES A WATERTIGHT SEAL AT THE
CONNECTION TO THE CURB. REFER TO MECHANICAL
DRAWINGS FOR MORE INFORMATION.
EXISTING VENT TO REMAIN
EXISTING ROOF MOUNTED DUCTWORK (N.IC.)
A140
PROVIDE NEW CONTINUOUS
FLASHING w/ DRIP EDGE
PATCH AND REPAIR ROOF MEMBRANE AS
NECESSARY AFTER EQUIPMENT
DEMOLITION IS COMPLETE. REFER TO
SPECIFICATIONS FOR FLASHING
COMPONENTS, FASTENERS, AND SEALANTS.
EXISTING REINSTALLED WALKWAY PADS
EXISTING REINSTALLED ROOF PIPE
SUPPORT BLOCKS (4), PROVIDE
NEW HARDWARE FASTENERS.
EXISTING VENT
TO REMAIN
NEW FLASHING w/ DRIP SET IN SEALANT
REINSTALL EXISTING SURROUNDING ROOF
TILES AND PLATE STEEL AS REQUIRED.
EXISTING ROOF MEMBRANE TO REMAIN
AND BE PROTECTED DURING
INSTALLATION OF EQUIPMENT. PATCH
AND REPAIR AS REQUIRED.
REFER TO MECHANICAL FOR COMPLETE
NEW WORK SCOPE AND EQUIPMENT TO
BE INSTALLED
VIF VIF
PROVIDE NEW FIRE RETARDANT WOOD
BLOCKING TO REPLACE ANY DAMAGED
SECTIONS. MATCH EXISTING WIDTH (VIF)
NEW CURB ADAPTER; REFER TO
MECHANICAL
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Location
Issue Date
Project Number
Building NO.
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEERS:STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
FF
A/E:
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
NOT F
OR
CONSTRUCTIO
N
541-25-504
BLDG 1
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
05/14/2026
FLOOR NO.
ROOF
/1
/2
:4
:3
P
M A u to d e s k D o c s /2
A
E R
E P
L A
C E
R E
H A
B M
E D
IC
IN
E A
H U
C L E
V E
L A
N D
V A
M E
D
IC
A L C
E N
T E
R /2
A E
R E
P L
A C
E R
E H
A B
M E
D
IC
IN
E
A H
U C
L E
V E
L A
N D
V A
M E
D
IC
A L C
E N
T E
R
R
.r v t
A140
PCMH
CLEVELAND VAMC
10701 EAST BLVD, CLEVELAND, OH 44106
AE REPLACE REHAB MEDICINE
AHU CLEVELAND VA MEDICAL
CENTER
ROOF PLAN
Approver
NORTH
SCALE: 1/4" = 1'-0"
ROOF PLAN
NORTH
SCALE: 3/4" = 1'-0"
TYPICAL NEW WORK SECTION
Scale: NTS
Department of Veteran Affairs
EXHAUST
EQUIPMENT
PIPING
RETURN
RELOCATE
REVISION
SUPPLY
TEXT
BACKGROUND
EXISTING
SCOPE
COLUMN LINE
MECHANICAL LAYERS MECHANICAL SYMBOLS
S-#
NECK SIZE
CFM
(TYP. #)
SUPPLY CEILING DIFFUSER
S-#
SLOTS-SLOT WIDTH-LENGTH
CFM
(TYP. #)
S-# LxW
CFM
(TYP. #)
SUPPLY SIDEWALL DIFFUSER
SUPPLY LINEAR DIFFUSER
B#-FC-# EQUIPMENT TAG (BUILDING NO -
EQUIP NAME - EQUIP NUMBER)
FSD
REVISION DELTAS
T STATS
FIRE SMOKE DAMPER
SHEET NOTES
CO2 SENSORCO2
TVAV-1
SMOKE DETECTOR
ROOM PRESSURE MONITORP
RELOCATE
GENERAL NOTES
1. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL
BE EXERCISED TO MINIMIZE ALL INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF
THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS
OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN THE
CONSTRUCTION AREA.
2. NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN
WITHOUT PRIOR REVIEW WITH THE COR AND/OR ENGINEER TO CONFIRM THAT AREAS TO
REMAIN IN OPERATION WILL NOT BE AFFECTED. IF AREAS NOT WITHIN THE SCOPE OF
WORK ARE AFFECTED BY ANY SHUTDOWN, REMOVAL OR DISCONNECTION, SUFFICIENT
ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER INDICATING WHICH AREAS WILL BE
AFFECTED, WHEN THE PROPOSED SHUTDOWN WILL OCCUR, AND FOR HOW LONG A
PERIOD OF TIME.
3. ALL ITEMS INDICATED AS BEING DEMOLISHED OR REMOVED SHALL BE DISPOSED OF
OFF-SITE.
4. THE MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO PROCEEDING WITH ALL WORK. WHERE DISCREPANCIES OCCUR
BETWEEN THESE DOCUMENTS AND EXISTING CONDITIONS, THE DISCREPANCY SHALL BE
REPORTED TO THE COR AND/OR ENGINEER FOR RESOLUTION.
5. ALL SHUT DOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE
COR PRIOR TO COMMENCEMENT OF SAID WORK.
6. CLEAN THE JOB SITE DAILY AND REMOVE FROM THE PREMISES ALL DIRT AND DEBRIS
CAUSED BY THE PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT.
7. USE OF THE OWNER'S ELEVATORS AND BUILDING CORRIDORS FOR THE HANDLING OF
NEW AND/OR REMOVED EQUIPMENT AND MATERIALS SHALL BE AT THE DIRECTION OF THE
COR AND SHALL BE COORDINATED WITH HIS OPERATIONS.
8. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF HIS
OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR
PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS.
9. EXCEPT WHERE INDICATED AS BEING RELOCATED, EXISTING MATERIALS THAT ARE
REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS.
10. PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FOR
PIPING/DUCTWORK. DO NOT LEAVE PIPING/DUCTWORK OPEN ENDED.
11. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL".
12. THE MECHANICAL CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER TRADES
PRIOR TO FABRICATION, PURCHASE AND/OR INSTALLATION OF ANY WORK.
13. THE BALANCING CONTRACTOR SHALL TAKE AIRFLOW (CFM) AND PRESSURE READINGS
PRIOR TO THE START OF WORK ON ALL DUCTWORK THAT SERVES AREAS NOT PART OF
THIS PROJECT BUT WHERE AIRFLOW TO THOSE AREAS IS AFFECTED BY THIS PROJECT'S
WORK. AFTER MODIFICATIONS TO AIR SYSTEMS COVERED UNDER THIS PROJECT ARE
COMPLETED, THE BALANCING CONTRACTOR SHALL BALANCE THE NON-AFFECTED AREAS
TO THEIR ORIGINAL AIRFLOW AND PRESSURE OR NEW AIRFLOW AND PRESSURE IF
NOTED.
14. IF MECHANICAL CONTRACTOR ENCOUNTERS WHAT APPEARS TO BE A HAZARDOUS OR
QUESTIONABLE MATERIAL, HE SHALL DISCONTINUE WORK IMMEDIATELY AND CONTACT
THE OWNER'S REPRESENTATIVE.
15. USE OF OWNER'S UTILITIES (I.E. ELECTRICITY, WATER, HVAC, ETC.) FOR WORK INDICATED
ON THESE DOCUMENTS SHALL BE APPROVED BY THE COR PRIOR TO COMMENCEMENT OF
SAID WORK.
16. THE MECHANICAL CONTRACTOR SHALL CONFORM TO OWNER'S SAFETY AND SECURITY
GUIDELINES IN THE PERFORMANCE OF ALL WORK INCLUDED IN THIS CONTRACT.
17. ALL BRANCH PIPING SHALL BE FURNISHED WITH SHUT OFF VALVES AND SHALL BE
LOCATED IN ACCESSIBLE LOCATION BY OFFSETTING BRANCH PIPING WITH VALVES DOWN
NEAR CEILING. PROVIDE ACCESS PANEL FOR ALL VALVES AND EQUIPMENT IN NON
ACCESSIBLE CEILING AREAS.
18. ALL SUSPENDED PIPING, DUCTWORK, CONDUIT AND CABLE TRAYS SHALL BE PROVIDED
WITH, SEISMIC SWAY BRACES IN ACCORDANCE WITH THE MASON INDUSTRIES SEISMIC
RESTRAINT GUIDELINES FOR SUSPENDED PIPING, DUCTWORK AND ELECTRICAL SYSTEMS
AND THE APPLICABLE CODES. INSTALLED SYSTEM SHALL MATCH EXISTING, RIGID OR
CABLE TYPE.
19. ALL INDIVIDUAL INLET DUCTS TO CONSTANT AIR VOLUME BOXES (CAV) OR VARIABLE AIR
VOLUME BOXES (VAV) SHALL BE SAME SIZE AS INLET CONNECTION OF CAV BOX, UNLESS
NOTED OTHERWISE.
20. ALL INDIVIDUAL BRANCH PIPING TO CONSTANT AIR VOLUME BOXES (CAV) OR VARIABLE
AIR VOLUME BOXES (VAV) SHALL BE 3/4" IN SIZE, UNLESS NOTED OTHERWISE.
21. PRIOR TO ANY MODIFICATIONS OF EXISTING DUCT SYSTEMS, TEST EXISTING AIRFLOWS
AT TRAVERSE POINTS NOTED IN DRAWINGS AND SUBMIT TO ENGINEER FOR REVIEW.
TEST REPORT SHALL INDICATE EXISTING CONDITION AIRFLOW VALUES. UPON
COMPLETION OF NEW SYSTEMS, WITHIN THE SCOPE OF THE PROJECT, ALL PREVIOUSLY
TESTED SYSTEM AIRFLOWS SHALL BE SET TO ORIGINAL CONDITIONS.
22. GENERAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES ARE INDICATED ON AIR
CONDITIONING PLANS. REFERENCE ARCHITECTURAL REFLECTED CEILING PLANS AND
INTERIOR ELEVATIONS FOR SPECIFIC LOCATIONS.
23. RESTORE EXISTING FIRE PROOFING TO BEAMS, DECKS AND ALL OTHER BUILDING
ELEMENTS WHICH ARE DISTURBED OR MODIFIED AS A RESULT OF NEW WORK BEING
INSTALLED. RESTORED CONDITIONS SHALL MATCH EXISTING PRIOR TO NEW WORK BEING
PERFORMED.
24. ALL EXISTING DUCT INSULATION REMOVED, AS REQUIRED TO PERFORM SCOPE OF WORK,
SHALL BE REPAIRED USING LIKE MATERIAL TO THAT WHICH IS EXISTING.
25. DUCT ROUTINGS ARE DIAGRAMMATIC IN NATURE. PROVIDE OFFSETS, DROPS AND RISERS
AS NECESSARY TO AVOID EXISTING ELECTRICAL, HVAC, PLUMBING, FIRE PROTECTION,
ETC. SYSTEMS WHICH MAY INTERFERE WITH GENERAL ROUTING SHOWN ON DRAWINGS.
RESIZING OF DUCTS WILL BE ALLOWED PROVIDED REVISED DUCT SIZE DOES NOT EXCEED
AIR VELOCITIES OF SYSTEM DESIGN AND DRAWING IS SUBMITTED FOR REVIEW, NOTING
CHANGES PROPOSED, PRIOR TO DUCT SYSTEM FABRICATION AND INSTALLATION.
26. VERIFY EXISTING DUCT SYSTEM SIZES PRIOR TO FABRICATION OF NEW DUCT SYSTEMS.
ANY EXISTING DUCT SYSTEMS DIFFERING IN SIZE FROM THAT NOTED ON DRAWINGS
SHALL BE BROUGHT TO THE ATTENTION OF THE COR AND MECHANICAL ENGINEER.
27. PROVIDE INSULATION OVER EXISTING DUCT SECTIONS WHICH HAVE BEEN PATCHED.
INSULATION TYPE, THICKNESS AND DENSITY SHALL MATCH EXISTING. SEE
SPECIFICATIONS FOR REQUIREMENTS OF NEW DUCT SYSTEM INSULATION.
28. NOT ALL SYMBOLS, ABBREVIATIONS AND EQUIPMENT ABBREVIATIONS INDICATED APPEAR
ON THESE CONTRACT DRAWINGS
29. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A
FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.
30. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.
DUCT SIZES ARE NET INSIDE DIMENSIONS.
31. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,
DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH
MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
32. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL
UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING.
33. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD
EQUIPMENT DETAILS.
34. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
35. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO
PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
36. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED
WITH BOTTOM ELEVATION OF REGISTER AT 7" ABOVE FINISHED FLOOR.
37. ALL PRESSURES LISTED ARE GAGE PRESSURE, UNLESS OTHERWISE NOTED.
38. TERMINAL AIR UNIT INLET SIZES SHALL BE THOSE SHOWN ON THE SCHEDULES, UNLESS
OTHERWISE NOTED.
VAV BOX
VAV BOX WITH REHEAT COIL
CEILING DIFFUSER (SUPPLY, RETURN,
EXHAUST)
RETURN/EXHAUST AIR SIDEWALL
DIFFUSER
DEMOLITION CEILING DIFFUSER
ELBOW (1R UNLESS OTHERWISE
NOTED)
MITERED ELBOW WITH TURNING VANES
CONICAL TAP
RISER
VOLUME DAMPER
POINT OF CONNECTION
CAP
HEPA DIFFUSERS
SUPPLY AIR SIDEWALL DIFFUSER
X
X
X
X XX
X
X
X
X
X
X
EXISTING CEILING DIFFUSER
PIPE UP
PIPING SYMBOLS
PIPE DOWN
TEE
FLOW DIRECTION
FLOOR DRAIN
FLOOR SINK
PUMP
REDUCER
ANGLED GLOBE
AUTOMATIC BALANCING CONTROL
BALANCING
BALL
BUTTERFLY
CHECK
CIRCUIT SETTER
CONTROL - FLOAT OPERATED
FLOW METER
GATE
GLOBE
M
MODULATING CONTROL
ABBREVIATIONS
TABLE OF CONTENTS
DWG # DWG TITLE
M-001 MECHANICAL COVER SHEET
M-401 MECHANICAL SCHEDULES
MD-101 MECHANICAL ROOF DEMOLITION PLAN
MH-101
M-501 MECHANICAL DETAILS
GENERAL DEMOLITION NOTES
1. SCHEDULE ALL SHUTDOWNS THAT AFFECT UTILITIES AND PORTIONS OF THE BUILDING
THAT MUST REMAIN IN OPERATION WITH THE COR .
2. DEMOLITION WORK AT ALL TIMES SHALL BE SUBJECT TO THE DIRECTION AND APPROVAL
OF THE COR AND CARRIED OUT IN SUCH A MANNER SO AS NOT TO INTERFERE WITH THE
NORMAL OPERATION OF THE BUILDING.
3. DISPOSE OF ALL REMOVED MATERIALS IN AN APPROVED MANNER.
4. ISOLATE, DRAIN, AND REFILL EXISTING SYSTEMS AS REQUIRED TO ACCOMMODATE
INSTALLATION OF EXISTING AND NEW SYSTEMS.
5. PROVIDE ALL NECESSARY TEMPORARY/PERMANENT CAPS OR PLUGS FOR PIPING. DO
NOT LEAVE PIPING OPEN ENDED.
6. ALL EXISTING PIPING SHALL BE FIELD VERIFIED FOR PROPER DEMOLITION. CONTRACTOR
SHALL NOTIFY THE COR AND ENGINEER IMMEDIATELY IF ANY DISCREPANCIES FROM
CONTRACT DOCUMENTS OCCUR THAT MAY EFFECT EXISTING OPERATIONS.
7. DEMOLITION OF PIPING INCLUDES ALL ASSOCIATED VALVES, ACCESSORIES, INSULATION,
HANGERS, AND SUPPORTS.
8. COORDINATE WITH COR ON REMOVAL AND PLACEMENT OF EQUIPMENT NOTED TO BE
TURNED OVER TO COR. FOR EQUIPMENT NOT DESIRED BY COR, CONTRACTOR SHALL
REMOVE OFF SITE IN AN APPROVED MANNER.
LINEAR DIFFUSER (1-, 2-, 3-SLOT)
DETAIL NUMBER
DRAWING SYMBOLS
M-XXX
X
DRAWING NUMBER
SECTION LETTER
DRAWING NUMBERM-XXX
X
COLD WATER
HOT WATER
HOT WATER RETURN
SANITARY SEWER (WASTE)
VENT
EXISTING COLD WATER
EXISTING HOT WATER
EXISTING HOT WATER RETURN
EXISTING SANITARY SEWER
EXISTING VENT
PLUMBING LAYERS
SPECIALITY PIPING
SPECIALITY PIPING RETURN
XX
XX
MODULATING CONTROL BUTTERFLY
PLUG
PNEUMATIC CONTROL
PRESSURE REDUCING (PRV)
PRESSURE REGULATING
PRESSURE SAFETY
SHUTOFF
THREE-WAY MODULATING CONTROL
THREE-WAY TWO POSITION CONTROL
TWO POSITION CONTROL
WATER BALANCE DEVICE
WYE STRAINER
UNION
TEMPERATURE GAGE
PRESSURE GAGE
TEST PLUG
AUTOMATIC AIR VENT
MANUAL AIR VENTMV
AV
RADIANT CEILING PANEL
STANDARD 45° TAP
BLIND TRANSMITTER
CONTROL SYMBOLS
CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
OCCUPANCY SENSOR
CONDUCTIVITY TRANSMITTER
PRESSURE CONTROLLER
PRESSURE DIFFERENTIAL SWITCH
MOTOR OPERATOR FOR VALVE OR DAMPER
SOLENOID VALVE
VARIABLE FREQUENCY DRIVE CONTROLLER
ANALOG SIGNAL IN
PNEUMATIC OPERATOR FOR VALVE OR DAMPER
APPLICATION SPECIFIC CONTROLLER
BUILDING AUTOMATION SYSTEM
BUILDING CONTROLLER PANEL
DIGITAL SIGNAL IN
DIGITAL SIGNAL OUT
FAIL CLOSED
FAIL LAST
FAIL OPEN
NORMALLY CLOSED
NORMALLY OPEN
OPERATOR WORKSTATION
BUILDING MANAGEMENT SYSTEM
ANALOG SIGNAL OUT
CUSTOM APPLICATION CONTROLLER
AT
AT
AT
AT
CT
PC
PDS
M
VFD
AI
AO
SV
ASC
CAC
BAS
BCP
DO
FC
BMS
DI
FL
FO
NC
NO
OWS
PRESSURE SWITCH LOW
PRESSURE TRANSMITTER
SPEED CONTROLLER
LOCAL TEMPERATURE CONTROL PANEL
HVAC CONTROL PANEL
VARIABLE SPEED MOTOR CONTROLLER
PSL
PT
SC
LTCP
HVAC
VSMC
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE GAUGE
PRESSURE SWITCH HIGH
PDT
PI
PSH
ELECTRONIC TO PNEUMATIC TRANSDUCER
FLOW CONTROLLER
FLOW ELEMENT
FLOW SWITCH
EPT
FC
FE
FS
FLOW SWITCH HIGH
FLOW SWITCH LOW
FLOW TRANSMITTER
HUMIDISTAT
FSH
FSL
FT
H
HAND SWITCH
CURRENT TRANSMITTER
TIME CLOCK CONTROLLING EQUIP ON SCHEDULE
LOCAL RECORDING TIME CLOCK (RUNTIME)
HS
IT
KC
KR
LEVEL CONTROLLER
LEVEL TRANSMITTER
HIGH LIMIT HUMIDITY SENSOR
MOISTURE (HUMIDITY) TRANSMITTER
LC
LT
MSH
MT
OC
CO
CO2
VALVE OR DAMPER POSITION CONTROLLER
POSITION SWITCH
ZC
ZS
ECC
SMOKE DETECTORSD
STATIC PRESSURE SENSOR
THERMOSTAT
TEMPERATURE CONTROLLER
THERMOMETER
SPS
T
TC
TI
TEMPERATURE SWITCH
TEMPERATURE SWITCH HIGH (FREEZESTAT)
TEMPERATURE SWITCH LOW (FREEZESTAT)
TEMPERATURE TRANSMITTER
TS
TSH
TSL
TT
INTEGRATE CONTROL POINT ON REMOTE
GRAPHICS WORKSTATION AT ENERGY CONTROL
CENTER
MOTOR STARTER
A/E ARCHITECT / ENGINEER
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CD CEILING DIFFUSER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHW CHILLER WATER
CHS/CHR CHILLED WATER SUPPLY/RETURN
CO CLEAN OUT
CO2 CARBON DIOXODE
COP COEFFICIENT OF PERFORMANCE
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWS/CWR CONDENSER WATER
SUPPLY/RETURN (FROM/TO
COOLING TOWER)
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT
(SUBMISSION 1)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DX DIRECT EXPANSION
(E) EXISTING
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EQUIP EQUIPMENT
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
F FAHRENHEIT
FSD COMBINATION FIRE SMOKE
DAMPER
FC FLEXIBLE CONNECTION
FD FLOOR DRAIN
FD FIRE DAMPER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
GAL GALLONS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIBB
HP HORSEPOWER
HW HOT WATER
HWS/HWR HEATING HOT WATER
SUPPLY/RETURN
HZ HERTZ
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE STEAM
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAX MAXIMUM
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MERV MINIMUM EFFICIENCY
REPORTING VALUE
MIN MINIMUM
N/A NOT APPLICABLE
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
Pa PASCAL
PD PRESSURE DROP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION LINE
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SD SMOKE DETECTOR
SD-1 SCHEMATIC DESIGN
(SUBMISSION1)
SDPR SMOKE DAMPER
SP STATIC PRESSURE
SQ FT/SF SQUARE FOOT (FEET)
TAB TESTING, ADJUSTING, BALANCE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
UC UNDER CUT
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
W WATTS
Wb WET-BULB (TEMPERATURE)
YR YEAR
EQUIP. ABBREVIATIONS
AAHX AIR TO AIR HEAT EXCHANGER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
AF AFTER FILTER
AHU AIR-HANDLING UNIT
AS AIR SEPARATOR
B BOILER
BDR BASE BOARD RADIATOR
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BT BLOWOFF TANK
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CFP CHEMICAL FEED PUMP
CH CHILLER
CHP CHILLED WATER PUMP
COMP COMPRESSOR UNIT
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
DXCC DIRECT EXPANSION COOLING COIL
EC EVAPORATIVE COOLER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EH EXHAUST HOOD
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FPTU FAN POWERED TERMINAL UNIT
FTR FIN TUBE RADIATION
H HUMIDIFER
HC HEATING COIL
HD HOOD
HP HEAT PUMP
HPDT HIGH PRESSURE DRIP TRAP
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING)
PANEL
HRW HEAT RECOVERY WHEEL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
ICF IN-LINE CENTRIFUGAL FAN
IU INDUCTION UNIT
LLHX LIQUID TO LIQUID HEAT
EXCHANGER
MAU MAKE-UP AIR UNIT
P PUMP
PF PRE-FILTER
PHC PREHEAT COIL
PTAC PACKAGED TERMINAL AIR
CONDITIONER
RAHX ROTARY AIR HEAT EXCHANGER
RCCH REMOTE CONDENSER
CHILLER
RCU RECIPROCATING CHILLER UNIT
RF RETURN FAN
RHC REHEAT COIL
SAD SOUND ATTENUATING DEVICE
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SSHX STEAM TO STEAM HEAT
EXCHANGER
ST STEAM TRAP
SUH STEAM UNIT HEATER
SWHX STEAM TO WATER HEAT
EXCHANGER
TU TERMINAL UNIT
UC UNIT COOLER
UH UNIT HEATER
VUH VERTICAL UNIT HEATER
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING
UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
SCOPE OF WORK
REPLACE POOLPAK AHU AND EXHAUST FAN.
MH-102 MECHANICAL ROOF NEW WORK PLAN
MECHANICAL BASEMENT NEW WORK PLAN
DEMOLITION
POINT OF DISCONNECTION
M-601 POOL UNIT CONTROLS DIAGRAM
M-602 ROOFTOP EXHAUST FAN CONTROLS DIAGRAM
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text M-001
AutoCAD SHX Text
MECHANICAL COVER SHEET
AutoCAD SHX Text
CLEVELAND VAMC 10701 EAST BLVD, CLEVELAND, OH 44106
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text
AE REPLACE REHAB MEDICINE AHU CLEVELAND VA MEDICAL CENTER
AutoCAD SHX Text 541-25-504
AutoCAD SHX Text
JM
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Dwg. of 08
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
BID SET SUBMISSION
AutoCAD SHX Text 05/14/2026
AutoCAD SHX Text
AB
AutoCAD SHX Text 05/14/2026
AutoCAD SHX Text
SD
AutoCAD SHX Text R
Veteran Affairs
PROJECT
LOCATION:
MC
F
HG
E
L
BA
D K
KEY NOTES
SHEET NOTES
KEY PLAN
N
1. REMOVE EXISTING ROOFTOP POOLPAK CONDENSING UNIT
AND LEAVE EXISTING RAILS IN PLACE.
2. REMOVE EXISTING ROOFTOP POOLPAK AIR HANDLING UNIT
AND EXISTING CURB. REMOVE ANY OBSTRUCTIONS TO
FUTURE DUCTWORK PATH.
3. REMOVE EXISTING ROOFTOP WET EXHAUST FAN AND
REPLACE WITH SAME OR SIMILAR UNIT PER VA TIL
STANDARDS. ENSURE PROPER DISCONNECTION,
STRUCTURAL SUPPORT, CORROSION RESISTANCE, AND
WEATHERPROOFING. FOLLOW VA HVAC, SEISMIC, AND FIRE
PROTECTION GUIDELINES. SUBMIT DOCUMENTATION AND
VERIFY PERFORMANCE THROUGH COMMISSIONING.
1. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR(S) TO VERIFY
EXISTING DUCTWORK, PIPING, AND EQUIPMENT
LOCATIONS. REPORT ANY DISCREPANCIES BETWEEN
PLANS AND SITE CONDITIONS TO A/E. CONTRACTOR SHALL
COORDINATE WITH ALL OTHER TRADES AND EXISTING
CONDITIONS.
2. NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED,
DISCONNECTED, OR SHUT DOWN WITHOUT PRIOR REVIEW
WITH THE COR AND/OR ENGINEER TO CONFIRM THAT
AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED.
IF AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED
BY ANY SHUTDOWN, REMOVAL, OR DISCONNECTION,
SUFFICIENT ADVANCE NOTICE OF TEN (10) BUSINESS DAYS
SHALL BE GIVEN TO THE OWNER INDICATING WHICH AREAS
WILL BE AFFECTED, WHEN THE PROPOSED SHUTDOWN
WILL OCCUR, AND FOR HOW LONG A PERIOD OF TIME.
3. CONTRACTOR SHALL VERIFY AND DOCUMENT THE
ROUTING AND LOCATION OF ALL ELECTRICAL POWER
CIRCUITS AND CONTROL WIRING PRIOR TO DEMOLITION.
COORDINATE WITH OWNER AND ENSURE SAFE ISOLATION
BEFORE REMOVAL.
4. COORDINATE WITH ELECTRICAL CONTRACTOR FOR
DISCONNECTING EXISTING ELECTRICAL FEEDS, CONTROLS,
AND DISCONNECT SWITCHES. ELECTRICAL SCOPE SHOWN
UNDER SEPARATE DIVISION.
5. REMOVE ALL TEMPORARY FASTENERS, BLOCKING, AND
LEGACY SUPPORTS ASSOCIATED WITH THE EXISTING
UNITS, WHETHER SHOWN OR NOT.
6. ALL DEMOLITION WORK TO OCCUR DURING
OFF-HOUR/WEEKEND SHUTDOWN AS COORDINATED WITH
OWNER.
7. CONTRACTOR TO TAB AIR FLOWS PRIOR TO AND
FOLLOWING INSTALLATION TO BEST RETAIN EXISTING
CONDITIONS LIKE FOR LIKE.
1/4" = 1'-0"1 MECHANICAL BASEMENT PLAN - DEMOLITION
T
R
Q
P
N
U
V
36 3735
(E) AHU-1
(E) EF-6B
(E) CU-1
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text
MD-101
AutoCAD SHX Text
MECHANICAL ROOF DEMOLITION PLAN
AutoCAD SHX Text
CLEVELAND VAMC 10701 EAST BLVD, CLEVELAND, OH 44106
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text
AE REPLACE REHAB MEDICINE AHU CLEVELAND VA MEDICAL CENTER
AutoCAD SHX Text 541-25-504
AutoCAD SHX Text
JM
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Dwg. of 08
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
BID SET SUBMISSION
AutoCAD SHX Text 05/14/2026
AutoCAD SHX Text
AB
AutoCAD SHX Text 05/14/2026
AutoCAD SHX Text 2B-152Q
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text 2B-152R
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text 2B-152C
AutoCAD SHX Text 2B-152B
AutoCAD SHX Text
OPERATORY
AutoCAD SHX Text
EMS
AutoCAD SHX Text 2B-152A
AutoCAD SHX Text
ADA OPERATORY
AutoCAD SHX Text 2B-151K
AutoCAD SHX Text 2B-151H
AutoCAD SHX Text
RECOVER
AutoCAD SHX Text
ATTEND
AutoCAD SHX Text 2B-151J
AutoCAD SHX Text
ORAL SURG
AutoCAD SHX Text
DOCTORS
AutoCAD SHX Text 2B-151D
AutoCAD SHX Text
BOTTLE STOR
AutoCAD SHX Text 2B-151C
AutoCAD SHX Text
CONSULT./ WAIT
AutoCAD SHX Text 2B-151B
EXISTING ROOF MOUNTED DUCTWORK (NIC)
2 1
Veteran Affairs
3/16" = 1'-0"1 MECHANICAL BASEMENT PLAN - NEW WORK
PROJECT
LOCATION:
MC
F
HG
E
L
BA
D K
KEY NOTES
KEY PLAN
N
1. CONNECT EXISTING SUPPLY & RETURN DUCTWORK TO
NEW AHU-1 PER VA TIL STANDARDS. ENSURE PROPER
ALIGNMENT, SEALING, AND SUPPORT. USE
SMACNA-COMPLIANT FITTINGS AND MATERIALS. MAINTAIN
AIRFLOW INTEGRITY, INSULATION, AND SYSTEM
PERFORMANCE. VERIFY INSTALLATION THROUGH
COMMISSIONING AND SUBMIT REQUIRED DOCUMENTATION.
SEAL ALL DUCT CONNECTIONS AIRTIGHT TO SMACNA SEAL
CLASS A OR HIGHER. BALANCE SYSTEM AIRFLOWS AND
VERIFY PROPER OPERATION PER MANUFACTURER AND
DESIGN REQUIREMENTS.
2. CONNECT EXISTING EXHAUST DUCTWORK TO NEW
ROOFTOP EXHAUST FAN EF-6B PER VA TIL STANDARDS.
USE SMACNA-COMPLIANT MATERIALS AND SEALING
METHODS. ENSURE PROPER ALIGNMENT, SUPPORT, AND
CORROSION RESISTANCE. MAINTAIN AIRFLOW INTEGRITY
AND FIRE SAFETY. SUBMIT DOCUMENTATION AND VERIFY
INSTALLATION THROUGH COMMISSIONING. SEAL ALL DUCT
CONNECTIONS AIRTIGHT TO SMACNA SEAL CLASS A OR
HIGHER. BALANCE SYSTEM AIRFLOWS AND VERIFY
PROPER OPERATION PER MANUFACTURER AND DESIGN
REQUIREMENTS.
SHEET NOTES
1. SEE DRAWING M-001 FOR GENERAL NOTES, SYMBOLS,
ABBREVIATIONS, AND GENERAL PHASING NOTES.
2. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR(S) TO VERIFY
EXISTING DUCTWORK, PIPING AND EQUIPMENT LOCATIONS.
REPORT ANY DISCREPANCIES BETWEEN PLANS AND SITE
CONDITIONS TO A/E. CONTRACTOR SHALL COORDINATE
WITH ALL OTHER TRADES AND EXISTING CONDITIONS.
3. DUCTWORK AND PIPING SIZES SHOWN ARE BEST
INTERPRETATION OF AVAILABLE DATA. CONTRACTOR TO
VERIFY PIPE SIZES DURING COURSE OF WORK, AND REPORT
ANY DISCREPANCIES BETWEEN PLANS AND SITE
CONDITIONS.
4. THE USE OF ASTM A307 BOLTS IS PROHIBITED ON THIS
PROJECT. CONTRACTOR IS TO UTILIZE ALLOY-STEEL OR
STAINLESS STEEL, ASTM A193 METHODS FOR ALL FLANGE
BOLTING. IF THE CONTRACTOR IDENTIFIES OR OBSERVES
POTENTIAL ASTM A307 BOLTS ON ANY EXISTING STEAM OR
HYDRONIC PIPING WITHIN THE PROJECT AREA THEY ARE TO
NOTIFY THE VA COR IMMEDIATELY AND DOCUMENT THE
LOCATION AND QUANTITY IN WRITING.
5. DUCTWORK IS REPRESENTATIVE AND NO NEW WORK IS
INTENDED OTHER THAN THE CONNECTION OF THE SUPPLY,
RETURN, AND EXHAUST DUCT CONNECTIONS TO THE NEW
ROOFTOP MOUNTED EQUIPMENT. NO MODIFICATIONS OF
EXISTING DUCTWORK WITHIN THE SPACE IS INCLUDED IN
THE SCOPE OF WORK.
6. CONTRACTOR TO TAB AIR FLOWS PRIOR TO AND FOLLOWING
INSTALLATION TO BEST RETAIN EXISTING CONDITIONS LIKE
FOR LIKE.
36 37 39 40 41 42353433
V
T
R
Q
P
N
L1
L
L-B-411
L-B-412
L-B-413A
L-B-413B
L-B-413
L-B-410A
L-B-416
L-B-417
L-B-414
L-B-418
L-B-419
F19
F21
L-B-415
L-B-490
L-B-400
L-B-421 L-B-401
L-B-410
8Ø SA
8Ø RA
8Ø SA
10Ø SA
12x10 SA
12x12 RA
6Ø SA
8Ø RA
6Ø SA
6Ø EA
8Ø EA
x1
SA
6Ø SA
10Ø SA
6Ø SA
6Ø SA
6Ø SA
6Ø SA
6Ø SA
8Ø SA
6Ø SA
x1
R
A x1
R
A
12x6 EA
12Ø SA
8Ø SA
10x4 RA
8Ø EA
10x10 EA
6Ø EA
14x10 EA
6Ø SA 8Ø EA
x1
SA
18x12 SA18x7 SA
18x7 SA x1
SA
14x10 EA
12x8 EA x7 S
A
18x12 SA 20x14 SA
18x7 SA
18x7 SA
18x12 EA
30x12 EA
20x16 SA
18x7 SA
6Ø SA
8Ø EA
10x6 RA
11x10 SA
12x7 EA
10x6 EA
8Ø SA
11Ø SA
6Ø SA
6Ø SA
6Ø EA
6Ø EA
10x8 EA
12x7 EA
10x10 EA
8Ø EA
12x8 EA
6Ø SA 11x10 EA
56x16 RA
34x18 RA x2
R
A
24x11 EA
16x7 EA x1
EA
24x24 SA 24x24 SA
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text
MH-101
AutoCAD SHX Text
MECHANICAL BASEMENT NEW WORK PLAN
AutoCAD SHX Text
CLEVELAND VAMC 10701 EAST BLVD, CLEVELAND, OH 44106
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text
AE REPLACE REHAB MEDICINE AHU CLEVELAND VA MEDICAL CENTER
AutoCAD SHX Text 541-25-504
AutoCAD SHX Text
JM
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Dwg. of 08
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
BID SET SUBMISSION
AutoCAD SHX Text 05/14/2026
AutoCAD SHX Text
AB
AutoCAD SHX Text 05/14/2026
AutoCAD SHX Text L-B-411
AutoCAD SHX Text L-B-412
AutoCAD SHX Text L-B-413A
AutoCAD SHX Text L-B-413B
AutoCAD SHX Text L-B-413
AutoCAD SHX Text L-B-410A
AutoCAD SHX Text L-B-416
AutoCAD SHX Text L-B-417
AutoCAD SHX Text L-B-414
AutoCAD SHX Text L-B-418
AutoCAD SHX Text L-B-419
AutoCAD SHX Text F19
AutoCAD SHX Text F21
AutoCAD SHX Text L-B-415
AutoCAD SHX Text L-B-490
AutoCAD SHX Text L-B-400
AutoCAD SHX Text L-B-421
AutoCAD SHX Text L-B-401
AutoCAD SHX Text L-B-410
AutoCAD SHX Text U
AutoCAD SHX Text L3
AutoCAD SHX Text L2
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
%%UVAV-104
AutoCAD SHX Text
%%UVAV-103
AutoCAD SHX Text
%%UVAV-102
AutoCAD SHX Text
UP
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
PT/RT
AutoCAD SHX Text
WORK
AutoCAD SHX Text
POOL
AutoCAD SHX Text
POOL
AutoCAD SHX Text
CIRCULATION
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
MAIN
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
TLT
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
SHWR
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
MENS
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
KINESIOTHERAPY
AutoCAD SHX Text
MEDICAL
AutoCAD SHX Text
DIRECTOR
AutoCAD SHX Text
HALL
AutoCAD SHX Text
HALL
AutoCAD SHX Text
%%UVAV-101
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DN.
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFM
AutoCAD SHX Text
AutoCAD SHX Text
CFM
PROJECT
LOCATION:
MC
F
HG
E
L
BA
D K
KEY NOTES
KEY PLAN
N
1. INSTALL NEW ROOFTOP AHU-1 CONDENSING UNIT. PROVIDE
NEW VIBRATION ISOLATORS AND SUPPORTS PER
MANUFACTURER REQUIREMENTS.
2. INSTALL NEW ROOFTOP AHU-1 AIR HANDLING UNIT AND
CURB. PROVIDE NEW VIBRATION ISOLATORS AND
SUPPORTS PER MANUFACTURER REQUIREMENTS.
3. PROVIDE AND INSTALL NEW REFRIGERANT PIPING BETWEEN
CONDENSER AND EVAPORATOR COIL. SIZE, ROUTE, AND
SUPPORT PER MANUFACTURER REQUIREMENTS.
PRESSURE-TEST AND EVACUATE SYSTEM.
4. PROVIDE NEW ROOFTOP CONDENSATE DRAIN PIPING,
SUPPORTS, AND ROOF DRAINAGE INTERFACE AS SHOWN.
ENSURE POSITIVE SLOPE AND PROPER DISCHARGE.
5. INSTALL NEW ROOFTOP WET EXHAUST FAN TO…