90157-541-25-504 Cle Replace Rehab Medicine AHU - Drawings 20260514.pdf

PDF 11 MB Posted

Attached to
36C25026Q0753-Replace Rehab Medicine AHU
Solicitation number
36C25026Q0753
Issued by

About this file

This is a 100% bid set of architectural and engineering construction documents for the replacement of a rooftop air handling unit (AHU), condenser unit (CU), and exhaust fan (EF-6B) at the Louis Stokes Cleveland VA Medical Center in Cleveland, Ohio. The project is identified as 541-25-504, Building 1, with an issue date of May 14, 2026.

The project scope includes removal of existing PoolPak AHU and condensing equipment, installation of new AHU-1 with associated refrigerant piping and condensate drainage, replacement of the rooftop wet exhaust fan with weatherproofing and structural support, and all necessary ductwork connections to existing systems. Mechanical work encompasses new vibration isolators, supports per manufacturer specifications, pressure testing and system evacuation, and gravity/backdraft dampers. Electrical work requires installation of three new 3R disconnects (100A for AHU, 15A for exhaust fan, 15A for condenser), new GFCI receptacles for wet locations, data outlets with conduit to IT room, new feeder circuits with appropriate wire sizing, and fire alarm duct detectors interconnected to the existing fire alarm system. The construction documents establish phased demolition and new work procedures with infection control risk assessment protocols for Class II construction, including negative air pressure maintenance, HEPA filtration, and barrier containment. All work must comply with VA HVAC, seismic, and fire protection guidelines, with commissioning and performance verification required upon completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Location

Issue Date

Project Number

Building NO.

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEERS:STAMPCONSULTANT

Revisions: Date:

VA FORM 08 - 6231

FF

A/E:

600 E. Michigan Ave., Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

NOT F

OR

CONSTRUCTIO

N

541-25-504

BLDG 1

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

05/14/2026

FLOOR NO.

ROOF

/1

/2

:3

:2

P

M A u to d e s k D o c s /2

A

E R

E P

L A

C E

R E

H A

B M

E D

IC

IN

E A

H U

C L E

V E

L A

N D

V A

M E

D

IC

A L C

E N

T E

R /2

A E

R E

P L

A C

E R

E H

A B

M E

D

IC

IN

E

A H

U C

L E

V E

L A

N D

V A

M E

D

IC

A L C

E N

T E

R

R

.r v t

GI001

PCMH

CLEVELAND VAMC

10701 EAST BLVD, CLEVELAND, OH 44106

AE REPLACE REHAB MEDICINE

AHU CLEVELAND VA MEDICAL

CENTER

COVER SHEET

Project Director

SHEET DESCRIPTION

GENERAL

GI001 COVER SHEET

ARCHITECTURAL

AD140 ARCHITECTURAL ROOF DEMOLITION PLAN

A140 ROOF PLAN

CLEVELAND , OHIO

NORTH

LOCATION MAP

PROJECT TEAM

ARCHITECTURE:

OWNER:

SEVEN GENERATIONS A+E

CLEVELAND VA

10701 EAST BLVD,

CLEVELAND, OH 44106

AE REPLACE REHAB MEDICINE AHU

CLEVELAND, OHIO

LOUIS STOKES CLEVELAND VA

MEDICAL CENTER

PROJECT LOCATION

MECHANICAL AND ELECTRICAL ENGINEERING:

DAVENERGY SOLUTIONS

STRUCTURAL ENGINEERING:

JUNKER GONZALEZ ENGINEERING GROUP

100% BID SET

MECHANICAL

M-001

MD-101

MH-101

MH-102

M-401

M-501

M-601

M-602

MECHANICAL COVER SHEET

MECHANICAL ROOF DEMOLITION PLAN

MECHANICAL BASEMENT NEW WORK PLAN

MECHANICAL ROOF NEW WORK PLAN

MECHANICAL SCHEDULES

MECHANICAL DETAILS

POOL UNIT CONTROLS DIAGRAM

ROOFTOP EXHAUST FAN CONTROLS DIAGRAM

ELECTRICAL

E-001

ED-101

EP-101

E-501

E-601

E-701

2207 GARNET AVE (I)

SAN DIEGO, CA 92109

PHONE: 619.770.8552

600 E MICHIGAN AVE, SUITE B

KALAMAZOO, MI 49007

PHONE: 269.927.0144

8285 LA MESA BLVD, SUITE C

LA MESA, CA 91942

PHONE: 858.215.3660

ELECTRICAL SYMBOLS, GENERAL NOTES AND ABBREVIATIONS

ELECTRICAL BASEMENT POWER PLANS - DEMO

ELECTRICAL POWER PLANS - DEMO

ELECTRICAL DETAILS

ELECTRICAL SINGLE LINE DIAGRAM

ELECTRICAL SCHEDULES

BID SET SUBMISSION 05/14/2026BID SET SUBMISSION 05/14/2026

Q

M

REMOVE EXISTING EXHAUST FAN

(EF-6B). ROOF CURB TO REMAIN.

REFER TO MECHANICAL DRAWINGS

EXISTING ROOF

DRAIN TO REMAIN

EXISTING POOL CONDENSER(S)

TO BE REMOVED. REFER TO

MECHANICAL DRAWINGS

EXISTING AIR HANDLING UNIT

TO BE REMOVED. REFER TO

MECHANICAL DRAWINGS

EXISTING MECHANICAL EQUIPMENT

CURB TO REMAIN. REMOVE

EXISTING FLASHING COMPLETE.

EXISTING MECHANICAL EQUIPMENT

SUPPORT RAIL CURB TO REMAIN.

REMOVE EXISTING FLASHING

COMPLETE ALL SIDES.

37 38

R

P

N

NOTE: EXISTING ROOF IS PROTECTED BY

ROOF PAVER TILES ON PEDESTALS.

CONTRACTOR TO PROTECT AND REPLACE IN

KIND ANY TILES THAT ARE INADVERTENTLY

DAMAGED WITH THIS PROJECT.

AD140

EXISTING VENT

TO REMAIN

EXISTING VENT TO REMAIN

REMOVE EXISTING FLASHING

COMPLETE.

EXISTING ROOF MOUNTED DUCTWORK (N.IC.)

EXISTING WALKWAY

PAD TO BE REMOVED,

SALVAGED AND

REINSTALLED

EXISTING PIPING TO

BE REMOVED; REFER

TO MECHANICAL

EXISTING ROOF PIPE

SUPPORT BLOCKS (4)

AND HARDWARE TO BE

REMOVED, SALVAGED

AND REINSTALLED WITH

NEW PIPING LAYOUT.

GENERAL DEMO NOTES

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON

THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS AND ITEMS AS

REQUIRED TO FACILITATE NEW CONSTRUCTION.

2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS. IF CONDITIONS DO NOT REFLECT

WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY THE

ARCHITECT.

3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF CONSTRUCTION

DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING

WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF DUMPSTERS

TO BE DETERMINED BY COR WITH CONTRACTORS INPUT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS. DO NOT

ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO

ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER.

NO ONSITE SALE OR BURNING OF REMOVED ITEMS IS PERMITTED.

6. CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE

PUBLIC AND/OR WORKERS ON THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY

PERSON ON, ABOUT OR ADJACENT TO THE PREMISES. THE CONTRACTOR SHALL COMPLY

WITH ALL LAWS, ORDINANCES, CODES AND REGULATIONS PERTAINING TO SAFETY AND

THE PREVENTION OF ACCIDENTS.

7. CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION, WATERPROOFING,

EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE

TO REMAIN. PROVIDE TEMPORARY MEASURES TO KEEP THE ELEMENTS OUT OF THE

EXISTING BUILDING

8. OWNER RESERVES THE RIGHT TO ANY REMOVED MATERIALS OR ITEMS. CONTRACTOR TO

COORDINATE WITH OWNER.

9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD

CHANGE THEIR LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.

10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION. PREPARE FOR NEW

CONSTRUCTION AS REQUIRED.

11. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS WITH A

ONE-HOUR FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST BARRIER. TEMPORARILY SEAL

OFF ALL RETURN & SUPPLY AIR DIFFUSERS IN CONSTRUCTION AREA. PROVIDE

RECIRCULATING HEPA FILTER IN CONSTRUCTION AREA. ALL DEMOLISHED MATERIAL IS TO

BE REMOVED FROM SITE IN A COVERED CONTAINER. MAINTAIN NEGATIVE AIR PRESSURE

WITHIN CONSTRUCTION ZONE.

12. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION, CONTRACTOR

SHALL CONTACT OWNER FOR ABATEMENT.

13. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED

DURING DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING

WARRANTIES.

14. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.

15. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL APPLIED FIREPROOFING MATERIAL

IN AREAS LEFT UNPROTECTED DUE TO REMOVAL OF EXISTING ELEMENTS OR AREAS

DAMAGED DURING NEW WORK AND DEMOLITION. MATCH EXISTING FIREPROOFING

MATERIAL TYPE AND THICKNESS TO MAINTAIN EXISTING LEVEL OF PROTECTION.

KEY PLAN

PROJECT

LOCATION

N

INFECTION CONTROL RISK ASSESSMENT NOTES -

CLASS II

DURING CONSTRUCTION PROJECT

UPON COMPLETION OF PROJECT

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS

BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD,

PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR

IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH

HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. NEGATIVE PRESSURE MONITORING DEVICES SHOULD BE

VISIBLE FROM OUTSIDE THE WORKSITE AND READINGS SHOULD

BE DOCUMENTED AS LEAST DAILY.

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

6. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT OF

WORK AREA.

7. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED BY THE SAFETY

DEPARTMENT AND INFECTION PREVENTION & CONTROL AND

THOROUGHLY CLEANED BY THE ENVIRONMENTAL

MANAGEMENT SERVICE.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4. WET MOP AREA WITH CLEANER/DISINFECTANT.

5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK

WAS PERFORMED.

REMOVE COMPLETE EXISTING FLASHING

AND ALL ATTACHMENTS IF NEEDED

REMOVE EXISTING SURROUNDING

ROOF TILES AND PLATE STEEL AS

REQUIRED, REINSTALL.

EXISTING ROOF MEMBRANE TO REMAIN

AND BE PROTECTED DURING DEMOLITION

AND INSTALLATION OF EQUIPMENT.

PATCH AND REPAIR AS REQUIRED.

REFER TO MECHANICAL FOR FURTHER

COMPLETE DEMOLITION SCOPE

VIF VIF

FIRE AND SAFETY NOTES

1. MAINTAINING THE INTEGRITY OF THE FIRE AND SAFETY SYSTEMS IN

PLACE IN THE MEDICAL CENTER AND ALL OF ITS OUT BUILDINGS

DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE

GENERAL CONTRACTOR.

2. IN ADDITION TO ALL VA MEDICAL CENTER POLICIES, ALL NATIONAL,

STATE, AND LOCAL CODES AND ORDINANCES SHALL APPLY TO ALL

OF THEIR CONTRACTORS AND SUB-CONTRACTORS.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL

PERTINENT OSHA SAFETY REQUIREMENTS.

4. PROVIDE LOCKOUT-TAGOUT AND CONFINED SPACE ENTRY POLICIES

AS APPLICABLE AND AS REQUIRED BY OSHA. THESE POLICIES SHALL

BE SUBMITTED FOR PRIOR APPROVAL BY THE VA SAFETY OFFICER /

COR.

5. SUBMIT APPROPRIATE INTERIM LIFE SAFETY MEASURES. REFER TO

SPECIFICATION 01 01 10 FOR MORE INFORMATION.

6. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS OF NON-

COMBUSTIBLE MATERIALS WHICH PROVIDE A SMOKE TIGHT

SEPARATION BETWEEN THE CONSTRUCTION AREAS AND ALL OTHER

OCCUPIED AREAS. MAINTAIN INTEGRITY OF THE ENCLOSURE DURING

THE CONSTRUCTION. REFER TO SPECIFICATION SECTION 00 01

10-1HR.

7. EXISTING FIRE PROTECTION SYSTEMS, INCLUDING FIRE ALARM

SYSTEMS, SMOKE DETECTION SYSTEMS, AND SPRINKLER SYSTEMS SHALL

NOT BE IMPAIRED DURING CONSTRUCTION. SMOKE DETECTOR

DISABLE REQUESTS: OUTAGE REQUESTS TO BE SUBMITTED TO FM

ENGINEER FOR APPROVAL FOR SPECIFIC DATE AND TIME. ALARMS

WILL ONLY BE TURNED OFF FOR SPECIFIC SHIFTS REQUESTED AND

WHEN CONTRACTORS ARE IN THE CONSTRUCTION AREA. ALARMS

WILL BE RESTORED AT THE END OF THE WORK DAY BY CALLING THE

SAME EXTENSION. AT NO TIME WILL ALARMS REMAIN OFF

OVERNIGHT. SMOKE DETECTORS AND OR SPRINKLER HEADS: DO NOT

COVER BY BAGS, TAPE, AND PLASTIC OR IN ANY OTHER MANNER

THAT WILL DEFEAT THEIR ABILITY TO SENSE SMOKE OR HEAT AND

OPERATE AS DESIGNED.

8. DAILY ACCUMULATIONS OF TRASH, COMBUSTIBLE MATERIALS,

PACKAGING, AND DEBRIS SHALL BE REMOVED FROM THE

CONSTRUCTION AREA ON A DAILY BASIS. FLAMMABLE MATERIALS

MAY BE STORED ON SITE IN AN APPROVED AND APPROPRIATELY

MARKED FLAMMABLE MATERIALS CABINET.

9. THE LOUIS STOKES VA MEDICAL CENTER IS A TOBACCO FREE ZONE.

USE OF TOBACCO PRODUCTS IS PROHIBITED,

1. PATCH AND REPAIR ALL AREAS AFFECTED BY DEMO AND / OR

CONSTRUCTION TO MATCH EXISTING. PATCHED AREAS ARE TO

RECEIVE FINISHES AND TRIM TO MATCH ADJACENT AREA, EXCEPT AS

NOTED IN THE ROOM FINISH SCHEDULE. PATCH CEILINGS AND

FLOORS TO ACHIEVE A CONTINUOUS FINISHED APPEARANCE.

2. ALL EQUIPMENT TO BE DISCONNECTED AND REMOVED BY

CONTRACTOR. VA TO BE NOTIFIED WHEN EQUIPMENT IS AVAILABLE

AND BE GIVEN THE OPTION TO TAKE POSSESSION OF ALL EQUIPMENT.

CONTRACTOR TO DISPOSE OF ALL EQUIPMENT THE VA DOES NOT

WANT AND REMOVE ALL ITEMS WITH EXTREME CARE.

3. REMOVE, RELOCATE, STORE AND REINSTALL PORTABLE EQUIPMENT

WHICH WOULD INTERFERE WITH DEMOLITION WORK.

4. REFER TO SPECIFICATIONS FOR SHORING REQUIREMENTS WHERE

DEMOLITION WORK AFFECTS THE STRUCTURAL INTEGRITY OF WALLS

OR FLOORS. IF NOT SO INDICATED IN SPECIFICATIONS,

CONTRACTOR SHALL SUBMIT SHORING PLAN AND SHOP DRAWINGS

SIGNED BY AN ENGINEER FOR VA APPROVAL. ALL SHORING IS

CONTRACTOR'S RESPONSIBILITY.

5. PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY DAMAGED

SURFACES SHALL BE REPLACED TO MATCH ORIGINAL ITEM OR

REPAIRED TO MATCH EXISTING OR ADJACENT MATERIAL AS

APPROVED BY THE VA COR.

6. VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR TO

SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL NOT RELIEVE THIS

CONTRACTOR FROM PERFORMING THE WORK REQUIRED UNDER THIS

CONTRACT.

7. ALL SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND ATTEND A

PRE-BID WALK THRU TO INSPECT THE EXISTING AREA AND

THOROUGHLY FAMILIARIZE THEMSELVES WITH ACTUAL JOB

CONDITIONS BEFORE SUBMITTING BID.

8. WHILE THE SIZE AND LOCATION OF NEW WORK AND EQUIPMENT IN

THE EXISTING AREA HAS BEEN INDICATED ON THE DRAWINGS AS

ACCURATELY AS POSSIBLE, CONTRACTOR SHALL ADJUST THEIR WORK

AS REQUIRED TO AVOID EXISTING UTILITIES, GAS LINES, SEWER, FIRE

ALARM, ROOF DRAINS, ACCESS COVERS, AND OTHER STRUCTURES

NOT PARTICULARLY SHOWN ON THE PLAN AT NO ADDITIONAL COST.

BEFORE CONSTRUCTION, INSPECT PREMISES MAKE A DETAILED

EXAMINATION OF ALL LOCATIONS WHERE NEW WORK IS TO BE

INSTALLED, EXAMINE EXISTING PIPING, CONDUITS, STRUCTURAL

SUPPORTING BEAMS, AND OTHER CONDITIONS.

9. DISCONNECT AT SOURCE AND REMOVE EXISTING MECHANICAL AND

ELECTRICAL MATERIALS AND EQUIPMENT WHICH ARE RENDERED

OBSOLETE BY THESE ALTERATIONS AND ADDITIONS. VA TO BE GIVEN

THE OPTION TO TAKE POSSESSION OF REMOVED EQUIPMENT AND

MATERIALS. ANY EQUIPMENT THAT THE VA DOES NOT WANT ARE THE

PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE

SITE. NO MECHANICAL, ELECTRICAL, PLUMBING EQUIPMENT, ETC.

SHALL BE ABANDONED IN PLACE.

10. DISCONNECT, REMOVE AND RELOCATE EXISTING MECHANICAL AND

ELECTRICAL MATERIALS AND EQUIPMENT WHICH INTERFERE OR ARE

INTERFERED WITH, OBSTRUCT OR ARE OBSTRUCTED BY, THESE

ALTERATIONS AND ADDITIONS. PERMANENTLY INSTALL SUCH ITEMS IN

NEW LOCATIONS AS DIRECTED. RECONNECT SUCH ITEMS IN PROPER

OPERATING CONDITION AT NEW LOCATIONS.

11. DO NOT INTERFERE WITH EXISTING BUILDING'S MECHANICAL,

ELECTRICAL, AND SECURITY SYSTEMS OPERATIONS. IF IT IS

ABSOLUTELY NECESSARY TO SHUT DOWN FACILITY SYSTEMS AT ANY

TIME, CONSULT COR TO MAKE ARRANGEMENTS TO DO SO ON OFF

WORKING HOUR PERIODS AT THE OWNER'S CONVENIENCE. PRIOR

NOTICE SHALL BE GIVEN TO THE COR IN WRITING (21) DAYS IN

ADVANCE OF THE DESIRED SHUT-DOWN TIME. ANY PREMIUM OR

OVERTIME COSTS NECESSARY TO ACCOMPLISH THE ABOVE SHALL BE

INCLUDED IN THIS BID. FAILURE TO PROCEED WITHOUT PROPER

PRIOR NOTIFICATION MAY RESULT IN THE ASSESSMENT OF A CREDIT

TO THE CONTRACT.

12. IN ALL CONSTRUCTION ZONES AND AREAS, CONTRACTOR

RESPONSIBLE FOR MAINTAINING AN ACTIVE STROBE SPEAKER SYSTEM

AT ALL TIMES. TYPICAL FOR ALL CONSTRUCTION ZONES FOR ALL

BUILDINGS.

GENERAL CONSTRUCTION NOTES

SECURITY NOTES

1. NO TOOLS OR EQUIPMENT TO BE LEFT UNATTENDED.

2. CONTRACTOR TO PROVIDE TEMPORARY SECURITY WALLS IN HIGH

SECURITY AREAS.

3. CONTRACTOR VA IDENTIFICATION TO BE DISPLAYED AT ALL TIMES ON

PERSON.

4. TOOLS AND EQUIPMENT NOT NEEDED FOR TASKS AT HAND TO BE

STORED OFF SITE.

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Location

Issue Date

Project Number

Building NO.

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEERS:STAMPCONSULTANT

Revisions: Date:

VA FORM 08 - 6231

FF

A/E:

600 E. Michigan Ave., Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

NOT F

OR

CONSTRUCTIO

N

541-25-504

BLDG 1

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

05/14/2026

FLOOR NO.

ROOF

/1

/2

:4

:5

P

M A u to d e s k D o c s /2

A

E R

E P

L A

C E

R E

H A

B M

E D

IC

IN

E A

H U

C L E

V E

L A

N D

V A

M E

D

IC

A L C

E N

T E

R /2

A E

R E

P L

A C

E R

E H

A B

M E

D

IC

IN

E

A H

U C

L E

V E

L A

N D

V A

M E

D

IC

A L C

E N

T E

R

R

.r v t

AD140

PCMH

CLEVELAND VAMC

10701 EAST BLVD, CLEVELAND, OH 44106

AE REPLACE REHAB MEDICINE

AHU CLEVELAND VA MEDICAL

CENTER

ARCHITECTURAL ROOF DEMOLITION PLAN

Approver

NORTH

SCALE: 1/4" = 1'-0"

DEMOLITION ROOF PLANSCALE: 3/4" = 1'-0"1

TYPICAL DEMO SECTION

INSTALL NEW EXHAUST FAN ON

EXISTING ROOF CURB. REFER

TO MECHANICAL DRAWINGS

EXISTING ROOF DRAIN TO REMAIN

NEW MECHANICAL EQUIPMENT.

REFER TO MECHANICAL DRAWINGS

FOR MORE INFORMATION.

Q

M

PATCH AND REPAIR ROOF MEMBRANE AS

NECESSARY AFTER EQUIPMENT

DEMOLITION IS COMPLETE. REFER TO

SPECIFICATIONS FOR FLASHING

COMPONENTS, FASTENERS, AND SEALANTS.

PROVIDE NEW SHEET METAL CAP FLASHING w/ DRIP

EDGE FOR EXISTING-TO-REMAIN SUPPORT RAILS.

ENSURE FLASHING PROVIDES A WATERTIGHT SEAL AT

THE CONNECTION TO THE CURB. REFER TO

MECHANICAL DRAWINGS FOR MORE INFORMATION.

37 38

R

P

N

PROVIDE NEW SHEET METAL CAP FLASHING w/ DRIP

EDGE AND CURB ADAPTER FOR EXISTING-TO-REMAIN

EQUIPMENT CURB. FIELD VERIFY SIZE AND LOCATION OF

DUCT PENETRATIONS PRIOR TO FABRICATION. ENSURE

FLASHING PROVIDES A WATERTIGHT SEAL AT THE

CONNECTION TO THE CURB. REFER TO MECHANICAL

DRAWINGS FOR MORE INFORMATION.

EXISTING VENT TO REMAIN

EXISTING ROOF MOUNTED DUCTWORK (N.IC.)

A140

PROVIDE NEW CONTINUOUS

FLASHING w/ DRIP EDGE

PATCH AND REPAIR ROOF MEMBRANE AS

NECESSARY AFTER EQUIPMENT

DEMOLITION IS COMPLETE. REFER TO

SPECIFICATIONS FOR FLASHING

COMPONENTS, FASTENERS, AND SEALANTS.

EXISTING REINSTALLED WALKWAY PADS

EXISTING REINSTALLED ROOF PIPE

SUPPORT BLOCKS (4), PROVIDE

NEW HARDWARE FASTENERS.

EXISTING VENT

TO REMAIN

NEW FLASHING w/ DRIP SET IN SEALANT

REINSTALL EXISTING SURROUNDING ROOF

TILES AND PLATE STEEL AS REQUIRED.

EXISTING ROOF MEMBRANE TO REMAIN

AND BE PROTECTED DURING

INSTALLATION OF EQUIPMENT. PATCH

AND REPAIR AS REQUIRED.

REFER TO MECHANICAL FOR COMPLETE

NEW WORK SCOPE AND EQUIPMENT TO

BE INSTALLED

VIF VIF

PROVIDE NEW FIRE RETARDANT WOOD

BLOCKING TO REPLACE ANY DAMAGED

SECTIONS. MATCH EXISTING WIDTH (VIF)

NEW CURB ADAPTER; REFER TO

MECHANICAL

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Location

Issue Date

Project Number

Building NO.

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEERS:STAMPCONSULTANT

Revisions: Date:

VA FORM 08 - 6231

FF

A/E:

600 E. Michigan Ave., Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

NOT F

OR

CONSTRUCTIO

N

541-25-504

BLDG 1

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

05/14/2026

FLOOR NO.

ROOF

/1

/2

:4

:3

P

M A u to d e s k D o c s /2

A

E R

E P

L A

C E

R E

H A

B M

E D

IC

IN

E A

H U

C L E

V E

L A

N D

V A

M E

D

IC

A L C

E N

T E

R /2

A E

R E

P L

A C

E R

E H

A B

M E

D

IC

IN

E

A H

U C

L E

V E

L A

N D

V A

M E

D

IC

A L C

E N

T E

R

R

.r v t

A140

PCMH

CLEVELAND VAMC

10701 EAST BLVD, CLEVELAND, OH 44106

AE REPLACE REHAB MEDICINE

AHU CLEVELAND VA MEDICAL

CENTER

ROOF PLAN

Approver

NORTH

SCALE: 1/4" = 1'-0"

ROOF PLAN

NORTH

SCALE: 3/4" = 1'-0"

TYPICAL NEW WORK SECTION

Scale: NTS

Department of Veteran Affairs

EXHAUST

EQUIPMENT

PIPING

RETURN

RELOCATE

REVISION

SUPPLY

TEXT

BACKGROUND

EXISTING

SCOPE

COLUMN LINE

MECHANICAL LAYERS MECHANICAL SYMBOLS

S-#

NECK SIZE

CFM

(TYP. #)

SUPPLY CEILING DIFFUSER

S-#

SLOTS-SLOT WIDTH-LENGTH

CFM

(TYP. #)

S-# LxW

CFM

(TYP. #)

SUPPLY SIDEWALL DIFFUSER

SUPPLY LINEAR DIFFUSER

B#-FC-# EQUIPMENT TAG (BUILDING NO -

EQUIP NAME - EQUIP NUMBER)

FSD

REVISION DELTAS

T STATS

FIRE SMOKE DAMPER

SHEET NOTES

CO2 SENSORCO2

TVAV-1

SMOKE DETECTOR

ROOM PRESSURE MONITORP

RELOCATE

GENERAL NOTES

1. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL

BE EXERCISED TO MINIMIZE ALL INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF

THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS

OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN THE

CONSTRUCTION AREA.

2. NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN

WITHOUT PRIOR REVIEW WITH THE COR AND/OR ENGINEER TO CONFIRM THAT AREAS TO

REMAIN IN OPERATION WILL NOT BE AFFECTED. IF AREAS NOT WITHIN THE SCOPE OF

WORK ARE AFFECTED BY ANY SHUTDOWN, REMOVAL OR DISCONNECTION, SUFFICIENT

ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER INDICATING WHICH AREAS WILL BE

AFFECTED, WHEN THE PROPOSED SHUTDOWN WILL OCCUR, AND FOR HOW LONG A

PERIOD OF TIME.

3. ALL ITEMS INDICATED AS BEING DEMOLISHED OR REMOVED SHALL BE DISPOSED OF

OFF-SITE.

4. THE MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO PROCEEDING WITH ALL WORK. WHERE DISCREPANCIES OCCUR

BETWEEN THESE DOCUMENTS AND EXISTING CONDITIONS, THE DISCREPANCY SHALL BE

REPORTED TO THE COR AND/OR ENGINEER FOR RESOLUTION.

5. ALL SHUT DOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE

COR PRIOR TO COMMENCEMENT OF SAID WORK.

6. CLEAN THE JOB SITE DAILY AND REMOVE FROM THE PREMISES ALL DIRT AND DEBRIS

CAUSED BY THE PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT.

7. USE OF THE OWNER'S ELEVATORS AND BUILDING CORRIDORS FOR THE HANDLING OF

NEW AND/OR REMOVED EQUIPMENT AND MATERIALS SHALL BE AT THE DIRECTION OF THE

COR AND SHALL BE COORDINATED WITH HIS OPERATIONS.

8. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF HIS

OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR

PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS.

9. EXCEPT WHERE INDICATED AS BEING RELOCATED, EXISTING MATERIALS THAT ARE

REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS.

10. PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FOR

PIPING/DUCTWORK. DO NOT LEAVE PIPING/DUCTWORK OPEN ENDED.

11. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL".

12. THE MECHANICAL CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER TRADES

PRIOR TO FABRICATION, PURCHASE AND/OR INSTALLATION OF ANY WORK.

13. THE BALANCING CONTRACTOR SHALL TAKE AIRFLOW (CFM) AND PRESSURE READINGS

PRIOR TO THE START OF WORK ON ALL DUCTWORK THAT SERVES AREAS NOT PART OF

THIS PROJECT BUT WHERE AIRFLOW TO THOSE AREAS IS AFFECTED BY THIS PROJECT'S

WORK. AFTER MODIFICATIONS TO AIR SYSTEMS COVERED UNDER THIS PROJECT ARE

COMPLETED, THE BALANCING CONTRACTOR SHALL BALANCE THE NON-AFFECTED AREAS

TO THEIR ORIGINAL AIRFLOW AND PRESSURE OR NEW AIRFLOW AND PRESSURE IF

NOTED.

14. IF MECHANICAL CONTRACTOR ENCOUNTERS WHAT APPEARS TO BE A HAZARDOUS OR

QUESTIONABLE MATERIAL, HE SHALL DISCONTINUE WORK IMMEDIATELY AND CONTACT

THE OWNER'S REPRESENTATIVE.

15. USE OF OWNER'S UTILITIES (I.E. ELECTRICITY, WATER, HVAC, ETC.) FOR WORK INDICATED

ON THESE DOCUMENTS SHALL BE APPROVED BY THE COR PRIOR TO COMMENCEMENT OF

SAID WORK.

16. THE MECHANICAL CONTRACTOR SHALL CONFORM TO OWNER'S SAFETY AND SECURITY

GUIDELINES IN THE PERFORMANCE OF ALL WORK INCLUDED IN THIS CONTRACT.

17. ALL BRANCH PIPING SHALL BE FURNISHED WITH SHUT OFF VALVES AND SHALL BE

LOCATED IN ACCESSIBLE LOCATION BY OFFSETTING BRANCH PIPING WITH VALVES DOWN

NEAR CEILING. PROVIDE ACCESS PANEL FOR ALL VALVES AND EQUIPMENT IN NON

ACCESSIBLE CEILING AREAS.

18. ALL SUSPENDED PIPING, DUCTWORK, CONDUIT AND CABLE TRAYS SHALL BE PROVIDED

WITH, SEISMIC SWAY BRACES IN ACCORDANCE WITH THE MASON INDUSTRIES SEISMIC

RESTRAINT GUIDELINES FOR SUSPENDED PIPING, DUCTWORK AND ELECTRICAL SYSTEMS

AND THE APPLICABLE CODES. INSTALLED SYSTEM SHALL MATCH EXISTING, RIGID OR

CABLE TYPE.

19. ALL INDIVIDUAL INLET DUCTS TO CONSTANT AIR VOLUME BOXES (CAV) OR VARIABLE AIR

VOLUME BOXES (VAV) SHALL BE SAME SIZE AS INLET CONNECTION OF CAV BOX, UNLESS

NOTED OTHERWISE.

20. ALL INDIVIDUAL BRANCH PIPING TO CONSTANT AIR VOLUME BOXES (CAV) OR VARIABLE

AIR VOLUME BOXES (VAV) SHALL BE 3/4" IN SIZE, UNLESS NOTED OTHERWISE.

21. PRIOR TO ANY MODIFICATIONS OF EXISTING DUCT SYSTEMS, TEST EXISTING AIRFLOWS

AT TRAVERSE POINTS NOTED IN DRAWINGS AND SUBMIT TO ENGINEER FOR REVIEW.

TEST REPORT SHALL INDICATE EXISTING CONDITION AIRFLOW VALUES. UPON

COMPLETION OF NEW SYSTEMS, WITHIN THE SCOPE OF THE PROJECT, ALL PREVIOUSLY

TESTED SYSTEM AIRFLOWS SHALL BE SET TO ORIGINAL CONDITIONS.

22. GENERAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES ARE INDICATED ON AIR

CONDITIONING PLANS. REFERENCE ARCHITECTURAL REFLECTED CEILING PLANS AND

INTERIOR ELEVATIONS FOR SPECIFIC LOCATIONS.

23. RESTORE EXISTING FIRE PROOFING TO BEAMS, DECKS AND ALL OTHER BUILDING

ELEMENTS WHICH ARE DISTURBED OR MODIFIED AS A RESULT OF NEW WORK BEING

INSTALLED. RESTORED CONDITIONS SHALL MATCH EXISTING PRIOR TO NEW WORK BEING

PERFORMED.

24. ALL EXISTING DUCT INSULATION REMOVED, AS REQUIRED TO PERFORM SCOPE OF WORK,

SHALL BE REPAIRED USING LIKE MATERIAL TO THAT WHICH IS EXISTING.

25. DUCT ROUTINGS ARE DIAGRAMMATIC IN NATURE. PROVIDE OFFSETS, DROPS AND RISERS

AS NECESSARY TO AVOID EXISTING ELECTRICAL, HVAC, PLUMBING, FIRE PROTECTION,

ETC. SYSTEMS WHICH MAY INTERFERE WITH GENERAL ROUTING SHOWN ON DRAWINGS.

RESIZING OF DUCTS WILL BE ALLOWED PROVIDED REVISED DUCT SIZE DOES NOT EXCEED

AIR VELOCITIES OF SYSTEM DESIGN AND DRAWING IS SUBMITTED FOR REVIEW, NOTING

CHANGES PROPOSED, PRIOR TO DUCT SYSTEM FABRICATION AND INSTALLATION.

26. VERIFY EXISTING DUCT SYSTEM SIZES PRIOR TO FABRICATION OF NEW DUCT SYSTEMS.

ANY EXISTING DUCT SYSTEMS DIFFERING IN SIZE FROM THAT NOTED ON DRAWINGS

SHALL BE BROUGHT TO THE ATTENTION OF THE COR AND MECHANICAL ENGINEER.

27. PROVIDE INSULATION OVER EXISTING DUCT SECTIONS WHICH HAVE BEEN PATCHED.

INSULATION TYPE, THICKNESS AND DENSITY SHALL MATCH EXISTING. SEE

SPECIFICATIONS FOR REQUIREMENTS OF NEW DUCT SYSTEM INSULATION.

28. NOT ALL SYMBOLS, ABBREVIATIONS AND EQUIPMENT ABBREVIATIONS INDICATED APPEAR

ON THESE CONTRACT DRAWINGS

29. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A

FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING.

30. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED.

DUCT SIZES ARE NET INSIDE DIMENSIONS.

31. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,

DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND

INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH

MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.

32. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL

UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING.

33. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD

EQUIPMENT DETAILS.

34. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

35. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO

PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

36. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED

WITH BOTTOM ELEVATION OF REGISTER AT 7" ABOVE FINISHED FLOOR.

37. ALL PRESSURES LISTED ARE GAGE PRESSURE, UNLESS OTHERWISE NOTED.

38. TERMINAL AIR UNIT INLET SIZES SHALL BE THOSE SHOWN ON THE SCHEDULES, UNLESS

OTHERWISE NOTED.

VAV BOX

VAV BOX WITH REHEAT COIL

CEILING DIFFUSER (SUPPLY, RETURN,

EXHAUST)

RETURN/EXHAUST AIR SIDEWALL

DIFFUSER

DEMOLITION CEILING DIFFUSER

ELBOW (1R UNLESS OTHERWISE

NOTED)

MITERED ELBOW WITH TURNING VANES

CONICAL TAP

RISER

VOLUME DAMPER

POINT OF CONNECTION

CAP

HEPA DIFFUSERS

SUPPLY AIR SIDEWALL DIFFUSER

X

X

X

X XX

X

X

X

X

X

X

EXISTING CEILING DIFFUSER

PIPE UP

PIPING SYMBOLS

PIPE DOWN

TEE

FLOW DIRECTION

FLOOR DRAIN

FLOOR SINK

PUMP

REDUCER

ANGLED GLOBE

AUTOMATIC BALANCING CONTROL

BALANCING

BALL

BUTTERFLY

CHECK

CIRCUIT SETTER

CONTROL - FLOAT OPERATED

FLOW METER

GATE

GLOBE

M

MODULATING CONTROL

ABBREVIATIONS

TABLE OF CONTENTS

DWG # DWG TITLE

M-001 MECHANICAL COVER SHEET

M-401 MECHANICAL SCHEDULES

MD-101 MECHANICAL ROOF DEMOLITION PLAN

MH-101

M-501 MECHANICAL DETAILS

GENERAL DEMOLITION NOTES

1. SCHEDULE ALL SHUTDOWNS THAT AFFECT UTILITIES AND PORTIONS OF THE BUILDING

THAT MUST REMAIN IN OPERATION WITH THE COR .

2. DEMOLITION WORK AT ALL TIMES SHALL BE SUBJECT TO THE DIRECTION AND APPROVAL

OF THE COR AND CARRIED OUT IN SUCH A MANNER SO AS NOT TO INTERFERE WITH THE

NORMAL OPERATION OF THE BUILDING.

3. DISPOSE OF ALL REMOVED MATERIALS IN AN APPROVED MANNER.

4. ISOLATE, DRAIN, AND REFILL EXISTING SYSTEMS AS REQUIRED TO ACCOMMODATE

INSTALLATION OF EXISTING AND NEW SYSTEMS.

5. PROVIDE ALL NECESSARY TEMPORARY/PERMANENT CAPS OR PLUGS FOR PIPING. DO

NOT LEAVE PIPING OPEN ENDED.

6. ALL EXISTING PIPING SHALL BE FIELD VERIFIED FOR PROPER DEMOLITION. CONTRACTOR

SHALL NOTIFY THE COR AND ENGINEER IMMEDIATELY IF ANY DISCREPANCIES FROM

CONTRACT DOCUMENTS OCCUR THAT MAY EFFECT EXISTING OPERATIONS.

7. DEMOLITION OF PIPING INCLUDES ALL ASSOCIATED VALVES, ACCESSORIES, INSULATION,

HANGERS, AND SUPPORTS.

8. COORDINATE WITH COR ON REMOVAL AND PLACEMENT OF EQUIPMENT NOTED TO BE

TURNED OVER TO COR. FOR EQUIPMENT NOT DESIRED BY COR, CONTRACTOR SHALL

REMOVE OFF SITE IN AN APPROVED MANNER.

LINEAR DIFFUSER (1-, 2-, 3-SLOT)

DETAIL NUMBER

DRAWING SYMBOLS

M-XXX

X

DRAWING NUMBER

SECTION LETTER

DRAWING NUMBERM-XXX

X

COLD WATER

HOT WATER

HOT WATER RETURN

SANITARY SEWER (WASTE)

VENT

EXISTING COLD WATER

EXISTING HOT WATER

EXISTING HOT WATER RETURN

EXISTING SANITARY SEWER

EXISTING VENT

PLUMBING LAYERS

SPECIALITY PIPING

SPECIALITY PIPING RETURN

XX

XX

MODULATING CONTROL BUTTERFLY

PLUG

PNEUMATIC CONTROL

PRESSURE REDUCING (PRV)

PRESSURE REGULATING

PRESSURE SAFETY

SHUTOFF

THREE-WAY MODULATING CONTROL

THREE-WAY TWO POSITION CONTROL

TWO POSITION CONTROL

WATER BALANCE DEVICE

WYE STRAINER

UNION

TEMPERATURE GAGE

PRESSURE GAGE

TEST PLUG

AUTOMATIC AIR VENT

MANUAL AIR VENTMV

AV

RADIANT CEILING PANEL

STANDARD 45° TAP

BLIND TRANSMITTER

CONTROL SYMBOLS

CARBON DIOXIDE TRANSMITTER

CARBON MONOXIDE TRANSMITTER

OCCUPANCY SENSOR

CONDUCTIVITY TRANSMITTER

PRESSURE CONTROLLER

PRESSURE DIFFERENTIAL SWITCH

MOTOR OPERATOR FOR VALVE OR DAMPER

SOLENOID VALVE

VARIABLE FREQUENCY DRIVE CONTROLLER

ANALOG SIGNAL IN

PNEUMATIC OPERATOR FOR VALVE OR DAMPER

APPLICATION SPECIFIC CONTROLLER

BUILDING AUTOMATION SYSTEM

BUILDING CONTROLLER PANEL

DIGITAL SIGNAL IN

DIGITAL SIGNAL OUT

FAIL CLOSED

FAIL LAST

FAIL OPEN

NORMALLY CLOSED

NORMALLY OPEN

OPERATOR WORKSTATION

BUILDING MANAGEMENT SYSTEM

ANALOG SIGNAL OUT

CUSTOM APPLICATION CONTROLLER

AT

AT

AT

AT

CT

PC

PDS

M

VFD

AI

AO

SV

ASC

CAC

BAS

BCP

DO

FC

BMS

DI

FL

FO

NC

NO

OWS

PRESSURE SWITCH LOW

PRESSURE TRANSMITTER

SPEED CONTROLLER

LOCAL TEMPERATURE CONTROL PANEL

HVAC CONTROL PANEL

VARIABLE SPEED MOTOR CONTROLLER

PSL

PT

SC

LTCP

HVAC

VSMC

PRESSURE DIFFERENTIAL TRANSMITTER

PRESSURE GAUGE

PRESSURE SWITCH HIGH

PDT

PI

PSH

ELECTRONIC TO PNEUMATIC TRANSDUCER

FLOW CONTROLLER

FLOW ELEMENT

FLOW SWITCH

EPT

FC

FE

FS

FLOW SWITCH HIGH

FLOW SWITCH LOW

FLOW TRANSMITTER

HUMIDISTAT

FSH

FSL

FT

H

HAND SWITCH

CURRENT TRANSMITTER

TIME CLOCK CONTROLLING EQUIP ON SCHEDULE

LOCAL RECORDING TIME CLOCK (RUNTIME)

HS

IT

KC

KR

LEVEL CONTROLLER

LEVEL TRANSMITTER

HIGH LIMIT HUMIDITY SENSOR

MOISTURE (HUMIDITY) TRANSMITTER

LC

LT

MSH

MT

OC

CO

CO2

VALVE OR DAMPER POSITION CONTROLLER

POSITION SWITCH

ZC

ZS

ECC

SMOKE DETECTORSD

STATIC PRESSURE SENSOR

THERMOSTAT

TEMPERATURE CONTROLLER

THERMOMETER

SPS

T

TC

TI

TEMPERATURE SWITCH

TEMPERATURE SWITCH HIGH (FREEZESTAT)

TEMPERATURE SWITCH LOW (FREEZESTAT)

TEMPERATURE TRANSMITTER

TS

TSH

TSL

TT

INTEGRATE CONTROL POINT ON REMOTE

GRAPHICS WORKSTATION AT ENERGY CONTROL

CENTER

MOTOR STARTER

A/E ARCHITECT / ENGINEER

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

ASHRAE AMERICAN SOCIETY OF HEATING

REFRIGERATION AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CD CEILING DIFFUSER

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CHW CHILLER WATER

CHS/CHR CHILLED WATER SUPPLY/RETURN

CO CLEAN OUT

CO2 CARBON DIOXODE

COP COEFFICIENT OF PERFORMANCE

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWS/CWR CONDENSER WATER

SUPPLY/RETURN (FROM/TO

COOLING TOWER)

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DESIGN DEVELOPMENT

(SUBMISSION 1)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DX DIRECT EXPANSION

(E) EXISTING

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EQUIP EQUIPMENT

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

F FAHRENHEIT

FSD COMBINATION FIRE SMOKE

DAMPER

FC FLEXIBLE CONNECTION

FD FLOOR DRAIN

FD FIRE DAMPER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIBB

HP HORSEPOWER

HW HOT WATER

HWS/HWR HEATING HOT WATER

SUPPLY/RETURN

HZ HERTZ

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPS LOW PRESSURE STEAM

LWT LEAVING WATER TEMPERATURE

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAX MAXIMUM

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT

AMPACITY

MERV MINIMUM EFFICIENCY

REPORTING VALUE

MIN MINIMUM

N/A NOT APPLICABLE

NC NOISE CRITERIA

NIC NOT IN CONTRACT

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

Pa PASCAL

PD PRESSURE DROP

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION LINE

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SD SMOKE DETECTOR

SD-1 SCHEMATIC DESIGN

(SUBMISSION1)

SDPR SMOKE DAMPER

SP STATIC PRESSURE

SQ FT/SF SQUARE FOOT (FEET)

TAB TESTING, ADJUSTING, BALANCE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

UC UNDER CUT

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

W WATTS

Wb WET-BULB (TEMPERATURE)

YR YEAR

EQUIP. ABBREVIATIONS

AAHX AIR TO AIR HEAT EXCHANGER

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

AF AFTER FILTER

AHU AIR-HANDLING UNIT

AS AIR SEPARATOR

B BOILER

BDR BASE BOARD RADIATOR

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT

EXCHANGER

BT BLOWOFF TANK

CC COOLING COIL

CCD COOLING COIL CONDENSATE

DRAIN

CFP CHEMICAL FEED PUMP

CH CHILLER

CHP CHILLED WATER PUMP

COMP COMPRESSOR UNIT

CP CONDENSATE PUMP

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

DXCC DIRECT EXPANSION COOLING COIL

EC EVAPORATIVE COOLER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EF EXHAUST FAN

EH EXHAUST HOOD

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ET EXPANSION TANK

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FHX FLUE GAS/FEEDWATER HEAT

EXCHANGER

FPTU FAN POWERED TERMINAL UNIT

FTR FIN TUBE RADIATION

H HUMIDIFER

HC HEATING COIL

HD HOOD

HP HEAT PUMP

HPDT HIGH PRESSURE DRIP TRAP

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING)

PANEL

HRW HEAT RECOVERY WHEEL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

ICF IN-LINE CENTRIFUGAL FAN

IU INDUCTION UNIT

LLHX LIQUID TO LIQUID HEAT

EXCHANGER

MAU MAKE-UP AIR UNIT

P PUMP

PF PRE-FILTER

PHC PREHEAT COIL

PTAC PACKAGED TERMINAL AIR

CONDITIONER

RAHX ROTARY AIR HEAT EXCHANGER

RCCH REMOTE CONDENSER

CHILLER

RCU RECIPROCATING CHILLER UNIT

RF RETURN FAN

RHC REHEAT COIL

SAD SOUND ATTENUATING DEVICE

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SSHX STEAM TO STEAM HEAT

EXCHANGER

ST STEAM TRAP

SUH STEAM UNIT HEATER

SWHX STEAM TO WATER HEAT

EXCHANGER

TU TERMINAL UNIT

UC UNIT COOLER

UH UNIT HEATER

VUH VERTICAL UNIT HEATER

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING

UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

SCOPE OF WORK

REPLACE POOLPAK AHU AND EXHAUST FAN.

MH-102 MECHANICAL ROOF NEW WORK PLAN

MECHANICAL BASEMENT NEW WORK PLAN

DEMOLITION

POINT OF DISCONNECTION

M-601 POOL UNIT CONTROLS DIAGRAM

M-602 ROOFTOP EXHAUST FAN CONTROLS DIAGRAM

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text M-001

AutoCAD SHX Text

MECHANICAL COVER SHEET

AutoCAD SHX Text

CLEVELAND VAMC 10701 EAST BLVD, CLEVELAND, OH 44106

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text

AE REPLACE REHAB MEDICINE AHU CLEVELAND VA MEDICAL CENTER

AutoCAD SHX Text 541-25-504

AutoCAD SHX Text

JM

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Dwg. of 08

AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text

BID SET SUBMISSION

AutoCAD SHX Text 05/14/2026

AutoCAD SHX Text

AB

AutoCAD SHX Text 05/14/2026

AutoCAD SHX Text

SD

AutoCAD SHX Text R

Veteran Affairs

PROJECT

LOCATION:

MC

F

HG

E

L

BA

D K

KEY NOTES

SHEET NOTES

KEY PLAN

N

1. REMOVE EXISTING ROOFTOP POOLPAK CONDENSING UNIT

AND LEAVE EXISTING RAILS IN PLACE.

2. REMOVE EXISTING ROOFTOP POOLPAK AIR HANDLING UNIT

AND EXISTING CURB. REMOVE ANY OBSTRUCTIONS TO

FUTURE DUCTWORK PATH.

3. REMOVE EXISTING ROOFTOP WET EXHAUST FAN AND

REPLACE WITH SAME OR SIMILAR UNIT PER VA TIL

STANDARDS. ENSURE PROPER DISCONNECTION,

STRUCTURAL SUPPORT, CORROSION RESISTANCE, AND

WEATHERPROOFING. FOLLOW VA HVAC, SEISMIC, AND FIRE

PROTECTION GUIDELINES. SUBMIT DOCUMENTATION AND

VERIFY PERFORMANCE THROUGH COMMISSIONING.

1. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE

RESPONSIBILITY OF THE CONTRACTOR(S) TO VERIFY

EXISTING DUCTWORK, PIPING, AND EQUIPMENT

LOCATIONS. REPORT ANY DISCREPANCIES BETWEEN

PLANS AND SITE CONDITIONS TO A/E. CONTRACTOR SHALL

COORDINATE WITH ALL OTHER TRADES AND EXISTING

CONDITIONS.

2. NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED,

DISCONNECTED, OR SHUT DOWN WITHOUT PRIOR REVIEW

WITH THE COR AND/OR ENGINEER TO CONFIRM THAT

AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED.

IF AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED

BY ANY SHUTDOWN, REMOVAL, OR DISCONNECTION,

SUFFICIENT ADVANCE NOTICE OF TEN (10) BUSINESS DAYS

SHALL BE GIVEN TO THE OWNER INDICATING WHICH AREAS

WILL BE AFFECTED, WHEN THE PROPOSED SHUTDOWN

WILL OCCUR, AND FOR HOW LONG A PERIOD OF TIME.

3. CONTRACTOR SHALL VERIFY AND DOCUMENT THE

ROUTING AND LOCATION OF ALL ELECTRICAL POWER

CIRCUITS AND CONTROL WIRING PRIOR TO DEMOLITION.

COORDINATE WITH OWNER AND ENSURE SAFE ISOLATION

BEFORE REMOVAL.

4. COORDINATE WITH ELECTRICAL CONTRACTOR FOR

DISCONNECTING EXISTING ELECTRICAL FEEDS, CONTROLS,

AND DISCONNECT SWITCHES. ELECTRICAL SCOPE SHOWN

UNDER SEPARATE DIVISION.

5. REMOVE ALL TEMPORARY FASTENERS, BLOCKING, AND

LEGACY SUPPORTS ASSOCIATED WITH THE EXISTING

UNITS, WHETHER SHOWN OR NOT.

6. ALL DEMOLITION WORK TO OCCUR DURING

OFF-HOUR/WEEKEND SHUTDOWN AS COORDINATED WITH

OWNER.

7. CONTRACTOR TO TAB AIR FLOWS PRIOR TO AND

FOLLOWING INSTALLATION TO BEST RETAIN EXISTING

CONDITIONS LIKE FOR LIKE.

1/4" = 1'-0"1 MECHANICAL BASEMENT PLAN - DEMOLITION

T

R

Q

P

N

U

V

36 3735

(E) AHU-1

(E) EF-6B

(E) CU-1

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text

MD-101

AutoCAD SHX Text

MECHANICAL ROOF DEMOLITION PLAN

AutoCAD SHX Text

CLEVELAND VAMC 10701 EAST BLVD, CLEVELAND, OH 44106

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text

AE REPLACE REHAB MEDICINE AHU CLEVELAND VA MEDICAL CENTER

AutoCAD SHX Text 541-25-504

AutoCAD SHX Text

JM

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Dwg. of 08

AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text

BID SET SUBMISSION

AutoCAD SHX Text 05/14/2026

AutoCAD SHX Text

AB

AutoCAD SHX Text 05/14/2026

AutoCAD SHX Text 2B-152Q

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text 2B-152R

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text 2B-152C

AutoCAD SHX Text 2B-152B

AutoCAD SHX Text

OPERATORY

AutoCAD SHX Text

EMS

AutoCAD SHX Text 2B-152A

AutoCAD SHX Text

ADA OPERATORY

AutoCAD SHX Text 2B-151K

AutoCAD SHX Text 2B-151H

AutoCAD SHX Text

RECOVER

AutoCAD SHX Text

ATTEND

AutoCAD SHX Text 2B-151J

AutoCAD SHX Text

ORAL SURG

AutoCAD SHX Text

DOCTORS

AutoCAD SHX Text 2B-151D

AutoCAD SHX Text

BOTTLE STOR

AutoCAD SHX Text 2B-151C

AutoCAD SHX Text

CONSULT./ WAIT

AutoCAD SHX Text 2B-151B

EXISTING ROOF MOUNTED DUCTWORK (NIC)

2 1

Veteran Affairs

3/16" = 1'-0"1 MECHANICAL BASEMENT PLAN - NEW WORK

PROJECT

LOCATION:

MC

F

HG

E

L

BA

D K

KEY NOTES

KEY PLAN

N

1. CONNECT EXISTING SUPPLY & RETURN DUCTWORK TO

NEW AHU-1 PER VA TIL STANDARDS. ENSURE PROPER

ALIGNMENT, SEALING, AND SUPPORT. USE

SMACNA-COMPLIANT FITTINGS AND MATERIALS. MAINTAIN

AIRFLOW INTEGRITY, INSULATION, AND SYSTEM

PERFORMANCE. VERIFY INSTALLATION THROUGH

COMMISSIONING AND SUBMIT REQUIRED DOCUMENTATION.

SEAL ALL DUCT CONNECTIONS AIRTIGHT TO SMACNA SEAL

CLASS A OR HIGHER. BALANCE SYSTEM AIRFLOWS AND

VERIFY PROPER OPERATION PER MANUFACTURER AND

DESIGN REQUIREMENTS.

2. CONNECT EXISTING EXHAUST DUCTWORK TO NEW

ROOFTOP EXHAUST FAN EF-6B PER VA TIL STANDARDS.

USE SMACNA-COMPLIANT MATERIALS AND SEALING

METHODS. ENSURE PROPER ALIGNMENT, SUPPORT, AND

CORROSION RESISTANCE. MAINTAIN AIRFLOW INTEGRITY

AND FIRE SAFETY. SUBMIT DOCUMENTATION AND VERIFY

INSTALLATION THROUGH COMMISSIONING. SEAL ALL DUCT

CONNECTIONS AIRTIGHT TO SMACNA SEAL CLASS A OR

HIGHER. BALANCE SYSTEM AIRFLOWS AND VERIFY

PROPER OPERATION PER MANUFACTURER AND DESIGN

REQUIREMENTS.

SHEET NOTES

1. SEE DRAWING M-001 FOR GENERAL NOTES, SYMBOLS,

ABBREVIATIONS, AND GENERAL PHASING NOTES.

2. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE

RESPONSIBILITY OF THE CONTRACTOR(S) TO VERIFY

EXISTING DUCTWORK, PIPING AND EQUIPMENT LOCATIONS.

REPORT ANY DISCREPANCIES BETWEEN PLANS AND SITE

CONDITIONS TO A/E. CONTRACTOR SHALL COORDINATE

WITH ALL OTHER TRADES AND EXISTING CONDITIONS.

3. DUCTWORK AND PIPING SIZES SHOWN ARE BEST

INTERPRETATION OF AVAILABLE DATA. CONTRACTOR TO

VERIFY PIPE SIZES DURING COURSE OF WORK, AND REPORT

ANY DISCREPANCIES BETWEEN PLANS AND SITE

CONDITIONS.

4. THE USE OF ASTM A307 BOLTS IS PROHIBITED ON THIS

PROJECT. CONTRACTOR IS TO UTILIZE ALLOY-STEEL OR

STAINLESS STEEL, ASTM A193 METHODS FOR ALL FLANGE

BOLTING. IF THE CONTRACTOR IDENTIFIES OR OBSERVES

POTENTIAL ASTM A307 BOLTS ON ANY EXISTING STEAM OR

HYDRONIC PIPING WITHIN THE PROJECT AREA THEY ARE TO

NOTIFY THE VA COR IMMEDIATELY AND DOCUMENT THE

LOCATION AND QUANTITY IN WRITING.

5. DUCTWORK IS REPRESENTATIVE AND NO NEW WORK IS

INTENDED OTHER THAN THE CONNECTION OF THE SUPPLY,

RETURN, AND EXHAUST DUCT CONNECTIONS TO THE NEW

ROOFTOP MOUNTED EQUIPMENT. NO MODIFICATIONS OF

EXISTING DUCTWORK WITHIN THE SPACE IS INCLUDED IN

THE SCOPE OF WORK.

6. CONTRACTOR TO TAB AIR FLOWS PRIOR TO AND FOLLOWING

INSTALLATION TO BEST RETAIN EXISTING CONDITIONS LIKE

FOR LIKE.

36 37 39 40 41 42353433

V

T

R

Q

P

N

L1

L

L-B-411

L-B-412

L-B-413A

L-B-413B

L-B-413

L-B-410A

L-B-416

L-B-417

L-B-414

L-B-418

L-B-419

F19

F21

L-B-415

L-B-490

L-B-400

L-B-421 L-B-401

L-B-410

8Ø SA

8Ø RA

8Ø SA

10Ø SA

12x10 SA

12x12 RA

6Ø SA

8Ø RA

6Ø SA

6Ø EA

8Ø EA

x1

SA

6Ø SA

10Ø SA

6Ø SA

6Ø SA

6Ø SA

6Ø SA

6Ø SA

8Ø SA

6Ø SA

x1

R

A x1

R

A

12x6 EA

12Ø SA

8Ø SA

10x4 RA

8Ø EA

10x10 EA

6Ø EA

14x10 EA

6Ø SA 8Ø EA

x1

SA

18x12 SA18x7 SA

18x7 SA x1

SA

14x10 EA

12x8 EA x7 S

A

18x12 SA 20x14 SA

18x7 SA

18x7 SA

18x12 EA

30x12 EA

20x16 SA

18x7 SA

6Ø SA

8Ø EA

10x6 RA

11x10 SA

12x7 EA

10x6 EA

8Ø SA

11Ø SA

6Ø SA

6Ø SA

6Ø EA

6Ø EA

10x8 EA

12x7 EA

10x10 EA

8Ø EA

12x8 EA

6Ø SA 11x10 EA

56x16 RA

34x18 RA x2

R

A

24x11 EA

16x7 EA x1

EA

24x24 SA 24x24 SA

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text

MH-101

AutoCAD SHX Text

MECHANICAL BASEMENT NEW WORK PLAN

AutoCAD SHX Text

CLEVELAND VAMC 10701 EAST BLVD, CLEVELAND, OH 44106

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text

AE REPLACE REHAB MEDICINE AHU CLEVELAND VA MEDICAL CENTER

AutoCAD SHX Text 541-25-504

AutoCAD SHX Text

JM

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Dwg. of 08

AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text

BID SET SUBMISSION

AutoCAD SHX Text 05/14/2026

AutoCAD SHX Text

AB

AutoCAD SHX Text 05/14/2026

AutoCAD SHX Text L-B-411

AutoCAD SHX Text L-B-412

AutoCAD SHX Text L-B-413A

AutoCAD SHX Text L-B-413B

AutoCAD SHX Text L-B-413

AutoCAD SHX Text L-B-410A

AutoCAD SHX Text L-B-416

AutoCAD SHX Text L-B-417

AutoCAD SHX Text L-B-414

AutoCAD SHX Text L-B-418

AutoCAD SHX Text L-B-419

AutoCAD SHX Text F19

AutoCAD SHX Text F21

AutoCAD SHX Text L-B-415

AutoCAD SHX Text L-B-490

AutoCAD SHX Text L-B-400

AutoCAD SHX Text L-B-421

AutoCAD SHX Text L-B-401

AutoCAD SHX Text L-B-410

AutoCAD SHX Text U

AutoCAD SHX Text L3

AutoCAD SHX Text L2

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

%%UVAV-104

AutoCAD SHX Text

%%UVAV-103

AutoCAD SHX Text

%%UVAV-102

AutoCAD SHX Text

UP

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

PT/RT

AutoCAD SHX Text

WORK

AutoCAD SHX Text

POOL

AutoCAD SHX Text

POOL

AutoCAD SHX Text

CIRCULATION

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

MAIN

AutoCAD SHX Text

STREET

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

TLT

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

SHWR

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

MENS

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

KINESIOTHERAPY

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

DIRECTOR

AutoCAD SHX Text

HALL

AutoCAD SHX Text

HALL

AutoCAD SHX Text

%%UVAV-101

AutoCAD SHX Text

PHASE 2

AutoCAD SHX Text

PHASE 1

AutoCAD SHX Text

PHASE 1

AutoCAD SHX Text

PHASE 2

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

DN.

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text

CFM

PROJECT

LOCATION:

MC

F

HG

E

L

BA

D K

KEY NOTES

KEY PLAN

N

1. INSTALL NEW ROOFTOP AHU-1 CONDENSING UNIT. PROVIDE

NEW VIBRATION ISOLATORS AND SUPPORTS PER

MANUFACTURER REQUIREMENTS.

2. INSTALL NEW ROOFTOP AHU-1 AIR HANDLING UNIT AND

CURB. PROVIDE NEW VIBRATION ISOLATORS AND

SUPPORTS PER MANUFACTURER REQUIREMENTS.

3. PROVIDE AND INSTALL NEW REFRIGERANT PIPING BETWEEN

CONDENSER AND EVAPORATOR COIL. SIZE, ROUTE, AND

SUPPORT PER MANUFACTURER REQUIREMENTS.

PRESSURE-TEST AND EVACUATE SYSTEM.

4. PROVIDE NEW ROOFTOP CONDENSATE DRAIN PIPING,

SUPPORTS, AND ROOF DRAINAGE INTERFACE AS SHOWN.

ENSURE POSITIVE SLOPE AND PROPER DISCHARGE.

5. INSTALL NEW ROOFTOP WET EXHAUST FAN TO…