900465 Final Signed Plans.pdf

PDF 21 MB Posted

Attached to
2026 ITB 7 Old Coburg Road Stormwater Retrofit
Solicitation number
S-KE0010-00016892
Issued by
Oregon

About this file

900465 Final Signed Plans

This document comprises final signed construction plans for the 2026 ITB 7 Old Coburg Road Stormwater Retrofit project in Oregon. The project scope includes removal of existing curbless concrete splash pads at stormwater facilities, installation of temporary traffic control and erosion control measures, tree preservation activities, construction of new concrete splash pads, concrete stormwater planters, concrete mow curbs, minor lawn repair work, and stormwater soil, mulch, and planting installation. The signed plans represent the final approved design documentation for the bidding and construction phases of this stormwater infrastructure improvement project.

The plans establish the technical specifications and construction details necessary for contractors to execute the work described in the invitation to bid. As final signed plans, these documents serve as the binding specifications against which contractor bids will be evaluated and construction performance will be measured. The plans include detailed drawings, dimensions, material specifications, and construction methodologies required to complete the stormwater retrofit improvements in compliance with applicable Oregon standards and the original project scope.

View the file

Other files

File Type Posted
900465 contract and bonds.pdf PDF
900465 Bid Forms.pdf PDF
900465 specifications.pdf PDF
900465 Instructions to Bidders.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .