900070 plans 2023_Part7.pdf
PDF 25 MB Posted
- Attached to
- 2023 ITB 4 8th Avenue Streetscape and Bikeway
- Solicitation number
- S-KE0010-00005773
- Issued by
- Lane County, Elmira CDP, Oregon
About this file
The document provided is a set of plans for a state and local contract opportunity titled "2023 ITB 4 8th Avenue Streetscape and Bikeway" involving Lane County and the City of Eugene, Oregon. The scope of work for this contract includes cold plane removal of existing asphalt surfaces, asphalt paving, roadway reconstruction, wastewater pipe repairs, storm water structure modifications and stormwater pipe installation, temporary pedestrian and traffic control, construction of concrete walk and curbs, permanent pavement markings and signage, permanent signals and detection, coordination with utilities, and constructing new storm pipes and rain gardens.
The document does not provide specific details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information. The contract appears to be for construction services related to the 8th Avenue Streetscape and Bikeway project in the jurisdictions of Lane County and the City of Eugene, Oregon.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .