900070-20230309 Bid Tabulation.pdf
PDF 90 KB Posted
- Attached to
- 2023 ITB 4 8th Avenue Streetscape and Bikeway
- Solicitation number
- S-KE0010-00005773
- Issued by
- Lane County, Elmira CDP, Oregon
About this file
This document is a Bid Tabulation Summary Report for the 8th Avenue Streetscape and Bikeway project, which involves road reconstruction work in Lane County and the City of Eugene, Oregon. The scope of work includes cold plane removal of existing asphalt, asphalt paving, wastewater pipe repairs, storm water structure modifications and stormwater pipe installation, construction of concrete walks and curbs, permanent pavement markings and signage, and permanent signals and detection. The project received bids from two contractors, Wildish Construction Co. and RiverBend Construction Inc. The engineer's estimate for the project was $4,369,939.25, while the bids received were $6,785,810.80 from Wildish Construction Co. and $6,585,982.10 from RiverBend Construction Inc. The bid tabulation provides detailed pricing information for over 100 line items. The project is funded by the state and local jurisdictions.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pay Item No. Quantity Unit Extended Value Unit Value Extended Value
2100010 1.00 LS $300,000.00 $650,000.00 $650,000.00
2250010 1.00 LS $70,000.00 $150,000.00 $150,000.00
2250020 1.00 LS $15,000.00 $25,000.00 $25,000.00
2250480 521.00 FT $4,689.00 $4.00 $2,084.00
2250490 924.00 SF $13,860.00 $9.00 $8,316.00
2250550 1.00 EA $11,000.00 $7,500.00 $7,500.00
2250630 8.00 EA $2,400.00 $550.00 $4,400.00
2800010 1.00 LS $8,000.00 $33,000.00 $33,000.00
2800170 1.00 LS $8,000.00 $8,000.00 $8,000.00
2800190 101.00 EA $7,575.00 $150.00 $15,150.00
2900010 1.00 LS $300.00 $500.00 $500.00
2900030 1.00 LS $300.00 $500.00 $500.00
2940000 5,000.00 FA $5,000.00 $1.00 $5,000.00
2940010 1.00 LS $500.00 $5,000.00 $5,000.00
3100100 4.00 FT $2,400.00 $140.00 $560.00
3100020 35.00 FT $5,250.00 $74.00 $2,590.00
3100080 18.00 EA $17,100.00 $1,000.00 $18,000.00
3100090 1.00 EA $1,700.00 $2,400.00 $2,400.00
3100095 2,130.10 SF $21,301.00 $18.00 $38,341.80
3300010 1,271.70 CY $63,585.00 $82.00 $104,279.40
4150020 1,424.70 FT $18,521.10 $13.00 $18,521.10
4300120 132.00 FT $5,940.00 $87.00 $11,484.00
4420015 1.00 LS $8,000.00 $4,300.00 $4,300.00
4450095 70.10 FT $4,556.50 $62.00 $4,346.20
4450130 1,146.50 FT $91,720.00 $180.00 $206,370.00
4450140 278.20 FT $27,820.00 $250.00 $69,550.00
4451470 4.00 EA $1,800.00 $520.00 $2,080.0027 3" Cleanout $450.00 $400.00 $1,600.00
26 12 Inch PVC Storm Pipe $100.00 $260.00 $72,332.00
25 10 Inch PVC Storm Pipe $80.00 $250.00 $286,625.00
24 3 Inch PVC Pipe $65.00 $30.00 $2,103.00
23 CSLM Cap Over Duct Bank, 2 Inches Thick $8,000.00 $1,500.00 $1,500.00
22 4" Perforated PVC Drain Pipe $45.00 $80.00 $10,560.00
21 Mainline Video Inspection $13.00 $9.00 $12,822.30
20 General Excavation $50.00 $95.00 $120,811.50
19 Remove Concrete Surfacing $10.00 $20.00 $42,602.00
18 Removal of Manholes $1,700.00 $6,000.00 $6,000.00
17 Removal of Inlets $950.00 $1,200.00 $21,600.00
16 Removal of Pipes $150.00 $75.00 $2,625.00
15 Removal of Rock Wall $600.00 $1,000.00 $4,000.00
14 Health and Safety Plan $500.00 $1,500.00 $1,500.00
13 Contaminated Soil Removal $1.00 $1.00 $5,000.00
12 CWRR Report $300.00 $400.00 $400.00
11 Pollution Control Plan $300.00 $400.00 $400.00
10 Inlet Protection $75.00 $80.00 $8,080.00
9 Concrete Washout Facility $8,000.00 $7,000.00 $7,000.00
8 Erosion Control $8,000.00 $15,000.00 $15,000.00
7 City Provided Special Info Signs $300.00 $500.00 $4,000.00
6 Portable Changeable Message Signs $11,000.00 $5,000.00 $5,000.00
5 Legend Removal $15.00 $3.00 $2,772.00
4 Stripe Removal $9.00 $2.00 $1,042.00
3 Temporary Pedestrian Work Zone Traffic Control $15,000.00 $50,000.00 $50,000.00
2 Temp. Work Zone Traffic Control, Complete $70,000.00 $250,000.00 $250,000.00
1 Mobilization $300,000.00 $675,000.00 $675,000.00
Line No Description Unit Value Unit Value Extended Value
Bidder 1 Bidder 2
Engineer Estimate Wildish Construction Co RiverBend Construction Inc
BID TABULATION SUMMARY REPORT
Project Number 900070 Project Name 8TH AVENUE STREETSCAPE AND BIKEWAY
Run Date: 3/9/2023 Page 1 of 5
Pay Item No. Quantity Unit Extended Value Unit Value Extended ValueLine No Description Unit Value Unit Value Extended Value
Bidder 1 Bidder 2
Engineer Estimate Wildish Construction Co RiverBend Construction Inc
BID TABULATION SUMMARY REPORT
Project Number 900070 Project Name 8TH AVENUE STREETSCAPE AND BIKEWAY
4700030 20.00 EA $70,000.00 $10,000.00 $200,000.00
4700260 2.00 EA $6,200.00 $6,800.00 $13,600.00
4700370 2.00 EA $5,600.00 $5,400.00 $10,800.00
4700410 29.00 EA $81,200.00 $3,800.00 $110,200.00
4709999 33.00 EA $66,000.00 $4,500.00 $148,500.00
4900010 33.00 EA $36,300.00 $2,400.00 $79,200.00
4900032 2.00 EA $4,000.00 $4,900.00 $9,800.00
4900035 4.00 EA $8,000.00 $4,500.00 $18,000.00
4900040 22.00 EA $6,600.00 $700.00 $15,400.00
4900050 1.00 EA $750.00 $4,300.00 $4,300.00
4900070 23.00 EA $16,100.00 $1,500.00 $34,500.00
4900090 3.00 EA $2,250.00 $1,800.00 $5,400.00
4900100 1.00 EA $3,000.00 $6,300.00 $6,300.00
4900120 9.00 EA $4,500.00 $650.00 $5,850.00
4900130 13.00 EA $5,850.00 $650.00 $8,450.00
4900152 1.00 EA $700.00 $2,700.00 $2,700.00
4900170 1.00 EA $1,500.00 $4,400.00 $4,400.00
4900360 1.00 EA $600.00 $4,700.00 $4,700.00
4901830 4.00 EA $1,200.00 $1,100.00 $4,400.00
4901850 15.00 EA $6,000.00 $1,100.00 $16,500.00
4901980 14.00 EA $2,800.00 $130.00 $1,820.00
6200030 5,833.30 SY $17,499.90 $7.00 $40,833.10
6200030 1,067.20 SY $4,535.60 $36.00 $38,419.20
6200040 2,878.90 SY $12,955.05 $15.00 $43,183.50
6200045 2,927.90 SY $14,639.50 $21.00 $61,485.90
6400050 763.20 SY $19,080.00 $63.00 $48,081.60
7440060 2,378.50 TN $309,205.00 $200.00 $475,700.0054 Level 2, 1/2 Inch ACP Mixture with 35% RAM $130.00 $156.00 $371,046.00
53 Aggregate Working Platform, 12" thick $25.00 $37.00 $28,238.40
52 Cold Plane Pavement Removal, Varies, Park Blocks $5.00 $13.00 $38,062.70
51 Cold Plane Pavement Removal, 4 Inches Deep $4.50 $8.00 $23,031.20
50 Cold Plane Pavement Removal, 3 Inches Deep $4.25 $8.50 $9,071.20
49 Cold Plane Pavement Removal, 2 Inches Deep $3.00 $6.00 $34,999.80
48 Reconnect Weep Hole $200.00 $200.00 $2,800.00
47 Abandon Pipe in Place $400.00 $300.00 $4,500.00
46 Plug Pipe Void in Existing Structure $300.00 $500.00 $2,000.00
45 12 Inch Concrete Pipe Repair $600.00 $3,900.00 $3,900.00
44 10 Inch PVC Pipe Repair $1,500.00 $3,600.00 $3,600.00
43 Replace Catch Basin Frame and Bike-Proof Grate $700.00 $1,000.00 $1,000.00
42 Manhole Frame and Cover - Stormwater $450.00 $600.00 $7,800.00
41 Manhole Frame and Cover - Wastewater $500.00 $600.00 $5,400.00
40 Extra for Manhole Over Existing Pipe $3,000.00 $9,000.00 $9,000.00
39 Connection to Existing Pipe $750.00 $1,000.00 $3,000.00
38 Connection to Existing Structures $700.00 $1,500.00 $34,500.00
37 Adjusting Catch Basins $750.00 $2,500.00 $2,500.00
36 Adjusting Boxes $300.00 $500.00 $11,000.00
35 Modify Existing Curb Inlet $2,000.00 $1,500.00 $6,000.00
34 Concrete Inlet Top and Lid, Type 4 A $2,000.00 $2,000.00 $4,000.00
33 Minor Adjustment of Manholes $1,100.00 $2,200.00 $72,600.00
32 Planter Overflow Inlet $2,000.00 $5,000.00 $165,000.00
31 Modified Planter Inlet $2,800.00 $3,600.00 $104,400.00
30 Catch Basins, With Cast Iron Bike Proof Grates $2,800.00 $3,500.00 $7,000.00
29 Concrete Inlets, Type 2-1/2A $3,100.00 $5,000.00 $10,000.00
28 Concrete Stormwater Manhole $3,500.00 $11,000.00 $220,000.00
Run Date: 3/9/2023 Page 2 of 5
Pay Item No. Quantity Unit Extended Value Unit Value Extended ValueLine No Description Unit Value Unit Value Extended Value
Engineer Estimate Wildish Construction Co RiverBend Construction Inc
BID TABULATION SUMMARY REPORT
Project Number 900070 Project Name 8TH AVENUE STREETSCAPE AND BIKEWAY
7480025 222.00 SY $5,550.00 $29.00 $6,438.00
7480040 360.80 SY $10,824.00 $44.00 $15,875.20
7480055 168.60 SY $5,901.00 $55.00 $9,273.00
7560030 386.90 SY $69,642.00 $198.00 $76,606.20
7560330 2.00 EA $10,000.00 $35,200.00 $70,400.00
7590010 1,870.70 FT $140,302.50 $76.00 $142,173.20
7590015 41.00 FT $3,690.00 $86.00 $3,526.00
7590020 22.10 FT $1,326.00 $68.00 $1,502.80
7590040 1,294.20 FT $103,536.00 $150.00 $194,130.00
7590080 285.30 FT $25,677.00 $200.00 $57,060.00
7590084 716.50 FT $85,980.00 $300.00 $214,950.00
7590085 177.00 FT $26,550.00 $200.00 $35,400.00
7590086 26.70 FT $3,471.00 $210.00 $5,607.00
7590091 4,232.80 SF $253,968.00 $34.00 $143,915.20
7590120 40.40 SF $1,010.00 $37.00 $1,494.80
7590147 690.20 SF $20,706.00 $25.00 $17,255.00
7590150 5,312.90 SF $58,441.90 $14.00 $74,380.60
7590151 10,410.00 SF $260,250.00 $34.00 $353,940.00
7590160 16,334.30 SF $408,357.50 $17.00 $277,683.10
7590360 58.70 FT $5,870.00 $96.00 $5,635.20
7590361 271.00 FT $32,520.00 $82.00 $22,222.00
7590361 1,104.30 FT $88,344.00 $90.00 $99,387.00
7590390 2,040.80 SF $71,428.00 $46.00 $93,876.80
7590392 393.10 SF $17,689.50 $89.00 $34,985.90
7590500 3.00 EA $6,000.00 $1,350.00 $4,050.00
7590510 1.00 EA $1,000.00 $3,000.00 $3,000.00
7590530 4.60 FT $1,150.00 $360.00 $1,656.0081 Concrete Weir $250.00 $800.00 $3,680.00
80 Parallel Covered Spillway and Splash Pad $1,000.00 $1,400.00 $1,400.00
79 Angle Inlet With Spillway $2,000.00 $1,400.00 $4,200.00
78 Truncated Domes on New Surfaces, Radial $45.00 $58.00 $22,799.80
77 Truncated Domes on New Surfaces $35.00 $30.00 $61,224.00
76 Valley Gutter, Modified $80.00 $36.00 $39,754.80
75 Valley Gutter, 18" Wide $120.00 $60.00 $16,260.00
74 Valley Gutter $100.00 $70.00 $4,109.00
73 Concrete Walks, 7 Inches Thick $25.00 $18.00 $294,017.40
72 Concrete Ramp, 4 Inches Thick $25.00 $25.00 $260,250.00
71 Concrete Walks, 4 Inches Thick $11.00 $17.00 $90,319.30
70 Concrete Walks, 7 Inches Thick, Reinforced $30.00 $45.00 $31,059.00
69 Concrete Driveways, 7 Inches Thick $25.00 $115.00 $4,646.00
68 Concrete Traffic Separator $60.00 $13.00 $55,026.40
67 Concrete Curbs, 12 Inches Wide Planter Curb $130.00 $220.00 $5,874.00
66 Concrete Curbs, 18 Inches Wide Planter Curb and Gutter $150.00 $210.00 $37,170.00
65 Concrete Curbs, Planter Curb and Gutter $120.00 $210.00 $150,465.00
64 Concrete Curbs, Planter Curb $90.00 $185.00 $52,780.50
63 Concrete Curb, Notched Curb $80.00 $185.00 $239,427.00
62 Concrete Curb, Standard Curb $60.00 $145.00 $3,204.50
61 Concrete Curbs, 12" Wide Curb and Gutter $90.00 $160.00 $6,560.00
60 Concrete Curbs, Curb and Gutter $75.00 $150.00 $280,605.00
59 Flexible to Rigid Pavement Transitions $5,000.00 $3,000.00 $6,000.00
58 Plain Concrete Pavement, Dowelled, 8 inches Thick $180.00 $255.00 $98,659.50
57 15 Inch Asphalt Concrete Pavement Repair $35.00 $85.00 $14,331.00
56 12 Inch Asphalt Concrete Pavement Repair $30.00 $60.00 $21,648.00
55 8 Inch Asphalt Concrete Pavement Repair $25.00 $42.00 $9,324.00
Run Date: 3/9/2023 Page 3 of 5
Pay Item No. Quantity Unit Extended Value Unit Value Extended ValueLine No Description Unit Value Unit Value Extended Value
Engineer Estimate Wildish Construction Co RiverBend Construction Inc
BID TABULATION SUMMARY REPORT
Project Number 900070 Project Name 8TH AVENUE STREETSCAPE AND BIKEWAY
7599996 389.50 SF $9,737.50 $35.00 $13,632.50
8150100 4.00 EA $3,000.00 $4,200.00 $16,800.00
8409999 1.00 LS $50,000.00 $63,000.00 $63,000.00
8550010 3.00 EA $19.50 $32.00 $96.00
8550030 86.00 EA $559.00 $8.00 $688.00
8550090 9.00 EA $90.00 $8.00 $72.00
8560010 31.00 EA $9,300.00 $290.00 $8,990.00
8560015 5.00 EA $1,250.00 $750.00 $3,750.00
8600020 1,110.00 FT $7,770.00 $4.00 $4,440.00
8650030 1.00 LS $30,000.00 $30,000.00 $30,000.00
8670012 1,630.00 SF $24,450.00 $16.00 $26,080.00
8670020 18.00 EA $5,400.00 $660.00 $11,880.00
8670139 5.00 EA $1,250.00 $1,100.00 $5,500.00
8670140 14.00 EA $4,200.00 $360.00 $5,040.00
8670141 23.00 EA $6,900.00 $700.00 $16,100.00
8670160 84.00 EA $6,300.00 $150.00 $12,600.00
8670180 4.00 EA $1,400.00 $360.00 $1,440.00
8670210 6.00 EA $2,400.00 $780.00 $4,680.00
8670220 1,000.00 SF $18,000.00 $23.00 $23,000.00
9050020 25.00 EA $1,500.00 $200.00 $5,000.00
9050040 25.00 EA $11,250.00 $400.00 $10,000.00
9400020 152.00 SF $7,600.00 $32.00 $4,864.00
9700080 1.00 LS $200,000.00 $160,000.00 $160,000.00
9700085 5,000.00 FA $5,000.00 $1.00 $5,000.00
9870080 10,000.00 FA $10,000.00 $1.00 $10,000.00
9870081 3.00 EA $15,000.00 $6,000.00 $18,000.00
9870082 3.00 EA $15,000.00 $2,000.00 $6,000.00108 Adjustment of Telecommunications Manhole Lid $5,000.00 $1,500.00 $4,500.00
107 Adjustment of Telecommunications Vault Lid $5,000.00 $1,500.00 $4,500.00
106 Telecommuncations, Complete $1.00 $1.00 $10,000.00
105 Adjustment of Illumination Wiring $1.00 $1.00 $5,000.00
104 Illumination, Complete $200,000.00 $180,000.00 $180,000.00
103 Signs, Standard Sheeting, Sheet Aluminum $50.00 $128.00 $19,456.00
102 Remove and Reinstall Existing Signs $450.00 $850.00 $21,250.00
101 Remove Existing Signs $60.00 $250.00 $6,250.00
100 Pavement Bar, Type B-HS: Green $18.00 $10.00 $10,000.00
99 Pavement Legend, Type B-HS: Speed Hump Marking $400.00 $160.00 $960.00
98 Pavement Legend, Type B-HS: Shared Lane Marking $350.00 $295.00 $1,180.00
97 Pavement Legend, Type B-HS: On-Street Parking $75.00 $35.00 $2,940.00
96 Pavement Legend, Type B-HS: Off Street Bicycle Stencil On Concrete $300.00 $200.00 $4,600.00
95 Pavement Legend, Type B-HS: Bicycle Lane Stencil $300.00 $275.00 $3,850.00
94 Pavement Legend, Type B-HS: Bicycle Detector Loop Stencil $250.00 $162.00 $810.00
93 Pavement Legend, Type B-HS: Arrows $300.00 $415.00 $7,470.00
92 Pavement Bar, Type B-HS $15.00 $8.15 $13,284.50
91 Methyl Methacrylate, Extruded, Surface, Non-Profiled $30,000.00 $16,500.00 $16,500.00
90 Painted Curbs $7.00 $3.00 $3,330.00
89 Tuff Curb with Tubular Markers $250.00 $450.00 $2,250.00
88 Permanent Surface Mounted Tubular Markers $300.00 $185.00 $5,735.00
87 Bi-Directional Blue Type 1AR Markers $10.00 $10.00 $90.00
86 Bi-Directional Yellow Type 1 Markers $6.50 $10.00 $860.00
85 Bi-Directional White Type 1 Markers $6.50 $10.00 $30.00
84 Modular Bus Island $50,000.00 $49,000.00 $49,000.00
83 Bollards $750.00 $3,200.00 $12,800.00
82 Concrete Curbs, Curb and Fillet $25.00 $24.00 $9,348.00
Run Date: 3/9/2023 Page 4 of 5
Pay Item No. Quantity Unit Extended Value Unit Value Extended ValueLine No Description Unit Value Unit Value Extended Value
Engineer Estimate Wildish Construction Co RiverBend Construction Inc
BID TABULATION SUMMARY REPORT
Project Number 900070 Project Name 8TH AVENUE STREETSCAPE AND BIKEWAY
9900020 1.00 LS $500,000.00 $1,280,000.00 $1,280,000.00
9900025 1.00 LS $100,000.00 $17,000.00 $17,000.00
9900180 14.00 EA $4,900.00 $700.00 $9,800.00
9900190 3.00 EA $1,500.00 $2,000.00 $6,000.00
10200010 24.00 EA $2,400.00 $150.00 $3,600.00
10300090 441.00 SF $2,205.00 $8.00 $3,528.00
10400070 778.10 SY $28,789.70 $60.00 $46,686.00
10400190 4,243.00 SF $8,486.00 $2.00 $8,486.00
10400144 22,000.00 FA $22,000.00 $1.00 $22,000.00
10400142 125.00 EA $2,750.00 $20.00 $2,500.00
10400141 1,491.00 EA $22,365.00 $9.00 $13,419.00
10400143 3,082.00 EA $24,656.00 $8.00 $24,656.00
10400290 6,770.00 SF $20,310.00 $1.00 $6,770.00
10409999 572.30 SF $8,584.50 $15.00 $8,584.50
10500010 315.00 FT $3,150.00 $50.00 $15,750.00
10500015 5.00 EA $500.00 $1,000.00 $5,000.00
10650030 2.00 EA $1,000.00 $900.00 $1,800.00
10650040 1.00 EA $500.00 $600.00 $600.00
10700040 1.00 EA $400.00 $1,000.00 $1,000.00
10800010 26.00 EA $2,600.00 $160.00 $4,160.00
10800020 22.00 EA $4,400.00 $1,900.00 $41,800.00
10800025 1.00 EA $500.00 $1,800.00 $1,800.00
1120100 3,000.00 FA $3,000.00 $1.00 $3,000.00
4000001 750.00 HR $15,000.00 $20.00 $15,000.00
$4,369,939.25 $6,785,810.80GRAND TOTAL: $6,585,982.10
132 On The Job Training $20.00 $20.00 $15,000.00
131 Irrigation Repair/Relocation $1.00 $1.00 $3,000.00
130 Remove and Reinstall Existing Bench $500.00 $1,200.00 $1,200.00
129 Remove and Reinstall Parking Meter $200.00 $600.00 $13,200.00
128 Remove Existing Parking Meters $100.00 $200.00 $5,200.00
127 Remove and Reinstall Existing Mailbox $400.00 $600.00 $600.00
126 Remove and Reinstall Trash Can $500.00 $300.00 $300.00
125 Remove and Reinstall Bike Rack $500.00 $1,000.00 $2,000.00
124 Remove and Reinstall Existing Post and Chain $100.00 $400.00 $2,000.00
123 Remove and Rebuild Chain-Link Fence $10.00 $25.00 $7,875.00
122 Expanded Root Zone Soil $15.00 $15.00 $8,584.50
121 Rock Mulch $3.00 $1.50 $10,155.00
120 Plants, 4" Pot - Install Only $8.00 $6.50 $20,033.00
119 Plants, 1 Gallon - Install Only $15.00 $7.50 $11,182.50
118 Plants, 3 Gallon - Install Only $22.00 $16.00 $2,000.00
117 Plants, Materials Only $1.00 $1.00 $22,000.00
116 Bark Mulch $2.00 $1.10 $4,667.30
115 Stormwater Facility Blended Soil, 18" Deep $37.00 $60.00 $46,686.00
114 Lawn Seeding $5.00 $7.00 $3,087.00
113 Tree Protection Fencing $100.00 $200.00 $4,800.00
112 Major Adjustment of Junction Box $500.00 $1,800.00 $5,400.00
111 Minor Adjustment of Junction Box $350.00 $600.00 $8,400.00
110 Traffic Signal Removal, Complete $100,000.00 $18,000.00 $18,000.00
109 Traffic Signal Modification, Complete $500,000.00 $1,365,000.00 $1,365,000.00