9-WBCM - Site Layout Plan.pdf
PDF 909 KB Posted
- Solicitation number
- Not on record
- Issued by
- Butler County, Pennsylvania
About this file
This is a Site Layout Plan for the Borough of Saxonburg in Butler County, Pennsylvania, prepared by Whitney Bailey Cox & Magnani, LLC (WBCM) for the John Roebling's Historic Wire Rope Workshop Restoration project. The plan, dated October 19, 2022 and drawn at a scale of 1" = 20', depicts the site layout improvements for the historic Roebling Wire rope shop, including the locations of existing and new buildings (workshop, museum, gazebo, and pavilion), utility infrastructure (electrical, gas, water, sanitary, and storm drain systems), site features (concrete pads, brick walks, stone memorials, flag poles, and landscaping), and proposed drainage improvements. The schematic design shows storm drain notes including new 8" HDPE combined storm sewer and underdrain pipe (SD-1), new 6" HDPE storm drain (SD-2), new 4" HDPE perforated pipe and French drain system (SD-3), connections to existing catch basins (SD-4), and new PennDOT Type M inlets (SD-5). Construction notes address the protection of buried cables, electrical transformers, and the relocation of the workshop building, electrical meter, and sign/tie-rod display.
The plan serves as the schematic foundation for the site drainage improvements portion of a design-build project focused on foundation renovation and water infiltration remediation of the historic structure. Signed and sealed architectural, engineering, and final permit drawings are required to be submitted by all bidding contractors to Codesys Code Consulting, with design costs to be broken out separately for grant reimbursement. The project is financed in part by a grant from the Commonwealth of Pennsylvania through the Commonwealth Financing Authority and will be executed in accordance with the Secretary of the Interior's Standards for the treatment of Historic Properties.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X concrete pads
LP
LP
LP LP
LP LP
LP
LP
LP
CATCH
BASIN
CATCH
BASIN
CATCH
BASIN
CATCH
BASIN
G G
G G
G G
G G
G
GG
G G
G G
G G
G G
G G
BO
LL
AR
D
RO
W
BU
ILD
IN
G
RE
ST
RO
OM
BUILDING
MUSEUM
DUMPSTER
PAD
LP
LP
stone memorials conc.
pad
BLACKTOP
PARKING
GRASS
YARD
concrete pads concrete pads
BUILDING
PAVILION
conc.
pads co nc re te wa lk co nc re te wa lk br ick w alk brick walkbrick walk planter flag pole
NO
RT
H
RE
BE
CC
A
ST
RE
ET
BUILDING
GAZEBO
tranformer pad tele.
ped gas stop gas meter conduit concrete walk concrete walk concrete walk flag pole pavilion/ covered concrete pad yard lamp yard lamp
N 4750
E 5075
N 5000
E 5125
26" oak
20"maple
15"maple
26"locust
30"oak20"oak
20"maple
40" oak 20"oak twin 18" oaks
10"tree
36"oak
30"oak
24"oak twin 20"oaks
36"oak
499.5
500.0
499.5
499.5
500.0
499.5
500.5
1.0
500.0
500.5
501.0
499.5
499.5
8.5
9.0
9.5
500.0
499.0
499.5
500.5
D D
D D
D D
D
D
D
D
D D
D D
D D
D D
STONE
PILLARBRIDGE
E E
E E
E E
E E
499.5 499.3
499.0499.7
ELEC PANEL
METER
TELE.
PED
N-1 N-2
N-3
N-4
N-5
BUILDING
WORKSHOP
SD-4
SD-1
SD-2
SD-3
DSDS
DS DS
SD-3
SD-3
SD-5
EX. CONC.
EX. PAVING
EX. BLDG.
EELECTRIC
GAS G
OVERHEAD ELECTRIC OHE
WATER W
SANITARY SS
DSTORM DRAIN
LEGEND
EXISTING
FIRE HYDRANT
WATER VALVE
STREET LIGHT
POWER POLE
ED SMANHOLE
1115CONTOUR
CONCRETE WALK
CURB
PAVING
BUILDING
INLET
CLEANOUT
FENCE
SPOT ELEVATION x 1114.85
PP
LP
COMMUNICTATIONS T
X
WV
WALL
C.O.
TREE
EX. BRICKBRICK WALK
N-1 NEW CONCRETE SIDEWALK.
N-2 LOCATE BURIED CABLE AND PROTECT DURING TEMPORARY BUILDING
RELOCATION AND FOUNDATION CONSTRUCTION.
N-3 PROTECT ELECTRICAL TRANSFORMER DURING ALL PHASES OF
CONSTRUCTION.
N-4 DISCONNECT EXISTING ELECTRICAL METER AND REINSTALL ON
RELOCATED WORKSHOP BUILDING.
N-5 REINSTALL SIGN AND TIE-ROD DISPLAY W/CONCRETE PAD
CONSTRUCTION NOTES:
LEGEND
NEW
+ 1114.85
SD-1 NEW 8" HDPE COMBINED STORM SEWER AND UNDERDRAIN PIPE.
SD-2 NEW 6" HDPE STORM DRAIN.
SD-3 NEW 4" HDPE PERFORATED PIPE & FRENCH DRAIN SYSTEM.
SD-4 CONNECT TO EXISTING CATCH BASIN.
SD-5 NEW PENNDOT TYPE "M" INLET.
STORM DRAIN NOTES:
Ja n 0
5, :54 am
Us er
: h hw an g
\\wbcm.llc\data\Projects\2022\22036200\Drawings\07-Site\2022036200-C201-Site Layout Plan.dwg C WBCM 2022
DESIGNED: M.A.M.
DRAWN: H.H.
CHECKED: B.W.L.
DATE: 10/19/2022
SCALE:
DRAWING:
PROJECT: 2022.0362.00
RO
EB
LIN
G
W
IR
EO
PE
W
OR
KS
HO
P
BY
NO
DA
TE
RE
VI
SI
ON
DRAWINGS SUBMISSION
SA
XO
NB
UR
G
BO
RO
UG
H
BU
TL
ER
C
OU
NT
Y, P A
ISSUED 10-19-2022
XX
/X
X/
D e s i g n i n g
I n f r a s t r u c t u r e f o r
T o m o r r o w
W H
IT
N
E Y
B A
IL
E
Y C
O X
M
A G
N A
N I, LL
C
B ur sc a
D riv e S ui te
P itt sb ur gh , P
A
2.
1.
w w w .w bc m
.c om
W B
C M
C201
SI
TE
LA
YO
UT
P
LA
N
G R
ID
N
O R
TH
PA
S
TA
TE
P
LA
N E
N
AD
1" = 20'
SITE LAYOUT PLAN
SCALE: 1" = 20'
CAUTION:
IF THIS DRAWING IS A REDUCTION,
USE THE GRAPHIC SCALES.
1"=20'-0" 20 0 10 20 40 jweidler Callout Brick walk
File details come from the government source that posted it. Updated .