9-Liquidated Damages Form.pdf

PDF 84 KB Posted

Attached to
Pinewalk Transfer Station Repairs
Solicitation number
ITB No. 2026-012
Issued by
Palm Beach County, Florida

About this file

This is a Liquidated Damages Form issued by the Town of Palm Beach, Florida, establishing financial penalties for contractor non-performance on construction projects. The document acknowledges that the Town requires timely work completion, with time being of the essence, and recognizes the difficulty in calculating actual damages from project delays. The form stipulates that contractors and their surety bonds shall pay liquidated damages in daily amounts as specified in the attached Florida Department of Transportation schedule (paragraph 8-10) for each calendar day of delay beyond the scheduled completion date, including any approved time extensions granted through written change orders. If a contractor is terminated for default prior to project completion, liquidated damages continue to accrue and are charged against the contractor until the work is ultimately completed. The document requires authorized company representatives to sign and date a confirmation of understanding and compliance with these liquidated damages terms.

The specific liquidated damages rate schedule is referenced as the adopted Florida Department of Transportation schedule and is provided in an attachment to this form, though the exact daily rate is not specified within the document itself. The form serves as a standard contractual requirement for the Pinewalk Transfer Station Repairs project, valued at an Engineer's Opinion of Cost of $206,290, which involves structural repairs, concrete work, pavement restoration, ramp modifications, and drainage installation at the transfer station facility in Palm Beach.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF PALM BEACH

Liquidated Damages Form

Contractor is aware of Town's requirement that the Work achieve timely Completion, time being of the essence. Town and Contractor recognize and hereby acknowledge the difficulty and uncertainty of computing the damages that would be realized by Town in the event the Completion is not timely achieved. It is therefore agreed by Town and Contractor, that the Contractor and the Contractor's surety, shall be liable to and shall pay Town liquidated damages in the amount per attached list - Town adopted Florida Department of Transportation schedule, paragraph 8-10, see attached - for each calendar day after the date on which Completion was to have been achieved (including any Time Extension in approved, written Change Order(s) until Completion of the Work is achieved. In the event Contractor is terminated by reason of default prior to Completion being achieved, any liquidated damages shall continue to accrue and be charged against Contractor until Completion is achieved.

I hereby confirm that our company understands and will comply with Liquidated Damages Term above:

Company Name: Name:

Date: Authorized Signature:

TOWN OF PALM BEACH – Liquidated Damages Form

Company Name:
Name:
Date: