9 FY22 Appendix A Construction and Security Specifications.pdf
PDF 6 MB Posted
- Attached to
- Anchorage Marines Recruiting Office Federal contract opportunity
- Solicitation number
- DACA855180005200
About this file
This document provides construction specifications for a military recruiting office in Anchorage, Alaska under solicitation number DACA855180005200 issued by the Department of the Army Corps of Engineers Engineering District Alaska. The specifications outline requirements for mechanical, electrical, communications, safety and fire equipment, architectural finishes, fixtures and supplies. Mechanical requirements include HVAC, plumbing and utilities to service the office. Electrical requirements include distribution, interior and exterior lighting, outlets, switches, cover plates and emergency lighting. Communications requirements specify telephone equipment, cabling and outlets. The document provides paint schedules, flooring types, window and door specifications, and details for architectural elements like ceilings and walls. Restroom fixtures and accessories are also defined.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 11 FY22 Appendix F Janitorial Specifications.pdf | ||
| 5 GSA Form 1217 Lessors Annual Cost Statement.pdf | ||
| Request for Lease Proposal.docx | DOCX document | |
| 4 GSA Form 3518 SAM Representations and Certifications.pdf | ||
| 8 USACE Form 1364 Lease Proposal.xlsx | XLSX spreadsheet | |
| Lease Form to Districts L100 2021.02.03.docx | DOCX document | |
| 12 Appendix F Janitorial Service Checklist.pdf | ||
| 6 Certificate of Authorization Corporate-LLC-Partnership FINAL 2020.10.16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1
APPENDIX “A”
Military Recruiting Facilities
CONSTRUCTION SPECIFICATIONS for Production Offices
VERSION: FY 22.1
(Address) (Date)
GENERAL STANDARDS (GS)
A. General Guidance:
Each designated military service to be located at this recruiting facility will have their specific standards utilized along with the following General Standards (GS). Any significant departure from either the intent of these construction specifications or the approved floor plan will require prior approval of the Corps of Engineers (COE); P.O.C.:_________________, phone #:_________, email:_________. IMPORTANT:
NOTHING IN THESE SPECIFICATIONS WILL PROHIBIT THE SUBSTITUTION, WITH PRIOR
APPROVAL OF THE COE, OF AN EQUIVALENT PRODUCT, SERVICE OR FINISH.
IMPORTANT: For all supplied communication requirements and electronic security applications (K.1. & K.2. below), the lessor (or their contractors) are PROHIBITED (2019 N.D.A.A. law) from providing to the Government any such equipment or services as a substantial or essential component, or as critical technology as part of any system. These security / telecommunications products are PROHIBITED to be from any of the following source entities, any subsidiary or affiliate of such source entities: 1) The People’s Republic of China; 2) Huawei Technologies Company; 3) ZTE Corporation; 4) Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company; 5) or Dahua Technology Company.
Lessor (or contractors) must verify the equipment is not from any of these sources and provide written confirmation to the COE Representative prior to installation.
1. The Lessor will be responsible for permitting, constructing, operating, maintaining, and obtaining a
Certificate of Occupancy for this facility in accordance with the lease/solicitation requirements. Any changes on the build out of this space should be addressed directly to the COE representative. The recruiters for the subject office are NOT authorized to change anything related to the construction of the office. The general floorplan provided by the COE representative will be used as the initial exhibit to the lease, and for bid purposes. Prior to starting construction activities, space alterations, dimensioned architectural drawings with square foot allocations by military service and common area will be provided by the Lessor. These drawings will show at a minimum, wall, door, window, columns, electrical/communication outlet placement and finish schedules. The Lessor is responsible for coordinating with the COE in the development of these plans. Electrical, mechanical, plumbing diagrams and communications layouts may be drawn on separate drawings. Note: A reduction of these drawings to an 11 x 17 format shall replace the floorplan exhibit of the lease or become an additional exhibit and will serve as a basis to resolve any issues of variance which may arise. The construction specifications and the contractor’s construction bid will both become separate exhibits to the lease.
2. Codes and Standards: The facility must comply with all Federal, State and local construction standards, building codes and all other applicable laws. Any variance from these guidelines must have prior approval by the authority having jurisdiction. Where conflicts between standards arise, the build-out of the recruiting office must comply with the most stringent requirements.
3. Only Energy Star labeled components and natural resource conserving/recyclable products shall be installed.
4. Number of Recruiters: For the purposes of determining the number of keys or access control system desk stations per Service, the following number (#) of recruiters for each Service is provided:
Army _______; Navy _______; Air Force _______; Marines _______;
Air Force Reserve _______; Air National Guard _______; Army National Guard ________.
B. Mechanical:
1. Utilities: Utility and mechanical service facilities, if located within the leased space, shall be enclosed.
Exposed ducts, piping and/or conduit runs are not permitted outside the utility rooms. This enclosed room may NOT, under any circumstances, be co-used for other purposes.
Page | 2
2. Heating, Ventilation and Air Conditioning (HVAC):
a. The HVAC system design shall conform to applicable temperature standards and operating practices. If existing, the present HVAC system shall be balanced to accommodate the floor plan and operational needs of each military service. If not otherwise stipulated, the HVAC equipment shall be capable of maintaining a minimum temperature of 70 degrees Fahrenheit during the heating season and a maximum of 78 degrees Fahrenheit during the cooling season regardless of outside temperature. Areas that may be affected by solar radiation (either excessive heat gain or loss) shall be accounted for by the Lessor within the design of the HVAC system. Note: Within the constraints of the existing HVAC system, every effort shall be made to design and provide individual temperature controlled thermostats to each military office. The contractor will coordinate with the COE on the determination of acceptable thermostat(s). A digital, 7-day programmable, code-protected thermostat is preferred.
b. Ventilation to the leased space shall be provided in the most energy efficient and cost-effective manner. It will meet or exceed all applicable building code standards for air-exchange rates and distribution.
c. Security Closets: The security closet [to be utilized with the Closed Circuit Television (CCTV) system – see paragraph K.2.n. for more details] shall have its own supply and return vents installed for adequate ventilation for appropriate air flow heat dispensation.
C. Plumbing:
1. Potable water shall be provided to the leased space. The Lessor shall verify the existing water supply meets all potable water standards. If deficient, the Lessor will be responsible for providing an acceptable, alternate water supply. The water heating system shall produce and maintain a hot water temperature of 105 degrees for restrooms and the janitorial mop service sink. All water heater systems must be secured from public access and out of public view.
2. Restrooms: At a minimum, a unisex restroom will be provided. Recruiting offices with six (6) or more authorized recruiters shall require two (2) restrooms. Lessor will confirm number of restroom facilities required at this location as _________. Restrooms shall contain, at a minimum, the following plumbing fixtures and approximate square footage:
a. Unisex/Men's: 100 sq. ft., 1 commercial toilet, 1 urinal, 1 sink, stainless steel partitions/urinal screens as required.
b. Women's (if required): 64 sq. ft., 1 commercial toilet, 1 sink.
c. Restroom Fixtures & Accessories: See para. G.6.
d. If existing, restrooms to be updated with all appropriate paint, tile, fixtures, etc.
3. Drinking fountain-water cooler: The Lessor to install a stainless steel drinking fountain equal to Elkay EZ Series, EZS8WSSK, non-filtered electric water cooler, with an attached EZH20 bottle filling station. Location as shown on floor plan.
4. Janitorial Closet: shall contain 1-floor mounted mop sink and service faucet with a hot and cold water supply.
D. Electrical:
1. Electrical Distribution: Each electrical circuit shall be 20 amp rated or greater as defined by the
National Electrical Code (NEC). All outlets shall be Quadplex unless otherwise specified, spaced a maximum of 8-feet apart and shall be installed in offices, test rooms and foyers. Installation to be at industry standard height unless otherwise specified. Installation at desktop or countertop level (as required) will be as specifically referenced on the floor plans.
a. All electrical panels servicing the Government leased space panels within the space, the building or outside the building must be secured (locked).
b. Communication (Commo) Boards for Each Military Service: Two (2) dedicated quadplex outlets
(outlets centered underneath both commo board shelves – see para. E.3.) and commo board shall be installed on the same wall with isolated copper grounding plate connected to a green #6 ground wire which will then be attached either to the building ground or grounding rod in accordance with local standards. Note: An equivalent standard for isolated electrical ground installation is acceptable.
c. Security Closet: Shall have two, dedicated quadplex outlets. Lowest outlet to be usable for the first shelf, and the second outlet to be two feet above in line with the other outlet. See paragraph K.2.n.
for more details.
Page | 3
d. Each individual service’s storage room will have quadplex outlets spaced at 6-foot intervals with one as a dedicated outlet.
e. Janitorial closet outlet mounted 42” AFF; will be located as shown on floor plan.
f. Unless referenced differently within each Military Services’ section, electrical faceplate for all outlets shall be: standard white. For unique, military service specific electrical requirement(s), see applicable military service Attachment.
g. Additional specific electrical requirements for single/dual roller shades can be found in paragraph G.7.a.1.
h. Additional specific electrical requirements can be found in paragraph K.1 for the video access control system and paragraph K.2 for CCTV/NVR system.
2. Interior Lighting: Light fixtures shall be capable of producing and maintaining a uniform lighting level of a minimum of 50 foot-candles of illumination at working surface height in all office spaces.
All other non-working areas will have a minimum of 30 foot-candles of illumination at floor level.
a. LED: Lighting provided by the Lessor in all office, hallways, display areas and test rooms will be a minimum of 2 x 4 flat panel, 4300 lumens, 4000k temperature, energy efficient, LED light fixtures, with a minimal lifespan of 60,000 hours. In lavatories and smaller rooms requiring smaller scaled fixtures, similar 2x2 energy efficient, recessed LED fixtures will be provided. Note:
If existing light fixtures differ from those specified, the Lessor will consult with the COE on their acceptability. If existing fixtures are used, LED lamps to be installed. Interior office spaces and test rooms to have wall mounted on-off switch with full range dimmers. All other areas to use standard commercial grade switches without dimmers.
b. LED: Shall be installed in mechanical rooms, security closets, janitorial closets and other working areas as needed.
3. Exterior Lighting:
a. The Lessor will ensure building entrances and designated government parking areas use energy efficient lighting with a minimum illumination of 3 foot-candles/square foot at ground level.
b. Rear Exit, if applicable: If not already present, an exterior security light shall be installed by the
Lessor. Light fixture to be LED, equivalent to 150 watts or greater, with ‘dusk-to-dawn’ light sensor with manual override.
4. Outlets, Switches and Cover Plates: Shall be standard, commercial grade. All switches shall be color coordinated with required faceplates. See specific military service Attachment for appropriate color information.
5. Emergency Lighting: Shall be LED, installed with extended, maintenance-free, sealed batteries on walls or ceilings to maintain illumination throughout the means of egress. A minimum of one emergency light per military service will be provided. The unit(s) will be hardwired to maintain an adequate charge on battery pack; be UL listed and shall be neutral in color.
6. Entry Bell: The Lessor will install a hard-wired entry alert door chime to all front, and secondary exterior doors. NO WIRELESS and/or BATTERY OPERATED CHIMES ALLOWED. The system shall be installed to ensure the door chime is operated by the opening of the door and shall have a tone acceptable for an office environment and must be audible in all collocated services’ offices. The COE will approve the proposed tone of the chime before installation. The main entry chime shall have a two-tone ping (e.g. - “ding-dong”) while the secondary exit door chimes shall have a single-tone ping (e.g. - “ding”). If site specific conditions require a non-electrical door chime, a fully mechanical system (no electrical wiring) is allowed, as long as each Service can hear them in their offices.
7. Mounted Televisions: Each mounted television (CCTV and Non-CCTV related), shall have one (1) duplex electrical outlet installed at 7’-6” AFF as indicated on the approved floorplan. See K.2. for mounting support information.
8. Roller Shades: Wiring to be contained in appropriate conduit, minimized in appearance and if exposed, and shall be arranged in a tight compact arrangement/appearance.
E. Communications:
1. Outlets, Switches and Cover Plates: See “Electrical Distribution” paragraph D.1.
2. Telephone Equipment: The telephone demarcation point provided by the Lessor must be secured from public access. If required, mitigation to secure the demarcation point shall be coordinated with the COE. The telephone system shall be capable of supplying the required phone service to each military office and be so installed as to provide easy activation by the military phone service and their
Page | 4 provider(s). The Lessor shall coordinate with the COE’s representative on the number of required phone lines for each military service.
3. Communications Board (known herein as the specific military service’s “communication” or “commo” board): Within each services storage room the Lessor will install a 3/4”, wall mounted, fire-retardant treated plywood backboard, the board to be 4’-0” W x 4’-0” H, mounted 4’-0” above finished floor (AFF), painted with fire-resistant paint and finished to match, as close as possible, adjacent walls.
The commo board will have 36” of front clearance to facilitate access and have 2 shelves (12” x 24”) mounted approximately 5’-0” AFF. See paragraph D.1. for electrical requirements.
4. Telecommunications (See ENCLOSURE # 1 for a simplified diagram of telecommunications requirements):
a. Outlets / Wiring: Shall be installed within 2” horizontally of electrical outlets. These telecommunications and electrical outlets will be aligned so that the tops of both outlets measure to the same height AFF. These telecommunication outlet boxes shall be duplex; with 1” conduit terminating 12” above finished wall height. Note: The Lessor shall be responsible for any special telecommunication permitting requirements (e.g. - low voltage permits, etc.,) which shall be a requirement to obtain a “Certificate of Occupancy”.
1. Each wall outlet (destination end) shall be equipped with two (2) female RJ45 sockets, each connected by a Straight-Through CAT 6 cable (T568B). Each wall outlet socket shall have a port identification number which corresponds with the source end (communications board) of the CAT 6 cable tag.
2. All wiring coming into the top of the communications board shall be collected and routed in an organized manner.
3. The source end of the Straight-Through CAT 6 cable shall have a minimum of three (3) feet of slack from the communications board to allow the cables to plug into Military Service(s) provided equipment. The ends of each Straight-Through CAT 6 cable at the communications board shall be equipped with a male RJ45 connector.
4. The RJ45 connector can then be connected to a modem, router, switch, adaptive security appliance, etc. which is installed by the Military Service’s telecom provider.
5. Each cable shall be labeled/tagged at the source and destination ends with the corresponding port number for easy identification.
6. All Communications outlets, faceplates, and data ports to be coordinated with electrical faceplate color requirements.
7. For locations that have more than one Service sharing a communications board, each cable shall also be labeled for each Service as follows:
i. Air Force = “USAF”
ii. Air Force Reserve = “AFR”
iii. Army = “USA”
iv. Navy = “USN”
v. Marine Corps = “USMC”
vi. Air National Guard = “ANG”
vii. Army National Guard = “ARNG”
b. Conduit: The Lessor shall install conduit (minimum of 1” or greater for each office or building layout) capable of handling the telephone and high-speed internet access needs for all of the Military Service(s); requirements are as follows:
1. From the building’s communications demarcation point to the commo board for each Military
Service within the leased space (conduit with two (2) pull strings per service). If a junction box is necessary (due to local code) between the buildings communications demarcation point and the Military Service(s) commo board, conduit and (2) pull strings are required between this junction box and 1) the building demarcation point; and 2) the Military Service(s) commo board.
2. From each of the telecommunication outlet boxes to the commo board, conduit to terminate 12” above finished wall height (1” minimum diameter in size for CAT6 cabling in paragraph 3.a above). See raceway requirements below. Note: This is separate from CCTV requirements, see K.2 for more details.
c. Raceways: Wiring not contained in conduit shall be raceway installed.
Page | 5
d. Military Services Responsibilities & Equipment: Military Services are responsible for all remaining telecommunications requirements via their service provider that are not reflected above. The following list (but not limited to) is what the Military Services telecomm provider will install, etc.: 1) any cabling/wiring/terminations required from the building demarcation point and/or junction box to the commo board; 2) any equipment required to install service at the building demarc point; 3) any equipment required at the commo board to include (but not limited to) modems, routers, PBX’s, network switches, intermediate distribution frames, main distribution frames, distribution frames of any kind, patch panels, punch blocks, etc.; 4) any patch cables to connect all equipment; 5) all communications services (internet, Wi-Fi, cable TV if applicable, signal repeaters, etc.); 6) etc. It is each military service’s / telecom providers responsibility to coordinate with the Lessor, and to install or contract for installation, all remaining required telephone, telecommunications, and internet equipment (not listed in Lessor’s responsibilities above), including communications permitting (e.g. – low voltage, etc.).
F. Safety and Fire Equipment:
1. The Lessor shall be responsible for any required remediation of the fire protection system for fire code compliance.
2. Exit signs: Shall be placed at doors and/or exit ways that open to areas exterior from each recruiting office. Signs shall be hardwired, UL listed, have 6” H lettering with backup batteries which shall provide at least 1-1/2 hours of power to light as per NFPA 101. Mounting: Must be capable of ceiling, wall, or end mounting; either single or double faced as required. The sign must utilize long-life LED lamps and self-diagnostics.
3. One, 10-lb. ABC Dry-Chemical Fire Extinguisher with Semi-Recessed Protective White Cabinet:
Shall be installed within each military recruiting office, and in rear common area. Location of these units will be coordinated with the COE representative. Mounting height of protective cabinet should be 48” to 52” AFF (or as dictated by local building code regulations) with maximum travel distance to fire extinguisher of 75 feet.
4. Dual Sensor Photoelectric/Ionization Smoke and Fire Detector-Alarm: The Lessor shall ensure the location and installation of all smoke detectors are in accordance with manufacturer’s recommendations for coverage area. At a minimum, at least one hardwired, 120-volt smoke detector with lithium battery backup and test function shall be installed in each military recruiting office and common area, The alarm will be UL approved and capable of emitting an audible alarm of at least 85 dB at 10 feet.
5. Fire Dept. Access Lock-box: Where required for rapid emergency access, COE and Lessor shall coordinate to provide access keys to Government leased space.
G. Architectural Finishes-Fixtures-Supplies:
1. Ceilings: Office ceilings shall be 9 feet or no more than 11 feet, from floor to lowest obstruction.
a. Existing: It will be the Lessor’s responsibility to consult with the COE’s on the acceptability of the style of the buildings existing ceiling system. If found acceptable, all ceiling tiles that are damaged, stained or sagging shall be replaced. If matching tiles cannot be found, or if replacement exceeds 50%, then all ceiling tiles shall be replaced and meet the standard for new ceilings.
b. New: A suspended ceiling system with acoustical tile panels shall be installed. It will be a 2’ x 2’ revealed pattern on an exposed 2’ x 4’ grid with 2’ x 4’ ceiling tile (tegular-revealed) panels. The ceiling panels and grid to be white. All panels shall have a noise reduction coefficient (NRC) of not less than .65 in accordance with ASTM C-423.
c. Restrooms: Ceiling to be 5/8” gypsum wallboard, taped and sanded, with a Level 4 finish.
2. Walls:
a. Demising and Mechanical Room: Walls separating government leased space from adjacent tenants and interior walls enclosing mechanical facilities will be erected from floor to building understructure. It shall be constructed of 5/8”, Type “X” gypsum wallboard, taped and sanded, with a Level 4 finish, applied over 3-5/8” metal studs, 16” o.c. In lieu of; Option #1: Steel chain link fence may be substituted for gypsum wallboard for wall sections above the finished ceiling line. Option #2: Open, 3-5/8”, 25ga. (minimum) studding, 6” o.c., reinforced horizontally @ 24” o.c. maybe used without chain link fence or drywall installation above finished ceiling line.
b. Separation of Individual Military Service Office(s): Walls separating collocated military service offices and common areas shall extend from finished floor to 12” above finished ceiling.
Page | 6
Construction shall be of 3-5/8” metal studs 16” o.c. with 5/8” gypsum wallboard, taped and sanded, with a Level 4 finish. See paint schedule for wall colors.
c. Standard Interior Office Partitions: Walls shall extend from finished floor to finished ceiling.
Construction shall be of 3 5/8” metal studs 16” o.c. with 5/8” gypsum wallboard, taped and sanded, with a Level 4 finish. See paint schedule for wall colors.
d. Sound-Proofing: Sound attenuating batts with a minimum Sound Transmission Class (STC) of 45, when tested in accordance with ASTM E-336, shall be inserted in all demising and internal walls.
e. Accent Walls: Will be as specified on floor plan and as referenced on the specific military service paint-finish schedule.
PAINT SCHEDULE
General Note: For individual military service, see the specific military service Attachment-Paint Schedule.
COMMON AREA & RESTROOMS PAINT SCHEDULE
Mfr: Color Name: Color #: Product: Coats: Finish: Area:
Sherwin Williams PRIMER ProMar 200
White (see Note 1) B28W02600 1 Latex:
Acrylic Primer
All Walls / All Painted Trim
Sherwin Williams
Common Area & Restroom Walls Worldly Gray
SW 7043
Worldly Gray B20W12651 2 Latex: Eg-Shel Walls (Restroom &
Common Areas) Sherwin Williams
Trim for Common Area & Restrooms Worldly Gray
SW 7043
Worldly Gray B31W2651 2 Latex: Semi-Gloss Trim (Restroom &
Common Areas) Sherwin Williams
Common Area Chair Rail Mega Greige
SW 7031
Mega Greige B31W2651 2 Latex: Semi-Gloss Chair Rail
(Common Areas) Sherwin Williams
Standard Ceiling Finish White
Standard White Ceiling Finish Standard 2 Latex: Eg-Shel Ceiling
(Restroom)
Note 1: ProMar 200 Primer to be tinted to match the applicable wall color for all walls, and all painted trim.
Note 2: For individual military service paint-finish schedule, see specific military service Attachment-Paint Schedule.
Note 3: All window and door frames shall have semi-gloss finish; color to be: Worldly Gray SW 7043.
Note 4: Chair Rail to be: Mega Greige SW 7031 Note 5: Restrooms to be: Worldly Gray SW 7043 Note 6: Gypsum Wallboard Ceilings (where applicable) to be: Standard White Ceiling Finish Note 7: If selected, contractor should request Sherwin Williams’ colors as listed above for common areas.
Formulas to these colors are available on Sherwin Williams’ National Accounts Database.
f. Porcelain Wainscot Wall Tile (Restroom): Wall tiles shall be installed per ENCLOSURE #2, including ordering instructions, typical wainscot pattern, including tile, transitions, and grout color designations.
g. Fiberglass Wall Panels (Janitorial Closet): Shall be installed to full-wall-height on all janitorial closet walls. Panels to be standard white, Class C, Fiberglass Reinforced Plastic (FRP). Panel performance to comply with ASTM E-84.
3. Flooring: General parameters: All floor areas will be of a common level, finished in a specified material and have a minimum live-load capacity of 50 pounds per square foot. Floor areas with porcelain tile will be grout sealed, ¼”.
a. Porcelain Entry Tiles (Front/Rear Exterior Exits as necessary): Porcelain tile with unpolished, non-slip surface shall be installed at the interior side of exterior / exit entrance doors for recruiting offices located in a 4-season climate zone. See ENCLOSURE #2, including ordering instructions, for a typical floor tile pattern, including tile color / name, grout color / name, and tile transition designations. Service facility front entrance tile area shall be approximately 4’ L x 5’ W (with one foot on each side of the door width), see floorplan where applicable. See specific military service Attachment for their requirements.
b. Lobby- Front/Rear Exterior Exit-Corridor and Restroom Areas: Porcelain tile with unpolished, non-slip surface shall be installed in the lobby, exit, corridor, security closets
Page | 7
(connected to common area hallways), and restroom area floors. See ENCLOSURE #2, including ordering instructions, for a typical floor tile pattern, including tile color / name, grout color / name, and tile transition designations. See specific military service Attachment for their requirement.
c. Storage areas: Vinyl Composition Tile (VCT) with base cove shall be installed in storage areas.
Note: See specific military service Attachment for requirements.
d. Base Cove (for VCT & Carpet only): Note: See specific military service Attachment for requirements.
e. Janitorial-Mechanical room(s): Exposed concrete with non-slip floor sealer.
Base Cove: Johnsonite/Tarkett (https://distributor.tarkett.com), Rubber; Color: #40, Black, 4” H.
f. Carpet Schedule by Military Service (Office, test room and related areas): For individual military service requirements, see the specific Military Service Attachment’s Carpet Schedule.
4. Windows:
a. Exterior: Windows shall be weather tight and if operable, shall be equipped with lock assemblies.
Window unit(s) that cannot be secured must be replaced.
1. Existing Laminated Glass - IMPORTANT: Lessor will confirm that all glass meets the following minimum requirements: a nominal ¼” thick laminated glass pane fabricated from two pieces of nominal 1/8” thick glass bonded together with a minimum 0.030” polyvinyl butyral (PVB) interlayer. If the window contains an insulating glass unit (IGU), then the innermost lite must be the laminated glass noted above and the outer lite may be monolithic glass. If the Lessor is unable to provide written confirmation that the existing glass meets this requirement, then glass fragment retention film must be installed as indicated below. With written confirmation from the lessor/contractor stating laminated glass is present (on ALL windows/doors that are on the perimeter of the Government’s space, regardless of the window being to the outside air or a shared common space with other tenants) and meets the required standards above, fragment retention film is not required.
2. Glass Fragment Retention Film - IMPORTANT: Without written confirmation of laminated glass installed, all glass in exterior windows and doors shall have fragment retention film applied to the interior (room) side in accordance with manufacturer's instructions by a certified installer. Fragment retention film can be either optically clear or, if approved by Lessor, with a light gray tint or a reflective surface. Film shall be 3M Safety & Security Window Film, series type Ultra S800 or Ultra Prestige S50. Film may be substituted that meets or exceeds the specified films (along with manufacturer’s flexible-mechanical or structural silicone adhesive anchoring systems), with prior approval of COE. Film shall be attached to the interior frame on all four (4) sides using an anchoring system in accordance with the manufacturer’s instructions for the chosen system. The anchoring system must use 3M Impact Protection Profile BP700 Attachment System, a flexible-mechanical, pre-molded profile strip with adhesive “legs”. If the flexible-mechanical method is unacceptable to Lessor, then the anchoring system shall use the 3M Impact Protection Adhesive structural silicone adhesive. Under NO circumstances are standard sealant or caulk compounds to be utilized for adhesive anchoring of the film. Note: If used, the structural silicone adhesive color shall complement existing framing system and adhesive shall be applied only after the window has been masked with 1” blue “safe release tape” applied to both film and window frame to assure clean, gasket-like appearance when tape is removed. For ‘wooden window/door frame systems’, an anchoring system need not be applied to glass fragment retention film edges (daylight application). If selected, for installation, government pricing-expedited delivery is available from; Window Film Depot, P.O.C. Jeff Franson, 866-933-3456;
email: jeff@windowfilmdepot.com.
3. Mini-Blinds: NOT TO BE INSTALLED ON ANY EXTERIOR WINDOWS OR DOORS.
4. Roller Shades: See Para. G.7.a.1. (below).
5. Perforated Window Wraps: See Para. G.7.c.
b. Interior:
1. Windows: A 3’-0” H x 4’-0” W fixed, glass window set in metal frame shall be installed in interior walls of hallways and recruiter-in-charge office(s) at a height of window frame approximately 42” AFF. Note: Ganged windows along hallways are acceptable. These mailto:jeff@windowfilmdepot.com
Page | 8 windows shall meet all safety code requirements and be equipped with mini-blinds that meet standards referenced in G.7.a. (below).
2. Test Room(s): Except for the Marine Corps, test rooms shall have an individual window(s) as indicated on the floor plan. Mini-blinds are not to be installed for these windows.
3. Window Frames: Window frames shall match interior door frames in color, style, and material. See para. G.5.b. Interior Finish for guidance.
4. Mini-Blinds (interior windows/doors only, except test rooms): See Para. G.7.b.
5. Doors:
a. Exterior: All exterior doors shall be weather-tight, with Grade 1 hardware with anti-pry plate/latch bolt protector; finish to match existing store front. If existing, any double-door entrance will be eliminated either by a permanent one-door, lock down or by a complete replacement to a single-door entry system. Note: Reduction in exit width shall be compliant with all building/fire code requirements. Additionally, if removable, all door hinge pins exposed to the outside exterior of the office premises will be secured to prevent manual removal. The Lessor will confirm and provide written confirmation that the existing glass in doors meets the minimum laminated glass requirements identified in Para. G.4.a. above or else fragment retention film must be installed.
When required, the fragment retention film for exterior glass doors shall be installed.
1. Fragment Retention Film: The Lessor will confirm and provide written confirmation that the existing glass in doors meets the minimum laminated glass requirements identified in Para.
G.4.a above or else fragment retention film must be installed. When required, the fragment retention film for exterior glass doors shall be installed.
2. Fixed Panel Shade: See paragraph G.7.a.1.ii below for details.
3. Main entrance: Doors shall be equipped with dead-bolt lock-set, automatic door closer and entry alert door chime system. (See para. D.6. entry bell and para. K.1. video access control system requirements).
4. Secondary Exits: Doors shall be equipped with the following: an automatic door closer with a dead bolt panic bar assembly; Securitech, Model: #TEL-200F, TEL-KLT-AP, TEL-EP1;
entry alert door chime system (see para. D.6. entry bell) and a door view/peep hole with 180 degree viewing range ~ approximate installation height; 5’-0” AFF. Door viewer to have optics which will provide a sharp and clear view to the exterior side of the exit door.
5. Anti-Pry Plate (aka Security Latch Guard): Install a stainless steel anti-pry plate that is a minimum of: 12 gauge thickness, 10” L, and 3.25” W. Mounting studs shall be concealed welded on the back side of the security plate thereby leaving no point of attack from the building exterior. Note: Anti-Pry plate provided must conform to existing door configuration (e.g., offset, door handle, etc.).
6. Keying or Re-Keying: Before delivery and acceptance of the space, all previous existing exterior door-locks shall be re-keyed. The Lessor will be responsible for coordinating with the COE on the number of new keys required to be furnished to each military service. (Note:
Both front and rear exterior exit doors should be same-keyed.) Each military service shall be same-keyed for front and rear exit exterior doors, security closet and each Military Service entrance and their interior doors (except Station Commanders Offices). Station Commanders Offices shall be separately keyed. See also paragraph A.4 regarding the number of recruiters needing keys.
7. Mini-blinds NOT to be installed on exterior windows or doors.
b. Interior: Unless otherwise noted, all interior doors will be a solid-core, flat panel, maple veneer, pre-hung wood unit with metal door frame with convex door bumper. Hardware sets including a door lever profile similar or equal to Hager, style; ‘August,’ shall be Grade 2 or better with brushed, stainless steel finish or finish to comply with existing standards.
1. Main access doors to each military service shall be separately keyed from other areas in accordance with the interior door schedule. The Lessor will be responsible for coordinating with the COE on the number of keys required to be furnished to each military service. See also paragraph A.4 regarding the number of recruiters needing keys.
2. Size: All interior doors shall be a minimum thickness 1-3/4”, solid core, 36” x 80”.
3. Finish:
i. Frames (for doors & windows) to have 2-coats latex paint of semi-gloss finish; color to match adjacent wall color - see paint schedules.
Page | 9
ii. Door color to be stained MinWax, Red Chestnut #232 (on all sides). Two (2) coats of polyurethane matte finish to be applied to stained areas. All interior door frames to match interior window frames in style and finish.
4. Main Access to each military service, Recruiter-in-charge interior office(s) and Test Rooms to have full-length glass door.
5. Mini-blinds to be installed on interior doors (except test rooms): See Para. G.7.b.
6. If applicable, any secondary military service access door from each office into
Government controlled common area space shall have a door-view/peep-hole with 180 degree viewing range ~ appropriate installation height: 5’-0” AFF.
7. The following hardware schedule shall apply:
INTERIOR DOOR HARDWARE SCHEDULE
Hardware Grade No. 2 or better Solid Core Minimum Size Hardware Set
Interior Entry / Exit Doors (w/in Gov’t controlled space)
X 36”x80” D
Test & Interview Room X 36”x80” E Private Office X 36”x80” B Storage Room X 36”x80” B Security Closet X 30”x80” B Janitorial Closet X 36”x80” A Restroom X 36”x80” C Mechanical Room (if applicable) X 36”x80” D
A: Dead bolt lock with interior thumb latch B: Standard with key lock (single-cylinder) C: Thumb latch D: Standard key lock with dead bolt (both single-cylinders) E: Standard (passage) door set - without lock NOTE: Lessor will be responsible for coordinating with COE on the number of keys required to be furnished for each Military Service. See also paragraph A.4 regarding the number of recruiters needing keys.
6. Restroom Fixtures, Accessories and Miscellaneous: Shall contain the following:
a. Faucet(s) to be touchless, finish to be stainless steel (SS).
b. Toilet flush valves to be touchless, finish (SS).
c. Urinal flush valves to be touchless, finish (SS).
d. Foam soap dispenser to be touchless, wall mounted - finish (SS).
e. Mirror (above sink) with shelf – finish (SS).
f. Dual-roll toilet paper dispenser – finish (SS).
g. Commercial grade, stand alone, waste receptacle – finish (SS).
h. Commercial grade, wall mounted, touchless hand-dryer – finish (BSS). Hand-dryer to be equal to or better than Xlerator Model # XL-SB.
i. Urinal screen and/or toilet partition panels – finish (SS).
j. Sanitary napkin waste receptacle, wall mounted (Unisex, Women’s restroom) – finish (SS).
k. Coat hooks: inside face of each water closet stall door and wall mounted adjacent to lavatories and/or where appropriate – finish (SS).
l. Exhaust fan; 100cfm minimum or as required by code; sound level <2.0 sones.
m. GFI electrical outlet adjacent to mirror/sink.
n. If existing, restrooms to be updated with all appropriate paint, tile, fixtures, etc.
7. Miscellaneous:
a. Exterior Windows/Doors:
1. Roller Shades: ALL exterior windows shall have roller shades installed. WHEN
INSTALLED, SHADES SHALL NOT ALLOW FOR ANY VISUAL GAPS.
i. Roller Shades (windows only): The Lessor will coordinate with the COE as to whether single roller shades are required. Single or Dual shades to be Hunter Douglas, Contract
Page | 10
Roller Shade: Model #RB500 or equivalent. Fascia & End Cap finishes to be “anodized aluminum”. These shades will not require military logos. To ensure a uniform appearance, all window shades will be motorized, with an appropriate electric wall switch control(s) as identified on the floorplan. Roller Shade couplers will be used to minimize the number of motors and electrical drop(s) required (up to 300” in length and/or 6 roller shades). All electrical power to be hardwired within conduit inside walls. Shades shall NOT be installed inside the window frame (in order to connect multiple roller shades together with a single motor). Motor to be, Sonesse Ultra model # 50 RA with a sound level equivalent to an office conversation. Installation shall be as per manufacturer’s written instructions ~ to include all necessary blocking and structural supports. Shades to include the required number of Individual Group Control (IGC) 4N1 motor controls with a HARDWIRED DecoFlex Dry Contact Keypad/Switch. Keypad/ Switch to have the appropriate number of channels to address any potential variety of multiple shade zones ~ dependent on floor plan layout. NOTE: BATTERY OPERATED KEYPADS ARE NOT ALLOWED. Shades will have a lifetime warranty and pass the NFPA 701 Small Scale test. If window(s) cannot be equipped with roller shades, either because of their unique shape and/or the inability to install the shade correctly, then only with expressed prior approval of the COE, a fixed panel shade shall be applied in accordance with fixed panel specifications below. If already installed, existing glass block requires no window covering. For wiring diagrams, see ENCLOSURE #3 and ENCLOSURE #4.
• Single Roller Shades (windows only): Privacy shade shall be a fabric equal to
Hunter Douglas SheerWeave 7100, color White. To be installed when an exterior perforated window wrap IS INSTALLED / WILL be applied to the exterior windows (Lessor to coordinate with the COE). See Para G.7.c. for Perforated Window Wrap guidelines.
• Dual Roller Shades (windows only): Dual Roller shades will be installed when an exterior perforated window wrap IS NOT or WILL NOT be applied to the exterior windows. Shades to have both ‘Sheer’ and ‘Privacy’ fabrics. The ‘Sheer Shade’ shall be of a fabric equal to Hunter Douglas E Screen color, White/White with an openness factor of 3% and shall be closest to the window. The ‘Privacy Shade’ shall be fabric equal to Hunter Douglas SheerWeave 7100, color White. Note: If a dual shade application is required, it may be necessary to install two individual shades if existing window conditions do not allow enough room to accommodate a dual shade bracket.
ii. Fixed Panel Shades: All exterior glass entrance doors shall have a fixed panel shade installed on the interior side of the glass. This fixed panel shade shall include:
• Fixed panel shades to be Hunter Douglas Contract Shade: Model #RB500 or equivalent.
• Shade shall be a sheer fabric equal to Hunter Douglas E Screen color, White/White with an openness factor of 3%.
• Fixed panel shall have a thread reinforced welded pocket.
• Attachment anchoring system to be clear anodized aluminum rods, mounted with fixed rod mount in a silver finish using # 8 stainless screws and be affixed to the door frame.
• Shade shall eliminate all light gaps with a minimum of ½” overlap.
• Door(s) shall receive separate top and bottom panels. The top panel to cover all exposed glass above the door handle. The bottom panel to cover all exposed glass below the door handle. If no door handle exists, two separate panel shades are also to be installed for stability.
• Any sidelight or transom windows adjacent to door(s) too narrow to receive roller shade(s) or unable to be effectively covered by specified roller shade(s) shall receive a single fixed panel shade as described above.
• Installation shall be as per manufacturer’s written instructions.
Page | 11
• See ENCLOSURE #5 for typical pictures and installation drawings for the fixed panel shades. This enclosure includes Hunter Douglas drawing specification number references which will ensure proper materials are ordered.
iii. If selected, for installation and government pricing-expedited delivery: Hunter Douglas Contract division; P.O.C. Nichole, 1-800-417-3248; email:
armycorpsorders@hunterdouglas.com. Installation video can be found at the following link: https://www.youtube.com/watch?v=DEWBwhFNIaI
b. Perforated Window Wraps: The application of perforated window wraps is dependent upon the type of facility, along with other requirements. COE representative / Service(s) shall have control over what graphic is applied, what position the graphic will be placed and on which windows.
Lessor/contractor will coordinate with the COE representative.
1. Stand-Alone OR Collocated with Separate Entrance Doors: Install perforated window wrap with appropriate service(s) graphic on the exterior of all storefront glass. Perforated window wrap installations shall have 100% coverage of all exterior glass, including common areas (see individual Service graphic requirements). The Graphic below is provided for example purposes ONLY. The COE Representative to provide the appropriate link for each Military Services graphic (all appropriate files to be downloaded by contractor for use).
Example Only – COE to Provide Specific Graphics.
mailto:armycorpsorders@hunterdouglas.com https://www.youtube.com/watch?v=DEWBwhFNIaI
Page | 12
Example Only – COE to Provide Link for Specific Graphics.
2. Collocated with a Shared Entrance Door (JRFC Graphic): When multiple services are present and they share the same entrance door, a “JRFC Graphic” will be installed.
Perforated window wrap installations shall have 100% coverage of all exterior glass, including common area windows (if applicable). If Military Service “exclusive” windows on the sides or rear of the space (not front windows) are present, individual Service graphics can be applied to those windows (coordinate with the COE Representative). The JRFC Graphic image shown below is provided for reference purposes ONLY. This image will be included in a PDF “Style Guide” that the contractor MUST download with detailed instructions. The image needs to be put together with specified materials and look as close to the below image as possible. In the Style Guide, the black lines represent window/door mullions. The COE representative will provide a link and folder name for the contractor to download ALL appropriate files necessary (36 in total) to create/install the JRFC Graphic:
3. The Lessor will provide, for COE approval, mockup elevations and when chosen, provide final proofs and storefront elevation renderings of the approved graphics.
4. The approved graphic(s) shall meet the following standard(s) or equivalent on all storefront window wrap applications (including all manufacturer installation requirements MUST be followed, especially for temperatures, for the installation of all perforated exterior graphics):
i. 3M, 8170 – P40 (40% perforated), 4-mil, opaque, cast vinyl film with a high gloss finish.
ii. Window graphic film will have a visual obscurity density of 60/40.
iii. Apply 3M Scotchcal Optically Clear Gloss Overlaminate (8518) and shall be laminated prior to installation.
iv. Apply 3M edge sealer tape 8914 at time of installation to all edges of the perforated film to prevent pealing.
5. The lessor will coordinate with the COE representative regarding the correct graphic. The following are the types of graphics that might be installed at a location (as indicated in #1 and #2 above), and in rare cases both could be installed.
i. Military Service Individual Graphics (Stand-alone OR Collocated with separate entrance doors).
ii. JRFC Graphic (Collocated with shared entrance door for all Military Services).
6. Note: Only the COE representative will make the final decision on the approved graphics.
c. Interior Windows/Doors:
1. Mini-Blinds: All interior windows and glass doors (except test rooms) shall be equipped with mini-blinds having non-corroding mechanisms and synthetic tapes. Each window shall have its own individual mini-blind. Mini-blinds shall be Hunter Douglas Contract CD Series, Style:
CD-80, Color: Brushed Aluminum #065, with 1” wide aluminum horizontal slat with beveled steel profile or approved equal. Test and Interview room windows DO NOT have mini-
Page | 13 blinds. Note: To prevent swaying, mini-blinds that are installed on interior doors must be secured at the bottom of the door with metal clips.
d. Mail Delivery: Exterior doors with existing mail slots shall be replaced. Replacement door(s) to conform to existing store front and/or building design standards. Lessor will coordinate with COE and USPS on the appropriate mail delivery method. Delivery to be by external secured cluster box.
e. Chair Rail: Shall be installed on common area walls, excluding restrooms, and as referenced on the individual, military services’ finish schedule/floor plan. Chair rail to be mounted at bottom edge, 30” AFF, with semi-gloss paint finish. Profile to be ½” x 3-5/8” with eased ogee edge, top and bottom. See specific military services’ Attachment for their specific requirements. Note:
Example of designated chair rail shown below:
f. Shelving:
1. Storage rooms: Shall have a minimum of four, 16” deep, industrial grade, tight-wire-mesh shelves with support brackets affixed to wall studs, 16” o.c. Shelves shall be installed approximately 15” o.c. vertically, beginning 30” from floor and be capable of maintaining a structural integrity of 50 lb/lf deadload. Design of the shelf system shall be approved by the COE before installation.
2. Janitorial closet: Shall have a shelf system consistent with that installed within the typical Military Service storage room; minimum two (2) shelves, minimum size to be 12” x 24”.
g. Desktop:
1. Test Room: Where installed, desktop to be approximately 30” AFF x 24” D, with a rear installed grommet to allow electrical/data cable access along with an appropriate, under-counter support. Electrical and data outlets are to be located and centered under desktop.
Desktop shall be adequately supported by under-desktop support braces to prevent future sagging. See specific military services’ Attachment for requirements.
h. Security Closet: See paragraph K.2.n. for security closet specifications.
H. Signage:
1. Exterior Signage: If collocated, Brand Identity Sign will read “Armed Forces Career Center” and shall comply with local building code requirements and Lessor specific guidelines. The sign shall have LED technology and be fabricated and installed in accordance with the referenced graphic and design standards. Note: The COE will provide an EPS format file to the Lessor for sign fabrication. The sign will be the maximum size allowed by code.
Note: If appropriate, to achieve contrast to the building façade, white lettering may be substituted.
a. Signage requirements for single, stand-alone recruiting office, see specific military service Attachment-Exterior Signage.
Chair Rail
Page | 14
b. If applicable, separate small individual exterior signs shall be provided at each individual military service entrance (in addition to the “Armed Forces Career Center” sign). These internally illuminated LED small entrance box signs (or style approved by Lessor) shall identify, by single name, the appropriate military service at its respective entrance. Unless otherwise requested, the signs shall have a black, lexan face with white Helvetica Condensed lettering.
c. All signs will function by use of a ‘dusk to dawn’ light sensor, or, if appropriate, by pre-set timer.
The Lessor shall ensure proper sign erection and electrical installation.
d. Marquee/Monument/Pylon Sign (road side - as applicable): For a stand-alone service, sign panel shall reflect the residing military service. If collocated, sign panel will read “Armed Forces Career Center”. If panel size permits, the American flag, should be utilized as an identifying feature. See potential example below (lessor to coordinate with COE on specific design).
Note: Additional security signage is listed in Paragraph K “security applications” below.
e. Perforated Window Wrap: See paragraph G.7.c. for full details.
2. Interior Signage:
a. Hallway blade sign(s): Size not to exceed 5” x 30” and be constructed of a satin black panel with surface-applied, silver, self-adhesive, vinyl lettering identifying the applicable military service.
Mounting height to be a minimum 84” AFF from the bottom edge of sign.
b. Rest room signs shall be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .