9-File 3657 Rev 2 Connector A 202 Construction.pdf
PDF 720 KB Posted
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Pennsylvania
About this file
This construction plan document depicts the installation of optical emergency pre-emption (EPD) equipment at the intersection of Bethlehem Pike (SR 0309) and Connector A/Garden Golf Boulevard in Montgomery Township, Montgomery County, Pennsylvania. The plan illustrates the existing and new locations for equipment mounting, with a specific callout notation indicating that mounting to a camera arm is required due to topographical challenges, specifically a hill formation over a bridge in the area. The document serves as a technical guide for contractors executing the installation work as part of Montgomery Township's broader Bethlehem Pike Emergency Pre-Emption Detection project, which encompasses six intersections along Bethlehem Pike and US Route 202.
The construction plan is a supporting exhibit for the sealed bid procurement with a bid submission deadline of October 17, 2025 at 10:00 A.M. local time via PennBid. Bidders must submit a 10% bid bond or certified check and, upon award, furnish Performance and Payment Bonds equal to 100% of the contract amount plus a 10% Maintenance Bond. The successful contractor must demonstrate technical expertise in emergency pre-emption equipment installation and the ability to address site-specific challenges such as the topographical constraints noted in this Connector A installation plan. Work is subject to the Pennsylvania Prevailing Wage Act requirements.
View the file
Other files
Show 40 more
Latest 50 of 154 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
wnugent Text Box
CONSTRUCTION PLAN
wnugent Text Box
CONSTRUCTION PLAN
wnugent Arrow wnugent Arrow wnugent Arrow wnugent Text Box Existing location New location wnugent Arrow wnugent Arrow wnugent Arrow akennard Callout Mount to camera arm due to hill coming over bridge
File details come from the government source that posted it. Updated .