This is a Bidder's Acknowledgement Form for Montgomery Township, Pennsylvania, Contract No. 2026-00512, relating to the 2026 Emergency Pre-Emption Detection project. The project involves the installation of optical emergency pre-emption equipment at five intersections: Dekalb Pike (S.R. 2202) and Cheswick Drive/Montgomery Square; Dekalb Pike (S.R. 2202) and Montgomery Mall Access; U.S. 202 Parkway (S.R. 0202) and Connector A (S.R. 8019); U.S. 202 Parkway (S.R. 0202) and Costco Drive/Terrace Way; and North Wales Road and Knapp Road. Questions regarding the bid are due by 10:00 A.M. local time on Friday, July 24, 2026, and sealed bids must be submitted online via PennBid by 10:00 A.M. local time on Thursday, July 30, 2026, at which time bids will be opened and made available for viewing. Bidders are required to visit the site and become familiar with site conditions, federal, state, and local laws and regulations, and all subsurface conditions and existing structures that may affect the work. The bidder acknowledges that the total bid price includes rock removal required for construction and that unit prices are computed based on estimated quantities that are not guaranteed. The work must be substantially complete within 90 calendar days after the contract commences and fully completed within 120 calendar days, with liquidated damages applicable for failure to meet these deadlines.
Bidders must submit a bid bond or certified check equal to at least 10 percent of the total bid amount. The successful contractor will be required to furnish Performance and Payment Bonds each in the amount of 100 percent of the contract amount and a Maintenance Bond equal to 15 percent of the contract amount. Bids remain subject to acceptance for 60 days after the bid opening or for such longer period as the bidder may agree to in writing. All bid documents and solicitation details are available at no cost via PennBid at https://pennbid.bonfirehub.com, though the low bidder is responsible for a fee to PennBid. The form requires bidders to submit supporting documentation including a PennBid Bid Form, Bidder's Qualification Form, Non-Collusion Affidavit, Agreement of Surety, Public Works Employment Verification Form, and a list of subcontractors. Montgomery Township reserves the right to waive immaterial defects, reject any or all bids, and eliminate specific bid items at its discretion.
View the file
Other files
Show 40 more
Latest 50 of 154 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIDDER’S ACKNOWLEDGEMENT FORM
00 43 00-1
DOCUMENT 00 43 00
PROJECT IDENTIFICATION: 2026 EMERGENCY PRE-EMPTION DETECTION.
CONTRACT IDENTIFICATION AND NUMBER: Contract No. 2026-00512
1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with
OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. The Bid will remain subject to acceptance for sixty (60) days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.
3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and (2) reports and drawings of a Hazardous Environmental Condition, if any, which has been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.
E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.
00 43 00-2
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that
Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance of the Work for which this Bid is submitted.
4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.
5.01 Bidder is aware that the Total Bid Price is to include rock removal required to accomplish construction of the proposed Work.
6.01 Bidder will complete the Work in accordance with the Contract Documents for the submitted bid amount.
Unit Prices have been computed in accordance with paragraph 11.03.B of the General Conditions.
Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents.
7.01 Bidder agrees that the Work will be substantially complete within 90 calendar days after the date when the Contract Times commence to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.07.B of the General Conditions within 120 calendar days after the date when the Contract Times commence to run.
7.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified above, which shall be stated in the Agreement.
8.01 The following documents are submitted along with this document and made a condition of this Bid:
A. PennBid Bid Form (BidTable)
B. Required Bid security;
C. Bidder’s Acknowledgement Form;
D. Required Bidder's Qualification Form with supporting data;
E. Non-Collusion Affidavit;
F. Required Agreement of Surety;
G. Public Works Employment Verification Form;
H. List of Subcontractors
9.01 Communications concerning this Bid shall be addressed to the following individual:
If the address, telephone number, and fax number of the above individual is different than noted at the end of the Bid Form, note the address, telephone number, and fax number of the above individual:
Business Address:
00 43 00-3
Telephone No.: (____)
Fax No. (____)
Email:
10.01 The terms used in this Bid with initial capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
SUBMITTED on , 20___.
Name of Bidder:
� Corporation State of Incorporation:
Date of Qualification to do Business:
� Partnership General Partner:
� Individual Doing Business as:
Business Address:
Telephone No.: (____)
Fax No.: (____)
Name of Person authorized to sign (typed or printed):
Title of Person authorized to sign (typed or printed):
(Authorized Signature)
SEAL Affix Corporate Seal if Corporation
Attested by Corporate Secretary or an Assistant Secretary if Corporation
END OF DOCUMENT