This is a Bid Schedule document for the City of Fort Worth's Cotton Lane Improvements project (CIP 42046), spanning from Estrella Parkway to Cotton Lane Bridge in Arizona. The project encompasses comprehensive roadway construction and infrastructure improvements, including earthwork, asphalt paving, drainage systems, curb and gutter installation, landscaping, traffic control, and striping. Bid line items include major components such as 39,500 cubic yards of roadway excavation, 20,435 cubic yards of aggregate base course, 20,250 tons of asphalt concrete pavement, 16,803 linear feet of vertical curb and gutter, storm drainage pipe installation ranging from 18 to 36 inches in diameter, and hydro seeding of 19 acres. The schedule also incorporates allowances for owner discretion totaling $650,000, contingent hard dig work of $50,000, contingent subgrade repair of $200,000, and stormwater compliance measures. The document is dated April 20, 2026, and serves as the revised bid schedule (Revision 1) for contractor pricing and cost estimation.
The bid schedule format requires contractors to provide unit costs and total pricing for each line item, with the document structured to calculate construction subtotal, project taxes, and total bid amount in both words and figures. While specific award criteria, contract term details, and payment terms are not detailed in this schedule document, the comprehensive nature of the work and multiple allowance categories indicate a significant construction project with anticipated complexity and potential for change orders. The schedule does not identify a pre-established budget or contract duration but serves as the baseline pricing mechanism for bid evaluation and contractor compensation determination.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cotton Lane Improvements Estrella Parkway to Cotton Lane Bridge
BID SCHEDULE - REV 1 4.20.26
FOR
CIP 42046
Owner's Allowance (To be used at Owner's Direction, not Contingency) Allowance 1 650,000.00$ 650,000.00$
105.80000 Construction Surveying and Layout LS 1
105.80001 As-Builts LS 1
106.00000 Contractor Quality Control and Materials Testing LS 1
107.02000 Stormwater Compliance (AZPDES) Allowance 1 20,000.00$ 20,000.00$
107.02002 Sediment Wattle, 9" Dia LF 23,102
107.02003 Rock Check Dam Each 63
107.02004 Storm Drain Inlet Protection Each 12
107.02005 Storm Drain Median Inlet Protection Each 8
107.02006 Rock Cut/Fill Transition SY 234
107.02007 Stabilized Construction Entrance/Exit CY 33
109.09000 Mobilization/Demobilization LS 1
205.01150 Roadway Excavation CY 39,500
205.01750 Hard Dig Allowance (Contingent) Allowance 1 50,000.00$ 50,000.00$
215.01510 Earthwork for Retention Basins CY 5,933
220.10150 Riprap, D50=6 in CY 45
301.01000 Subgrade Preparation SY 61,304
301.02010 Subgrade Repair (Contingent) Allowance 1 200,000.00$ 200,000.00$
310.03000 Aggregate Base Course (Class II) CY 20,435
Item No. Description Unit Quantity Unit Cost Total
1 of 3 Date Printed: 4/20/2026
BID SCHEDULE - REV 1 4.20.26
FOR
CIP 42046
Item No. Description Unit Quantity Unit Cost Total
321.01301 Asphalt Concrete Pavement (Superpave 3/4 in Mix, Low Traffic) Ton 20,250
321.04005 Thickened Edge, MAG Det 201, Type B LF 15,844
329.01000 Bituminous Tack Coat SS-1h, Diluted Ton 16
340.01110 Vertical Curb & Gutter, Type A, H=6 in, MAG Det 220 LF 16,803
340.01130 Roll Curb & Gutter, Type C, MAG Det 220 LF 60
340.01600 Concrete Apron & Valley Gutter, MAG Det 240 SF 491
345.01100 Adjust Manhole Frame & Cover, MAG Det 422 Each 5
345.01200 Adjust Frame & Cover to Grade, MAG Det 391-1 Each 11
350.01400 Remove Catch Basin Each 2
350.01800 Remove Concrete Curb and Gutter LF 8,026
350.01801 Remove Valley Gutter SF 398
350.04000 Remove and Salvage Traffic Sign Assembly EA 21
350.07500 Removal of Pavement SF 52,484
351.01700 Relocate 2” Air/Vacuum Release Valve Per COG Std G-3328 Each 1
401.01000 Maintenance of Traffic/Traffic Control LS 1
401.01100 Uniformed Off-Duty Law Enforcement Officer Hours 80
430.01201 Hydro Seeding - Native Seed Mix AC 19
460.02000 Remove Thermoplastic Stripe LF 117
462.01100 4 in White Thermoplastic Traffic Stripe LF 28,966
2 of 3 Date Printed: 4/20/2026
BID SCHEDULE - REV 1 4.20.26
FOR
CIP 42046
Item No. Description Unit Quantity Unit Cost Total
462.01200 4 in Yellow Thermoplastic Traffic Stripe LF 16,552
463.01200 Reflectorized Raised Pavement Marker (Type G, Clear, 1-Way) Each 405
463.01520 Thermoplastic/Preformed Symbol Bike Lane Marking Set Each 14
465.01006 Furnish and Install Roadside Sign Assembly (Base, Post, Sign Panel) (C.O.G. Std. Detail G-32 Each 73
505.10150 Catch Basin, MAG Det 535, Type F Each 8
505.13627 Catch Basin COG Std G-3535, Type M-2, L=17 ft Each 7
610.10210 Concrete Encasement of Waterline, 20 in Pipe, MAG Det 404 LF 22
610.27050 Relocate Fire Hydrant Bypass Assembly, COG Std G-3336 Each 1
618.00930 Concrete Pipe Collar for 30 in Pipe, MAG Det 505 Each 1
618.00936 Concrete Pipe Collar for 36 in Pipe, MAG Det 505 Each 1
618.20518 18 in RGRCP, Class V LF 200
618.20524 24 in RGRCP, Class V LF 411
618.20530 30 in RGRCP, Class V LF 64
618.20536 36 in RGRCP, Class V LF 4
625.01100 Storm Drain Manhole, MAG Det 520 & 522 Each 1
CONSTRUCTION SUBTOTAL
TOTAL BID SCHEDULE AMOUNT IN WORDS (INCLUDING TAXES):
TOTAL BID SCHEDULE AMOUNT IN FIGURES (INCLUDING TAXES):
PROJECT TAXES
3 of 3 Date Printed: 4/20/2026
Cotton Lane Bid Tab