9-Daniel Miller Stream General Instructions (pennbid).docx

DOCX document 13 KB Posted

Attached to
Daniel Miller Stream Restoration
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

Daniel Miller Stream General Instructions

This document comprises general instructions for bidders issued by the Donegal Chapter of Trout Unlimited, acting as Project Sponsor, with project management oversight from the Pennsylvania Department of Environmental Protection (DEP) and support from the Environmental Protection Agency. The project encompasses approximately 2,090 linear feet of natural channel stream stabilization and riparian buffer enhancement located at 376 Goat Hill Road, Peach Bottom, Pennsylvania 17563 in Lancaster County. The work utilizes Best Management Practices (BMPs) following Pennsylvania Fish and Boat Commission guidelines for trout stream habitat improvement. All work is bid as lump sum items, with the contractor responsible for providing all equipment, labor, materials, and supplies necessary for completion per approved drawings (Revision 3, dated February 9, 2026). Regulatory permits are already in place; contractors must not reference the original permit drawings dated January 13, 2023. Bid questions should be directed to Bob Landis, Bid Coordinator, at president@donegaltu.org or 717.381.7470, or to Marlan Nolt, Project Manager, at conservationa@dongeltu.org or 717.419.8410. Bidders may withdraw or modify proposals at any time prior to the PennBid due date and time.

The project is funded through a Section 319 Nonpoint Source Pollution Grant administered by the DEP. Bids exceeding $250,000 require a 5% bid guarantee, a 100% performance bond, and a 100% payment bond. All contractors must obtain a Standard Accord Certificate of Insurance in the amount of $1,000,000 covering workers' compensation, public liability and property damage, and automobile bodily injury and property damage prior to contract award. Pennsylvania prevailing wage rates apply, requiring contractors to identify appropriate wage categories for their workforce. Upon project completion and final inspection with as-built documentation, contractors shall submit an itemized invoice for the entire amount due to the Donegal Chapter of Trout Unlimited, with anticipated payment within 90 days of invoice receipt pending DEP reimbursement verification. The contractor assumes responsibility for locating and protecting all utilities and must obtain inspector approval for all materials prior to use.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DONEGAL CHAPTER OF TROUT UNLIMITED

NATURAL CHANNEL STREAM RESTORATION

GENERAL INSTRUCTIONS FOR PROJECT BIDDERS

Project Information:

Part of a national program managed in Pennsylvania by the Pennsylvania Department of Environmental Protection (DEP) for the implementation of Best Management Practices that restore watersheds with DEP and Environmental Protection Agency-approved Watershed Implementation Plans( WIP).

The project is located at 376 Goat Hill Rd Peach Bottom PA 17563, and is owned by Daniel Miller. The goal of this project is to restore approximately 2,090 linear feet of stream stabilization.

The project will be funded by a Section 319 NonpointSource Pollution Grant. The 319 funding is part of a national program managed in Pennsylvania by the Department of Environmental Protection (DEP). All work is bid as LUMP SUM items.

A. The contractor shall provide all equipment, labor, materials, and supplies necessary to complete the work per the drawing (date Rev. 3 2/9/26). The Project Design and Technical Specifications are intended to cover one contract. The contractor shall, at all times and in all respects, be the party primarily responsible for the performance of work under the contract or any work thereunder.

B. The regulatory approved permits are in place for the Daniel Miller project. See attached permits and approved drawings (Rev. 3 2/9/26). Do not use the supplied drawings in the permit dated January 13, 2023. The revised build to drawings are attached separately.

C. Materials shall be approved by the inspector prior to use.

D. The contractor shall be responsible for locating and protecting all utilities.

E. DTU is acting as the Project Sponsor. Bob Landis is the Bid Coordinator and any bid questions he can be contacted a president@donegaltu.org or 717.381.7470. Marlan Nolt is the Project Manager conservationa@dongeltu.org or mobile phone 717.419.8410.

F. Any bidder may withdraw a proposal at any time prior to the scheduled closing time for receipt of proposals. A Bid may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids.

Award of a contract shall be made on the earliest possible date from the bid opening date. In the event no satisfactory bids are received, all bidders shall be so notified within a 24-hour period.

The contractor to whom award is made shall provide the following information to the contracting representative prior to starting construction.

A. Standard Accord Certificate(s) of Insurance (Contractual Liability Type) ($1,000,000)

1. Worker’s Compensation Insurance

2. Public Liability and Property Damage Insurance

3. Automobile Bodily Injury and Property Damage Insurance

The following apply to bids in excess of $250,000.

B. A bid guarantee in the amount of 5% of the bid price is required with the submittal bid C. A Performance Bond (100% of the contract amount provided prior to award) D. A Payment Bond (100% of the contract amount provided prior to award)

Prevailing Wages Pennsylvania prevailing wage rates apply to this project. Wage Determination from PA Department of Labor & Industry. Bidders should determine the specific wage categories appropriate for the project (i.e. Operators, Truck drivers, Labors etc.).

Reimbursement Upon acceptance of the work at the final inspection using an as-built diagram, and verification of all legal documents,the contractor shall submit an itemized invoice for the entire amount due to DTU. It is anticipated that payments shall be made to the contractor within 90 days of receipt of invoice, depending on timely reimbursement from the DEP. DTU will verify the quality and work meets the specification and BMP drawing requirements. Funding and/or buyer organization will make the final determination that the work is acceptable.

Indemnification The Contractor shall indemnify and hold harmless the landowner, Donegal Chapter of Trout Unlimited, the Pennsylvania Department of Environmental Protection, and all other of their representatives against any and all claims for damages to persons or property asserted by any person, partnership, corporation, or other organization, arising out of services performed or undertaken by said Contractor, its agents, employees, or subcontractors, except for claims for damages directly caused by the sole fault or negligence of the parties hereto, their officers, or employees.

Commonwealth Standard Terms and Conditions All bidders need to follow the following standard terms and conditions outlined in the: Commonwealth Standard Terms and Conditions Grant Version (Revised-10/1/2023), Attachments B through E. (supplied).