About this file
This document is a site visit requirement notification for the Daniel Miller Stream Restoration project managed by the Pennsylvania Department of Environmental Protection or related state agency in Lancaster County. The project involves streambank stabilization and restoration work on 2,090 feet of the Daniel Miller Stream located at 376 Goat Hill Road, Peach Bottom, Pennsylvania 17563 in Fulton Township. The scope of work requires furnishing all materials, equipment, supplies, and labor to implement streambank stabilization using multiple Best Management Practices (BMPs) and natural channel design principles as outlined by the Pennsylvania Fish and Boat Commission's "Habitat Improvements for Trout Streams" guidelines. The project also includes enhancement and management of the existing riparian buffer in the floodplain and adjacent wetlands to support long-term stabilization and sediment reduction objectives. An on-site visit is mandatory for prospective bidders to evaluate project conditions and site-specific requirements prior to preparing their proposals.
The document emphasizes that an on-site inspection is a required component of the bidding process for this restoration contract. Bidders must conduct this visit to gain firsthand understanding of the stream conditions, terrain, existing vegetation, and project scope before submitting their bids. This requirement ensures that all prospective contractors have accurate information regarding site accessibility, material delivery constraints, and the technical complexity of implementing the restoration work across the designated streambank segments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To: Site Meeting Participants
From: Robert Landis, DTU
RE: Mandatory Site Visit for Sealed Bid on June 1, 2026 at 11:00 am
MEETING PURPOSE
Funding sources for the Daniel Miller Project are provided by the Pennsylvania Department of Environmental
Protection and Section 319 of the Clean Water Act. The mandatory site visit will allow potential contractors to physically view the project site and ask questions of Donegal Chapter of Trout Unlimited (DTU) Conservation
Committee members. The design and permits are completed. Potential bidders will be quoting construction, oversight, and reports for the project.
Grant Term October 1st, 2025 - March 11, 2028
Sealed Bid Deadline June 12 at 6:00 pm; electronically filed with Penn Bid
Subcontractor Selection Date No later than June 17 at 6:00 pm
Address 376 Goat Hill Rd Peach Bottom PA 17563
DTU Bid/Coordinator Bob Landis, president@donegaltu.org, 717-381-7470
Project Summary The work product will center around approximately 1.7 acres of buffer established and 2,090 feet of streambank stabilization using techniques such as rock deflectors, mud sills, boulder wall/terrace combination, a cattle crossing, rock cross-vanes, and floodplain benches. See the approved drawings and permits.