9-Attachment No. 8. REQ-0007694 Table 2 Labor Hours Technician(s) PM Service Task.pdf

PDF 117 KB Posted

Attached to
Preventative Maintenance and Repair of Electrical Equipment
Solicitation number
REQ-0007694
Issued by
Wayne County, Michigan

About this file

This attachment to Request for Proposal REQ-0007694 is a labor requirements table for the Great Lakes Water Authority (GLWA) preventative maintenance and repair contract covering five facility locations: the Wastewater Resource Recovery Facility (WRRF), Combined Sewer Overflow (CSO) facilities, Water Treatment Plants (WTP), Pumping Stations (PS), and Sewage facilities. The document specifies crew sizes and labor hour requirements for technicians assigned to complete individual preventative maintenance service tasks across all locations. Tasks encompass maintenance of medium and high voltage electrical equipment including circuit breakers, motor starters, soft starters, variable frequency drives, protective relays, transformers, load break switches, motor control centers, bus ducts, and battery testing systems. The labor requirements vary by task and location, with crew sizes ranging from one to two technicians per service item and labor hours specified per technician completing each preventative maintenance task.

The table does not contain pricing information, set-asides, incumbent details, funding sources, or contract term specifications. Rather, it serves as a staffing and scheduling reference document that establishes the baseline labor allocation needed to execute the full scope of preventative maintenance services across all GLWA facilities. Contractors bidding on this opportunity would use this table to calculate labor costs, schedule technician resources, and determine project feasibility based on the specified crew compositions and task requirements for each electrical equipment category.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQ-0007694

Attachment No. 8 - Table 2 – Labor Hours & Technician(s) PM Service Task

Table 2 - Labor Hours & Technician(s) Required to Complete Each PM Service Task

GLWA Location

PM

Service Item #

Description Crew Size

Labor Hours/Tech.

WRRF #4-1 Medium Voltage Vacuum Circuit Breakers PM 2

WRRF #4-2 Medium Voltage Air Circuit Breakers PM 1

WRRF #4-3 Medium Voltage Motors Starters/Air Contactors PM 2

WRRF #4-4

Medium Voltage Motor Starters/Vacuum Contactors PM

WRRF #4-5 Medium Voltage Soft Starters PM 1

WRRF #4-6

Variable Frequency Drives, Field Control Cubicles and Brushless Monitoring Systems PM

WRRF #4-7

PLC or Relay, Operator Interface, or Meeting Cubicle PM

WRRF #4-8A

Switchgear Electro-Mechanical Protective Relays

PM

WRRF #4-8B Switchgear Solid State Protective Relays PM 1

WRRF #4-8C

Switchgear Complicated SEL, Bus Differential and Transmission Protective Relays PM

WRRF #4-9

Medium Voltage and High Voltage Load Break Switch or Fused Disconnect

WRRF #4-10 Dry type Transformers PM 2

WRRF #4-11 Liquid Filled Transformers - Oil Testing 1

Table 2 - Labor Hours & Technician(s) Required to Complete Each PM Service Task*

GLWA Location

PM

Service Item #

Description Crew Size

Labor Hours/Tech.

WRRF #4-12 Liquid Filled Transformers PM 2

WRRF #4-13 Neutral Grounding Resistor PM 2

WRRF #4-14

480V and Medium Voltage Substation Line-up PM (Per Vertical Section)

WRRF #4-15 480V Draw-out Circuit Breakers PM 2

WRRF #4-16

480V Main Load Break Switches and Switchboard Switches PM

WRRF #4-17

Motor Control Center PM (MCC) - Per Compartment/Bucket, Excluding Space

WRRF #4-18 Power Factor Correction Capacitors PM (PFCC) 1

WRRF #4-19 480V and Medium Voltage Bus Duct PM 2

WRRF #4-20 Motor Analyzing PM 1

WRRF #4-21 Motor Analyzing PM - Single Motor 1

WRRF #4-22 Load Bank Battery Testing PM 1

CSO #5-1 Medium Voltage Vacuum Circuit Breakers PM 2

CSO #5-2 Medium Voltage Air Circuit Breakers PM 2

CSO #5-3 Medium Voltage Motors Starters/Air Contactors PM 1

CSO #5-4

Medium Voltage Motor Starters/Vacuum Contactors PM

CSO #5-5 Medium Voltage Soft Starters PM 2

Service Item #

Description Crew Size

Labor Hours/Tech.

CSO #5-6

Variable Frequency Drives, Field Control Cubicles and Brushless Monitoring Systems PM

CSO #5-7

PLC or Relay, Operator Interface, or Meeting Cubicle PM

CSO #5-8A

Switchgear Electro-Mechanical Protective Relays

CSO #5-8B Switchgear Solid State Protective Relays PM 1

CSO #5-8C

Switchgear Complicated SEL, Bus Differential and Transmission Protective Relays PM

CSO #5-9

Medium Voltage and High Voltage Load Break Switch or Fused Disconnect

CSO #5-10 Dry type Transformers PM 2

CSO #5-11 Liquid Filled Transformers - Oil Testing 1

CSO #5-12 Liquid Filled Transformers PM 2

CSO #5-13 Neutral Grounding Resistor PM 1

CSO #5-14

480V and Medium Voltage Substation Line-up PM

CSO #5-15 480V Draw-out Circuit Breakers PM 2

CSO #5-16

480V Main Load Break Switches and Switchboard

CSO #5-17

Service Item #

Description Crew Size

Labor Hours/Tech.

CSO #5-18

Motor Control Center Testing (MCC) - Per

CSO #5-19 Power Factor Correction Capacitors PM (PFCC) 1

CSO #5-20 480V and Medium Voltage Bus Duct PM 1

CSO #5-21 Motor Analyzing PM 1

CSO #5-22 Load Bank Battery Testing PM 1

CSO #5-23 Periodic Inspection (Per CSO Facility) 1

WTP #6-1 Medium Voltage Vacuum Circuit Breakers PM 2

WTP #6-2 Medium Voltage Air Circuit Breakers PM 2

WTP #6-3 Medium Voltage Air Circuit Breakers 750MVA PM 2

WTP #6-4 Medium Voltage Motors Starters/Air Contactors PM 2

WTP #6-5

Medium Voltage Motor Starters/Vacuum

WTP #6-6 Medium Voltage Soft Starters PM 2

WTP #6-7

Variable Frequency Drives, Field Control Cubicles

WTP #6-8

WTP #6-9A

WTP #6-9B Switchgear Solid State Protective Relays PM 1

Service Item #

Description Crew Size

Labor Hours/Tech.

WTP #6-9C

Switchgear Complicated SEL, Bus Differential and

WTP #6-10

WTP #6-11

Medium Voltage Bolt-in Load Break Switch or Fused Disconnect

WTP #6-12 Dry type Transformers PM 2

WTP #6-13 Liquid Filled Transformers - Oil Testing 1

WTP #6-14 Liquid Filled Transformers PM 2

WTP #6-15 Liquid Filled Transformers LTC PM 2

WTP #6-16 Neutral Grounding Resistor PM 1

WTP #6-17

480V and Medium Voltage Substation Line-up PM

WTP #6-18 480V Draw-out Circuit Breakers PM 2

WTP #6-19

480V Main Load Break Switches and Switchboard

WTP #6-20

WTP #6-21 Power Factor Correction Capacitors PM (PFCC) 1

WTP #6-22 480V and Medium Voltage Bus Duct PM 1

WTP #6-23 Motor Analyzing PM 1

WTP #6-24 Load Bank Battery Testing PM 2

Service Item #

Description Crew Size

Labor Hours/Tech.

PS #7-1 Medium Voltage Vacuum Circuit Breakers PM 2

PS #7-2 Medium Voltage Air Circuit Breakers PM 2

PS #7-3 Medium Voltage Motors Starters/Air Contactors PM 2

PS #7-4

Medium Voltage Motor Starters/Vacuum

PS #7-5 Medium Voltage Soft Starters PM 2

PS #7-6

Variable Frequency Drives, Field Control Cubicles

PS #7-7

PS #7-8A

PS #7-8B Switchgear Solid State Protective Relays PM 1

PS #7-8C

Switchgear Complicated SEL, Bus Differential and

PS #7-9

PS #7-10 Dry type Transformers PM 2

PS #7-11 Liquid Filled Transformers - Oil Testing 1

PS #7-12 Liquid Filled Transformers PM 2

PS #7-13 Neutral Grounding Resistor PM 2

Service Item #

Description Crew Size

Labor Hours/Tech.

PS #7-14

480V and Medium Voltage Substation Line-up PM

PS #7-15 480V Draw-out Circuit Breakers PM 2

PS #7-16

480V Main Load Break Switches and Switchboard

PS #7-17

PS #7-18 Power Factor Correction Capacitors PM (PFCC) 1

PS #7-19 480V and Medium Voltage Bus Duct PM 1

PS #7-20 Motor Analyzing PM 1

PS #7-21 Load Bank Battery Testing PM 1

Sewage #8-1 Medium Voltage Vacuum Circuit Breakers PM 2

Sewage #8-2 Medium Voltage Air Circuit Breakers PM 1

Sewage #8-3 Medium Voltage Motors Starters/Air Contactors PM 1

Sewage #8-4 Medium Voltage Motor Starters/Vacuum

Sewage #8-5 Medium Voltage Soft Starters PM 1

Sewage #8-6 Variable Frequency Drives, Field Control Cubicles

Sewage #8-7

Service Item #

Description Crew Size

Labor Hours/Tech.

Sewage #8-8A Switchgear Electro-Mechanical Protective Relays

Sewage #8-8B Switchgear Solid State Protective Relays PM 1

Sewage #8-8C Switchgear Complicated SEL, Bus Differential and

Sewage #8-9

Sewage #8-10 Dry type Transformers PM 2

Sewage #8-11 Liquid Filled Transformers - Oil Testing 1

Sewage #8-12 Liquid Filled Transformers PM 2

Sewage #8-13 Neutral Grounding Resistor PM 1

Sewage #8-14 480V and Medium Voltage Substation Line-up PM

Sewage #8-15 480V Draw-out Circuit Breakers PM 1

Sewage #8-16 480V Main Load Break Switches and Switchboard

Sewage #8-17

Sewage #8-18 Power Factor Correction Capacitors PM (PFCC) 1

Sewage #8-19 480V and Medium Voltage Bus Duct PM 1

Sewage #8-20 Motor Analyzing PM 1

Sewage #8-21 Load Bank Battery Testing PM 1