This attachment to Request for Proposal REQ-0007694 is a labor requirements table for the Great Lakes Water Authority (GLWA) preventative maintenance and repair contract covering five facility locations: the Wastewater Resource Recovery Facility (WRRF), Combined Sewer Overflow (CSO) facilities, Water Treatment Plants (WTP), Pumping Stations (PS), and Sewage facilities. The document specifies crew sizes and labor hour requirements for technicians assigned to complete individual preventative maintenance service tasks across all locations. Tasks encompass maintenance of medium and high voltage electrical equipment including circuit breakers, motor starters, soft starters, variable frequency drives, protective relays, transformers, load break switches, motor control centers, bus ducts, and battery testing systems. The labor requirements vary by task and location, with crew sizes ranging from one to two technicians per service item and labor hours specified per technician completing each preventative maintenance task.
The table does not contain pricing information, set-asides, incumbent details, funding sources, or contract term specifications. Rather, it serves as a staffing and scheduling reference document that establishes the baseline labor allocation needed to execute the full scope of preventative maintenance services across all GLWA facilities. Contractors bidding on this opportunity would use this table to calculate labor costs, schedule technician resources, and determine project feasibility based on the specified crew compositions and task requirements for each electrical equipment category.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQ-0007694
Attachment No. 8 - Table 2 – Labor Hours & Technician(s) PM Service Task
Table 2 - Labor Hours & Technician(s) Required to Complete Each PM Service Task
GLWA Location
PM
Service Item #
Description Crew Size
Labor Hours/Tech.
WRRF #4-1 Medium Voltage Vacuum Circuit Breakers PM 2
WRRF #4-2 Medium Voltage Air Circuit Breakers PM 1
WRRF #4-3 Medium Voltage Motors Starters/Air Contactors PM 2
WRRF #4-4
Medium Voltage Motor Starters/Vacuum Contactors PM
WRRF #4-5 Medium Voltage Soft Starters PM 1
WRRF #4-6
Variable Frequency Drives, Field Control Cubicles and Brushless Monitoring Systems PM
WRRF #4-7
PLC or Relay, Operator Interface, or Meeting Cubicle PM
WRRF #4-8A
Switchgear Electro-Mechanical Protective Relays
PM
WRRF #4-8B Switchgear Solid State Protective Relays PM 1
WRRF #4-8C
Switchgear Complicated SEL, Bus Differential and Transmission Protective Relays PM
WRRF #4-9
Medium Voltage and High Voltage Load Break Switch or Fused Disconnect
WRRF #4-10 Dry type Transformers PM 2
WRRF #4-11 Liquid Filled Transformers - Oil Testing 1
Table 2 - Labor Hours & Technician(s) Required to Complete Each PM Service Task*
GLWA Location
PM
Service Item #
Description Crew Size
Labor Hours/Tech.
WRRF #4-12 Liquid Filled Transformers PM 2
WRRF #4-13 Neutral Grounding Resistor PM 2
WRRF #4-14
480V and Medium Voltage Substation Line-up PM (Per Vertical Section)
WRRF #4-15 480V Draw-out Circuit Breakers PM 2
WRRF #4-16
480V Main Load Break Switches and Switchboard Switches PM
WRRF #4-17
Motor Control Center PM (MCC) - Per Compartment/Bucket, Excluding Space
WRRF #4-18 Power Factor Correction Capacitors PM (PFCC) 1
WRRF #4-19 480V and Medium Voltage Bus Duct PM 2
WRRF #4-20 Motor Analyzing PM 1
WRRF #4-21 Motor Analyzing PM - Single Motor 1
WRRF #4-22 Load Bank Battery Testing PM 1
CSO #5-1 Medium Voltage Vacuum Circuit Breakers PM 2
CSO #5-2 Medium Voltage Air Circuit Breakers PM 2
CSO #5-3 Medium Voltage Motors Starters/Air Contactors PM 1
CSO #5-4
Medium Voltage Motor Starters/Vacuum Contactors PM
CSO #5-5 Medium Voltage Soft Starters PM 2
Service Item #
Description Crew Size
Labor Hours/Tech.
CSO #5-6
Variable Frequency Drives, Field Control Cubicles and Brushless Monitoring Systems PM
CSO #5-7
PLC or Relay, Operator Interface, or Meeting Cubicle PM
CSO #5-8A
Switchgear Electro-Mechanical Protective Relays
CSO #5-8B Switchgear Solid State Protective Relays PM 1
CSO #5-8C
Switchgear Complicated SEL, Bus Differential and Transmission Protective Relays PM
CSO #5-9
Medium Voltage and High Voltage Load Break Switch or Fused Disconnect
CSO #5-10 Dry type Transformers PM 2
CSO #5-11 Liquid Filled Transformers - Oil Testing 1
CSO #5-12 Liquid Filled Transformers PM 2
CSO #5-13 Neutral Grounding Resistor PM 1
CSO #5-14
480V and Medium Voltage Substation Line-up PM
CSO #5-15 480V Draw-out Circuit Breakers PM 2
CSO #5-16
480V Main Load Break Switches and Switchboard
CSO #5-17
Service Item #
Description Crew Size
Labor Hours/Tech.
CSO #5-18
Motor Control Center Testing (MCC) - Per
CSO #5-19 Power Factor Correction Capacitors PM (PFCC) 1
CSO #5-20 480V and Medium Voltage Bus Duct PM 1
CSO #5-21 Motor Analyzing PM 1
CSO #5-22 Load Bank Battery Testing PM 1
CSO #5-23 Periodic Inspection (Per CSO Facility) 1
WTP #6-1 Medium Voltage Vacuum Circuit Breakers PM 2
WTP #6-2 Medium Voltage Air Circuit Breakers PM 2
WTP #6-3 Medium Voltage Air Circuit Breakers 750MVA PM 2
WTP #6-4 Medium Voltage Motors Starters/Air Contactors PM 2
WTP #6-5
Medium Voltage Motor Starters/Vacuum
WTP #6-6 Medium Voltage Soft Starters PM 2
WTP #6-7
Variable Frequency Drives, Field Control Cubicles
WTP #6-8
WTP #6-9A
WTP #6-9B Switchgear Solid State Protective Relays PM 1
Service Item #
Description Crew Size
Labor Hours/Tech.
WTP #6-9C
Switchgear Complicated SEL, Bus Differential and
WTP #6-10
WTP #6-11
Medium Voltage Bolt-in Load Break Switch or Fused Disconnect
WTP #6-12 Dry type Transformers PM 2
WTP #6-13 Liquid Filled Transformers - Oil Testing 1
WTP #6-14 Liquid Filled Transformers PM 2
WTP #6-15 Liquid Filled Transformers LTC PM 2
WTP #6-16 Neutral Grounding Resistor PM 1
WTP #6-17
480V and Medium Voltage Substation Line-up PM
WTP #6-18 480V Draw-out Circuit Breakers PM 2
WTP #6-19
480V Main Load Break Switches and Switchboard
WTP #6-20
WTP #6-21 Power Factor Correction Capacitors PM (PFCC) 1
WTP #6-22 480V and Medium Voltage Bus Duct PM 1
WTP #6-23 Motor Analyzing PM 1
WTP #6-24 Load Bank Battery Testing PM 2
Service Item #
Description Crew Size
Labor Hours/Tech.
PS #7-1 Medium Voltage Vacuum Circuit Breakers PM 2
PS #7-2 Medium Voltage Air Circuit Breakers PM 2
PS #7-3 Medium Voltage Motors Starters/Air Contactors PM 2
PS #7-4
Medium Voltage Motor Starters/Vacuum
PS #7-5 Medium Voltage Soft Starters PM 2
PS #7-6
Variable Frequency Drives, Field Control Cubicles
PS #7-7
PS #7-8A
PS #7-8B Switchgear Solid State Protective Relays PM 1
PS #7-8C
Switchgear Complicated SEL, Bus Differential and
PS #7-9
PS #7-10 Dry type Transformers PM 2
PS #7-11 Liquid Filled Transformers - Oil Testing 1
PS #7-12 Liquid Filled Transformers PM 2
PS #7-13 Neutral Grounding Resistor PM 2
Service Item #
Description Crew Size
Labor Hours/Tech.
PS #7-14
480V and Medium Voltage Substation Line-up PM
PS #7-15 480V Draw-out Circuit Breakers PM 2
PS #7-16
480V Main Load Break Switches and Switchboard
PS #7-17
PS #7-18 Power Factor Correction Capacitors PM (PFCC) 1
PS #7-19 480V and Medium Voltage Bus Duct PM 1
PS #7-20 Motor Analyzing PM 1
PS #7-21 Load Bank Battery Testing PM 1
Sewage #8-1 Medium Voltage Vacuum Circuit Breakers PM 2
Sewage #8-2 Medium Voltage Air Circuit Breakers PM 1
Sewage #8-3 Medium Voltage Motors Starters/Air Contactors PM 1
Sewage #8-4 Medium Voltage Motor Starters/Vacuum
Sewage #8-5 Medium Voltage Soft Starters PM 1
Sewage #8-6 Variable Frequency Drives, Field Control Cubicles
Sewage #8-7
Service Item #
Description Crew Size
Labor Hours/Tech.
Sewage #8-8A Switchgear Electro-Mechanical Protective Relays
Sewage #8-8B Switchgear Solid State Protective Relays PM 1
Sewage #8-8C Switchgear Complicated SEL, Bus Differential and
Sewage #8-9
Sewage #8-10 Dry type Transformers PM 2
Sewage #8-11 Liquid Filled Transformers - Oil Testing 1
Sewage #8-12 Liquid Filled Transformers PM 2
Sewage #8-13 Neutral Grounding Resistor PM 1
Sewage #8-14 480V and Medium Voltage Substation Line-up PM
Sewage #8-15 480V Draw-out Circuit Breakers PM 1
Sewage #8-16 480V Main Load Break Switches and Switchboard
Sewage #8-17
Sewage #8-18 Power Factor Correction Capacitors PM (PFCC) 1
Sewage #8-19 480V and Medium Voltage Bus Duct PM 1
Sewage #8-20 Motor Analyzing PM 1
Sewage #8-21 Load Bank Battery Testing PM 1