About this file

This attachment outlines heat protection safety requirements for the Construction of the Meyergrove Stormwater Detention Basin - Phase 2 project being executed for the Harris County Flood Control District in Texas. The document mandates that all contractors include comprehensive weather-related safety provisions in their project Safety Plan, with particular emphasis on protecting workers from heat-related and cold-related illnesses. The requirements specify that when temperatures or heat index values exceed 90 degrees Fahrenheit, the Prime Contractor must develop and implement a project-specific Heat Awareness Plan that includes provisions for worker acclimatization, water access, adequate rest periods, and shaded areas.

The Prime Contractor is required to provide accommodations to workers as deemed necessary during extended periods of adverse weather conditions. Vendors acknowledge their agreement to comply with these heat protection safety requirements upon signing the Bid Acknowledgement at the time of bid submission. This safety guidance applies to all weather-related conditions throughout the execution of work and is a binding contractual obligation for all bidders on this FEMA-funded project.

View the file

Other files

File Type Posted
6-Attachment K - Payment Bond.pdf PDF
19-Attachment S - Plans and Drawings.pdf PDF
17-Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
11-Attachment G - Contractor Profile.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
20-Attachment AA - Report File.pdf PDF
28-Attachment GG - Prevailing Wage Rates TX20260031.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
16-Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf PDF
29-Federal IFB General Conditions and Specifications - Construction.pdf PDF
18-Attachment U - Project Manual.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
10-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
15-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
23-Attachment JJ - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
24-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
21-Attachment HH - Harris County Contractor and Worksite Safety Policies.pdf PDF
12-Attachment A - Bid Addenda Acknowledgement.pdf PDF
26-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
4-Attachment F - References.pdf PDF
27-Attachment EE - BABAA Self-Certification Form.pdf PDF
13-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
14-Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
22-Attachment II - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
25-Attachment P - Required Contract Provisions.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment FF

Heat Protection Safety Requirement

Guidance for all weather-related safety of workers, including but not limited to, extreme heat, cold weather or any adverse weather conditions shall be included in the project

Safety Plan. At a minimum, this must include provisions for keeping workers safe from heat related and/or cold related illnesses throughout the execution of their work. During extended periods of adverse weather conditions, the Prime Contractor shall provide accommodations to the workers as deemed necessary. This may include a project specific Heat Awareness Plan when temperatures reach over 90 degrees (temperature or heat index) with provisions for acclimatization, water, rest and shade.

Vendor understands by signing the Bid Acknowledgement at the time of submission that they agree to follow this heat protection safety requirement.

File details come from the government source that posted it. Updated .