27-Attachment EE - BABAA Self-Certification Form.pdf

PDF 132 KB Posted

Attached to
ITB - Construction of the Meyergrove Stormwater Detention Basin - Phase 2 - for the Harris County Flood Control District (FEMA)
Solicitation number
26/0145
Issued by
Harris County, Texas

About this file

This is a Build America, Buy America Act (BABAA) Self-Certification Form for the Harris County Flood Control District's Meyergrove Stormwater Detention Basin - Phase 2 construction project in Texas, which is federally funded through FEMA. The form serves as a contractual certification document that contractors and subcontractors must complete and sign to demonstrate compliance with BABAA requirements under Public Law No. 117-58, Section 70914. The certification applies to all iron, steel, manufactured products, and construction materials utilized in the infrastructure project.

The form requires the undersigned contractor or subcontractor to certify three compliance standards: (1) all iron and steel must be produced in the United States through all manufacturing processes from initial melting through coating application; (2) all manufactured products must be produced in the United States with domestic component costs exceeding 55 percent of total component costs unless another standard applies under applicable law; and (3) all construction materials must be manufactured in the United States. The signatory acknowledges that false certification is subject to penalties under 31 U.S.C. Chapter 38, Administrative Remedies for False Claims and Statements. The form requires signature, printed name and title, and date from an authorized official of the contractor or subcontractor prior to project execution.

View the file

Other files

File Type Posted
6-Attachment K - Payment Bond.pdf PDF
19-Attachment S - Plans and Drawings.pdf PDF
17-Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
9-Attachment FF - Heat Protection Safety Requirements.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
11-Attachment G - Contractor Profile.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
20-Attachment AA - Report File.pdf PDF
28-Attachment GG - Prevailing Wage Rates TX20260031.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
16-Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf PDF
29-Federal IFB General Conditions and Specifications - Construction.pdf PDF
18-Attachment U - Project Manual.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
10-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
15-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
23-Attachment JJ - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
24-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
21-Attachment HH - Harris County Contractor and Worksite Safety Policies.pdf PDF
12-Attachment A - Bid Addenda Acknowledgement.pdf PDF
26-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
4-Attachment F - References.pdf PDF
13-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
14-Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
22-Attachment II - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
25-Attachment P - Required Contract Provisions.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment EE Build America, Buy America Act (BABAA) Self-Certification Form

The undersigned certifies, to the best of their knowledge and belief, that:

The Build America, Buy America Act (BABAA) requires that no federal financial assistance for

“infrastructure” projects is provided “unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States.” Section 70914 of Public Law No. 117-58, §§ 70901-52.

The undersigned certifies that for the _______________________________ (Project Name and Location)

______________________ the iron, steel, manufactured products, and construction materials used in this contract are in full compliance with the BABAA requirements including:

1. All iron and steel used in the project are produced in the United States. This means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.

2. All manufactured products purchased with FEMA financial assistance must be produced in the

United States. For a manufactured product to be considered produced in the United States, the cost of the components of the manufactured product that are mined, produced, or manufactured in the

United States is greater than 55% of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation.

3. All construction materials are manufactured in the United States. This means that all manufacturing processes for the construction material occurred in the United States

“The, ____ [Contractor or Subcontractor] __, certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the

[Contractor or Subcontractor] understands and agrees that the provisions of 31 U.S.C. Chap. 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any.”

Signature of [Contractor’s or Subcontractor’s] Authorized Official

Name and Title of [Contractor’s or Subcontractor’s] Authorized Official

Date

File details come from the government source that posted it. Updated .