9-Attachment 8 Asset Detail 2020 Farmhouse.pdf

PDF 290 KB Posted

Attached to
Trimborn Farm Use & Development
Solicitation number
RFP-ED2501
Issued by
Milwaukee County, Green Bay City, Wisconsin

About this file

The document is an Asset Detail Report for the Farmhouse, Asset #3150, located at Trimborn Farm in Greendale, Wisconsin, owned by Milwaukee County and leased to the Milwaukee County Historical Society. The two-story, 3,704 square foot historic building was constructed in 1850 and features a historical museum on the first floor and a caretaker's apartment on the second floor. The report details comprehensive renewal requirements for various building systems and components, with most renewal actions scheduled between 2025 and 2040, categorized as "Beyond Useful Life" and prioritized as 3-4 Future Planning.

The total estimated cost for the required renewals is $532,944, covering systems including mechanical (HVAC, plumbing), electrical, architectural/structural, and interior components. Key renewal items include boiler replacement, branch wiring, kitchen cabinets, cast iron radiators, acoustic tile systems, electrical panels, roofing, windows, and various structural elements. The building is classified as an A-3 Assembly occupancy with Type VB frame construction, and while not currently meeting all accessibility standards, it has accessible restrooms. The report also notes potential hazardous materials like asbestos and lead, given the 1850 construction date, and recommends further investigation and remediation as part of the renewal process.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asset Detail Report By Asset Name

Department/Division: Museum & Art CentersAsset: Farmhouse Site: Trimborn Farm Asset Number: 3150

Assets are ordered by Asset Name Currency: USD

Statistics

FCI Cost: 150,356 FCI: 0.20 RI Cost: 532,945 RI: 0.71 Total Requirements Cost: 532,944 Asset Condition Rating: Fair

Current Replacement Value: 748,660 Date of most Recent Assessment:

Jul 7, 2020

Type Building Area 3,704 SF Use Museum / Art Center Construction Type IBC - Type V B Floors 2 Historical Category On Register

Address 1 8801 W Grange Ave City Greendale Address 2 - State/Province/Region UNITED STATES OF AMERICA Year Constructed 1850 Zip/Postal Code 53129 Year Renovated 1930 Architect - Ownership MILW County - Owned Commission Date -

Decommission Date -

Inventory: Yes Occupancy Classification: A-3 Assembly

Insurable Value of Building: 0 Insurable Value of Contents: 0

Mission Category: Category 3

Photo

Farmhouse

Copyright 2025 VFA, Inc. All rights reserved. Jul 22, 2025 12:31:21 PM Page 1 of 8

Farmhouse

Asset Description

Building General Description:

The Farmhouse, Asset #3150, is located within Trimborn Farm, at 8801 W. Grange Ave., Greendale, WI 53129. It is leased to the Milwaukee County Historical Society.

The building is a two (2) story with basement, 3,623 square foot structure built in 1850.

Building interior includes:

Historical Museum on the first floor, and apartment for the site caretakers on the second floor.

Per the IBC Chapter 3 and the Wisconsin Administrative Code, SPS 354, the building is classified primarily as Assembly A-3, with the upper level (the Caretaker’s apartment) classified primarily as Residential. According to the IBC Chapter 6 the facility is primarily construction TYPE VB, Frame Construction Unprotected, as determined from field observations and as-built drawings.

The building has the following general systems:

ARCHITECTURAL/STRUCTURAL

SYSTEMS

Foundation Walls and Footings Stone Ft.

Foundation Walls and Footings Stone Ft.

Floor Structure Wood

Framed

Roof Structure Wood Framed

Porch Structure Wood

Exterior Stair Concrete

Roof Structure Wood Framed

Roof Structure Wood Framed

Veneered Walls Brick with Stud Backup

Veneered Walls Brick with Stud Backup

Windows Wood Single Glazing

Exterior Doors x Wood

Roofing

EPDM

Single -Ply Membrane

Roofing Wood Shingles

Copyright 2025 VFA, Inc. All rights reserved. Jul 22, 2025 12:31:21 PM Page 2 of 8

Fascia Wood Board

Gutters and Downspouts

Aluminum

Slab on Grade Concrete 5"

Restrooms Single

Restroom Single

Partitions Plaster Studs

Interior Doors x Wood

Stair Wood Interior

Flooring Brick

Flooring Wood

Ceiling Painted Plaster

Ceiling Acoustic Tile System

Cabinets

Kitchen

HANDICAPPED

ACCESSIBILITY

Building 3150's compliance with handicapped accessibility was evaluated utilizing International Building Code - ICC/ANSI A117.1, and

ADAAG.

This building is not exempt per the Codes.

The building has accessible restrooms

HAZARDOUS

MATERIALS

An asbestos report was not provided for this building, however, based on the 1850 date of construction asbestos and lead containing materials are presumed to be present in the building.

MECHANICAL

HVAC:

Boiler Hot Water

MBH

w/Circulator Pump

Hot Water Heating Distribution System w/Pump

Exhaust Hood Kitchen (2)

Electric Controls

HVAC

Exhaust System Restroom w/In-line Fan

Hydronic Fin Tube

Cast Iron Radiators

PLUMBING:

Water Heater Heat Exchanger Gal

Domestic Water Distribution

Sanitary Waste Gravity Discharge

Natural Gas Supply-1" Feed

Custodial/Utility Sink

FIRE

PROTECTION:

Fire Extinguishers Dry Chem

Copyright 2025 VFA, Inc. All rights reserved. Jul 22, 2025 12:31:21 PM Page 3 of 8

ELECTRICAL

Main Service 200A 120/240V

1PH

Underground from We Energies Padmount Transformer

Main Service Meter Cabinet

(3) Distribution Panels

(3) Fused Disconnect Switches

Branch Wiring, Equipment and Devices

Lighting Interior Fixtures

- Security System

DISCLAIMER

This report reflects equipment or system deficiencies, and construction cost estimates to correct those deficiencies. The construction cost estimates may not reflect the actual total project costs. The construction cost estimates do not include costs for project management, owner services, planning and design, plan review fees, construction management, construction general conditions, overhead and profit, testing services and design and construction contingencies. All projects need to be submitted to the AE & ES section of DAS-FM to verify actual cost estimates for any Capital Improvement Project (CIP) budget requests.

Requirements

Requirement Name Renewal Prime System Category Priority Action Date Estimated

Cost

Boiler - Hot Water - 164 MBH -w/Circulator Pump Renewal

Yes D3021 - Boilers Beyond Useful Life

4 - Future Planning

Jul 7, 2035 16,807

Branch Wiring, Equipment & Devices Renewal

Yes D5021 - Branch Wiring Devices

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 10,695

Cabinets - Kitchen Renewal Yes E2010 - Fixed Furnishings

Beyond Useful Life

3 - Necessary Not Yet Critical

Jul 7, 2025 8,889

Cast Iron Radiators Renewal Yes D3040 - Distribution Systems

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 16,577

Ceiling - Acoustic Tile System Renewal

Yes C3030 - Ceiling Finishes

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 4,043

Ceiling - Painted Plaster - 1850 Renewal

Yes C3030 - Ceiling Finishes

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 37,377

Custodial/Utility Sink Renewal Yes D2010 - Plumbing Fixtures

Beyond Useful Life

4 - Future Planning

Jul 7, 2036 2,150

Domestic Water Distribution Renewal

Yes D2020 - Domestic Water Distribution

Beyond Useful Life

4 - Future Planning

Jul 7, 2036 9,549

Electric Controls - HVAC Yes D3060 - Controls Beyond Useful 4 - Future Jul 7, 2030 9,453

Copyright 2025 VFA, Inc. All rights reserved. Jul 22, 2025 12:31:21 PM Page 4 of 8

Requirement Name Renewal Prime System Category Priority Action Date Estimated

Cost

Renewal and Instrumentation

Life Planning

Exhaust Hoods - Kitchens Renewal

Yes D3040 - Distribution Systems

Beyond Useful Life

4 - Future Planning

Jul 7, 2039 5,023

Exhaust System - Restroom and Janitor Closet Renewal

Yes D3040 - Distribution Systems

Beyond Useful Life

4 - Future Planning

Jul 7, 2026 5,164

Exterior Doors - 3 x 7 Wood Renewal

Yes B2030 - Exterior Doors

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 24,795

Exterior Stair - Concrete Renewal Yes B1015 - Exterior Stairs and Fire Escapes

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 10,273

Fascia - Wood Board Renewal Yes B3015 - Roof Eaves and Soffits

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 20,678

Fire Extinguisher Wall Mount No D4031 - Fire Extinguishers

Integrity 5 - Does Not Meet Current Codes or Standards

Fire Extinguishers - Dry Chemical Renewal

Yes D4031 - Fire Extinguishers

Beyond Useful Life

4 - Future Planning

Jul 7, 2035 4,331

Flooring - Brick & Concrete Renewal

Yes C3020 - Floor Finishes

Beyond Useful Life

3 - Necessary Not Yet Critical

Jul 7, 2025 20,834

Flooring - Wood Renewal Yes C3020 - Floor Finishes

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 37,476

Foundation Walls and Footings - Stone- 6-Ft Renewal

Yes A1010 - Standard Foundations

Beyond Useful Life

3 - Necessary Not Yet Critical

Jul 7, 2025 2,259

Fused Disconnect Switch DS-001

- 200A 240V 3P Renewal

Yes D5012 - Low Tension Service and Dist.

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 1,843

Fused Disconnect Switch DS-002

- 30A 240V 3P Renewal

Yes D5012 - Low Tension Service and Dist.

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 562

Fused Disconnect Switch DS-003

- 30A 240V 3P Renewal

Yes D5012 - Low Tension Service and Dist.

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 562

Copyright 2025 VFA, Inc. All rights reserved. Jul 22, 2025 12:31:21 PM Page 5 of 8

Requirement Name Renewal Prime System Category Priority Action Date Estimated

Cost

Gutters and Downspouts - Aluminum Renewal

Yes B3016 - Gutters and Downspouts

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 2,446

Hot Water Heating Distribution System w/Pump Renewal

Yes D3040 - Distribution Systems

Beyond Useful Life

4 - Future Planning

Jul 7, 2045 34,436

Hydronic Fin Tube Heating Units Renewal

Yes D3040 - Distribution Systems

Beyond Useful Life

4 - Future Planning

Jul 7, 2033 1,586

Install Boiler System Improvements

No D3021 - Boilers Functionality 2 - Potentially Critical

Jul 7, 2023 4,403

Install Ceiling Box Cover No D5021 - Branch Wiring Devices

Code Compliance

1 - Currently Critical

Jul 7, 2021 119

Interior Doors - 3 x 7 Wood Renewal

Yes C1020 - Interior Doors

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 14,285

Lighting - Interior Fixtures Renewal

Yes D5022 - Lighting Equipment

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 18,852

Paint Fascia and Soffit and Repair

No B3015 - Roof Eaves and Soffits

Maintenance 2 - Potentially Critical

Jul 7, 2023 2,507

Panel PB-001A - 100A 120/240V 1PH 24C MLO Renewal

Yes D5012 - Low Tension Service and Dist.

Beyond Useful Life

4 - Future Planning

Jul 7, 2031 4,202

Panel PB-001B - 100A 120/240V 1PH 24C MLO Renewal

Yes D5012 - Low Tension Service and Dist.

Beyond Useful Life

4 - Future Planning

Jul 7, 2031 3,600

Panel PB-001 - 100A 120/240V 1PH 20C MCB Renewal

Yes D5012 - Low Tension Service and Dist.

Beyond Useful Life

4 - Future Planning

Jul 7, 2031 5,317

Partitions - Plaster - Studs Renewal

Yes C1010 - Partitions Beyond Useful Life

4 - Future Planning

Jul 7, 2030 19,126

Patch Ceramic Tile Wall No C10 - Interior Construction

Integrity 2 - Potentially Critical

Jul 7, 2023 256

Porch Structure - Wood Renewal Yes B1010 - Floor Construction

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 322

Repair Basement Brick Floor No C3020 - Floor Finishes

Integrity 2 - Potentially Critical

Jul 7, 2023 5,638

Copyright 2025 VFA, Inc. All rights reserved. Jul 22, 2025 12:31:21 PM Page 6 of 8

Requirement Name Renewal Prime System Category Priority Action Date Estimated

Cost

Repair Masonry Foundation Wall No A1010 - Standard Foundations

Integrity 2 - Potentially Critical

Jul 7, 2023 28,294

Repair Plaster Ceiling No C3030 - Ceiling Finishes

Integrity 2 - Potentially Critical

Jul 7, 2023 1,846

Repair Plaster at Stair Foundation Wall

No A1010 - Standard Foundations

Functionality 2 - Potentially Critical

Jul 7, 2023 1,010

Repair Wood Base No C3020 - Floor Finishes

Integrity 3 - Necessary Not Yet Critical

Jul 7, 2025 339

Replace Dryer Vent Damper No D3040 - Distribution Systems

Operations 2 - Potentially Critical

Jul 7, 2023 121

Replace Non-Grounded Receptacles

No D5021 - Branch Wiring Devices

Modernization 4 - Future Planning

Jul 7, 2030 516

Replace Thermostats No D3060 - Controls and Instrumentation

Modernization 4 - Future Planning

Jul 7, 2030 1,410

Restroom - Unisex Single w/ Bathtub - 2nd Floor Renewal

Yes C10 - Interior Construction

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 7,241

Restrooms - Unisex Single - 1st Floor Renewal

Yes C10 - Interior Construction

Beyond Useful Life

4 - Future Planning

Jul 7, 2040 22,198

Roofing - EPDM Single-Ply Membrane Renewal

Yes B3010 - Roof Coverings

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 10,053

Roofing - Wood Shingles Renewal

Yes B3010 - Roof Coverings

Beyond Useful Life

3 - Necessary Not Yet Critical

Jul 7, 2025 30,442

Sanitary Waste - Gravity Discharge Renewal

Yes D2030 - Sanitary Waste

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 13,487

Security System Renewal Yes D5030 - Communications and Security

Beyond Useful Life

3 - Necessary Not Yet Critical

Jul 7, 2025 4,628

Stair - Wood - Interior Renewal Yes C2010 - Stair Construction

Beyond Useful Life

4 - Future Planning

Jul 7, 2040 1,316

Veneered Walls - Brick with Stud Backup - 1850 Renewal

Yes B2010 - Exterior Walls

Beyond Useful Life

4 - Future Planning

Jul 7, 2040 9,877

Copyright 2025 VFA, Inc. All rights reserved. Jul 22, 2025 12:31:21 PM Page 7 of 8

Requirement Name Renewal Prime System Category Priority Action Date Estimated

Cost

Water Heater - Heat Exchanger 52 Gal Renewal

Yes D2020 - Domestic Water Distribution

Beyond Useful Life

1 - Currently Critical

Jul 7, 2021 2,673

Windows - Wood - Single Glazing Renewal

Yes B2020 - Exterior Windows

Beyond Useful Life

3 - Necessary Not Yet Critical

Jul 7, 2025 30,933

Total 532,944

Copyright 2025 VFA, Inc. All rights reserved. Jul 22, 2025 12:31:21 PM Page 8 of 8

File details come from the government source that posted it. Updated .