13-Attachment 12 Asset Detail Lime Kiln 2020.pdf

PDF 303 KB Posted

Attached to
Trimborn Farm Use & Development
Solicitation number
RFP-ED2501
Issued by
Milwaukee County, Green Bay City, Wisconsin

About this file

The document is an Asset Detail Report from VFA for a Lime Kiln asset located at Trimborn Farm in Glendale, Wisconsin, owned by Milwaukee County. The asset is a historic, one-story building constructed around 1840, approximately 2,700 square feet, classified as an IBC Type VB building, and currently used as a Museum & Art Center. The building consists of four historic, abandoned lime kilns with architectural systems including a wood-framed canopy, solid stone exterior walls, wood shingles, and an EPDM single-ply membrane roof. The asset was most recently assessed on July 7, 2020, and has a current replacement value of $503,008.

The report identifies several renewal requirements with estimated costs totaling $47,733, including wood-framed canopy renewal ($1,034), solid stone exterior walls renewal ($28,262), EPDM single-ply membrane roof renewal ($3,700), and wood shingle roof renewal ($14,737). The requirements have varying priority levels and action dates, ranging from currently critical to future planning. The building is noted as not accessible and potentially contains asbestos and lead due to its 1840 construction date. No mechanical or electrical systems are present, and the asset condition is rated as "Good" according to the assessment.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asset Detail Report By Asset Name

Department/Division: Museum & Art CentersAsset: Lime Kiln Site: Trimborn Farm Asset Number: 3149

Assets are ordered by Asset Name Currency: USD

Statistics

FCI Cost: 15,771 FCI: 0.03 RI Cost: 47,732 RI: 0.09 Total Requirements Cost: 47,733 Asset Condition Rating: Good

Current Replacement Value: 503,008 Date of most Recent Assessment:

Jul 7, 2020

Type Building Area 2,700 SF Use Museum / Art Center Construction Type IBC - Type V B Floors 1 Historical Category Eligible

Address 1 8801 W Grange Ave City Grendale Address 2 - State/Province/Region UNITED STATES OF AMERICA Year Constructed 1840 Zip/Postal Code 53129 Year Renovated - Architect - Ownership MILW County - Owned Commission Date -

Decommission Date -

Occupancy Classification: A-5 Assembly Insurable Value of Building: 0

Insurable Value of Contents: 0 Mission Category: Category 3

Photo

Lime kiln front elevation

Asset Description

Building General Description:

Copyright 2025 VFA, Inc. All rights reserved. Aug 25, 2025 2:38:06 PM Page 1 of 3

The Lime Kiln, Asset #3149, is located within Trimborn Farm, at W.

Grange Ave., Greendale, WI

53129.

building is a one (1) story, approximately 2,700 square foot structure built around 1840.

Building consists of four (4) historic, abandoned lime kilns.

Per the

IBC

Code, building is construction classification is Type

VB.

has the following general systems:

ARCHITECTURAL/STRUCTURAL

SYSTEMS

Canopy Wood Framed

Exterior Walls Solid Stone

Roofing Wood Shingles

Roofing

EPDM

Single Ply Membrane

HANDICAPPED

ACCESSIBILITY

This building is not exempt per the Codes.

The building is not accessible.

HAZARDOUS

MATERIALS

An asbestos report was not provided for this building, however, based on the 1840’s date of construction asbestos and lead containing materials may be present in the construction.

MECHANICAL

SYSTEMS

(NONE)

Electrical Systems

(none)

DISCLAIMER

This report reflects equipment or system deficiencies, and construction cost estimates to correct those deficiencies. The construction cost estimates may not reflect the actual total project costs. The construction cost estimates do not include costs for project management, owner services, planning and design, plan review fees, construction management, construction general conditions, overhead and profit, testing services and design and construction contingencies. All projects need to be submitted to the AE & ES section of DAS-FM to verify actual cost estimates for any Capital Improvement Project (CIP) budget requests.

Requirements

Requirement Name Renewal Prime System Category Priority Action Date Estimated

Cost

Canopy - Wood Framed Renewal Yes B1020 - Roof Beyond 3 - Necessary Jul 7, 2025 1,034

Copyright 2025 VFA, Inc. All rights reserved. Aug 25, 2025 2:38:06 PM Page 2 of 3

Requirement Name Renewal Prime System Category Priority Action Date Estimated

Cost

Construction Useful Life Not Yet Critical

Exterior Walls - Solid Stone Renewal

Yes B2010 - Exterior Walls

Beyond Useful Life

4 - Future Planning

Jul 7, 2040 28,262

Roofing - EPDM Single-Ply Membrane Renewal

Yes B3010 - Roof Coverings

Beyond Useful Life

4 - Future Planning

Jul 7, 2030 3,700

Roofing - Wood Shingle Renewal Yes B3010 - Roof Coverings

Beyond Useful Life

1 - Currently Critical

Jul 7, 2020 14,737

Total 47,733

Copyright 2025 VFA, Inc. All rights reserved. Aug 25, 2025 2:38:06 PM Page 3 of 3