The document is an Asset Detail Report from VFA for a Lime Kiln asset located at Trimborn Farm in Glendale, Wisconsin, owned by Milwaukee County. The asset is a historic, one-story building constructed around 1840, approximately 2,700 square feet, classified as an IBC Type VB building, and currently used as a Museum & Art Center. The building consists of four historic, abandoned lime kilns with architectural systems including a wood-framed canopy, solid stone exterior walls, wood shingles, and an EPDM single-ply membrane roof. The asset was most recently assessed on July 7, 2020, and has a current replacement value of $503,008.
The report identifies several renewal requirements with estimated costs totaling $47,733, including wood-framed canopy renewal ($1,034), solid stone exterior walls renewal ($28,262), EPDM single-ply membrane roof renewal ($3,700), and wood shingle roof renewal ($14,737). The requirements have varying priority levels and action dates, ranging from currently critical to future planning. The building is noted as not accessible and potentially contains asbestos and lead due to its 1840 construction date. No mechanical or electrical systems are present, and the asset condition is rated as "Good" according to the assessment.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asset Detail Report By Asset Name
Department/Division: Museum & Art CentersAsset: Lime Kiln Site: Trimborn Farm Asset Number: 3149
Assets are ordered by Asset Name Currency: USD
Statistics
FCI Cost: 15,771 FCI: 0.03 RI Cost: 47,732 RI: 0.09 Total Requirements Cost: 47,733 Asset Condition Rating: Good
Current Replacement Value: 503,008 Date of most Recent Assessment:
Jul 7, 2020
Type Building Area 2,700 SF Use Museum / Art Center Construction Type IBC - Type V B Floors 1 Historical Category Eligible
Address 1 8801 W Grange Ave City Grendale Address 2 - State/Province/Region UNITED STATES OF AMERICA Year Constructed 1840 Zip/Postal Code 53129 Year Renovated - Architect - Ownership MILW County - Owned Commission Date -
Decommission Date -
Occupancy Classification: A-5 Assembly Insurable Value of Building: 0
Insurable Value of Contents: 0 Mission Category: Category 3
Photo
Lime kiln front elevation
Asset Description
Building General Description:
Copyright 2025 VFA, Inc. All rights reserved. Aug 25, 2025 2:38:06 PM Page 1 of 3
The Lime Kiln, Asset #3149, is located within Trimborn Farm, at W.
Grange Ave., Greendale, WI
53129.
building is a one (1) story, approximately 2,700 square foot structure built around 1840.
Building consists of four (4) historic, abandoned lime kilns.
Per the
IBC
Code, building is construction classification is Type
VB.
has the following general systems:
ARCHITECTURAL/STRUCTURAL
SYSTEMS
Canopy Wood Framed
Exterior Walls Solid Stone
Roofing Wood Shingles
Roofing
EPDM
Single Ply Membrane
HANDICAPPED
ACCESSIBILITY
This building is not exempt per the Codes.
The building is not accessible.
HAZARDOUS
MATERIALS
An asbestos report was not provided for this building, however, based on the 1840’s date of construction asbestos and lead containing materials may be present in the construction.
MECHANICAL
SYSTEMS
(NONE)
Electrical Systems
(none)
DISCLAIMER
This report reflects equipment or system deficiencies, and construction cost estimates to correct those deficiencies. The construction cost estimates may not reflect the actual total project costs. The construction cost estimates do not include costs for project management, owner services, planning and design, plan review fees, construction management, construction general conditions, overhead and profit, testing services and design and construction contingencies. All projects need to be submitted to the AE & ES section of DAS-FM to verify actual cost estimates for any Capital Improvement Project (CIP) budget requests.
Requirements
Requirement Name Renewal Prime System Category Priority Action Date Estimated
Cost
Canopy - Wood Framed Renewal Yes B1020 - Roof Beyond 3 - Necessary Jul 7, 2025 1,034
Copyright 2025 VFA, Inc. All rights reserved. Aug 25, 2025 2:38:06 PM Page 2 of 3
Requirement Name Renewal Prime System Category Priority Action Date Estimated
Cost
Construction Useful Life Not Yet Critical
Exterior Walls - Solid Stone Renewal
Yes B2010 - Exterior Walls
Beyond Useful Life
4 - Future Planning
Jul 7, 2040 28,262
Roofing - EPDM Single-Ply Membrane Renewal
Yes B3010 - Roof Coverings
Beyond Useful Life
4 - Future Planning
Jul 7, 2030 3,700
Roofing - Wood Shingle Renewal Yes B3010 - Roof Coverings
Beyond Useful Life
1 - Currently Critical
Jul 7, 2020 14,737
Total 47,733