This document is a Questions and Answers (Q&A) file for a PACS (Physical Access Control System) Refresh 2025 project. The Q&A covers critical implementation details for a security system upgrade involving Genetec Security Center integration. Key points include: 1) No existing Genetec system is currently in place, and the contract winner will assist in procuring necessary licenses, 2) All security components (video, access control, and intercom) will be Genetec-compatible and integrated into the Genetec Security Center, 3) One enrollment workstation will be configured with an enrollment reader and pivCLASS SDK license, and 4) A Streamvault SV-300E server will be deployed at Site E.

Additional project specifics include: on-site programming and configuration of all systems, 1-hour training sessions for each system type (camera, intercom, access control) conducted on-site in a small conference room, potential need for additional equipment to be determined during site inspection, and strict access requirements where all visitors/contract workers on SEPA grounds must have a visitor's badge and be escorted throughout the building. The winning bidder will be responsible for all tasks needed to bring the systems to 100% operational status and will receive access to all necessary resources for installation and configuration.

View the file

Other files

File Type Posted
SOW_9.12.25_REVISED.pdf PDF
SOW_8.14.25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PACS REFRESH 2025 Q&A

1. Does the customer currently have a Genetec system in place? If so, please provide the customer’s existing Genetec System ID for licensing and design purposes.

No we do not currently have any Genetec systems in place. Contract winner will assist in procuring any licenses needed.

2. Based on the provided bill of materials, it appears that the Video, Access Control, and Intercom equipment are all Genetec-compatible. Please confirm that all security components (Video, Access Control, and Intercom) are intended to be integrated into Genetec Security Center.

Yes , all components were chosen from the Genetec security center compatible products list and will need to be integrated into Genetec Security center.

3. Pending site inspection: Is the list of components included in the SOW complete, or is additional equipment required for the upgrade?

Additional equipment or components may be needed. Any additional equipment/components needed will need to be disclosed at site inspection.

4. Will the customer provide the enrollment workstations to be configured with Genetec Security Center? If yes:

Yes o How many workstations need to be configured?

o 1 o Will each workstation require an enrollment reader and a pivCLASS SDK license?

o Yes

5. Site E is listed to receive an SV-300E; however, this appears to be an incomplete part number. Please provide the full part number to ensure the appropriate server is selected.

Streamvault SV-300E

6. Will Wachter be granted access to the customer’s network for remote programming and support?

All programming will need to be done onsite

Please clarify the scope of programming and commissioning responsibilities:

o Which programming tasks will be performed by Wachter?

o All Task needed to bring the systems to 100% operation o Winning bidder will receive access to all resources needed to install and configure relevant equipment o Which tasks, if any, will be handled by the customer?

7. Please clarify how many hours of training will be required and how many training sessions.

o If multiple training sessions are needed, please clarify how many sessions to provide and how many hours per training session.

o 1 hour per system. (camera,intercom,& access control) o Will the training sessions be conducted at a central location, or will training need to be provided at each site?

o Training will need to be done onsite. A small conference room will be provided for training.

8.

Is there secure on-site storage? If not do we need to provide secure storage.

Please elaborate on what type of storage and for what use.

9. Will the use of spotters for manlift usage be needed?

If manlifts are needed, spotters will be required https://resources.genetec.com/en-datasheets/streamvault-sv-300e-datasheet

10. Will there be any special loading/unloading zones, traffic control areas or other areas where we need to be aware of or have special considerations?

All loading/unloading zones will be disclosed to winning bidder at time of performance. No special considerations will be needed

11. Are there any areas where we need special access, badging or escorts?

All visitors/contract workers on SEPA grounds will require a visitors badge and will be escorted throughout the building.