RFI_Amendment 0001.pdf
PDF 52 KB Posted
- Solicitation number
- 89503320QWA000058
- Issued by
-
Department of Energy
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20181109_142724.jpg | JPG image | |
| 20181109_142510.jpg | JPG image | |
| 20181109_142608.jpg | JPG image | |
| Sol_89503320QWA000058_Amd_0001.pdf | ||
| 20181109_142755.jpg | JPG image | |
| PWS-ODA-KT1A-Trans-Maintenance-Final.pdf | ||
| SF1449_89503320QWA000058.pdf | ||
| SCLS Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI for Transformer Corrosion Repair (Amendment 0001 to Solicitation 89503320QWA000058)
1. Can you provide pictures of the transformers?
Yes. Please see attached photos.
2. Can you provide data plate information for the transformers?
Yes. Please see attached photos.
3. When would the outages take place so that this work could be conducted?
The outage for this equipment is from 11/16/20-12/31/20, which is the period of performance.
4. Are there any limits to the duration of outage per transformer? Would we be able to coordinate outages so that all of the units could be done with one mobilization?
Yes, the entire system will be de-energized for the duration of the outage and work can be done continuously.
5. The PWS mentions in section 1.4.2 “(flow coat)” is that system required for this job, or would the government consider other coating systems that meet the relevant ASTM standards for corrosion protection?
The language “flow coat” was added to the PWS as this is a know process for being able to adequately coat the radiators. If your company has a similar process that meets ASTM standards, that is acceptable.
6. Would you consider a short extension, so that your office can publish an amendment with this information? This will allow bidders time to make better more effective offers.
We are not able to accommodate an extension at this time.
7. Are you going have job walk for this project?
Not prior to receipt of quotes. After award, an on-site walk may be coordinated within the performance work schedule.
File details come from the government source that posted it. Updated .