Sol_89503120QWA000127_Amd_0001.pdf
PDF 97 KB Posted
- Attached to
- WAPA Tower Inspection and Maintenance Services
- Solicitation number
- 89503120QWA000127
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1. Sol_89503120QWA000127 SF1449.pdf | ||
| 4. Sol_89503120QWA000127_Amd_0003.pdf | ||
| 2. Sol_89503120QWA000127_Amd_0001.pdf | ||
| 3. Sol_89503120QWA000127_Amd_0002.pdf | ||
| 5. BID SCHEDULE Amendment 3.xlsx | XLSX spreadsheet | |
| 05.1 WAPA TOWER INSPECTION PLAN Revised 7-30-20.xlsx | XLSX spreadsheet | |
| 17.3 PAST PERFORMANCE QUESTIONNAIRE.DOCX | DOCX document | |
| 05.1 WAPA TOWER INSPECTION PLAN.xlsx | XLSX spreadsheet | |
| Sol_89503120QWA000127.pdf | ||
| 17.2 BID SCHEDULE.xlsx | XLSX spreadsheet | |
| IPP Payment Requirements.docx | DOCX document | |
| 17.1 DOL Wage Determination ALL.pdf | ||
| 05. PWS FINAL.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
89503120QWA000127
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHOENIX AZ 85005-6457
DSW
PO BOX 6457
DESERT SOUTHWEST REGIONAL OFFICE
US DOE/WESTERN AREA POWER
WAPA (DSW)
07/30/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/17/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
In accordance with Clause WES-L-2003 Questions Concerning the Solicitation, the deadline for questions was 07/28/2020. Department of Energy (DOE), Western Area Power
Administration (WAPA), Desert Southwest Region (DSW) issues this AMENDMENT 1 to
Solicitation 89503120QWA000127 for Tower Inspection and Maintenance Services providing a response to the written questions received.
1. General - Requesting geo-location for the towers listed in Attachment 3- WAPA Tower
Inspection Plan?
WAPA Response: Due to security policy we cannot provide further tower location information than what was provided in the solicitation, which was county and state.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Steven G. Turner
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
07/30/2020
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
89503120QWA000127/0001
2. General - Is there an incumbent on this contract in all WAPA regions and if yes, what firm is currently performing this service.
WAPA Response: No.
3. General - Will the tower inspections and maintenance require rope access technicians or are all areas of the towers accessible by climbing.
WAPA Response: All WAPA communication towers are accessible by climbing. WAPA requires 100% attachment on communication towers. There are methods of rope access that are acceptable and provide 100% attachment. If the contractor chooses to use rope access, that system would need to be reviewed for compliance and approved by WAPA.
4. Will specifications be provided for maintenance parts?
WAPA Response: No specifications are provided for maintenance parts.
5. The PWS Sections 3.1, 3.2, and 3.3 calls out repairing galvanized guy wires, etc. What type of coating is to be applied in the field?
WAPA Response: Cold galvanizing (spray on application).
6. The SNR towers are marked “N/A” on the WAPA Tower Inspection Plan. Will these towers be inspected in the years that are marked as “N/A”, or are these towers excluded from inspection?
WAPA Response: At this time SNR will continue to complete their own tower inspections as identified in the plan in the years that are marked N/A, however, it is possible SNR may decide to issue a delivery task order under this award to have them completed.
7. The “Sioux City Repeater” tower is marked as inspected in years 3 and 5 in the WAPA Tower
Inspection Plan. Is this an error or will this tower be inspected twice in the first 5 years?
WAPA Response: Sioux City Repeater tower should be year 5 only in the WAPA Tower Inspection Plan attachment, which has been updated accordingly under Amendment 1 of the solicitation.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
89503120QWA000127/0001
8. Is a NATE Membership Required for the Contractor firm, or is this requirement met if the inspectors performing on the project have
NATE safety certification or an equivalent certification?
WAPA Response: At a minimum, one (1) employee of the firm responsible for the performance of work or performing the work on the project would be a NATE member.
9. Past Performance, does a firm’s prior experience in electrical transmission tower inspections and maintenance (up to 400 feet) and tower inspections and maintenance in the Oil and
Gas Industry qualify as “Past Performance”, or must the past performance be in the communications towers industry?
WAPA Response: Experience related to communication towers, specifically antennas, waveguide, grounding-lightening protection, knowledge of sensitive or rugged, RF Radiation exposure risks, etc. is preferred and more specific than general experience in tower inspections and maintenance. Relevance and similarities in complexity and magnitude compared to the requirements described in the PWS will be evaluated accordingly.
10. The evaluation criteria indicate that proof of applicable certification of licensure from an accredited source. Other than NATE, what other accredited sources will be accepted (e.g., IRATA, SPRAT, etc.)?
WAPA Response: A Safety Certification is required and shall be used as a guideline for the contract’s quality control program. The
Offeror’s proposed Safety Management Plan will be evaluated for compliance with requirements.
National Wireless Safety Alliance ---NWSA or
North American Technical Excellence -NATE
Certification https://natehome.com/membership/current-nate-membe rs/ is preferred, however, other comparable certifications in accordance with OSHA3877 best practices guidelines is also acceptable. More specifically, NATE's accreditation is based on a peer-review process made possible by volunteer experts who assist with the assessment of facilities and sit on NATE's various technical committees. To maintain accreditation, facilities
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
89503120QWA000127/0001
must be re-assessed regularly. The Industrial
Rope Access Trade Association (IRATA) and the
Society of Professional Rope Access Technicians
(SPRAT) mentioned in the question are internationally recognized standards for rope access work. Certification is attained by completing a 4-day course, then passing a written, oral and practical test administered by an independent IRATA Assessor or SPRAT Evaluator.
IRATA covers the oil and gas industry and correct rigging of rope access, but no mention of communications towers or associated equipment.
For these reasons IRATA and SPRAT are not considered a comparable accreditation to the NATE certification.
11. Will the inspection teams or superintendent be credentialed so that a WAPA escort is not required for entry to the tower sites?
WAPA Response: No contracted employees will be credentialed, a WAPA escort is always required for work performed under this project.