Questions Set 1.pdf

PDF 52 KB Posted

Attached to
Backup Generator Replacement WAPA DSW
Solicitation number
89503120QWA000116
Issued by

View the file

Other files

File Type Posted
Attach 19 Day Tank10.jpg JPG image
Attach 17 Day Tank8.jpg JPG image
Questions Set 2.pdf PDF
Attach 16 Day Tank7.jpg JPG image
Attach 18 Day Tank9.jpg JPG image
Attach 15 NEW SOW Backup Generator Replacement 18 May Revision.pdf PDF
Attach 12 phs_3328.pdf PDF
Attach 14 Gen_ATS Location.pdf PDF
Attach 13 phs_3326.pdf PDF
Attach 11 pic with dimensions.jpg JPG image
17. Amd_0001 Sol_89503120QWA000116_.pdf PDF
Attach 10 Drawing of generator building.pdf PDF
17. Sol_89503120QWA000116.pdf PDF
Attach 5 05. Gen 7.jpg JPG image
Attach 7 05. Gen 15.jpg JPG image
Attach 3 05. Gen 1.jpg JPG image
Attach 2 05. Annotation 2020-04-21 145922.jpg JPG image
Attach 8 05. Gen 16.jpg JPG image
Attach 1 05. SOW Backup Generator Replacement.pdf PDF
Attach 6 05. Gen 9.jpg JPG image
Attach 4 05. Gen 2.jpg JPG image
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Set 1

1. SOW Background section states “The unit KW capability should be increased to handle the entire facilities load as to not interfere with their Operation.” However, Scope Item 5 calls for a new 500KW unit, which is equal to the existing unit. Is the intent to replace in kind, or to design & install a larger generator system? If larger, please provide existing electrical system load data & electrical system drawings, if available. It is going to be a new 500KW gen only.

2. What are the dimensions of the existing air intake louvers on the building? 8ft X 8ft, see attached drawings PHS_3328 & PHS_3326 (Attach 12 & 13)

3. Where is the ATS located, in relation to the generator building? See attachment, Gen_ATS Location (attach 14)

4. What is the diesel fuel source that feeds the generator day tank? Underground diesel tank

5. How much more of a load do you need to support to take over the entire facility? Currently there is no plan to upgrade the generator to provide emergency power to the whole facility, the requirement is to perform a one-for-one swap of a 500KW generator.

6. Tank is 100 gal Day tank. Is there another larger tank feeding it? Or would you like a bigger tank under it? There is an underground fuel tank that services the 100 gallon day tank, no need for any other source of fuel.