This document is an attachment to a Request for Proposal outlining required contract deliverables for the Idaho Cleanup Project. The contractor must submit over 180 deliverables to the Department of Energy over the life of the contract. Key deliverables include plans for transitioning the contract, workforce and benefits transition, quality assurance and safety programs, environmental permits and compliance documents, and project management and reporting documents. Deliverables are due ranging from 10 days prior to contract transition to annually, and the Department of Energy's required action varies between approving, reviewing and receiving documents for information. The deliverables cover all aspects of managing the closure of the Radioactive Waste Management Complex and other environmental remediation and waste management objectives at the Idaho National Laboratory.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO CLEANUP PROJECT (ICP) – FINAL RFP SECTION J
SOLICITATION NO. 89303319REM000034, AMENDMENT 0001 ATTACHMENT J-2
J-2-1
ATTACHMENT J-2
LIST OF CONTRACT DELIVERABLES
J-2-2
This page intentionally left blank
J-2-3
The following Contract Deliverables list summarize the specific products the Contractor shall submit to the U.S. Department of Energy (DOE), and the date/timeframe the Contractor is required to submit the product over the life of the contract, inclusive of all task orders, and the type of action DOE will perform.
The DOE review period for Contract Deliverables shall be 30 days unless otherwise specified in the Deliverables or other agreement, such as the Partnering Agreement. Omission of applicable deliverables from this Section J Attachment entitled, List of Contract Deliverables, does not affect the obligation of the Contractor to submit required deliverables pursuant to this section or other sections of this Contract.
The DOE action is defined as:
Approve – The Contractor shall provide the deliverable to DOE for review and approval. DOE will review the deliverable and provide comments in writing.
DOE will discuss the comments with the Contractor, and the Contractor shall provide written responses. The Contractor shall rewrite the document to incorporate DOE mandatory comments and resubmit for DOE approval. Once approved by DOE, the deliverable shall be placed under change control, and no changes shall be made without DOE approval.
Review – The Contractor shall provide the deliverable to DOE for review and comment. DOE will have the option to review the information and provide comment. The Contractor shall respond to written comments.
Information – The Contractor shall provide the deliverable for information purposes only. DOE will have the option of reviewing the information and providing comments. Such comments do not require resolution under the
Contract.
Deliverable
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-1 Graded Approach for
Implementation of
Contract
Requirements
Plan
C.1.1 Prior to the end of contract transition
Approve
T-2 Transition Plan C.2.1 Within 14 calendar days after the effective date of the transition task order
Approve
T-3 Written
Notification of
Adoption of the
Incumbents
Programs and
Procedures
C.2.1 Prior to the end of contract transition
Information
J-2-4
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-4 Interface
Agreements with
INL contractor
Ft. St. Vrain
Physical
Security contractor
C.2.1
C.7.2.01.01
C.7.2.01.02
C.9.1.01.01
C.9.2.02
- Within 7 calendar days after agreement established
- Any agreement that requires
DOE review and/or approval shall be submitted at least 30 days prior to the end of contract transition.
Approve
T-5 Interface
Agreement for
INL Mandatory and Options Site
Services
C.2.1 At least 30 days prior to end of transition task order
Review DOE will review prior to providing concurrence on the interface agreement
T-6 Weekly status reports of transition activities
C.2.1 Weekly during contract transition
Information
T-7 Certified Permit
Modification
Requests per
Exhibit C-1
C.2.1; J
Attachment J-8;
H.56 (a)
At least 30 days prior to end of transition task order
Approve
T-8 Task Order
Proposal for
Implementation
Period
H.51 Task
Ordering
Procedure
14 days after Request for Task
Order Proposal (RTP), or as directed by the CO
Approve
T-9 Task Order Proposal for
IWTU Operations
H.51 Task Ordering
Procedure
30 days after Request for Task Order Proposal (RTP), or as directed by the CO
Approve
T-10 Task Order
Proposal for
Essential Missions
H.51 Task
Ordering
Procedure
30 days after Request for Task
Order Proposal (RTP), or as directed by the CO
Approve
T-11 Worker Safety and Health Plan
(WSHP)
C.9.3.05
H.36(a)
10 CFR 851
At least 30 days prior to end of transition task order
Approve The WSHP must be approved by
DOE by the end of contract transition date.
T-12 Emergency
Management
Program
C.9.3.10
At least 30 days prior to end of transition task order
Approve The Emergency
Management Plan must be approved by DOE by the end of contract transition date.
T-13 Continuity of
Operations Plan
(COOP)
C.2.1
C.9.3.10
DOE O 150.1
At least 30 days prior to end of transition
Approve The Continuity of
Operations Plan must be approved by DOE by the end of contract transition date.
T-14 Quality Assurance
Program (QAP)
C.9.3.12
10 CFR 830
DOE O 414.1;
and 10 CFR 72, Subpart G
30 days after the effective date of the transition task order, and review and update QAP annually
Approve The QAP must be approved by DOE by the end of contract transition date.
J-2-5
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-15 Radiation
Protection
Program (RPP)
C.9.3.13
10 CFR 835
30 days prior to the end of contract transition
Approve This deliverable is only required if the existing RPP is not adopted
T-16 Unreviewed
Safety Question
(USQ) Process
C.9.3.14
10 CFR 830
When a change is proposed Approve
T-17 Criticality Safety
Program (CSP)
C.9.3.15
DOE O 420.1
Prior to end of transition Approve
T-18 Contractor
Employee
Compensation Plan
H.5(a) By close of transition Approve
T-19 List of
Subcontractors that will flow down the requirement for continuation of benefits to eligible employees.
H.5(c)(1) 30 days prior to end of transition, and with each subsequent task order
Information
T-20 Proposed allowable base salaries for each key personnel position listed in the Contract for a determination of cost allowability for reimbursement under the
Contract. Also provide compensation market survey data to support/justify the requested salary and any other information as requested by the
CO
H.6(b) Within 20 days after the effective date of the transition task order
J-2-6
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-21 Workforce
Transition
(a) List of contractor personnel who will be responsible for transitioning the employees of the incumbent contractor;
(b) Description of agreements with contractors;
(c) Communications
Plan;
(d) Provide description of the process for regularly obtaining updated information from the incumbent contractor.
H.7(A)(1) Within 10 days after the effective date of the transition
Approve
J-2-7
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-22 Workforce
Transition
(a) Copies of the draft WF
Transition Plan for the Contractor and its first and second tier subcontractors, including processes and procedures regarding how the
Contractor will implement and ensure compliance with the hiring preferences set forth in Clauses H.4 and H.9, as applicable,
(b) Final written communication plan in accordance with
H.7(A)(2)(i) and
(ii).
H.7(A)(2) Within 15 days after the effective date of the transition task order
(a) Review
(b) Approve
T-23 Final WF
Transition Plan
H.7(A)(3) Within 30 days after the effective date of the transition task order
Approve
T-24 Final transition agreements
H.7(A)(4), H.7(B)(1)(G)
Within 60 days after the effective date of the transition task order
Information
T-25 Reports on implementation of the hiring preferences
H.7(A)(5) (A) During the 90-day
Contract Transition Period such reports shall be provided to the CO on a weekly basis;
or
(B) Less frequently, if requested by the CO.
Information
T-26 Final Benefits
Transition Plan
H.7(B) Within 30 days after the effective date of the transition
J-2-8
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-27 Draft Benefits
Transition Plan, describing in detail the
Contractor’s plans and procedures as to how the
Contractor will comply with Clause H.5, Employee
Compensation:
Pay and Benefits, and Section H.7, Paragraph (B).
H.7(B)
Within 20 days after the effective date of the transition
Review
T-28 (i) List of contractor personnel responsible for transitioning pension and other benefits;
(ii) information and documents necessary for the
Contractor to adhere to the requirements set forth in this
Contract pertaining to sponsoring existing benefits plans and the establishment of any new benefits plans
(iii) Estimated costs and detailed breakouts of the costs to accomplish workforce and benefits transition activities
(including costs for enrolled actuaries and counsel)
H.7(B)(1)(A) (i)-(iii) Within 10 days after the effective date of the transition task order
J-2-9
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-29 List of the information and documents that the Contractor has requested from the incumbent contractors, pertaining to the existing benefit plans.
H.7(B)(1)(B) (i) Within 15 days after the effective date of the transition task order
Information
T-30 Detailed description of its plans, processes, timeframes and specific projected dates for all activities to comply with the
Clause H.5 and
H.6. Identify relevant Contractor personnel or other personnel who will administer or assist in administering the benefit plans for the ICP segment of the INL
Employee
Retirement Plan, including the Contractor’s benefit plan administrators and personnel, head of human resources, ERISA counsel, actuaries, and any and all other personnel deemed necessary by the
Contractor.
H.7(B)(1)(C)(ii)
- (iii) Within 20 days after the effective date of the transition task order
Information
T-31 Minutes of meeting to discuss execution of transition agreements with the incumbent contractor and other applicable entities.
H.7(B)(1)(C)(iv) Two days after the meeting Information
J-2-10
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-32 Final Benefits
Transition Plan
(continued).
H.7(B)(1)(D) Within 30 days after the effective date of the transition task order
Approve As part of the final Benefits
Transition Plan, a written description of how the existing pension and other benefit plans will be amended or restated on or before the last day of the
Transition Period
T-33 Draft amendments or restatements of the pension and other benefit plans presently sponsored by the incumbent contractors. If applicable, the
Contractor shall also submit all draft restated benefit plans and draft Summary
Plan Descriptions
(SPDs) for pension and other benefit plans sponsored by the
Incumbent Contractor(s).
H.7(B)(1)(E)(i) Within 30 days after the effective date of the transition task order
Information
T-34 Drafts of any new benefit plan(s) as well as draft
Summary Plan
Documents (SPD) that the
Contractor proposes to sponsor.
H.7(B)(1)(E)(ii) Within 45 days after the effective date of the transition
J-2-11
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-35 Draft copies of the transition agreements entered into with
Fluor Idaho and
Spectra Tech, to ensure compliance with
Clause H.5, Employee
Compensation:
Pay and Benefits.
H.7(B)(1)(E)(iii) Within 45 days after the effective date of the transition task order
Information
T-36 Final versions of listed documents.
H.7(B)(1)(F) No later than 45 days after the effective date of the transition task order and prior to the adoption
Approve
T-37 Copies of all insurance policies
(including
Worker’s
Compensation
Insurance)
H.12(a), H.13(a)(5), H.13(a)(7)
- No later than 30 days after purchase date
- Prior to commencement of work at the end of transition.
Approve Contractor shall have coverage in accordance with
Section H. 12 (a), by the end of transition for at least a one-year period. Contract also requires continuous coverage throughout the performance period.
T-38 Contractor shall submit to the
Contracting
Officer for approval any proposed modifications to the current
Environmental Regulatory
Structure and
Interface Protocol for the ICP Core
Contractor incorporated as
Exhibit C-6 to the
PWS
H.56 (a) Within 60 days after the effective date of the transition task order
Approve
T-39 Litigation
Management Plan
Section H.61(a);
10 CFR 719
Within 60 days of contract award
J-2-12
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-40 Affirmative
Action Plan for
Females &
Minorities
Section I.49
FAR 52.222-26
Section I.55
FAR 52.222-36
Within 30 days of the effective date of the transition task order and updated annually by September 30
Approve
T-41 Affirmative
Action Plan for
Veterans
Section I.50
FAR 52.222-35
Within 30 days of the effective date of the transition task order and updated annually by September 30
Approve
T-42 Workplace
Substance Abuse
Program
FAR 52.223-6
DOE O 350.1
10 CFR 707
H.50
49 CFR 40
Within 30 days of the effective date of the transition task order and updated annually
Approve
T-43 Employee
Assistance
Program
Implementation
Plan
DOE 350.1 Within 60 days of the effective date of the transition task order
Approve
T-44 Employee
Concerns
Program as required by DOE
Order 442.1
DOE Order
442.1
30 days prior to end of contract transition
Approve
T-45 Conduct of
Operations Matrix
DOE O 422.1
Chg.3
Within 60 days of the effective date of the transition task order
Approve
T-46 Copy of Code of
Business Ethics and Conduct
I.11
FAR 52.203-13
Within 30 days of the effective date of the transition task order
Review
T-47 Organizational
Conflict of
Interest (OCI)
Management Plan
(Plan)
H.29 Within 15 calendar days after the effective date of the transition task order
Approve
T-48 Risk Management
Plan
C.9.2.01.05 Within 30 days of the effective date of the transition task order
Approve
T-49 Adopt and be in compliance with the INL Site Security Plan
C.9.2.02.01 By the end of contract transition
Review
T-50 Safety Basis
Documents
10 CFR 830
DOE O 420.1
Within 30 days of the effective date of the transition
T-51 ISMS program description document, including safety performance, objectives, measures, and commitments
(SPOMC)
DEAR
970.5223-1
Within 60 days after the effective date of the transition task order and updated annually, or when significant changes occur
Approve Assumes adoption of existing ISMSDD at end of contract transition.
J-2-13
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
T-52 Contractor
Assurance System
Description (CAS
D)
DOE O 226.1 Within 60 days after the effective date of the transition task order and updated annually
Approve Assumes adoption of existing CAS D at end of contract transition.
T-53 Declaration of
Readiness to
Execute Contract
C.2.1 10 days prior to end of
Transition Task Order
J-2-14
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
Subsurface Disposal
Area (SDA) cap
Construction related regulatory documents (e.g., Remedial Action
Work Plan)
C.4.2 As required Approve These documents are identified as stated in Section
C.4.2 (e.g., in
Remedial Design
Report, Section
6) and may not be a complete list.
55 Subsurface Disposal
Area (SDA) cap
Construction related regulatory documents necessary to obtain approval of CD-1, 2-, 3, and 4 (e.g., Hazard Analysis
Report)
C.4.2 As required Approve These documents are identified as stated in Section
C.4.2 (e.g., in
Remedial Design
Report, Section
6) and may not be a complete list.
56 Comprehensive
Remedial Action
Report for Operable
Unit 7-13/14
C.4.2 November 30, 2028 Approve
57 SDA well decommissioning plan
C.4.2 As required Approve
58 Rebound Study
Report
C.4.2.01 March 31, 2024 Approve
59 Long Term
Monitoring plan
C.4.2.02 As required Approve
60 Document SDA well decommissioning in annual INL Water Use report and
Comprehensive
Well Inventory
C.4.2 As required Approve
61 Renewed US Army
Corps of Engineers determination that spreading areas are not waters of the US
C.4.2 No later than June 13, 2022 Information
62 Monthly report required by FFA/CO
Section 17.1
FFA/CO
Section 17.1
By the 15th day of each month Information
63 DOE Order 435.1, ICDF DOE Order
435.1 annual report
C.4.3 Annually Information
J-2-15
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
64 2025 CERCLA 5-
year review document
C.4.4.04; July 15, 2025 Approve
65 The Contractor shall prepare a plug-in remedy memorandum and
Explanation of
Significant
Differences for CERCLA Plug-in remedies
C.4.4.04; As required Approve
66 New Site Part As C.4.4.04 30 days after discovery of a new site
Informational
67 New Site Part Bs C.4.4.04 As required Informational
68 Buried Waste
Exhumation Phase I
Interim Remedial
Action Report
C.5.2 December 31, 2023 Approve
69 RCRA closure plan(s) for remaining RWMC
RCRA facilities
C.5.1.01;
C.5.6
As required Approve
70 Transportation
Safety Document
C.5.1.04 A minimum of 30 days prior to the first inter-site transfer
Approve
71 Professional
Engineer’s Certification to the state of Idaho in accordance with the final approved
RCRA Closure Plan
C.6.3 In accordance with the final approved RCRA Closure Plan
Approve
72 Final Version of
DOE/ID-
11460 HWMA/RC
RA Closure Plan
C.6.3 As required Approve
73 Final Version of
DOE/ID-11477
HWMA/RCRA
Closure Plan
C.6.3 As required Approve
74 Final Incident Reports related to
Any security incident
C.7.2.01.01 As required Information
75 Hardware and software lifecycle replacement/ upgrade plan
C.9.1.01 Within 90 days after the end of contract transition, and updated annually
Review
76 Cyber Security
Program
C.9.1.01 Within 90 days after the end of contract transition, and updated annually
Review
77 Cyber Incident
Report
C.9.1.01 Monthly, buy the 15th Review
J-2-16
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
78 Records
Management Plan
Inventory and File
Plan, and Electronic
Information
Systems
C.9.1.02 Within 90 days after the end of contract transition
Approve
79 Electronic
Information
Systems list.
C.9.1.02.06 Annually Information
80 Monthly EEOICPA financial statements
C.9.1.02.12 Monthly Information
81 Earned Value Management
System Description
C.9.2.01.01 H.17
As required Approve
82 Project
Management Plan
(PMP)
C.9.2.01.01
H.17
DOE O 413.3
Within 90 days after the end of contract transition
Approve
83 Performance
Measurement
Baseline
C.9.2.01.01
H.17
As required Approve
84 Fiscal Year Work
Plan (FYWP) C.9.2.01.01 Annually by August 31 Review
85 Monthly
Performance Report
C.9.2.01.02 15th of each month Information
86 Integrated Master
Plan
C.9.2.01.04
H.17
As required Approve
87 Risk Management
Plan
C.9.2.01.05
DOE O 413.3
Annual update Approve
88 Contractor Personal
Property Management
System
C.9.2.03
FAR 52.245-1
Within 90 days after the end of contract transition
Approve
89 Nuclear
Maintenance
Management
Program (NMMP) description documents
C.9.2.04;
DOE O 433.1
Within 60 days after the effective date of the transition task order
And at least every 3 years or as directed by DOE.
Approve
(Minor changes or correction do not require new
DOE approval)
90 Phase-out Transition Plan
C.9.2.05.01 At least 60 days prior to end of contract period
Approve
91 Closeout Plan C.9.2.05.02 Within 60 days prior to the end of contract period
J-2-17
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
92 Permits and
Compliance
Documents
C.9.3.03
H.56
TBD (as required) Note that permit applications shall be provided to DOE initially not later than 90 days prior to the date they are to be submitted to the regulatory agency and that final regulatory documents shall be provided to DOE at least 30 days prior to the date of submittal to the regulatory agencies for DOE’s final review and signature or concurrence.
Approve
93 Certified data for regulatory reporting
C.9.3.04
DOE O 436.1
As required by regulatory document(s)
Review
94 ISMS Safety
Performance, Objectives, Measures, and
Commitments
(SPOMC) annual updates
C.9.3.07;
48 CFR
970.5223-1
Within one month prior to the end of each Government fiscal year
Approve May be waived for first year if less than 6 months of performance
95 Contractor Assurance System and ISMS
Effectiveness
Declarations
DOE O 226.1
Within one month following the end of each Government fiscal year
Approve
96 Revision to the
Radiation Protection
Program
C.9.3.13
10 CFR 835
Within 180 days after the end of contract transition if the existing RPP is adopted during contract transition.
Approve
97 Any changes to the established
Unreviewed Safety
Question (USQ)
Process
C.9.3.14
10 CFR 830
When a change is proposed Approve
98 Any changes to the Criticality Safety
Program plans
C.9.3.15
DOE O 420.1
When a change is proposed Approve
99 Environmental
Sustainability Plan
DOE O 436.1 Annually Information
100 Submission of vouchers
G.5
G.6
FAR 52.216-7
Not more frequently than Bi-weekly (Twice per month)
J-2-18
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
101 (1) An Annual
Contractor
Salary-Wage
Increase
Expenditure
Report
(2) A list of the five most highly compensated executives. An
Annual Report of Contractor
Expenditures for Employees
Supplemental
Compensation
(3) Annual Report of
Compensation and Benefits
H.5(d) (1) Annually, no later than
March 1 of each year
(2) At the time of contract award and at the time of any subsequent change to their total cash compensation
(3) No later than March 1 of each year in iBenefits
Information
102 (A) Any proposed major compensation program design changes prior to implementation.
(D) An Annual
Compensation
Increase Plan (CIP).
(F) Individual compensation actions for the top contractor official (e.g., laboratory director/plant manager or equivalent) and key personnel not included in the CIP.
H.5(e)(3)(i) (A) prior to implementation
(D) Annually, no later than
March 1 of each year
(F) initial contract award and when key personnel are replaced during the life of the contract
Approve
103 Employee Benefits
Value (Ben-Val)
Study
H.5(g)(3)(i) Every two years for each benefit tier
Approve
104 Corrective Action
Plan if net Benefit
Value exceeds comparator group by 5%
H.5(g)(3)(ii)(A) As required by CO following results of biennial Ben-Val
Study
J-2-19
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
105 Employee Benefits
Cost Study
Comparison
H.5(g)(3)(ii) Annually, no later than March
1 of each year for each benefit tier
Updated studies to the
Contracting Officer for approval prior to the adoption of any change to a pension or other benefit plan
Approve
106 Cost Analysis and Corrective Action
Plan if average total benefit per capita or total benefit costs as a percent of payroll exceed comparator group by 5% or more.
H.5(g)(3)(ii)(B) When the average total benefit per capita cost or total benefit cost as a percent of payroll exceeds the comparator group by more than five percent or if directed by the CO
Approve
107 ERISA section 103 audit results. In years in which a limited scope audit is conducted, the contractor must provide the contracting officer with a copy of the qualified trustee or custodian’s certification regarding the investment information that provides the basis for the plan sponsor to satisfy reporting requirements under
ERISA section 104.
H.5(i)(2) Annually Information
108 The Pension
Management Plan
(PMP)
H.5(i)(6) Annually no later than January
31 of each applicable year
Approve
109 Reporting
Requirements
1) Pension Plan
Actuarial Valuation
Reports
2) Forms 5500
3) Forms 5300
H.5(k) As soon as possible after the last day of the plan year by the contractor responsible for each designated pension plan funded by DOE but no later than the dates specified below:
(1) by the due date for filing
IRS Form 5500
(2) no later than that submitted to the IRS
(3) no later than that submitted to the IRS
J-2-20
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
110 Proposed changes to pension plans and pension plan funding
H.5(l)(1) At least sixty (60) days prior to the adoption of any changes to a pension plan
Approve
111 New benefit plans and changes to plan design or funding methodology.
H.5(l)(2) At least sixty (60) days prior to the adoption of any changes to a pension plan
Approve
112 Responses to any comments regarding the Contractor Employee
Compensation Plan provided by the
Contracting Officer under any of the above paragraphs
H.7(B)(1)(H) Within two days of receipt of the comments
J-2-21
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
113 (i) Documents relating to benefit plans offered to
Contractor
Employees, including but not limited to SPDs, all
Plan documents, applicable amendments, employee handbooks that summarize benefits provided to employees and other documents that describe benefits provided to employees of the
Contractor who perform work on this Contract;
(ii) Any and all other documents pertaining to implementation of and compliance with implementation of the compensation and benefit programs identified in Clause H.5,
(iii) timely data responses to
Departmental annual and ad hoc pension and Post
Retirement Benefit
(PRB) data requests
H.7(B)(2)(A) i-iii Promptly upon the request of the Contracting Officer
J-2-22
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
114 Economic
Bargaining
Parameters prior to
Collective
Bargaining
H.9(c) Prior to agreeing to any collective bargaining proposal
Approve
115 (h) A copy of all arbitration decisions issued by an arbitrator
(i) a “Report of
Settlement” after ratification of a collective bargaining agreement by accessing and inputting the information into the
Labor Relations module of DOE’s iBenefits reporting system
(j) A semi-annual report on grievances for which further judicial or administrative proceedings are anticipated, and all final step grievances.
H.9 (h) within one week of receipt of the decision.
(i) During next open quarter
(j) immediately on all arbitration requests.
The reports are due June 30 and December 31, of each year
Information
116 Business case for a
Self-Select
Voluntary
Separation Program
H.10(b)(4) 5 business days in advance of notification date
J-2-23
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
117 Workforce
Restructuring Plan
(Specific Plan)
H.10(d)
H.10(e)
When the Contractor determines that a reduction in work force is necessary
(greater than 100 employees)
Must be submitted to the CO at least 60 days in advance of the first communication given to the employees and public.
Any other Specific Plans
(Fewer than 100 employees) must be submitted to the CO 5 days in advance of the first communication to given to the employees and public.
Approve. Approval is required if the contractor plans to reduce the workforce by
100 or more employee through an involuntary separation action within a rolling
12-month period
118 Office of
Management and
Budget (OMB)
Control Number:
1910-5165, Semi-
Annual Davis-
Bacon Enforcement
Report
H.11(e) By April 21 and October 21 of each year.
Information Form submittal will be administered through the DOE iBenefits system or its successor system.
119 All new Worker’s
Compensation policies and all initial proposals for self-insurance
H.12(a) Prior to implementation Approve
120 Workers’ compensation settlement claims above the established threshold.
H.12(c) Upon receipt of claim Approve
121 Annual experience reports for each type of insurance
H.13(b)(1) Annually Information
122 Annual report of insurance costs and/or self-insurance charges
H.13(b)(2) Annually Information
123 Additional claim financial experience data
H.13(b)(3) As required Information Case-by-case basis
J-2-24
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
124 Overtime Control
Reporting
H.14 six (6) months after Task
Order execution start and annually thereafter no later than November 30 of each year.
Information
125 Business Systems H.15
H.16
H.17
H.18
H.19
H.20
As Required
Approve Includes corrective action plans and audits
126 Performance
Guarantee
Agreement
H.22 Upon entering into proceedings related to bankruptcy
Information
127 The Responsible
Corporate Official shall submit to the
Contracting Officer a quarterly report using appropriate corporate metrics for DOE review
H.23 Quarterly Review
128 Notify the CO annually if the
Privacy Act
Systems List is up to date
H.24 Annually Information
129 Community commitment plan
H.31 Annually for plan and semi-annually for progress report
Information
130 Diversity plan H.32 Within 60 calendar days after the effective date of the
Essential Mission task order
Approve
131 Annual diversity report
H.32(c) Annually Information
132 Reports itemizing information received as confidential or proprietary and setting forth the company or companies from which the
Contractor received such information.
H.34(e) Upon request from the CO Information
J-2-25
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
133 A copy of occupational safety and health self-assessments and/or inspections of work sites for job hazards for work performed at DOE facilities
H.36(c) Upon request of the CO or
COR
Information
134 Reports itemizing the confidential or proprietary information the
Contractor receives under this contract and identify the source (company, companies or other organizations) of the information.
H.40(e) Upon request of the CO Information
135 Written notice to the
COR when Contractor no longer requires access to the
Government
Information
Technology
Systems.
H.41(b) Immediately upon access no longer being required
Information
136 Changes to key personnel.
H.44(a)(1) At least 60 days in advance of any changes to key personnel
Approve
137 Notify Contracting
Officer in writing of the potential impact of the Contractor's compliance with the revised list of
Directives Section J, Attachment J-3, Requirements
Sources and
Implementing
Documents.
H.45(b) Within 30 days after receipt of the Contracting Officer's notice
J-2-26
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
138 Regarding workplace substance abuse programs for subcontracts – notify the CO of any subcontract the
Contractor believes may be subject to the requirements of
10 CFR part 707
H.50(c)(1)
10 CFR 707
and 49 CFR 40
In advance of, but not later than 30 days prior to, the award of any subcontract the
Contractor believes may be subject to the requirements of
10 CFR part 707
Information Unless the CO agrees to a different date
139 Subcontracted Work
Performance Report
B.8 Small
Business
Subcontracting
Fee Reduction;
H.52
Subcontracted
Work
Annually Information Contractor to report performance against the (1) progress toward meeting the cumulative small business performance percentage in accordance with the Section H
Clause entitled, Subcontracted
Work; (2) progress toward meeting the cumulative small business subcontracting goals for the
Master IDIQ Contract; and (3) progress toward meeting the required number of active
Mentor-Protégé
Agreements.
Also include
Task Order number; name(s) of subcontractor(s);
purpose of subcontract(s);
and meaningful work performed under subcontract(s).
140 Provide EEOICPA reports
H.55(b) As directed by CO Information
J-2-27
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
141 Return all
EEOICPA claims to DOE in the
Federal
Compensation
Program Act
(FCPA) electronic reporting system.
H.55(g) Within 45 calendar days of the date entered in the Federal
Compensation Program Act
(FCPA)
Information
142 The Contractor shall provide DOE copies of all environmental permits, authorizations, and regulatory approvals issued to the
Contractor by the regulatory agencies.
H.56(d) Upon issuance Information
143 Mentor Protégé
Lessons Learned
Evaluations
H.60;
DEAR Subpart
919.70
At the conclusion of the
Master IDIQ Contract
Information
144 All real estate actions to acquire, utilize, and dispose of real property assets.
H.65b) (1) Prior to real estate action Approve
145 Maintenance Management
Program
H.65 C.9.2.04
DOE O 433.1
DOE O 430.1
Annually Review
146 Occurrence
Reporting
Processing System
(ORPS) Reports
DOE O 232.2 As required Information
147 Submit the
Individual
Subcontract Report
(ISR) and/or the
Summary
Subcontract Report
(SSR), in accordance with paragraph (l) of this clause using the
Electronic
Subcontracting
Reporting System
(eSRS) at http://www.esrs.gov
Section I clause
FAR 52.219-9
Small
Business
Subcontracting
Plan (Aug
2018) – Alt II (Nov 2016)
Semi-annually during contract performance for the periods ending March 31 and
September 30. A report is also required for each contract within 30 days of contract completion. Reports are due 30 days after the close of each reporting period, unless otherwise directed by the CO.
Approve One ISR shall be submitted for the master IDIQ contract, incorporating all awarded Task
Orders.
148 Equal Employment
Report (EEO-1)
I.75
FAR 52.222-26
Annually by September 30 Information
J-2-28
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
149 Federal Contractor
Veterans’
Employment Report
(VETS-100A
Report)
I.82
FAR 52.222-37
Annually by September 30 Information
150 Annual Reports on the Product Types and Dollar Value of
Any USDA-
Designated Biobased Products
Purchased by the
Contractor During the Previous Fiscal
Year
I.92
FAR 52.223-2
Annually by October 31 Information
151 Material Safety
Data Sheets
I.93
29 CFR 1910
Prior to use of hazardous material
Information
152 Reports of loss, damage, destruction or theft of property
I.180
FAR 52.245-1
(f)(1) (vi)
As soon as facts become known
Approve
153 Reports of results for periodic physical inventories of property
I.180
FAR 52.245-
1(f)(1)(iv)
NLT September 30 Annually Approve
154 Input automated data into the
Property Inventory
Database System
(PIDS)
I.180
FAR 52.245-
1(f)(1)(iv)
NLT November 30 Annually Approve
155 GSA report of DOE property furnished to non-federal activities
41 CFR 102-
36.295
NLT October 31 Annually Approve
156 GSA report of DOE property sales and exchange transactions
41 CFR 102-
39.75
NLT October 31 Annually Approve
157 Plans and procedures for property management business system
I.180
FAR 52.245-1
(f)AL-2013-11
Revised
60 days following effective date of transition task order
Approve
158 Final property inventory for physically completed or terminated contracts
I.180
FAR 52.245-1
(f)(1)(iv)
60 days prior to contract completion or upon notice of termination
Approve
159 Fleet reports for assigned motor vehicles (FAST)
41CFR 102-
34.345
NLT December 15 Annually Approve
160 Special reports for assigned motor vehicles
41 CFR 109-
38.9
As required Approve
J-2-29
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
161 Emergency
Management
Program
C.9.3.10
DOE O 151.1
Updates as required Approve
162 Fire Protection
Summary
Information
DOE O 231.1, Annually by April 30 Information Fire protection database provided by
Office of the
Associate Under
Secretary for
Environment, Health, Safety, and Security
163 Conduct of
Operations Matrix
DOE O 422.1 Every three years Approve The contractor must review, update, and obtain approval of documentation demonstrating conformance to the order when changes in conditions require substantive changes in the documentation, and at least every three years.
164 External
Affairs/Public
Affairs program
C.9.6.01
DEAR
952.204-75
Within 30 days after transition task order
Approve
165 Environmental
Management System, certified to the ISO 14001 standard
C.9.3.07 Certified within 12 months after transition task order
166 Worker Safety and
Health Program annual update
10 CFR 851 Annually Approve
167 List of Closure
Facility Hazards
10 CFR 851.21 As required Approve
168 Quality Assurance
Program (QAP)
C.9.3.12
10 CFR 830
DOE O 414.1;
and 10 CFR 72, Subpart G
Update QAP annually Approve
J-2-30
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
169 Updated
Documented Safety
Analysis/Technical
Safety Documents or letter stating no changes made
10 CFR 830
Annually or when changes occur
Approve
170 Other Safety Basis
Documents
10 CFR 830
DOE O 420.1
As required Approve
171 Update Training
Program Plan and
Matrix (or a letter stating no changes)
DOE O 426.1 Every 3 years Approve
172 Annual Audit Plan and Annual Audit
Report
C.9.7.02
Cooperative
Audit Strategy
(Acquisition Guide 70.4)
Annually
Plan June 30
Report Due January 31
Review
173 Contract Funds
Status Report
DOE O 534.1 Monthly, by the 15th of each month reporting the prior month’s data
Review
174 Communications or
Releases of
Information to the public, the media, or
Members of
Congress
H.33 10 days prior to release Approve
175 Small Business
Subcontracting Plan
H.51
H.52
By October 1 of each FY;
additionally, as requested
Approve
176 Fire Protection
Program (FPP)
DOE O 420.1, 30 days prior to the end of transition
Approve
177 Reporting
Nonconforming
Items
FAR 52.246-26 As required Information DOE will transmit the report to the
Government-
Industry Data
Exchange
Program
FORT ST. VRAIN-SPECIFIC DELIVERABLES
178 Revisions to FSV
Emergency
Management
Program/Plan, including MOUs for medical, fire, and police services.
Must be compliant with the NRC
License
NRC License As required Approve Deliverable is only required, if
Contractor revises the documents.
J-2-31
Number
Deliverable Driver
Requirement
Deliverable Due DOE Action Notes
179 Follow-up Licensee
Event Report
Documentation
NRC License As required Approve Deliverable is only required, as defined in the
FSV Emergency
Management
Plan.
180 Security Training and Qualification
Plan, and applicable
Security Lesson Plan(s)
NRC License Annually and as required Approve Deliverable is required, if
Contractor revises the security lesson plans. Security
Training and
Qualification
Plan requires annual review and report.
181 Schedule for submission of NRC license-required plans and reports
NRC License Within 30 days of the effective date of the transition task order. Monthly; not later than the eighth business day prior to the end of each calendar month
Approve Included in the monthly progress reports
This includes a deliverable.
182 Training Schedule for Crane
Operations
NRC License As required Information
183 FSV NRC
Compliance Report
NRC License Once within 90 days after contract transition
Approve
184 FSV Wildland Fire
Management Plan
DOE O 420.1, Within 180 days after the end of contract transition
Approve Idaho Site facilities are incorporated into the INL sitewide
Wildland Fire
Management Plan established by INL contractor
185 FSV Emergency
Response Baseline
Needs Assessment
DOE O 420.1, Within 180 days after the end of contract transition
Approve Idaho Site facilities are incorporated into the INL sitewide
Emergency
Response
Baseline Needs
Assessment established by INL contractor
J-2-32
This page intentionally left blank