1240LU23Q0013 Attachment 5 SOW Pattee Picnic Area Pavilion.docx
DOCX document 52 KB Posted
- Attached to
- Pattee Picnic Are Pavilion Replacement Federal contract opportunity
- Solicitation number
- 1240LU22Q0013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240LU23Q0013 Commercial RFQ Pattee Picnic Area Pavilion Final Signed.pdf | ||
| 1240LU23Q0013 Attachment 2 Plans Pattee Picnic Area Pavilion.pdf | ||
| 1240LU23Q0013 Attachment 4 DB Wage Determination MT20230067 Missoula Cty MT.pdf | ||
| 1240LU23Q0013 Attachment 3 FS Supplemental Specs_Pattee Picnic Area Pavilion.pdf | ||
| 1240LU23Q0013 Attachment 1 Schedule of Items Pattee Picnic Area Pavilion.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work Pattee Picnic Area Pavilion Lolo National Forest
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 3 |
| 5.0 Deliverables / Schedule | 3 |
| 6.0 Travel | 3 |
| 7.0 Contractor’s Key Personnel | 3 |
| 8.0 Security Requirements | 3 |
| 9.0 Data Rights | 3 |
| 10.0 Section 508 – Electronic and Information Technology Standards | 3 |
| Attachment | 3 |
Project Pattee Picnic Area Pavilion-Lolo National Forest
General Information
1.0 Scope of Work
In general, the Work under this Contract includes, but is not necessarily limited to, the following major items of work as shown on the plans and as specified. The following descriptions are provided as an outline of major work items and shall not be construed as an inclusive or complete listing of all items of Work under this Contract.
Includes but is not limited to clearing and grubbing, excavation and backfill, aggregate pad, concrete slab, concrete footings and construction of one timber structure with metal roof.
2.0 Background
See Attachments
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
There is no Government Furnished property for this project
5.0 Deliverables / Schedule
| Item |
| Supplies/Services |
| Qty |
| Unit of Issue |
| Unit Price |
| Total Price |
| 0001 |
| Mobilization |
| 0002 |
| Pavilion Shelter |
| $ |
| $ |
| 0003 |
| Concrete Slab and Footings |
| $ |
| $ |
| 0004 |
| Crushed Aggregate (trail and under slab) Commercial Material Source |
| 0005 |
| Removal of Existing Picnic Tables (4) and Benches (4) |
| $ |
| $ |
| 0006 |
| Removal of Grill (4) and Concrete Pedestals (4) |
| 0007 |
| Gate/Pavement Removal & Disposal at Entrance |
TOTAL
| $ |
| $ |
6.0 Travel
There is no authorized payment for travel provided for in this contract.
7.0 Contractor’s Key Personnel
(a) The Contractor shall assign to this contract the following key personnel: CREW LEADER
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
8.0 Security Requirements
Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on the site. The Contractor shall be responsible for all costs required to provide such protection.
Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erection of structurally adequate barriers. Signing shall meet MUTCD Standards and advise the public of the work being done.