1240LU23Q0013 Attachment 3 FS Supplemental Specs_Pattee Picnic Area Pavilion.pdf
PDF 391 KB Posted
- Attached to
- Pattee Picnic Are Pavilion Replacement Federal contract opportunity
- Solicitation number
- 1240LU22Q0013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240LU23Q0013 Commercial RFQ Pattee Picnic Area Pavilion Final Signed.pdf | ||
| 1240LU23Q0013 Attachment 2 Plans Pattee Picnic Area Pavilion.pdf | ||
| 1240LU23Q0013 Attachment 5 SOW Pattee Picnic Area Pavilion.docx | DOCX document | |
| 1240LU23Q0013 Attachment 4 DB Wage Determination MT20230067 Missoula Cty MT.pdf | ||
| 1240LU23Q0013 Attachment 1 Schedule of Items Pattee Picnic Area Pavilion.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
5/17/2022
PATTEE PICNIC AREA PAVILION
U.S.D.A Forest Service Region One Lolo National Forest
Missoula Ranger District Missoula County, Montana
Prepared by:
GREAT WEST ENGINEERING
2501 Belt View Drive
Helena, MT 59604
SECTION 000110 - TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 011100 Summary of Work Section 011400 Work Restrictions Section 012750 Measurement and Payment Section 013300 Submittals Section 014100 Regulatory Requirements Section 014200 References Section 014300 Quality Assurance Section 014500 Quality Control Section 015000 Temporary Facilities and Controls Section 016600 Product Storage and Handling Requirements Section 017113 Mobilization Section 017123 Field Engineering Section 017400 Cleaning and Waste Management Section 017700 Closeout Procedures
DIVISION 03 – CONCRETE
Section 033000 Cast-in-Place Concrete
DIVISION 05 - METALS
Section 055000 Metal Fabrication
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
Section 061000 Rough Carpentry
DIVISION 09 - FINISHES
Section 099000 Painting, Staining and Transparent Finishes
DIVISION 31 - EARTHWORK
Section 311000 Site Clearing Section 312300 Excavation and Fill
DIVISION 32 – EXTERIOR IMPROVEMENTS
Section 321100 Crushed Base Course
END OF SECTION
SECTION 011100 – SUMMARY OF WORK
PART 1- GENERAL
1.1 DESCRIPTION
A. In general, the Work under this Contract includes, but is not necessarily limited to, the following major items of work as shown on the plans and as specified. The following descriptions are provided as an outline of major work items, and shall not be construed as an inclusive or complete listing of all items of Work under this Contract.
3. Mobilization
4. Pavilion. Includes but is not limited to clearing and grubbing, excavation and backfill, aggregate pad, concrete slab, concrete footings and construction of one timber structure with metal roof.
5. Government Provided Work: Government-provided optional sources for this project are identified as follows:
Item Description
Seeding Seeding and revegetation of disturbed areas
1.2 WORDING OF SPECIFICATIONS
A. Throughout these specifications the abbreviation CO shall mean "Contracting Officer”
Other reference standards are specified in Section 014200. The Contractor shall become thoroughly familiar with all reference specifications.
END SECTION
SECTION 012750 – MEASUREMENT AND PAYMENT
1.1 MEASUREMENT AND PAYMENT
A. Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as included in the payment for items shown.
1.2 UNITS OF MEASUREMENT
A. Payment will be by units defined and determined according to the U.S. Standard measure as follows;
1. Lump Sum – Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
1.3 METHODS OF MEASUREMENT
A. One of the following methods for measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item;
1. Lump Sum Quantity (LSQ) – These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.
1.4 PAY ITEMS
A. Refer to the SCHEDULE OF BID ITEMS for pay items.
SECTION 013300 - SUBMITTALS
A. Work Included:
1. Submittals are required under this contract for the purpose of establishing the final specifications for: (1) quality assurance; (2) design configuration; (3) performance standards; (4) color, texture, or finish; and/or (5) other features necessary for a complete description of the Work to be performed.
2. Submittals shall be approved by the Contracting Officer. The Contractor shall not purchase, order, ship, install, or otherwise incur costs for a product or other work subject to submittal approval until after approval is granted by the Contracting Officer; the Government shall not be responsible for payment for any work, product, design, etc., not approved.
3. Rejection of any submittals by the Contracting Officer constitutes notice that a resubmittal is required for the same purpose; rejections shall be explained.
4. The intent of the submittals is to provide complete information about the subject item sufficient for the Government to make a decision on that item's compliance with the purpose of the item and the general specification for that item. Descriptions contained in the approved submittals shall constitute an extension of the general specification concerning that item; and subsequent performance by the Contractor shall conform to submittal information except as allowed as substitutions in other sections as indicated.
1.2 RELATED WORK
A. Individual requirements for submittals may also be described in pertinent sections of the Technical Specifications.
1.3 QUALITY ASSURANCE
A. "Or Equal":
1. Where the phrase "or equal" or “equal as approved by the Contracting Officer," or "but are not limited to" occurs in the contract documents, do not assume that the materials, equipment, or methods will be approved as equal unless the item has been so specifically approved by the Contracting Officer.
PART 2 - PRODUCTS
2.1 REQUIRED SUBMITTALS
A. It shall be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the Work. Approvals must be obtained before starting any Work which involves them.
The following submittals are required following award of the contract for review and/or approval pursuant to contract provisions:
1. One copy of the Work Progress Schedule listing main types of Work and anticipated times for construction and completion.
2. One copy of the list of subcontractors proposed for the principal parts of the Work.
3. Copies of Certification and other documentation which establish the qualifications of proposed workers to perform the Work.
At a minimum the contractor shall provide project submittals as shown on the Submittal Log below.
Submittal requirements are listed throughout these specifications and the Drawings.
Log
No.
Incidental to Pay
Item(s) Description of Submittal Type of Submittal
Requirement found in
Specification No.
/Drawings
1 1 Schedule Schedule 013300
2 1 List of Subcontractors Listing 013300
3 1 Qualifications of Proposed Workers Listing 013300
4 1 Contractor Quality Control Plan Plan 153.02
5 1 Temporary Erosion and
Sedimentation Control Plan Plan 013300, 015000
6 1 Material Storage/Staging Plan Plan and Description
7 3 Concrete Mix Design Mix Design
Material Certifications 033000, Plans
8 3 Concrete compressive strength, slump, and air-entrainment testing Test Results 033000
9 3 Reinforcing Steel Order List 033000, Plans
10 2 Metal Fabrications Shop Drawings 055000, Plans
11 2 Coatings Color Samples, Material Submittals 055000, Plans
12 2 Lumber Submittals Material Submittals 061000, Plans
13 2 Roofing Materials Material Certification 061000, Plans
14 2 Painting Color Samples, Material Certification 099000, Plans
15 2 Structural Backfill and Backfill
Material Density Testing Test Results 208.11
16 4 Aggregate Material Certification 03123000, Plans
17 1 Closeout Documents As-Built Drawings 017700
2.2 MANUFACTURER'S LITERATURE AND SHOP DRAWINGS
A. One (1) electronic copy of applicable submittals shall be provided to the COR through email, ftp site, or other electronic method.
The information provided shall be adequate to determine compliance with the specifications.
Literature which is not marked or otherwise designated to show the exact model, size, etc. which the
Contractor proposes to use, will be returned by the Contracting Officer "without action." Circle or check applicable items on submittals. Do not use highlighter pens.
Submittals which are received from sources other than through the Contractor's office will be returned by the Contracting Officer "without notice."
Make submittals of Shop Drawings, Manufacturer's literature, tests, Schedules, samples, substitution requests, and other items in accordance with the provisions of this Section.
2.3 SAMPLES
A. Submit two samples of each color, style, etc. One sample of selected color, etc. will be retained. All other samples and all hardware samples will be returned.
2.4 TEMPORARY EROSION AND SEDIMENTATION CONTROL PLAN
A. Submit three (3) copies as specified paragraph 2.2 A, above, in accordance with requirements of Section 015000.
PART 3 - EXECUTION
3.1 IDENTIFICATION OF SUBMITTALS
A. Consecutively number all submittals. Cross reference all submittals with the specific Section number of the specifications.
1. When material is resubmitted for any reason, transmit under a new letter of transmittal with a new submittal number.
2. On submittals, cite the original submittal number for reference.
Accompany each submittal with letter of transmittal showing all information for identification and checking.
On at least the first page of each submittal, and elsewhere as required for positive identification, show the submittal number in which the item was included.
Where contents from manufacturers include data not pertinent to the submittal, clearly show which portions of the contents are being submitted for review.
Maintain an accurate submittal log for the duration of the Work, showing current status of all submittals at all times. The submittal log shall be made available to the Contracting Officer for review upon request.
3.2 GROUPING OF SUBMITTALS
A. Make construction drawing submittals in a group containing all associated items to assure that information is available for checking each item when it is received.
1. Partial submittals may be rejected as not complying with the provisions of the contract.
2. The Contractor may be liable for delays caused by rejected submittals.
3.3 TIMING OF SUBMITTALS
A. Submit temporary erosion control plan at the Post Award Conference. No work shall be started on the project site until the erosion control plan is approved by the Contracting Officer.
B. Make construction submittals for the first phases of Work within 15 days of the date of the Notice-To-Proceed.
In scheduling, allow at least twenty (20) working days for review by the Contracting Officer following receipt of the submittal.
3.4 REVIEW OF SUBMITTALS
A. The Contracting Officer will review submittals with reasonable promptness, indicating in writing the appropriate approval category ("Approved," "Disapproved," "Approved Subject to Corrections Shown") upon them. One (1) copy of the drawings or vendor's data shall be returned to the Contractor and when corrections are required, the Contractor shall make such corrections. The drawing (or other vendor's data) shall then be resubmitted by the Contractor for approval until an unqualified approval is obtained. After unqualified approval is obtained, the Contractor shall furnish the Contracting Officer with three (3) copies of the approved submittals.
Review by the Contracting Officer does not relieve the Contractor from responsibility for errors which may exist in the submitted data.
Revisions:
1. Make revisions required by Contracting Officer.
2. If the Contractor considers any required revision to be a change, the Contractor shall notify the Contracting Officer as provided for in the General Conditions.
SECTION 014100 – REGULATORY REQUIREMENTS
1.1 DESIGN STANDARDS AND CODES
A. All work shall comply with the rules and regulations of federal, state, and local agencies having jurisdiction. The Contractor shall acquire all permits, licenses and approval needed to complete the project from applicable state and local officials.
B. The construction methods shall meet the latest edition of all national, state and local codes.
The following standards and codes are made part of the contract specifications. In case of conflict, the most stringent shall apply.
AAN American Association of Nurserymen AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute ADAABAAG Americans with Disabilities Act-Architectural Barriers Act Accessibility
Guidelines AISC American Institute of Steel Construction AITC American Institute of Timber Construction ANSI American National Standards Institute ASTM American Society for Testing and Materials AWPA American Wood Preservers Association AWPB American Wood Preservers Bureau FSORAG USDA Forest Service Outdoor Recreation Accessibility Guidelines FSTAG USDA Forest Service Trail Accessibility Guidelines IBC International Building Code ICBO International Committee of Building Officials IEC International Electric Code MUTCD Manual on Uniform Traffic Control Devices (Department of Transportation) NBS National Bureau of Standards (Department of Commerce) NEC National Electric Code OSHA Occupational Safety and Health Administration (Department of Labor) SSPC Steel Structures Painting Council UFAS Uniform Federal Accessibility Standards WWPA Western Wood Products Association
1.2 REFERENCE SPECIFICATION
A. At all times, keep the following documents on site and available for use by the Contractor, Subcontractors, if any, and Contracting Officer:
1. American Concrete Institute Specifications for Structural Concrete (ACI 301-20).
1.3 VARIATIONS WITH REFERENCES
A. Promptly notify the Contracting Officer of any observed conflict between drawings and referenced standard or specification.
B. Assume responsibility for work known to be contrary to such requirements without notice.
SECTION 014200 - REFERENCES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specifications Sections, apply to this Section.
1.2 DEFINITIONS
A. General: Basic contract definitions are included in the Conditions of the Contract.
B. “Indicated”: The term “indicated” refers to graphic representations, notes, or schedules on the Drawings, or other paragraphs or Schedules in the Specifications, and similar requirements in the Contract Documents. Terms such as “shown,” “noted,” “scheduled,” and “specified” are used to help the reader locate the reference. Location is not limited.
C. “Directed”: Terms such as “directed,” “requested,” authorized,” “selected,” “approved,” “required,” and “permitted” mean directed by the CO, requested by the CO, and similar phrases.
D. “Approved”: The term “approved,” when used in conjunction with the CO’s action on the Contractor’s submittals, applications, and requests, is limited to the CO’s duties and responsibilities as stated in the Conditions of the Contract.
E. “Regulations”: The term “regulations” includes laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, as well as rules, conventions, and agreements within the construction industry that control performance of the work.
F. “Furnish”: The term “furnish” means supply and deliver to the Project Site, ready for unloading, unpacking, assembly, installation, and similar operations.
G. “Install”: The term “install” describes operations at the Project Site including the actual unloading, unpacking, assembly, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations.
H. “Provide”: The term “provide” means to furnish and install, complete and ready for the intended use.
I. “Installer”: An installer is the Contractor or another entity engaged by the Contractor, either as an employee, subcontractor, or contractor of lower tier, to perform a particular construction activity, including installations, erection, application, or similar operations. Installers are required to be experienced in the operations they are engaged to perform.
1. The term “experienced,” when used with the term “installer,” means having a minimum of 5 previous projects similar in size and scope to this Project, being familiar with the special requirements indicated, and having complied with requirements of authorities having jurisdiction.
2. Trades: Using terms such as “carpentry” does not imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as “carpenter.” It also does not imply that requirements specified apply exclusively to tradespersons of the corresponding generic name.
3. Assigning Specialists: Certain Sections of the Specifications require that specific construction activities shall be performed by specialists who are recognized experts in those operations. The specialist must be engaged for those activities, and their assignments are requirements over which the Contractor has no option. However, the ultimate responsibility for fulfilling contract requirements remains with the Contractor.
i. This requirement shall not be interpreted to conflict with enforcing building codes and similar regulations governing the Work. It is also not intended to interfere with local trade-union jurisdictional settlements and similar conventions.
J. “Project Site”: The space available to the Contractor for performing construction activities, either exclusively or in conjunction, with others performing other work as part of the Project.
The extent of the Project Site is shown on the Drawings and may or may not be identical with the description of the land on which the Project is to be built.
K. “Testing Agencies”: A testing agency is an independent entity engaged to perform specific inspections or tests, either at the Project Site or elsewhere, and to report on and, if required, to interpret results of those inspections or tests.
L. “CO”: Contracting Officer.
1.3 SPECIFICATION FORMAT AND CONTENT EXPLANATION
A. Specification Format: These Specifications are organized into Divisions and Sections based on Construction Specifications Institute (CSI) MasterFormat 2016 Edition numbering system.
B. Specification Content: This Specification uses certain conventions regarding the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations or circumstances. These conventions are explained as follows:
C. Abbreviated Language: Language used in Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be interpreted as the sense requires. Singular words will be interpreted as plural and plural words interpreted as singular where applicable as the context of the Contract Documents indicates.
D. Streamlined Language: The Specifications generally use the imperative mood and streamlined language. Requirements expressed in the imperative mood are to be performed by the Contractor. At certain locations in the Text, subjective language is used for clarity to describe responsibilities that must be fulfilled indirectly by the Contractor or by others so noted. The words “shall be” are implied where a colon (:) is used within a sentence or phrase.
1.4 INDUSTRY STANDARDS
A. Applicability of Standards: Except where the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.
B. Publications Dates: Comply with the standards in effect as of the date of the Contract Documents.
C. Conflicting Requirements: Where compliance with 2 or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer to the CO before proceeding for a decision on requirements that are different, but apparently equal; and where it is uncertain which requirement is the most stringent.
1. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum acceptable. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of the requirements. Refer uncertainties to the CO for a decision before proceeding.
D. Copies of Standards: Each entity engaged in construction on the Project is required to be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents. Where copies of standards are needed to perform a required construction activity, the Contractor shall obtain copies directly from the publication source.
E. Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. Where such acronyms or abbreviations are used in the Specifications or other Contract Documents, they mean the recognized name of the trade association, standard-generating organization, authorities having jurisdiction, or other entity applicable to the context of the text provision. Refer to “Gale Research Co.'’ “Encyclopedia of Associations,” available in most libraries.
SECTION 014300 – QUALITY ASSURANCE
A. Establish and maintain an effective quality control program and perform sufficient inspections and tests of all items of work, including those of subcontractors, to ensure compliance with the Contract Documents.
1.2 GENERAL
A. Provide for procedures to ensure that the latest Contract Documents, standards, codes, shop drawings and instructions are used for fabrication, construction and testing.
B. Furnish appropriate facilities, instruments and testing devices required for performance of the quality control program.
C. Contractor is responsible for inspections and tests required in Divisions 2 through 48, and the cost of same shall be included in the Contract Sum.
D. Ensure that the work of related trades is properly coordinated.
1.3 QUALIFICATIONS
A. Persons qualified by training and/or experience shall provide, install and/or perform all work.
Qualifications and/or minimum years of experience are specified in the technical sections of these Specifications. At the Pre-Work Conference, provide documentation demonstrating that qualifications for each phase of work will be met.
1.4 PRE-INSTALLATION
A. It is the Contractor's responsibility to be certain that all equipment and materials selected by the Contractor, subcontractors or material suppliers conform exactly to the requirements of the Contract Documents. Approval of a manufacturer's name by the CO does not relieve the Contractor of the responsibility for providing materials and equipment which comply with the Drawings and Specifications.
B. Before the installation of every major unit of work that requires coordination with other work, ensure that the unit of work can be installed and function as intended and required in conjunction with other work which has preceded or will follow. If the installer reports unsatisfactory conditions for installation, do not proceed until these conditions have been corrected.
1.5 INSTALLATION
A. Conform to testing and inspection requirements as specified. Coordinate enclosure of work with required inspections and tests, so as to avoid the necessity of uncovering work for that purpose.
B. Unless otherwise noted or directed, install all work in accordance with Manufacturer's recommendations for best results. Do not omit any preparatory steps or installation procedures unless specifically modified or exempted by the Documents.
C. Recheck measurements and dimensions of the Work, as an integral step of starting each installation.
D. Any modification necessary for the proper installation and function of an approved substituted item shall be made by the Contractor at no additional cost to the Government. The Contractor shall bear the cost of any detailing or design required to accommodate the change.
E. Protect newly installed work to ensure that it will remain without damage or deterioration during the remainder of the construction period. If damage or deterioration should occur, restore to new condition at no additional cost to the Government.
SECTION 014500 – QUALITY CONTROL
A. Contractor provided testing laboratory services.
1.2 RELATED WORK
A. Section 017800, Closeout Submittals
B. Individual Specification Sections: Inspections and tests required, and standards for testing.
1.3 REFERENCES
A. ANSI/ASTM D-3740: Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction.
B. ANSI/ASTM E-329: Standard Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction.
1.4 SELECTION AND PAYMENT
A. Contractor will employ and pay for services of an independent testing laboratory to perform specified inspection and testing. Sampling and testing shall be provided to assure compliance with the requirements of the drawings and Specifications.
B. Employment of testing laboratory shall in no way relieve the Contractor of obligation to perform work in accordance with requirements of contract documents.
C. Under no circumstances shall a supplier of materials be allowed to act as an approved testing laboratory.
D. No materials shall be placed or installed without prior acceptance by the Contracting Officer, based on test and inspection results.
1.5 QUALITY ASSURANCE
A. Comply with requirements of ANSI/ASTM E-329 and ANSI/ASTM D3740.
B. Laboratory shall maintain a full-time registered engineer on staff to review services.
C. Laboratory authorized to operate in the State of Montana.
D. Testing equipment shall be calibrated at reasonable intervals with devices of an accuracy traceable to either NBS Standards or accepted values of natural physical constants.
1.6 CONTRACTOR SUBMITTALS
A. Prior to start work, submit testing laboratory name, address, and telephone number, and names of full-time registered engineer and responsible officer.
B. Submit copy of report of laboratory facilities inspection made by Materials Reference Laboratory of National Bureau of Standards during most recent tour of inspection, with memorandum of remedies of any deficiencies reported by the inspection.
1.7 LABORATORY RESPONSIBILITIES
A. Test samples of mixes submitted by Contractor.
B. Provide qualified personnel at site after due notice; cooperate with the Contracting Officer and Contractor in performance of services.
C. Perform specified inspection, sampling, and testing of products.
D. Ascertain compliance of materials and mixes with requirements of contract documents.
E. Promptly notify the Contracting Officer and Contractor of observed irregularities or non conformance of work or products.
F. Perform additional inspections and tests required by the Contracting Officer.
1.8 LABORATORY REPORTS
A. After each inspection and test, promptly submit two (2) copies of the laboratory report to the Contracting Officer. Include: Date issued, project title and number, name of inspector, date and time of sampling or inspection, identification of product and specifications section, location in the project, type of inspection or test, date of test, results of test, and conformance with contract documents. When requested by the Contracting Officer, provide interpretation of test results.
1.9 LIMITS ON TESTING LABORATORY AUTHORITY
A. Laboratory may not release, revoke, alter, or enlarge on requirements of contract documents.
B. Laboratory may not approve or accept any portion of the work.
C. Laboratory may not assume any duties of the Contractor.
D. Laboratory has no authority to stop work.
1.10 CONTRACTOR RESPONSIBILITIES
A. Deliver to laboratory at designated location adequate samples of materials proposed to be used which require testing, together with proposed mix designs.
B. Cooperate with laboratory personnel and provide access to work.
C. Provide incidental labor and facilities for access to work to be tested, to obtain and handle samples at the site or source of products to be tested, to facilitate tests and inspections, and for storage and curing of test samples.
SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS
A. Work under this Section includes temporary facilities to facilitate the Work and construction controls to protect workers and the public from injury, harm or discomfort.
1.2 RELATED WORK
A. Section 013300, Submittals
B. Section 311000, Site Clearing
1.3 RULES AND REGULATIONS
A. All construction methods and procedures shall be in compliance with the State of Montana, Department of Labor, Division of Labor Standards and Safety.
B. The Contractor shall familiarize himself/herself with current OSHA rules and observe these regulations at all times during the term of this Contract.
1.4 UTILITIES
A. No utilities (water, sewer, electrical, or telephone) are available at the project site.
B. Contractor shall provide and pay for the hauling and or pumping of water used in construction.
1.5 SAFETY AND NOISE CONTROLS
A. Provide all labor, material, and equipment necessary for protection of public, personnel, vehicles and the environment from injury or damage.
B. Erect all necessary barricades and guards. Post appropriate warning signs. Use a water truck as necessary to control dust.
C. Comply with all applicable regulations and restrictions in regard to noise levels and noise-generating activities.
1.6 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
A. The contractor shall prepare a temporary erosion control plan for his/her method of controlling erosion and the sedimentation of rivers, streams, ponds, drainage ditches, or other areas of water impoundment. The plan shall identify the location of temporary erosion control devices and materials proposed for use. Submit SWPPP Plan for approval as specified in Section 013300.
B. The Contractor shall construct and maintain approved temporary erosion control devices through completion of the construction, or as otherwise directed by the CO. Such work may include silt fencing, temporary berms, dikes, sediment basins, slope drains and the use of temporary mulches or other control devices as necessary to control erosion and sedimentation.
C. Erosion control devices shall be constructed prior to the start of clearing and grubbing operations, except as otherwise approved by the CO. The Contractor shall provide additional erosion control measures as directed by the CO to correct conditions that develop during construction that were not foreseen during preparation and approval of the temporary erosion control plan.
D. Address provisions outlined in 40 CFR 122.26, EPA’s General Permit Construction Activities 64 FR 68722 and EPA 832-R-92-005 and include, at a minimum, the following:
1. Identify potential sources of pollution which may reasonably be expected to affect the quality of storm water discharge from the site.
2. Select applicable BMP’s from EPA 832-R-92-005.
3. Describe and ensure implementation of BMP’s which will be used to reduce the pollutants in stormwater discharge at the construction site.
4. Ensure compliance with the terms of EPA’s 64 FR 68722 for stormwater discharge.
5. Provide a completed signed original of the Notice of Intent and Notice of Termination (except for effective date), to comply with EPA’s General Permit for Construction Activities 64 FR 68722.
1.7 CLEANUP AND DISPOSAL
A. Remove all temporary facilities and construction controls at the completion of the Work.
B. Leave work area clean and free of all debris associated with this Section of Work.
SECTION 016600 – PRODUCT STORAGE AND HANDLING REQUIREMENTS
PART 1 GENERAL
A. This work includes the protection of products scheduled for use in the work by means including, but not necessarily limited to, those described in this Section.
1.2 QUALITY ASSURANCE
A. Include within the Contractor's quality assurance program such procedures as are required to assure full protection of work and materials.
1.3 MANUFACTURERS' RECOMMENDATIONS
A. Except as otherwise approved by the Contracting Officer, determine and comply with manufacturers' recommendations on product handling, storage, and protection.
1.4 PACKAGING
A. Deliver products to the job site in their manufacturer's original containers, with labels intact and legible.
B. Maintain packaged materials with seals unbroken and labels intact until time of use.
C. Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified requirements, at no additional cost to the Government.
D. The Contracting Officer may reject as non-complying such material and products that do not bear identification satisfactory to the Contracting Officer as to manufacturer, grade, quality, and other pertinent information. All packaging must include evidence that materials comply with the Buy American Regulations.
1.5 PROTECTION
A. Protect finished surfaces, including columns, beams and fascias of openings used as passageways, through which equipment and materials are handled.
B. Provide protection for finished surfacing in traffic areas prior to allowing equipment or materials to be moved over such surfaces.
C. Maintain finished surfaces clean, unmarred, and suitably protected until accepted by the Contracting Officer.
1.6 REPAIRS AND REPLACEMENTS
A. In event of damage, promptly make replacements and repairs to the approval of the Contracting Officer and at no additional cost to the Government.
B. Additional time required to secure placements and to make repairs will not be considered by the Contracting Officer to justify an extension in the Contract Time of Completion.
SECTION 017113 - MOBILIZATION
PART 1 – GENERAL
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
1.2 METHOD OF MEASUREMENT
A. The measurement shall be lump sum for mobilization.
1.3 BASIS OF PAYMENT
A. The lump sum price shall include full compensation for mobilization. Progress payments for mobilization will be made as follows:
1. The total amount of premiums paid by the Contractor to obtain performance and payment bonds will be paid at one time together with the first progress payment otherwise due.
2. When 5 percent of the total original contract amount is earned from other schedule items, 50 percent of the amount bid for mobilization will be paid, exclusive of any amount already paid the Contractor for performance and payment bond premiums.
3. When 10 percent of the total original contract amount is earned from other schedule items, the balance of the amount bid for mobilization will be paid.
SECTION 017123 – FIELD ENGINEERING
A. All field engineering services required to complete the work shall be provided by the Contractor unless otherwise noted.
1.2 RELATED WORK
A. Section 017700, Close Out Submittals
1.3 QUALITY ASSURANCE
A. Cost of field engineering shall be considered incidental to the item being constructed.
B. Survey work shall be completed by, or under the direct supervision of, a person experienced in construction surveying.
C. Provide layout and grade staking according to professional engineering and surveying procedures for the type of work being performed.
D. Provide structural design of shores, forms and similar items used by the Contractor as part of his/her means and methods of construction.
E. During the course of construction, the Contractor shall make available a person to help the Contracting Officer with field checking of grades and control as may be necessary to assure proper construction.
1.4 REFERENCE POINTS
A. Locate and protect monuments, bench marks, and initial control point, or reference thereto, prior to commencing work. Establish additional reference points as needed during construction.
B. Report to the Contracting Officer when reference points or initial control points are lost or destroyed during construction. Replace points immediately.
1.5 BASE DATA
A. Refer to Section 003119.
1.6 REQUIREMENTS
A. Establish lines and levels to properly layout and construct the work to the dimensions and elevations shown on the Plans. Re-establish and restake survey bearings, traverse lines, stationing and points of intersection as required to construct the work to the horizontal and vertical alignments as detailed.
B. Take measurements as far in advance of required installation as possible and verify measurements given on Drawings. Promptly report variations, discrepancies or nonclosing dimensions with the Contracting Officer for further direction.
C. Maintain construction lines and grade staking to assure accurate and proper control of the work and to verify final grades and construction lines.
D. Periodically, verify layouts and elevations by methods as required. No extra will be paid to the Contractor for removal and replacement of work which is found to be incorrectly installed.
1.7 FIELD ADJUSTMENTS
A. The Government reserves the right to field adjust layouts and grades for the purpose of avoiding obstructions and/or conforming to existing site features.
B. The Contractor shall make adjustments as directed by the Contracting Officer at no additional cost to the Government.
1.8 SURVEY RECORDS
A. Maintain a complete, accurate log of all control and construction survey work as it progresses.
SECTION 017400 – CLEANING AND WASTE MANAGEMENT
PART 1 - GENERAL
A. All clean up work including all materials, labor and equipment necessary for cleaning and debris removal.
1.2 DISPOSAL REQUIREMENTS
A. Conduct cleaning and disposal operations to comply with local codes, ordinances and regulations.
B. Dispose of all debris and materials at a site approved by the USFS, Contracting Officer, and Local Authority.
C. The Contractor shall be responsible for all costs and fees associated with disposal of waste materials and debris.
2.5 MATERIALS
A. Use only those cleaning materials which will not create hazards to health or property and which will not damage surfaces.
B. Use cleaning materials only on surfaces recommended by cleaning material manufacturer.
3.1 DURING CONSTRUCTION
A. Execute periodic cleaning to keep the work site and adjacent properties free from accumulations of waste materials and trash.
B. Provide on-site containers for the collection of waste materials and trash.
3.2 DUST CONTROL
A. Clean interior spaces prior to the start of finish painting and continue cleaning as needed until painting is finished.
B. Schedule operations so that dust and other contaminants resulting from cleaning process will not fall on wet or newly-coated surfaces.
3.3 FINAL CLEANING
A. At the completion of the project, or prior thereto if so directed by the Contracting Officer, the Contractor shall be responsible for complete cleaning of those portions of the project and site which his work effects.
B. Sweep and clean concrete slabs and toilets thoroughly and remove all marks, stains, fingerprints, dust, dirt, paint drippings and other construction residue from all surfaces. Clean and touch up all painted work. Clean site and remove excess debris, branches, rocks, and trash.
C. Prior to final inspection by Contracting Officer, Contractor shall conduct his own inspection of exposed interior and exterior surfaces, and all work areas, to verify that the entire work is clean and ready for inspection and use by the Government.
3.4 RESTORATION OF DAMAGED PROPERTY
A. To the extent that any roads, vegetation, structures, utilities or other items are damaged or displaced by the Contractor's operations, these shall be restored to their original or better condition prior to Final Inspection. This shall include both on-site and off-site items. Any damage which is severe enough to disrupt community travel or utilities shall be repaired by the Contractor immediately, when requested by the Contracting Officer.
SECTION 017700 – CLOSEOUT PROCEDURES
A. This Section describes an orderly and efficient transfer of the completed work to the USFS.
1.2 QUALITY ASSURANCE
A. Prior to requesting inspection by the Contracting Officer, use adequate means to assure that the work is substantially completed in accordance with the specified requirements and is ready for the requested inspection.
1.3 PROCEDURES
A. Substantial Completion:
1. Substantial completion is defined as that point at which the work is basically complete and ready for use. All specified products shall have been installed and are functionally operational. Remaining work shall be extremely minor or require seasonal opportunity to complete or subject to delayed completion items and shall not impair the functionality of the site.
2. The Contractor shall notify the Contracting Officer, in writing as required by the General Conditions, as to the date when in its opinion all or a designated portion of the work will be substantially completed and ready for inspection.
3. Within a reasonable time after receipt of such notice, the Contracting Officer will inspect to determine status of completion.
4. Should the Contracting Officer determine that the Work is not substantially complete:
i. The Contracting Officer promptly will so notify the Contractor in writing, giving the reasons therefore.
ii. The Contractor shall remedy the deficiencies and notify the Contracting Officer when ready for reinspection.
iii. The Contracting Officer will reinspect the Work.
iv. The Contractor shall be liable for expenses incurred by the USFS for reason of such Substantial Completion Reinspection.
5. When the Contracting Officer concurs that the Work is substantially complete:
i. The Contracting Officer will prepare a Punch List of items to be completed or corrected, as verified by the CO.
ii. The Contracting Officer will submit the Punch List to the Contractor for their written acceptance of the responsibilities assigned to them in the Punch List.
iii. Once the Contractor executes the Punch List, the Contracting Officer must be notified in writing.
B. Immediately following approval of Substantial Completion, the Contractor shall submit the following documents.
1. Final Pay Request with final adjustment of accounts stating all adjustments to the contract sum.
i. Previous change orders.
ii. Deductions or uncorrected work.
iii. Other adjustments.
2. Contractor's Certificate and Release
3. Operation and Maintenance Manuals.
4. As-Built Drawings and Submittals.
C. Final Inspection: Final Inspection shall be defined as that period at which all work in the Contract is 100% complete and no minor details remain to be performed.
1. Final inspection shall not be made until all work under the contract is completed. The Contractor shall notify the Contracting Officer in writing, at least 4 days prior to the date requested on which the work will be ready for final inspection.
2. Following notification, the Contracting Officer will make an inspection of the Contractor's work and record any deficiencies on the Final Punch List. The Contractor shall immediately correct these deficiencies at her/his own expense and notify the Contracting Officer in writing when all items have been corrected. The Contracting Officer will re-inspect the work to assure correction of all deficiencies before release of amounts retained for minor, seasonal or delayed items. The Contractor shall be liable for all costs of reinspection when the Substantial Completion Punch List deficiencies have not been corrected at the time of the Final Inspection and reinspection is required.
3. Any reasonable delay by the CO in making final inspection shall not relieve the Contractor of responsibility for the work nor shall the Government be held responsible for damages or claims for compensation on account of continuing overhead, maintenance, etc., occasioned by such a delay.
D. Final Pay Request will be processed for payment upon final inspection and Contracting Officer’s certification that work under the contract is 100% complete.
2.6 WARRANTY
A. The Contractor warrants the products delivered under the contract to be free from defects in design, material or workmanship, and against damage caused prior to final inspection.
Unless otherwise specified, this warranty extends for a period of one (1) year from the date of final acceptance.
The Contractor shall promptly repair or replace all defective or damaged items delivered under the Contract. The Contractor may elect to have any replaced item returned to his plant at his expense.
SECTION 033000 – CAST-IN-PLACE CONCRETE
A. This section of the specifications covers the requirements for furnishing and installing cast-in-place concrete footings and slabs on grade, including formwork and reinforcement, in conjunction with notes as shown on Drawings.
1.2 RELATED WORK
A. Section 013300, Submittals
B. Section 014500, Quality Control
C. Section 312300, Excavation and Fill
1.3 REFERENCE SPECIFICATION
A. ACI 301-20 - Standard Specifications for Structural Concrete.
B. International Building Code (IBC) - Chapter 19.
C. American Society For Testing and Materials (ASTM).
1.4 FIELD REFERENCE
A. The Contractor shall make available for on-site review one copy of ACI Field Reference Manual, SP-15 – Standard Specifications for Structural Concrete (ACI 301) with Selected ACI and ASTM.
1.5 QUALITY ASSURANCE
A. Concrete shall be supplied by a commercial ready-mix firm.
B. Mix design and trip tickets shall be submitted for all concrete delivered in conformance with Section 013300, Submittals.
1.6 TESTING
A. Compressive Strength Tests:
1. Obtain samples and conduct tests in accordance with ACI 301 Section 1.6.4.
2. One (1) set of three (3) cylinders per set shall be cast for testing for the concrete slabs, unless the slabs are placed on separate days, in which case one set of three cylinders shall be cast for each slab.
3. For each specified test: Cure one (1) cylinders for 28-day test age. Test one (1) cylinder at seven days, test one (1) cylinders at twenty-eight days, and hold one (1) cylinder in reserve as the CO directs. After fifty-six days, unless notified by the CO to the contrary, the reserve cylinder may be discarded without being tested for specimens meeting 28-day strength requirement.
4. Acceptance. Strength is satisfactory when:
i. The average of all tests equal or exceed the specified strength
ii. No individual test falls below the specified strength by more than 500 psi.
B. Slump Test:
1. Obtain samples and conduct slump tests in accordance with ASTM C143/C143M. Take concrete samples during concrete placement. Perform test at commencement of concrete placement and when test cylinders are made.
C. Air-Entrainment Test:
1. Obtain samples and conduct air-entrainment tests in accordance with ASTM C173/C173M. Test for air content at commencement of concrete placement and when test cylinders are made.
1.7 SUBMITTALS
A. Submit concrete design mix for CO review and approval fourteen (14) days prior to placing concrete. Conform to requirements of ACI Section 4.1.2.
Submit results of compressive strength, slump, and air-entrainment testing to CO for review. Conform to requirements of ACI Section 1.5.2.
B. Submit above per Section 013300, Submittals.
PART 2 - MATERIALS
2.1 FORM MATERIALS
A. Conform to ACI 301 Section 2 - Formwork and Form Accessories.”
B. Removal of Forms shall conform to ACI 301 Section 2.3.2 except strength indicated in ACI 301 Section 2.3.2.5 shall be 0.75 f’c.
C. Forms: Steel, wood, or other suitable material of size and strength to resist movement during concrete placement. Use straight forms, free of defects. Use flexible spring steel forms or laminated boards to form curved edges.
D. Form Coating: Release agent that will not adversely affect concrete or interfere with coating application.
2.2 BAR REINFORCEMENT
A. Bar reinforcement shall conform ASTM A615/A615M, Grade 60 unless noted otherwise.
B. Reinforcement shall be unfinished deformed billet-steel bars.
2.3 CONCRETE MIXTURES
A. Conform to ACI 301 Section 4 - Concrete Mixtures.
B. Provide concrete mixes conforming to the following requirements:
Member Type/Location
STRENGTH
(psi)
TEST AGE
(days)
MAX.
AGGREGATE
MAX W/C
RATIO
AIR
CONTENT
Sonotubes 3000 28 1” 0.50 6%
Slabs 4000 28 1” 0.45 6%
C Mix Design Notes
1. Water Cement (W/C) ratio: Water-cementitious material ratios shall be based on the total weight of cementitious materials. Ratios not shown in the table above are controlled by strength requirements.
2. Cementitious content: 5 ½ sack per cubic yard. The use of fly ash, other pozzolans, silica fume, or slag shall conform to ACI 301 Sec 4.2.2.8.B. Maximum amount of fly ash shall be 20% of total cementitious content unless reviewed and approved otherwise by the CO.
3. Air content: Conform to ACI 301 Section 4.2.2.4. Horizontal exterior surfaces in contact with the soil require entrained air. Use “Severe Exposure”. Tolerance is ±1-½%. Air content shall be measured at point of placement.
4. Slump: Conform to ACI 301 Section 4.2.2.2. Slump shall be determined at point of placement.
5. Chloride Content: Conform to ACI 301 Section 4.4.1 and Table 4.1.1 for “Other Reinforced Concrete Construction.”
6. Non-Choride Accelerator: Non-chloride accelerating admixture may be used in concrete slabs placed at ambient temperatures below 50ºF at the Contractor’s option.
2.4 CONCRETE MATERIALS
A. Portland Cement: Portland cement shall conform to ASTM C150, Type I or Type II. The cement shall be of the same brand and type and from the same plant of manufacture.
B. Aggregate: Conform to ASTM C33. Maximum aggregate size of ¾” unless approved otherwise by the CO. Aggregates shall be free from any substance that may be deleteriously reactive the alkalis in the cement and in a sufficient amount to cause excessive expansion of the concrete.
C. Fly Ash: Pozzolanic mineral admixture conforming to ASTM C618, Class F. Maximum loss on ignition to be 1%. Use fly ash from one single source for the whole project. When fly ash is used, the maximum amount shall be 30% weight of the total cementitious materials, unless otherwise noted.
D.…
This is the start of the file's text. The full file is on GovTribe.