The file's text, extracted by GovTribe without its formatting.
ATTCHMENT 5 - PRICE LIST
| Base Period: | Description | | | | |
| CLIN 001 | Provide three (3) person crew with a minimum of two (2) climbers and all necessary equipment | | to fell, prune, limb and remove tress from the USNA grounds. All transportation of crew, clipper | truck, bucket truck, chipper shall be included in the price. Chipper shall be able to chip a | minimum of 10” and chip box shall hold a minimum of 12 cubic yards. |
| | Price: $___________________ crew unit price per hour | | | |
| CLIN 002 | Additional Groundsman | | | | |
| | Price: $___________________ per hour | | | |
| CLIN 003 | Additional Climber | | | | |
| | Price: $____________________ per hour | | | |
| CLIN 004 | Provide 90 ton crane, support equipment and operator to include set-up and delivery | | | | |
| | Price: $____________________Daily rate based upon eight (8) hours | | | |
| CLIN 005 | Provide 120 ton crane, support equipment and operator to include set-up and delivery | |
| | Price: $____________________ Daily rate based upon eight (8) hours |
| CLIN 006 | Provide 190 ton crane, support equipment and operator to include set-up and delivery | |
| | Price: $____________________ Daily rate based upon eight (8) hours |
| CLIN 007 | Provide 75’ + bucket truck, support equipment and operator to include set-up and delivery | |
| | Price: $____________________ Daily rate based upon eight (8) hours |
| CLIN 008 | Provide loader/log truck, support equipment and operator to include set-up and delivery | |
| | Price: $____________________ Daily rate based upon eight (8) hours |
| CLIN 009 | Provide skid loader or tractor, support equipment and operator to include set-up and delivery | |
| | Price: $____________________ Daily rate based upon eight (8) hours |
| CLIN 0010 | Provide stump grinder, support equipment and operator and clean grinding to | | | grade to include set-up and delivery. |
| | 10”- 20” Price: $____________________ | | |
| | 21” – 30” Price: $____________________ | | |
| | 31” – 40” Price: $____________________ | | |
| | 41” – 50” Price: $____________________ | | |
| | >50” Price: $____________________ | | |
| CLIN 0011 | Provide cables, rods and necessary tools/equipment to install protective cabling | | | or rod system. |
| | Unit price per feet of cable | Price: $____________________ | |
| | Unit price per feet of rod | Price: $____________________ | |
*Please provide option period pricing for each CLIN.