876CM3024 Salisbury NC BID SET DRAWINGS_Bk02.pdf
PDF 18 MB Posted
- Attached to
- Salisbury National Cemetery Public Restroom Renovation and Columbarium Cemetery Expansion
- Solicitation number
- 36C78625R0014
About this file
This file contains site preparation and construction drawings detailing demolition and renovation work at Salisbury National Cemetery in North Carolina. The drawings show planned removals and modifications across multiple areas (Areas A-G) of both the Annex and Historic sections of the cemetery, including specifications for removing concrete pavements, chain link fences, storage buildings, and other existing structures. Key details include removal of a soil storage building, repairs to storm basins, installation of temporary construction fencing, protection requirements for existing graves/headstones, tree protection specifications, and utility modifications including water service changes and storm drain repairs.
The drawings provide comprehensive technical specifications including proper demolition sequences, required protection measures for graves and existing structures, grading plans, and detailed cross-sections for new installations. Specific measurements, elevations and construction notes are provided throughout. The documents include both overall site plans and detailed area-specific drawings with precise removal and modification instructions. All work must maintain cemetery operations and protect existing gravesites, with specific requirements outlined for temporary protection measures during construction.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
W M
CO
CO
CO
CO
COCOCO
COCO
CO
CO
COCO
CO
COCO CO
COCO
COCOCO
CO
ASPHALT
G R
AVEL
GRAVEL
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
6' C H
AIN
LIN
K FEN
C
E
6' CHAIN LINK FENCE
4' PICKET FENCE ON
BLOCK WALL
6' C H
AIN
LIN
K FEN
C
E
(TEM
PO
R
AR
Y)
6' C H
AIN
LIN
K FEN
C
E
ALU
M
IN
U
M C
AR
PO
R T
W O
O D
SH
ED
W O
O D
SHED
FH
8' CHAIN LINK FENCE
6' CHAIN LINK FENCE
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
FO MARKER
FO MARKER
H O
TBO
X O
N
C O
N C
R
ETE
SIG
N
SIG
N
SIG
N
SIG
N
4' PICKET FENCE ON
BLOCK WALL
4' PICKET FENCE ON
BLOCK W
ALL
FO MARKER
C O
N C
PAD
5 STO
R
Y
BR
IC
K
BU
ILD
IN
G
5 STO
R
Y
BR
IC
K
BU
ILD
IN
G
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
H O
TBO
X
CONCRETE
FH
C
O N
C
PAD
W
/TR
ASH
H O
SE BIB
CO
CO
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
CO
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
FH
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
W
ATER
SPIG
O
T
M O
N U
M
EN
T
FH
SH
ED
CO
VERED
DO
CK
CONCRETE
CONCRETE
4' C H
AIN
LIN
K FEN
C
E
4' CHAIN LINK FENCE
4' PICKET FENCE
4' PICKET FENCE
W
ATER
VAU
LT
4' PICKET FENCE
1.5 STO
R
Y
BR
IC
K
BU
ILD
IN
G
BRICK W
ALL
BRICK W
ALL
BR
IC
K W
ALL
BR
IC
K W
ALL
BR
IC
K W
ALL
BRICK W
ALL
BRICK W
ALL
FISH
FEED
ER
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
SHED
TRANSFO
RM
ER
4' CHAIN LINK FENCE
4' CHAIN LINK FENCE
4' PICKET FENCE
4' PICKET FENCE
4' PICKET FENCE
C O
N C
PAD
W
/TR
ASH
1.5 STORY
BRICK
BUILDING
4' PICKET FENCE
CONCRETE SIDEWALK
BRICK W
ALL
4' PICKET FENCE
6' CHAIN LINK FENCE
TRANSFO
RM
ER
TRANSFO
RM
ER
ASPHALT
ASPHALT
EM
ER
G
EN
C Y
C
ALL BO
X
D O
G W
ASTE
STATIO
N
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
1 STO
RY
BRICK
BUILDING
SHED
4' PICKET FENCE
4' PICKET
FENCE
R
IPR
AP
GRAVELDRIVE
GRAVEL DRIVE
GRAVEL DRIVE
1 STO
RY
W O
O
D FRAM
E
BUILDING
6' CHAIN LINK FENCE
B B
C O
VER
ED
W
ALK
W
AY
SHELTER
BR
IC
K W
ALL
BRICK W
ALL
BRICK WALL
BRICK WALL
FU
EL
AR
EA
EMERGENCY FUEL
SHUT OFF
C O
N C
. PAD
W
/ TR
AN
S
CONCRETE WALL
O
VER
H
AN
G
B
ELEC
BO
X
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
CO
CO
CO
COCO
CO
COCO
SIG
N
SIG
N SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
FFE=698.34
FFE=698.35
FFE=
698.32
FFE=
698.46
FFE=
698.46
FFE=698.39
FFE=698.34
650655
655655
680685
650 655
690 685
690 685
700700
B
B B
B B B B
B
B
BB
BB
BBBBB B B B B
B B
BBBBBBBBB B BBBBBB
B
B B
B B
B
B B
B B
B B
B B B B
BBB
B B
B
BB
B B
B B
B B
B
BB
B
B B
CO
W
M
FH
EM
STO
R Y
BR
IC
K
BU
ILD
IN
G
STO
R Y
BR
IC
K
BU
ILD
IN
G
M
ETAL
SH
ED
W O
O D
SHED
W O
O D
SHED
W O
O D
SHED
W O
O D
SHED
PUM
P
HO
USE
C
AR
PO
R
T
W O
O D
SH
ED
C O
N
EX
C O
N
TAIN
ER
C
O N
EX
C
O N
TAIN
ER
C O
N
EX
C O
N
TAIN
ER
C O
N
EX
C O
N
TAIN
ER
C O
N
EX
C O
N
TAIN
ER
C O
N
EX
C O
N
TAIN
ER
O
VER
H
AN
G
G R
AVEL
G R
AVEL
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
CONCRETE
C O
N C
. PAD
W
/ TR
AN
S
C O
N C
. PAD
W
/ H O
TBO
X
C O
N C
. PAD
W
/ SIG
N
C O
N C
. PAD
W
/ TR
AN
S
W M
CO
ASPHALT
ASPH
ALT
ASPH
ALT
G R
AVEL
G R
AVEL
G R
AVEL
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPHALT
G R
AVEL
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPHALT
ASPH
ALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
CONCRETE SIDEWALK
C O
N C
R
ETE SID
EW
ALK
CONCRETE SIDEW
ALK
CONCRETE SIDEWALK
CO
NCRETE SIDEW
ALK
R
IPR
AP
CONCRETE SIDEWALK
CONCRETE SIDEW
ALK
PO
N
D
CONCRETE W
ALL
CONCRETE W
ALL
CONCRETE SIDEW
ALK
CONCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CONCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE
CO
NCRETE
CONCRETE SIDEWALK
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
SHED
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPH
ALT
30' SAN
ITAR
Y
SEW
ER
EASEM
EN
T
STATESVILLE BLVD
S87°49'35"E 124.05'
S16°20'51"W
160.74'
S12°55'31"W
141.53'
S06°20'53"W
180.46'
S18°59'16"E239.95'
S05°39'45"E 158.59'
S04°20'23"W
46.33'
GATE
GATE
C O
N C
R
ETE
ST
AT
ES
VI
LL
E
BL
VD
SECTION 20
SECTION 19
SECTION 16
SECTION 10
SECTION 9
SECTION 15
SECTION 13
SECTION 12
SECTION 11
SECTION 8
GRANTS CREEK
COLUMBARIUM
PLAZA
COMMITTAL
SHELTER
EMPLOYEE
PARKING
MAINTENANCE
BUILDING
ADMINISTRATION
BUILDINGVISITOR
PARKING
COLUMBARIUM
PLAZA
MEMORIAL PATH
SECTION 21
SECTION
1475 PPC
SECTION
1546 PPC
SECTION
300 TC
SECTION
1258 PPC
SECTION
1600 IGC
SECTION
221 PPC
SECTION 18
SECTION 17
SECTION 14
EXISTING
FLAGPOLE
EXISTING
FLAGPOLE
CONTRACTOR
CONSTRUCTION
STAGING AREA -
APPROX 60'X40'
CONTRACTOR
PARKING
CONSTRUCTION
ENTRANCE
CONSTRUCTION
ACCESS ROUTE
8' HT TEMPORARY CHAIN
LINK CONSTRUCTION
FENCE (TYP.)
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
ASPH
ALT
GRAVEL
GRAVEL
CONC PAD
W/TRASH &
HOSE BIB
6' CHAIN LINK FENCE
6' C H
AIN
LIN
K FEN
C
E
4' P
IC
KE
T
FE
NC
E
O N
BL
O
CK
W
AL
L
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
(TEMPORARY)
6' CHAIN LINK FENCE
1 STORYBLOCKBUILDING
1 STORYBLOCKBUILDING
1 STORYBRICKBUILDING
ALUMINUMCARPORT
WOODSHED WOODSHED
8' CHAIN LINK FENCE
6' C
H
AI
N L
IN
K
FE
N
C E
2 STORYMULTI-FAMILYBRICKBUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX ON
CONCRETE
SIGN
SIGN
SIGN
SIGN
4' P
IC
KE
T
FE
NC
E
O N
BL
O
C K
W
AL
L
4' PICKET FENCE ON
BLOCK WALL
CONC PAD
5 STORYBRICKBUILDING
5 STORYBRICKBUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX
C O
N C
R
ET
E
CONC PAD
W/TRASH &
HOSE BIB
6' C
H
AI
N L
IN
K
FE
N
C E
6'
CHAIN
LI
NK FE
NCE
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
WATER
SPIGOT
MONUMENT
SHED
COVEREDDOCK
CO
NC
RE
TE
CO
NC
RE
TE
4' CHAIN LINK FENCE
4' CHAIN LINK FENCE
4' PICKET FENCE
4'
PI
CK
ET
F
EN
CE
WATERVAULT
4' PICKET FENCE
1.5 STORY
BRICK
BUILDING
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
FISHFEEDER
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
SHED
TRANSFORMER
4' CHAIN LINK FENCE
4'
CH
AI
N
LI
NK
F
EN
CE
4' PICKET FENCE
4'
PI
CKE
T
FE
NCE
4'
PIC
KET F
ENCE
CONC PAD
W/TRASH
1.5 STORY
BRICK
BUILDING
4' PICKET FENCE
CONCRETE
S
ID
EW
ALK
BRICK WALL
4'
PI
CK
ET
F
EN
CE
6'
CHAIN
LI
NK FE
NCE
TRANSFORMER
TRANSFORMER
AS
PH
AL
T
AS
PH
AL
T
EMERGENCY
CALL BOX
DOG WASTE
STATION
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
1 STORYBRICKBUILDING
SHED
4' PICKET FENCE
4' PICKET
FENCE
RIPRAP
G
RA
VE
L
D R
IV
E
G R
AV
EL
D R
IV
E
G R
AV
EL
D R
IV
E
1 STORYWOOD FRAMEBUILDING
6' C
HA
IN
L
IN
K
FE
NC
E
COVERED WALK
WAY
SHELTER
BRICK WALL
BRICK WALL
BR
IC
K W
AL
L
BRICK W
ALL
FUEL
AREA
EM
ER
G
EN
C Y
FU
EL
SH
UT
O
FF
CONC. PAD
W/ TRANS
C O
N C
R
ETE W
ALL
OVER-
HANG
ELEC BOX
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGNSIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
FFE=698.34
FFE=698.35 FFE=
698.32
FFE=
698.46
FFE=
698.46
FFE=698.39
FFE=698.34
STORY
BRICK
BUILDING
STORY
BRICK
BUILDING
METAL
SHED
WOODSHED
WOODSHED
WOODSHED
WOODSHED
PUMPHOUSE
CARPORT
WOOD
SHED
CONEX
CONTAINER CONEX
CONTAINER
CONEX
CONTAINER
CONEXCONTAINER
CONEX
CONTAINER
CONEX
CONTAINER
OVERHANG
GRAVEL
GRAVEL
CONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
C O
N C
R
ET
E
CONC. PAD
W/ TRANS
CONC. PAD
W/ HOTBOX
CONC. PAD
W/ SIGN
CONC. PAD
W/ TRANS
ASPHALT
ASPHALT
ASPHALT
GRAVEL
GRAVEL
GRAVEL
GRAVEL
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPH
ALT
ASPHALT
ASPHALT
AS
PH
AL
T
AS
PH
AL
T
AS
PH
AL
T
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE SIDEW
ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
C O
N C
R
ET
E
SI
D
EW
AL
K
CONCRETE SIDEWALK
RIPRAP
CO
NC
RE
TE
S
ID
EW
AL
K
CONCRETE SIDEWALK
POND
CONCRETE WALL
CONCRETE WALL
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE
CONCRETE
CO
NCRETE SIDEW
ALK
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
SHED
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
MATCHLINE SHEET 13
MATCHLINE SHEET 8
30' SANITARYSEWER EASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
STATESVILLE BLVD
N70°37'53"W
366.38'
S87°49'35"E
124.05'
S1 6°
'5
1" W
0.
S1 2°
'3
1" W
1.
S0 6°
'5
3" W
0.
S1 1°
'0
5" W
.9
2'
S0 1°
'3
3" E
2.
S0 7°
'4
5" E
.8
3'
S1 8°
'1
6" E
9.
S0 5°
'4
5" E
8.
S0 4°
'2
3" W
.3
3'
S0 6°
'3
4" W
S2 6°
'43
"W
0.
G
AT
E
G
ATE
CONCRETE
1. NOTICE TO PROCEED RECEIVED. INSTALL EROSION CONTROLS,
TEMPORARY CONSTRUCTION FENCE AND TEMPORARY TREE
PROTECTION FENCE.
2. INSTALL TEMPORARY CEMETERY OFFICE TRAILER AND
TEMPORARY RESTROOM TRAILER. PROVIDE TEMPORARY UTILITY
CONNECTIONS TO ALL TRAILERS, INCLUDING BUT NOT LIMITED TO
SANITARY TANKS . DO NOT INTERRUPT SERVICE TO EXISTING
BUILDINGS. INSTALL ALL ASSOCIATED TEMPORARY SIGNAGE,
PATHS, AND RAMPS. ALL FACILITIES SHALL MEET ADA
REQUIREMENTS. REFER TO SECTION 01 00 02 FOR ADDITIONAL
TRAILER REQUIREMENTS.
3. RELOCATE EXISTING EQUIPMENT AND FURNITURE FROM
AFFECTED AREAS OF THE BUILDING(S) TO THE TEMPORARY
TRAILERS, IN THEIR FINAL LOCATIONS AND FULLY FUNCTIONAL.
CEMETERY WILL TAG EXISTING EQUIPMENT AND FURNITURE TO BE
RELOCATED.
4. WHEN TEMPORARY FACILITIES ARE COMPLETE AND READY FOR
OCCUPANCY, CEMETERY STAFF WILL VACATE AFFECTED AREAS OF
THE EXISTING BUILDING(S).CONTRACTOR SHALL REQUEST THE
CO/COR TO RELEASE THE BUILDING(S) FOR COMMENCEMENT OF
WORK. PROVIDE TWO WEEK'S NOTICE.
5. PROVIDE AND COMPLETE BUILDING WORK, INCLUDING ALL
FURNISHINGS, UTILITIES, AND SYSTEMS.
6. WHEN BUILDING(S) ARE SUBSTANTIALLY COMPLETE AND
ACCEPTED BY THE NCA, RELOCATE EQUIPMENT AND FURNITURE
FROM THE TEMPORARY TRAILERS TO THE PERMANENT BUILDING IN
THEIR FINAL LOCATIONS AND FULLY FUNCTIONAL, AS DIRECTED BY
THE CEMETERY STAFF. CEMETERY STAFF WILL VACATE THE
TEMPORARY FACILITIES AND REOCCUPY THE BUILDING(S).
7. REMOVE TEMPORARY TRAILERS, TEMPORARY WALKWAYS, AND
ALL TEMPORARY TRAILER RELATED MATERIALS AND RESTORE THE
TRAILER SITES TO THEIR PRE-CONSTRUCTION CONDITION,
INCLUDING BUT NOT LIMITED TO SOD REPAIRS.
8. COMPLETE THE REMAINDER OF THE BUILDING AND SITE WORK.
8.1. COORDINATE PAVING AND ROAD CLOSURES WITH CEMETERY
DIRECTOR AND COR. PAVING WORK SHALL BE COMPLETED
PROMPTLY WITHOUT EXTENDED CLOSURES.
8.2. PUBLIC ACCESS TO ONE COMMITTAL SHELTER (ANNEX OR
HISTORIC SIDE) SHALL BE MAINTAINED AT ALL TIMES FOR
SERVICES.
9. PROJECT SHALL NOT BE CONSIDERED COMPLETE UNTIL ALL
BUILDING AND SITE WORK IS COMPLETED, CEMETERY STAFF HAVE
ESTABLISHED OPERATIONS IN THE RENOVATED FACILITIES, ALL
TEMPORARY FACILITIES AND STAGING MATERIALS HAVE BEEN
REMOVED, AND FINAL SITE REPAIRS AND CLEAN UP ARE
COMPLETED AND ACCEPTED BY THE NCA.
CONSTRUCTION SEQUENCE
BID SET
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
Project Director
Revisions: Date:
Location:
STAMP Office of Construction and Facilities ManagementCIVIL/STRUCTURAL ENGINEER
KCI Technologies Inc.
(302) 731-9176
LANDSCAPE ARCHITECT
Pashek + MTR, Ltd.
412-321-6362
MEP ENGINEER
Arium AE 410-730-2300
REG
IS
TE
R E
D L A ND S CA P E ARCH
ITECT
N O R T H C A R O LI N A
K A R A R O G G E N K A MP
2355X X
IRRIGATION DESIGNER
Aqua Engineering, Inc.
(970) 372-6104
GC-101
PUBLIC RESTROOM RENOVATION,
REPAIRS AND IMPROVEMENTS
2024-08-16 AW
CONSTRUCTION STAGING &
SEQUENCING PLAN - ANNEX OVERALL
Salisbury National Cemetery 501 Statesville Blvd, Salisbury, NC 28144
KR
SURVEY NOTE
SURVEY INFORMATION WAS PROVIDED BY KCI ASSOCIATES OF
NORTH CAROLINA, INC., 4505 FALLS OF NEUSE, FLOOR 4, RALEIGH,
NC 27607, 919-783-9214, FROM AERIAL SURVEY FLOWN ON MARCH 8,
2023, AND FIELD WORK CONDUCTED IN APRIL 2023.
HORIZONTAL DATUM: NAD 83
VERTICAL DATUM: NAVD 88
STATE PLANE ZONE: NORTH CAROLINA
876CM3024
KEY PLAN NOT TO SCALE
AREA A
NORTH
1. CONTRACTOR TO WORK IN ACCORDANCE WITH DIVISION 01
SPECIFICATION SECTION 'GENERAL REQUIREMENTS'.
2. SUBMIT CONSTRUCTION SEQUENCING PLAN AND SCHEDULE TO
COR FOR APPROVAL PRIOR TO STARTING WORK. SCHEDULE
SHALL INCLUDE APPROXIMATE DATES ON WHICH THE
CONTRACTOR INTENDS TO START AND FINISH WORK IN EACH
AREA OF THE SITE, BUILDING, OR PORTION THEREOF.
SCHEDULE SHALL BE UPDATED AND SUBMITTED WITH EACH
PAY APPLICATION.
3. CONTRACTOR SHALL NOTIFY THE COR TWO WEEKS IN
ADVANCE, IN WRITING, OF THE PROPOSED DATE OF STARTING
WORK IN EACH AREA OF THE SITE AND OF ANY PROPOSED
UTILITY INTERRUPTIONS OR CONFLICTS WITH CEMETERY
OPERATIONS.
4. CEMETERY OPERATIONS SHALL TAKE PRECEDENCE OVER
CONSTRUCTION ACTIVITIES. CONSTRUCTION ACTIVITIES SHALL
BE COORDINATED WITH THE CEMETERY DIRECTOR TO AVOID
CONFLICTS WITH OPERATIONS, SERVICES AND EVENTS.
COMMITTAL SERVICES CAN OCCUR BETWEEN 9AM AND 3PM
WEEKDAYS. CONTRACTOR SHALL CEASE NOISY WORK AND
DELIVERIES DURING COMMITTAL SERVICES WHENEVER THEY
OCCUR.
5. MAINTAIN PUBLIC ACCESS TO GRAVE SITES AT ALL TIMES
DURING CONSTRUCTION. OBTAIN CONTRACTING OFFICER'S
REPRESENTATIVE'S APPROVAL IF RESTRICTING ACCESS IS
NECESSARY FOR PUBLIC SAFETY DURING DEMOLITION OR
CONSTRUCTION. PROVIDE TEMPORARY BARRICADES,
FENCING, TRAFFIC CONTROL AND SIGNAGE AS NEEDED TO
MAINTAIN PUBLIC SAFETY DURING CONSTRUCTION.
6. REFER TO EROSION AND SEDIMENTATION CONTROL DRAWINGS
FOR RELATED SEQUENCE OF CONSTRUCTION AND REQUIRED
EROSION AND SEDIMENTATION CONTROLS FOR EACH TYPE OF
DISTURBANCE. PROVIDE REQUIRED EROSION CONTROLS
PRIOR TO ANY EARTH DISTURBANCE.
7. NO CONTRACTOR VEHICLE PARKING IS ALLOWED ON
CEMETERY ROADS. DO NOT BLOCK STAFF OR VISITOR PARKING
AREAS. COORDINATE WITH CEMETERY STAFF FOR ON-SITE
LOCATIONS FOR WORKER PARKING DURING CONSTRUCTION.
8. CONTRACTOR SHALL COORDINATE WITH THE COR FOR
SCHEDULING THE TRANSFER OF I.T. (INFORMATION
TECHNOLOGY) SERVICES. DELAYS DUE TO I.T. SERVICES
TRANSFER WILL NOT SERVE AS A BASIS FOR EXTENDING
CONTRACT TIME FOR COMPLETION, NOR AS A BASIS FOR
ADDITIONAL COMPENSATION.
9. CONTRACTOR SHALL NOT BEGIN DEMOLITION OR
CONSTRUCTION WITHIN THE EXISTING BUILDINGS UNTIL ALL
TEMPORARY FACILITIES ARE FULLY FUNCTIONAL AND
OCCUPIED.
10. CONTRACTOR SHALL MAINTAIN ALL TEMPORARY FACILITIES IN
GOOD CONDITION THROUGHOUT THE DURATION OF
CONSTRUCTION.
11. FOR EACH BUILDING TO BE TURNED OVER TO THE CEMETERY
FOR OCCUPANCY, ALL FURNISHINGS AND EQUIPMENT SHALL
BE IN PLACE AND ALL UTILITIES AND SYSTEMS SERVING THE
BUILDING SHALL BE COMPLETE, OPERATIONAL, AND
COMMISSIONED BEFORE THAT PORTION OF THE WORK IS
CONSIDERED SUBSTANTIALLY COMPLETE AND CONTRACTOR
RECEIVES NOTIFICATION OF ACCEPTANCE OF THAT PORTION
OF THE WORK.
12. CONTRACTOR SHALL DOCUMENT THE PRE-CONSTRUCTION
CONDITION OF THE BUILDINGS AND SITE AND SHALL RESTORE
ANY EXISTING FEATURES DAMAGED AS A RESULT OF
CONSTRUCTION OPERATIONS TO THEIR PRE-CONSTRUCTION
CONDITION, INCLUDING BUT NOT LIMITED TO PAVEMENTS,
ROADWAYS, AND LAWNS.
GENERAL PHASING NOTES
CONTRACTOR CONSTRUCTION ACCESS ROUTE
8' HT TEMPORARY CHAIN LINK
CONSTRUCTION FENCE
TREE PROTECTION FENCE
TEMPORARY GRAVEL SURFACE
- 6" DEPTH AASHTO #57 STONE OVER
GEOTEXTILE FABRIC
LEGEND
TEMPORARY ACCESSIBLE STONE DUST
WALKWAY
- 4" DEPTH LIMESTONE FINES (AASHTO
#10) OVER GEOTEXTILE FABRIC
AREA B
WM
CO
CO
HOTBOX ON
CONCRETE
SIGN
SIGN
SIGN
SIGN
4' P
IC
KE
T
FE
NC
E
O N
BL
O
CK
W
AL
L
FUEL
AREA
CONC. PAD
W/ TRANS
C O
N C
R
ETE W
ALL
OVER-
HANG
B
ELEC BOX
FFE=698.34
FFE=698.35 FFE=
698.32
FFE=
698.46
FFE=
698.46
FFE=698.39
FFE=698.34
B
B B
B B
B B
B
B
B
BBBB
B
B
B
B B B B B
STORY
BRICK
BUILDING
STORY
BRICK
BUILDING
METAL
SHED
CARPORT
WOOD
SHED
CONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
C O
N C
R
ET
E
CONC. PAD
W/ TRANS
WM
CO
ASPHALT
ASPHALT
ASPHALT
G
AT
E
G
ATE
EMPLOYEE
PARKING
MAINTENANCE
BUILDING
ADMINISTRATION
BUILDING
VISITOR
PARKING
TEMPORARY CEMETERY
OFFICE TRAILER - 24'x56'
TEMPORARY RESTROOM
TRAILER - 10'X30'
TEMPORARY ACCESSIBLE
STONE DUST WALKWAY
(TYP.)
RESOD LAWN WITHIN
FOOTPRINT OF TRAILERS
AT CONCLUSION OF
CONSTRUCTION
ADA RAMP
STAIRS
TEMPORARY ACCESSIBLE
STONE DUST WALKWAY
(TYP.)
STAIRS
ADA RAMP
RESOD LAWN WITHIN
FOOTPRINT OF TRAILERS
AT CONCLUSION OF
CONSTRUCTION
DO NOT BLOCK ACCESS
TO MAINTENANCE AREA
TEMPORARY ACCESSIBLE
STONE DUST WALKWAY
(TYP.)
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
ASPH
ALT
GRAVEL
GRAVEL
CONC PAD
W/TRASH &
HOSE BIB
6' CHAIN LINK FENCE
6' C H
AIN
LIN
K FEN
C
E
4' P
IC
KE
T
FE
NC
E
O N
BL
O
CK
W
AL
L
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
(TEMPORARY)
6' CHAIN LINK FENCE
1 STORYBLOCKBUILDING
1 STORYBLOCKBUILDING
1 STORYBRICKBUILDING
ALUMINUMCARPORT
WOODSHED WOODSHED
8' CHAIN LINK FENCE
6' C
H
AI
N L
IN
K
FE
N
C E
2 STORYMULTI-FAMILYBRICKBUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX ON
CONCRETE
SIGN
SIGN
SIGN
SIGN
4' P
IC
KE
T
FE
NC
E
O N
BL
O
C K
W
AL
L
4' PICKET FENCE ON
BLOCK WALL
CONC PAD
5 STORYBRICKBUILDING
5 STORYBRICKBUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX
C O
N C
R
ET
E
CONC PAD
W/TRASH &
HOSE BIB
6' C
H
AI
N L
IN
K
FE
N
C E
6'
CHAIN
LI
NK FE
NCE
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
WATER
SPIGOT
MONUMENT
SHED
COVEREDDOCK
CO
NC
RE
TE
CO
NC
RE
TE
4' CHAIN LINK FENCE
4' CHAIN LINK FENCE
4' PICKET FENCE
4'
PI
CK
ET
F
EN
CE
WATERVAULT
4' PICKET FENCE
1.5 STORY
BRICK
BUILDING
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
FISHFEEDER
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
SHED
TRANSFORMER
4' CHAIN LINK FENCE
4'
CH
AI
N
LI
NK
F
EN
CE
4' PICKET FENCE
4'
PIC
KET
FE
NCE
4'
PIC
KET F
ENCE
CONC PAD
W/TRASH
1.5 STORY
BRICK
BUILDING
4' PICKET FENCE
CONCRETE
S
ID
EW
ALK
BRICK WALL
4'
PI
CK
ET
F
EN
CE
6'
CHAIN
LI
NK FE
NCE
TRANSFORMER
TRANSFORMER
AS
PH
AL
T
AS
PH
AL
T
EMERGENCY
CALL BOX
DOG WASTE
STATION
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
1 STORYBRICKBUILDING
SHED
4' PICKET FENCE
4' PICKET
FENCE
RIPRAP
G
RA
VE
L
D R
IV
E
G R
AV
EL
D R
IV
E
G R
AV
EL
D R
IV
E
1 STORY
WOOD FRAMEBUILDING
6' C
HA
IN
L
IN
K
FE
NC
E
COVERED WALK
WAY
SHELTER
BRICK WALL
BRICK WALL
BR
IC
K W
AL
L
BRICK W
ALL
FUEL
AREA
EM
ER
G
EN
C Y
FU
EL
SH
UT
O
FF
CONC. PAD
W/ TRANS
C O
N C
R
ETE W
ALL
OVER-
HANG
ELEC BOX
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGNSIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
FFE=698.34
FFE=698.35 FFE=
698.32
FFE=
698.46
FFE=
698.46
FFE=698.39
FFE=698.34
STORY
BRICK
BUILDING
STORY
BRICK
BUILDING
METAL
SHED
WOODSHED
WOODSHED
WOODSHED
WOODSHED
PUMPHOUSE
CARPORT
WOOD
SHED
CONEX
CONTAINER CONEX
CONTAINER
CONEX
CONTAINER
CONEXCONTAINER
CONEX
CONTAINER
CONEX
CONTAINER
OVERHANG
GRAVEL
GRAVEL
CONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
C O
N C
R
ET
E
CONC. PAD
W/ TRANS
CONC. PAD
W/ HOTBOX
CONC. PAD
W/ SIGN
CONC. PAD
W/ TRANS
ASPHALT
ASPHALT
ASPHALT
GRAVEL
GRAVEL
GRAVEL
GRAVEL
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPH
ALT
ASPHALT
ASPHALT
AS
PH
AL
T
AS
PH
AL
T
AS
PH
AL
T
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE SIDEW
ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
C O
N C
R
ET
E
SI
D
EW
AL
K
CONCRETE SIDEWALK
RIPRAP
CO
NC
RE
TE
S
ID
EW
AL
K
CONCRETE SIDEWALK
POND
CONCRETE WALL
CONCRETE WALL
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE
CONCRETE
CO
NCRETE SIDEW
ALK
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
SHED
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
MATCHLINE SHEET 13
MATCHLINE SHEET 8
30' SANITARYSEWER EASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
STATESVILLE BLVD
N70°37'53"W
366.38'
S87°49'35"E 124.05'
S1 6°
'5
1" W
0.
S1 2°
'3
1" W
1.
S0 6°
'5
3" W
0.
S1 1°
'0
5" W
.9
2'
S0 1°
'3
3" E
2.
S0 7°
'4
5" E
.8
3'
S1 8°
'1
6" E
9.
S0 5°
'4
5" E
8.
S0 4°
'2
3" W
.3
3'
S0 6°
'3
4" W
S2 6°
'43
"W
0.
G
AT
E
G
ATE
CONCRETE
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
Project Director
Revisions: Date:
Location:
STAMP Office of Construction and Facilities ManagementCIVIL/STRUCTURAL ENGINEER
KCI Technologies Inc.
(302) 731-9176
LANDSCAPE ARCHITECT
Pashek + MTR, Ltd.
412-321-6362
MEP ENGINEER
Arium AE 410-730-2300
REG
IS
TE
R E
D L A ND S CA P E ARCH
ITECT
N O R T H C A R O LI N A
K A R A R O G G E N K A MP
2355X X
IRRIGATION DESIGNER
Aqua Engineering, Inc.
(970) 372-6104
GC-102
PUBLIC RESTROOM RENOVATION,
REPAIRS AND IMPROVEMENTS
2024-08-16 AW
CONSTRUCTION STAGING &
SEQUENCING PLAN - ANNEX AREA A
Salisbury National Cemetery 501 Statesville Blvd, Salisbury, NC 28144
KR
SURVEY NOTE
SURVEY INFORMATION WAS PROVIDED BY KCI ASSOCIATES OF
NORTH CAROLINA, INC., 4505 FALLS OF NEUSE, FLOOR 4, RALEIGH,
NC 27607, 919-783-9214, FROM AERIAL SURVEY FLOWN ON MARCH 8,
2023, AND FIELD WORK CONDUCTED IN APRIL 2023.
HORIZONTAL DATUM: NAD 83
VERTICAL DATUM: NAVD 88
STATE PLANE ZONE: NORTH CAROLINA
BID SET
876CM3024
KEY PLAN NOT TO SCALEKEY PLAN NOT TO SCALE
NORTH
CONTRACTOR CONSTRUCTION ACCESS ROUTE
8' HT TEMPORARY CHAIN LINK
CONSTRUCTION FENCE
TREE PROTECTION FENCE
TEMPORARY GRAVEL SURFACE
- 6" DEPTH AASHTO #57 STONE OVER
GEOTEXTILE FABRIC
LEGEND
TEMPORARY ACCESSIBLE STONE DUST
WALKWAY
- 4" DEPTH LIMESTONE FINES (AASHTO
#10) OVER GEOTEXTILE FABRIC
REFER TO SHEET GC-101
GENERAL PHASING NOTES
REFER TO SHEET GC-101
CONSTRUCTION SEQUENCE
MATCHLINE GC-103
6' CHAIN LINK FENCE
8' CHAIN LINK FENCE
FUEL
AREA
EM
ER
G
EN
CY
F
UE
L
SH
UT
O
FF
5B
B
B
B B B B B
CO
WM
FH
EM
WOODSHED
WOODSHED
WOODSHED
WOODSHED
PUMPHOUSE
CARPORT
WOOD
SHED
CONEXCONTAINER CONEX
CONTAINER
CONEX
CONTAINER
CONEX
CONTAINER
CONEX
CONTAINER
CONEX
CONTAINER
OVERHANG
GRAVEL
GRAVEL
CONC. PAD
W/ TRANS
CONC. PAD
W/ HOTBOX
CONC. PAD
W/ SIGN
ASPHALT
ASPHALT
GRAVEL
ASPHALT
G
AT
E
G
ATE
CONCRETE
TEMPORARY CEMETERY
OFFICE TRAILER - 24'x56'
STAIRS
CONTRACTOR
CONSTRUCTION STAGING
AREA - APPROX 60'X40'
CONTRACTOR
PARKING
DO NOT BLOCK ACCESS
TO MAINTENANCE AREA
DO NOT BLOCK ACCESS
TO MAINTENANCE AREA
TEMPORARY ACCESSIBLE
STONE DUST WALKWAY
(TYP.)
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
ASPH
ALT
GRAVEL
GRAVEL
CONC PAD
W/TRASH &
HOSE BIB
6' CHAIN LINK FENCE
6' C H
AIN
LIN
K FEN
C
E
4' P
IC
KE
T
FE
NC
E
O N
BL
O
CK
W
AL
L
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
(TEMPORARY)
6' CHAIN LINK FENCE
1 STORYBLOCKBUILDING
1 STORYBLOCKBUILDING
1 STORYBRICKBUILDING
ALUMINUMCARPORT
WOODSHED WOODSHED
8' CHAIN LINK FENCE
6' C
H
AI
N L
IN
K
FE
N
C E
2 STORYMULTI-FAMILYBRICKBUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX ON
CONCRETE
SIGN
SIGN
SIGN
SIGN
4' P
IC
KE
T
FE
NC
E
O N
BL
O
C K
W
AL
L
4' PICKET FENCE ON
BLOCK WALL
CONC PAD
5 STORYBRICKBUILDING
5 STORYBRICKBUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX
C O
N C
R
ET
E
CONC PAD
W/TRASH &
HOSE BIB
6' C
H
AI
N L
IN
K
FE
N
C E
6'
CHAIN
LI
NK FE
NCE
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
WATER
SPIGOT
MONUMENT
SHED
COVEREDDOCK
CO
NC
RE
TE
CO
NC
RE
TE
4' CHAIN LINK FENCE
4' CHAIN LINK FENCE
4' PICKET FENCE
4'
PI
CK
ET
F
EN
CE
WATERVAULT
4' PICKET FENCE
1.5 STORY
BRICK
BUILDING
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
FISHFEEDER
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
SHED
TRANSFORMER
4' CHAIN LINK FENCE
4'
CH
AI
N
LI
NK
F
EN
CE
4' PICKET FENCE
4'
PIC
KET
FE
NCE
4'
PIC
KET F
ENCE
CONC PAD
W/TRASH
1.5 STORY
BRICK
BUILDING
4' PICKET FENCE
CONCRETE
S
ID
EW
ALK
BRICK WALL
4'
PI
CK
ET
F
EN
CE
6'
CHAIN
LI
NK FE
NCE
TRANSFORMER
TRANSFORMER
AS
PH
AL
T
AS
PH
AL
T
EMERGENCY
CALL BOX
DOG WASTE
STATION
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
1 STORYBRICKBUILDING
SHED
4' PICKET FENCE
4' PICKET
FENCE
RIPRAP
G
RA
VE
L
D R
IV
E
G R
AV
EL
D R
IV
E
G R
AV
EL
D R
IV
E
1 STORY
WOOD FRAMEBUILDING
6' C
HA
IN
L
IN
K
FE
NC
E
COVERED WALK
WAY
SHELTER
BRICK WALL
BRICK WALL
BR
IC
K W
AL
L
BRICK W
ALL
FUEL
AREA
EM
ER
G
EN
C Y
FU
EL
SH
UT
O
FF
CONC. PAD
W/ TRANS
C O
N C
R
ETE W
ALL
OVER-
HANG
ELEC BOX
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGNSIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
FFE=698.34
FFE=698.35 FFE=
698.32
FFE=
698.46
FFE=
698.46
FFE=698.39
FFE=698.34
STORY
BRICK
BUILDING
STORY
BRICK
BUILDING
METAL
SHED
WOODSHED
WOODSHED
WOODSHED
WOODSHED
PUMPHOUSE
CARPORT
WOOD
SHED
CONEX
CONTAINER CONEX
CONTAINER
CONEX
CONTAINER
CONEXCONTAINER
CONEX
CONTAINER
CONEX
CONTAINER
OVERHANG
GRAVEL
GRAVEL
CONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
C O
N C
R
ET
E
CONC. PAD
W/ TRANS
CONC. PAD
W/ HOTBOX
CONC. PAD
W/ SIGN
CONC. PAD
W/ TRANS
ASPHALT
ASPHALT
ASPHALT
GRAVEL
GRAVEL
GRAVEL
GRAVEL
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPH
ALT
ASPHALT
ASPHALT
AS
PH
AL
T
AS
PH
AL
T
AS
PH
AL
T
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE SIDEW
ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
C O
N C
R
ET
E
SI
D
EW
AL
K
CONCRETE SIDEWALK
RIPRAP
CO
NC
RE
TE
S
ID
EW
AL
K
CONCRETE SIDEWALK
POND
CONCRETE WALL
CONCRETE WALL
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE
CONCRETE
CO
NCRETE SIDEW
ALK
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
SHED
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
MATCHLINE SHEET 13
MATCHLINE SHEET 8
30' SANITARYSEWER EASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
STATESVILLE BLVD
N70°37'53"W
366.38'
S87°49'35"E 124.05'
S1 6°
'5
1" W
0.
S1 2°
'3
1" W
1.
S0 6°
'5
3" W
0.
S1 1°
'0
5" W
.9
2'
S0 1°
'3
3" E
2.
S0 7°
'4
5" E
.8
3'
S1 8°
'1
6" E
9.
S0 5°
'4
5" E
8.
S0 4°
'2
3" W
.3
3'
S0 6°
'3
4" W
S2 6°
'43
"W
0.
G
AT
E
G
ATE
CONCRETE
BID SET
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
Project Director
Revisions: Date:
Location:
STAMP Office of Construction and Facilities ManagementCIVIL/STRUCTURAL ENGINEER
KCI Technologies Inc.
(302) 731-9176
LANDSCAPE ARCHITECT
Pashek + MTR, Ltd.
412-321-6362
MEP ENGINEER
Arium AE 410-730-2300
REG
IS
TE
R E
D L A ND S CA P E ARCH
ITECT
N O R T H C A R O LI N A
K A R A R O G G E N K A MP
2355X X
IRRIGATION DESIGNER
Aqua Engineering, Inc.
(970) 372-6104
GC-103
PUBLIC RESTROOM RENOVATION,
REPAIRS AND IMPROVEMENTS
2024-08-16 AW
CONSTRUCTION STAGING &
SEQUENCING PLAN - ANNEX AREA B
Salisbury National Cemetery 501 Statesville Blvd, Salisbury, NC 28144
KR
SURVEY NOTE
SURVEY INFORMATION WAS PROVIDED BY KCI ASSOCIATES OF
NORTH CAROLINA, INC., 4505 FALLS OF NEUSE, FLOOR 4, RALEIGH,
NC 27607, 919-783-9214, FROM AERIAL SURVEY FLOWN ON MARCH 8,
2023, AND FIELD WORK CONDUCTED IN APRIL 2023.
HORIZONTAL DATUM: NAD 83
VERTICAL DATUM: NAVD 88
STATE PLANE ZONE: NORTH CAROLINA
876CM3024
KEY PLAN NOT TO SCALEKEY PLAN NOT TO SCALE
NORTH
CONTRACTOR CONSTRUCTION ACCESS ROUTE
8' HT TEMPORARY CHAIN LINK
CONSTRUCTION FENCE
TREE PROTECTION FENCE
TEMPORARY GRAVEL SURFACE
- 6" DEPTH AASHTO #57 STONE OVER
GEOTEXTILE FABRIC
LEGEND
TEMPORARY ACCESSIBLE STONE DUST
WALKWAY
- 4" DEPTH LIMESTONE FINES (AASHTO
#10) OVER GEOTEXTILE FABRIC
REFER TO SHEET GC-101
GENERAL PHASING NOTES
REFER TO SHEET GC-101
CONSTRUCTION SEQUENCE
MATCHLINE GC-102
N C
R
ETE SID
EW
ALK
C O
N C
R
ETE SID
EW
ALK
6' PIC
KET FEN
C E
6' PICKET FENCE
6' PIC
KET FEN
C E
1 STO
R
Y
M U
LTIFAM
ILY
BR
IC
K
BU
ILD
IN
G
2 STO
R
Y
M U
LTIFAM
ILY
BR
IC
K
BU
ILD
IN
G
5' STO
N
E W
ALL
5' STONE WALL
CONCRETE SIDEWALK
1 STO
R
Y
M U
LTIFAM
ILY
BR
IC
K
BU
ILD
IN
G
1 STO
R
Y
M U
LTIFAM
ILY
BU
ILD
IN
G
1 STO
R
Y
M U
LTIFAM
ILY
BU
ILD
IN
G
BR
IC
K PAVER
S
ASPH
ALT
6' CHAIN LINK FENCE
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
C O
N C
PAD
W
/TR
ASH
C O
N C
PAD
W
/TR
ASH
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
5' STO
N
E W
ALL
6' PICKET FENCE 5' STONE WALL
W
ATER
SPIG
O
T
5' STONE WALL
C O
N C
PAD
W
/TR
ASHW
ATER
SPIG
O T
CONCRETE SIDEWALK
M O
N U
M
EN
T C
O N
C
SID
EW
ALKM
O N
U M
EN
T
G R
AN
ITE
M
EM
O R
IAL
5' STONE WALL
G R
AN
ITE
M
EM
O R
IAL
ASPHALT
ASPHALT
ASPHALT
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
5' STONE WALL
5' STONE WALL
3' PIC
KET
G
ATE
3' W O
O D
R
AILIN
G
2 STORY
BRICK
BUILDING
BR
IC
K W
ALK
GRAVEL
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
CONCRETE
4' W O
O
D FENCE
SHELTER
C O
N C
R
ETE
M
EM
O R
IAL
2 STO
RY
BRICK
BUILDING
2 STORY
BRICK
BUILDING
ASPHALT
5' STONE WALL
ASPHALT
5' STONE WALL
M O
N U
M
EN
T
5' STONE WALL
5' STO
NE W
ALL
5' STO
NE W
ALL
C O
N C
R
ETE SID
EW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
C O
N C
R
ETE SID
EW
ALK
W
ATER
SPIG
O
T
6' PIC
KET FEN
C E
6' PIC
KET
FEN
C
E
2 STO
R
Y
BR
IC
K
BU
ILD
IN
G
W
/BASEM
EN
T
1.5 STO
R
Y C
O N
C R
ETE
BU
ILD
IN
G
MILITARY AVE
6' PICKET FENCE
C O
N C
R
ETE W
ALL
6' PICKET FENCE
6' CHAIN LINK FENCE 6' PICKET FENCE
CO
NCRETE SIDEW
ALK
CONCRETE SIDEWALK
GRAVEL
C O
N C
PAD
W
/TR
ASH
D U
M
PSTER
W
ATER
SPIG
O
T
C O
N C
PAD
W
/TR
ASH
C O
N C
PAD
W
/TR
ASH
ASPHALT
W O
O D
4"X4"
C O
N C
PAD
W
/TR
ASH
C O
N C
R
ETE
G
ATE STO
P
BR
IC
K
GOVERNMENT RD
S RAILRO
AD ST
S RAILRO
AD ST
E MONROE ST
GOVERNMENT RD
ASPH
ALT
ASPHALT
ASPHALT
ASPH
ALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
S C
LAY ST
S C
LAY ST
E CHERRY ST
C O
N C
R
ETE SID
EW
ALK
C O
N C
R
ETE SID
EW
ALK
6' PIC
KET FEN
C E
6' PICKET FENCE
6' PIC
KET FEN
C E
1 STO
R
Y
M U
LTIFAM
ILY
BR
IC
K
BU
ILD
IN
G
2 STO
R
Y
M U
LTIFAM
ILY
BR
IC
K
BU
ILD
IN
G
5' STO
N
E W
ALL
5' STONE WALL
CONCRETE SIDEWALK
1 STO
R
Y
M U
LTIFAM
ILY
BR
IC
K
BU
ILD
IN
G
1 STO
R
Y
M U
LTIFAM
ILY
BU
ILD
IN
G
1 STO
R
Y
M U
LTIFAM
ILY
BU
ILD
IN
G
BR
IC
K PAVER
S
ASPH
ALT
6' CHAIN LINK FENCE
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
C O
N C
PAD
W
/TR
ASH
C O
N C
PAD
W
/TR
ASH
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
5' STO
N
E W
ALL
6' PICKET FENCE 5' STONE WALL
W
ATER
SPIG
O
T
5' STONE WALL
C O
N C
PAD
W
/TR
ASHW
ATER
SPIG
O T
CONCRETE SIDEWALK
M O
N U
M
EN
T C
O N
C
SID
EW
ALKM
O N
U M
EN
T
G R
AN
ITE
M
EM
O R
IAL
5' STONE WALL
G R
AN
ITE
M
EM
O R
IAL
ASPHALT
ASPHALT
ASPHALT
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
W
ATER
SPIG
O
T
5' STONE WALL
5' STONE WALL
3' PIC
KET
G
ATE
3' W O
O D
R
AILIN
G
2 STORY
BRICK
BUILDING
BR
IC
K W
ALK
GRAVEL
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
CONCRETE
4' W O
O
D FENCE
SHELTER
C O
N C
R
ETE
M
EM
O R
IAL
2 STORY
BRICK
BUILDING
2 STORY
BRICK
BUILDING
ASPHALT
5' STONE WALL
ASPHALT
5' STONE WALL
M O
N U
M
EN
T
5' STONE WALL
5' STO
NE W
ALL
5' STO
NE W
ALL
C O
N C
R
ETE SID
EW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
C O
N C
R
ETE SID
EW
ALK
W
ATER
SPIG
O
T
6' PIC
KET FEN
C E
6' PIC
KET
FEN
C
E
2 STO
R
Y
BR
IC
K
BU
ILD
IN
G
W
/BASEM
EN
T
1.5 STO
R
Y C
O N
C R
ETE
BU
ILD
IN
G
MILITARY AVE
6' PICKET FENCE
C O
N C
R
ETE W
ALL
6' PICKET FENCE
6' CHAIN LINK FENCE 6' PICKET FENCE
CO
NCRETE SIDEW
ALK
CONCRETE SIDEWALK
GRAVEL
C O
N C
PAD
W
/TR
ASH
D U
M
PSTER
W
ATER
SPIG
O
T
C O
N C
PAD
W
/TR
ASH
C O
N C
PAD
W
/TR
ASH
ASPHALT
W O
O D
4"X4"
C O
N C
PAD
W
/TR
ASH
C O
N C
R
ETE
G
ATE STO
P
BR
IC
K
710 715
735 735
GOVERNMENT RD
S RAILRO
AD ST
S RAILRO
AD ST
E MONROE ST
GOVERNMENT RD
ASPH
ALT
ASPHALT
ASPHALT
ASPH
ALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
S C
LAY ST
S C
LAY ST
E CHERRY ST
SECTION 4
SECTION 3
SECTION 7
SECTION 6
SECTION A
SECTION B
SECTION 2
SECTION 1
SECTION E
SECTION D
SECTION
C
SECTION H-1
SECTION F
SECTION
G-1
SECTION I
SECTION J
SECTION K
SECTION
G-1
SECTION M
SECTION L
S RAILRO
AD AVE.
S SH
AVER
STE CHERRY ST
S C
LAY ST
E M
ONROE ST
GOVERNMENT RD
MAINE
MONUMENT
SOLDIER
MONUMENT MEMORIAL
SECTION
BRIDGES
PIGEON CREEK
PENNA.
MAIN
GATE
LODGE
RESTROOMS
SERVICE BLDG
ROWEN
COUNTY
SERVICE
MONUMENT
FLAGPOLE
SECTION 5
SECTION N
SECTION
H
SECTION G
SECTION
G
CONTRACTOR
CONSTRUCTION
STAGING AREA
CONTRACTOR PARKING
BID SET
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
Project Director
Revisions: Date:
Location:
STAMP Office of Construction and Facilities ManagementCIVIL/STRUCTURAL ENGINEER
KCI Technologies Inc.
(302) 731-9176
LANDSCAPE ARCHITECT
Pashek + MTR, Ltd.
412-321-6362
MEP ENGINEER
Arium AE 410-730-2300
REG
IS
TE
R E
D L A ND S CA P E ARCH
ITECT
N O R T H C A R O LI N A
K A R A R O G G E N K A MP
2355X X
IRRIGATION DESIGNER
Aqua Engineering, Inc.
(970) 372-6104
GC-104
PUBLIC RESTROOM RENOVATION,
REPAIRS AND IMPROVEMENTS
2024-08-16 AW
CONSTRUCTION STAGING &
SEQUENCING PLAN - HISTORIC OVERALL
KR
SURVEY NOTE
SURVEY INFORMATION WAS PROVIDED BY KCI ASSOCIATES OF
NORTH CAROLINA, INC., 4505 FALLS OF NEUSE, FLOOR 4, RALEIGH,
NC 27607, 919-783-9214, FROM AERIAL SURVEY FLOWN ON MARCH 8,
2023, AND FIELD WORK CONDUCTED IN APRIL 2023.
HORIZONTAL DATUM: NAD 83
VERTICAL DATUM: NAVD 88
STATE PLANE ZONE: NORTH CAROLINA
876CM3024
Salisbury National Cemetery 202 Government Rd, Salisbury, NC 28144
NORTH
KEY PLAN NOT TO SCALE
CONTRACTOR CONSTRUCTION ACCESS ROUTE
8' HT TEMPORARY CHAIN LINK
CONSTRUCTION FENCE
TREE PROTECTION FENCE
TEMPORARY GRAVEL SURFACE
- 6" DEPTH AASHTO #57 STONE OVER
GEOTEXTILE FABRIC
LEGEND
TEMPORARY ACCESSIBLE STONE DUST
WALKWAY
- 4" DEPTH LIMESTONE FINES (AASHTO
#10) OVER GEOTEXTILE FABRIC
REFER TO SHEET GC-101
GENERAL PHASING NOTES
REFER TO SHEET GC-101
CONSTRUCTION SEQUENCE
N C
PAD
W
/TR
ASH
H
O
SE BIB
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
ASPHALT
G R
AVEL
GRAVEL
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
6' C H
AIN
LIN
K FEN
C
E
6' CHAIN LINK FENCE
4' PICKET FENCE ON
BLOCK WALL
6' C H
AIN
LIN
K FEN
C
E
(TEM
PO
R
AR
Y)
6' C H
AIN
LIN
K FEN
C
E
ALU
M
IN
U
M C
AR
PO
R T
W O
O D
SHED
W
O O
D
SHED
8' CHAIN LINK FENCE
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
H O
TBO
X O
N
C O
N C
R
ETE
SIG
N
SIG
N
SIG
N
SIG
N
4' PICKET FENCE ON
BLOCK WALL
4' PICKET FENCE ON
BLOCK W
ALL
C O
N C
PAD
5 STO
R
Y
BR
IC
K
BU
ILD
IN
G
5 STO
R
Y
BR
IC
K
BU
ILD
IN
G
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
H O
TBO
X
CONCRETE
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
C O
N C
PAD
W
/TR
ASH
H
O
SE BIB
W
ATER
SPIG
O
T
M O
N U
M
EN
T
SH
ED
CO
VERED
DO
CK
CONCRETE
CONCRETE
4' C H
AIN
LIN
K FEN
C
E
4' CHAIN LINK FENCE
4' PICKET FENCE
4' PICKET FENCE
W
ATER
VAU
LT
4' PICKET FENCE
1.5 STO
R
Y
BR
IC
K
BU
ILD
IN
G
BRICK W
ALL
BRICK W
ALL
BR
IC
K W
ALL
BR
IC
K W
ALL
BR
IC
K W
ALL
BRICK W
ALL
BRICK W
ALL
FISH
FEED
ER
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
SHED
TRANSFO
RM
ER
4' CHAIN LINK FENCE
4' CHAIN LINK FENCE
4' PICKET FENCE
4' PICKET FENCE
4' PICKET FENCE
C O
N C
PAD
W
/TR
ASH
1.5 STORY
BRICK
BUILDING
4' PICKET FENCE
CONCRETE SIDEWALK
BRICK W
ALL
4' PICKET FENCE
6' CHAIN LINK FENCE
TRANSFO
RM
ER
TRANSFO
RM
ER
ASPHALT
ASPHALT
EM
ER
G
EN
C Y
C
ALL BO
X
D O
G W
ASTE
STATIO
N
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
1 STO
RY
BRICK
BUILDING
SHED
4' PICKET FENCE
4' PICKET
FENCE
R
IPR
AP
GRAVELDRIVE
GRAVEL DRIVE
GRAVEL DRIVE
1 STO
RY
W O
O
D FRAM
E
BUILDING
6' CHAIN LINK FENCE
C O
VER
ED
W
ALK
W
AY
SHELTER
BR
IC
K W
ALL
BRICK W
ALL
BRICK WALL
BRICK WALL
FU
EL
AR
EA
EMERGENCY FUEL
SHUT OFF
C O
N C
. PAD
W
/ TR
AN
S
CONCRETE WALL
O
VER
H
AN
G
ELEC
BO
X
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
ZO
N
E AE
SIG
N
SIG
N SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
0.2%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
1%
AN
N U
AL C
H
AN
C
E
FLO
O D
H
AZAR
D
FFE=698.34
FFE=698.35
FFE=
698.32
FFE=
698.46
FFE=
698.46
FFE=698.39
FFE=698.34
655655
680685
690 685
690 685
700700
STO
R Y
BR
IC
K
BU
ILD
IN
G
STO
R Y
BR
IC
K
BU
ILD
IN
G
M
ETAL
SH
ED
W O
O D
SHED
W O
O D
SHED
W O
O D
SHED
W O
O D
SHED
PUM
P
HO
USE
C
AR
PO
R
T
W O
O D
SH
ED
C O
N
EX
C O
N
TAIN
ER
C
O N
EX
C
O N
TAIN
ER
C O
N
EX
C O
N
TAIN
ER
C O
N
EX
C O
N
TAIN
ER
C O
N
EX
C O
N
TAIN
ER
C O
N
EX
C O
N
TAIN
ER
O
VER
H
AN
G
G R
AVEL
G R
AVEL
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
C O
N C
R
ETE
CONCRETE
C O
N C
. PAD
W
/ TR
AN
S
C O
N C
. PAD
W
/ H O
TBO
X
C O
N C
. PAD
W
/ SIG
N
C O
N C
. PAD
W
/ TR
AN
S
ASPHALT
ASPH
ALT
ASPH
ALT
G R
AVEL
G R
AVEL
G R
AVEL
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPHALT
G R
AVEL
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPHALT
ASPH
ALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
CONCRETE SIDEWALK
C O
N C
R
ETE SID
EW
ALK
CONCRETE SIDEW
ALK
CONCRETE SIDEWALK
CO
NCRETE SIDEW
ALK
R
IPR
AP
CONCRETE SIDEWALK
CONCRETE SIDEW
ALK
PO
N
D
CONCRETE W
ALL
CONCRETE W
ALL
CONCRETE SIDEW
ALK
CONCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CONCRETE SIDEW
ALK
CONCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE SIDEW
ALK
CO
NCRETE
CO
NCRETE
CONCRETE SIDEWALK
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
ASPH
ALT
SHED
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPH
ALT
STATESVILLE BLVD
S16°20'51"W
160.74'
S05°39'45"E 158.59'
S04°20'23"W
46.33'
YAR
D
H
YD
R
AN
T
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
ASPH
ALT
GRAVEL
GRAVEL
CONC PAD
W/TRASH &
HOSE BIB
6' CHAIN LINK FENCE
6' C H
AIN
LIN
K FEN
C
E
4' P
IC
KE
T
FE
NC
E
O N
BL
O
CK
W
AL
L
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
(TEMPORARY)
6' CHAIN LINK FENCE
1 STORYBLOCKBUILDING
1 STORYBLOCKBUILDING
1 STORYBRICKBUILDING
ALUMINUMCARPORT
WOODSHED WOODSHED
8' CHAIN LINK FENCE
6' C
H
AI
N L
IN
K
FE
N
C E
2 STORYMULTI-FAMILYBRICKBUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX ON
CONCRETE
SIGN
SIGN
SIGN
SIGN
4' P
IC
KE
T
FE
NC
E
O N
BL
O
C K
W
AL
L
4' PICKET FENCE ON
BLOCK WALL
CONC PAD
5 STORYBRICKBUILDING
5 STORYBRICKBUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX
C O
N C
R
ET
E
CONC PAD
W/TRASH &
HOSE BIB
6' C
H
AI
N L
IN
K
FE
N
C E
6'
CHAIN
LI
NK FE
NCE
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
WATER
SPIGOT
MONUMENT
SHED
COVEREDDOCK
CO
NC
RE
TE
CO
NC
RE
TE
4' CHAIN LINK FENCE
4' CHAIN LINK FENCE
4' PICKET FENCE
4'
PI
CK
ET
F
EN
CE
WATERVAULT
4' PICKET FENCE
1.5 STORY
BRICK
BUILDING
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
FISHFEEDER
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
SHED
TRANSFORMER
4' CHAIN LINK FENCE
4'
CH
AI
N
LI
NK
F
EN
CE
4' PICKET FENCE
4'
PIC
KET
FE
NCE
4'
PIC
KET F
ENCE
CONC PAD
W/TRASH
1.5 STORY
BRICK
BUILDING
4' PICKET FENCE
CONCRETE
S
ID
EW
ALK
BRICK WALL
4'
PI
CK
ET
F
EN
CE
6'
CHAIN
LI
NK FE
NCE
TRANSFORMER
TRANSFORMER
AS
PH
AL
T
AS
PH
AL
T
EMERGENCY
CALL BOX
DOG WASTE
STATION
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
1 STORYBRICKBUILDING
SHED
4' PICKET FENCE
4' PICKET
FENCE
RIPRAP
G
RA
VE
L
D R
IV
E
G R
AV
EL
D R
IV
E
G R
AV
EL
D R
IV
E
1 STORY
WOOD FRAMEBUILDING
6' C
HA
IN
L
IN
K
FE
NC
E
COVERED WALK
WAY
SHELTER
BRICK WALL
BRICK WALL
BR
IC
K W
AL
L
BRICK W
ALL
FUEL
AREA
EM
ER
G
EN
C Y
FU
EL
SH
UT
O
FF
CONC. PAD
W/ TRANS
C O
N C
R
ETE W
ALL
OVER-
HANG
ELEC BOX
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGNSIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
FFE=698.34
FFE=698.35 FFE=
698.32
FFE=
698.46
FFE=
698.46
FFE=698.39
FFE=698.34
5 67
STORY
BRICK
BUILDING
STORY
BRICK
BUILDING
METAL
SHED
WOODSHED
WOODSHED
WOODSHED
WOODSHED
PUMPHOUSE
CARPORT
WOOD
SHED
CONEX
CONTAINER CONEX
CONTAINER
CONEX
CONTAINER
CONEXCONTAINER
CONEX
CONTAINER
CONEX
CONTAINER
OVERHANG
GRAVEL
GRAVEL
CONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
C O
N C
R
ET
E
CONC. PAD
W/ TRANS
CONC. PAD
W/ HOTBOX
CONC. PAD
W/ SIGN
CONC. PAD
W/ TRANS
ASPHALT
ASPHALT
ASPHALT
GRAVEL
GRAVEL
GRAVEL
GRAVEL
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPH
ALT
ASPHALT
ASPHALT
AS
PH
AL
T
AS
PH
AL
T
AS
PH
AL
T
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE SIDEW
ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
C O
N C
R
ET
E
SI
D
EW
AL
K
CONCRETE SIDEWALK
RIPRAP
CO
NC
RE
TE
S
ID
EW
AL
K
CONCRETE SIDEWALK
POND
CONCRETE WALL
CONCRETE WALL
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE
CONCRETE
CO
NCRETE SIDEW
ALK
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
SHED
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
MATCHLINE SHEET 13
MATCHLINE SHEET 8
30' SANITARYSEWER EASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
STATESVILLE BLVD
N70°37'53"W
366.38'
S87°49'35"E 124.05'
S1 6°
'5
1" W
0.
S1 2°
'3
1" W
1.
S0 6°
'5
3" W
0.
S1 1°
'0
5" W
.9
2'
S0 1°
'3
3" E
2.
S0 7°
'4
5" E
.8
3'
S1 8°
'1
6" E
9.
S0 5°
'4
5" E
8.
S0 4°
'2
3" W
.3
3'
S0 6°
'3
4" W
S2 6°
'43
"W
0.
YARD
HYDRANT
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
STABILIZE DISTURBED AREA
WITH SOD IMMEDIATELY
AFTER GRADING HAS BEEN
COMPLETED
STABILIZE DISTURBED AREA
WITH SOD IMMEDIATELY
AFTER GRADING HAS BEEN
COMPLETED
CG-100
2024-08-16 MD
EROSION AND SEDIMENT CONTROL
PLAN - ANNEX OVERALL
PG
SURVEY NOTE
SURVEY INFORMATION WAS PROVIDED BY KCI ASSOCIATES OF
NORTH CAROLINA, INC., 4505 FALLS OF NEUSE, FLOOR 4, RALEIGH,
NC 27607, 919-783-9214, FROM AERIAL SURVEY FLOWN ON MARCH 8,
2023.
HORIZONTAL DATUM: NAD 83
VERTICAL DATUM: NAVD 88
STATE PLANE ZONE: NORTH CAROLINA
LAYOUT NOTES
1. VERIFY LAYOUT WITH COR PRIOR TO CONSTRUCTION AND
ADJUST AS REQUIRED.
2. DETERMINE THAT LOCATION OF UNDERGROUND UTILITIES OR
FEATURES TO REMAIN DO NOT INTERFERE WITH PROPOSED
IMPROVEMENTS. IMMEDIATELY NOTIFY COR OF ANY
DISCREPANCIES OR CONFLICTS.
3. CONSTRUCTION NOTES AND TYPICALS MAY APPEAR ONLY ONCE
ON DRAWINGS, BUT APPLY TO ALL SIMILAR CONDITIONS WHERE
NEW CONSTRUCTION OCCURS TO FULFILL THE INTENT OF THE
DRAWINGS.
LEGEND
CONTOUR LINE
EXISTING SYMBOL
INDEX CONTOUR LINE
CURB
GRAVESTONES
TREE
KEY PLAN NOT TO SCALE
CG-102
CG-101
CG-104
NORTH
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
Project Director
Revisions: Date:
Location:
STAMP Office of Construction and Facilities ManagementCIVIL/STRUCTURAL ENGINEER
KCI Technologies Inc.
(302) 731-9176
LANDSCAPE ARCHITECT
Pashek + MTR, Ltd.
412-321-6362
MEP ENGINEER
Arium AE 410-730-2300
IRRIGATION DESIGNER
Aqua Engineering, Inc.
(970) 372-6104
EROSION AND SEDIMENT CONTROL NOTES:
1. INSPECTION AND MAINTENANCE OF ALL
EROSION AND SEDIMENT CONTROL BEST
MANAGEMENT PRACTICES SHALL OCCUR ON A
WEEKLY BASIS, BEFORE ANY ANTICIPATED
PRECIPITATION. MAINTAIN EROSION AND
SEDIMENT CONTROLS AS REQUIRED.
2. EROSION AND SEDIMENT CONTROLS ARE TO
REMAIN IN PLACE UNTIL ALL CONSTRUCTION
HAS BEEN COMPLETED. EROSION AND
SEDIMENT CONTROLS CAN ONLY BE REMOVED
AFTER RECEIVING WRITTEN APPROVAL FROM
THE RE/COR.
CG-103
CG-105
PUBLIC RESTROOM RENOVATION,
REPAIRS AND IMPROVEMENTS
Salisbury National Cemetery 501 Statesville Blvd, Salisbury NC 28144
BID SET
876CM3024
08/09/2024
WM
CO
CO
8' CHAIN LINK FENCE
CONC PAD
W/TRASH &
HOSE BIB
FO MARKER
FO MARKER
HOTBOX ON
CONCRETE
SIGN
SIGN
SIGN
SIGN
4' P
IC
KE
T
FE
NC
E
O N
BL
O
CK
W
AL
L
4' PICKET FENCE ON
BLOCK WALL
FO MARKER
FUEL
AREA
EM
ER
G
EN
CY
F
UE
L
SH
U
T O
FF
CONC. PAD
W/ TRANS
C O
N C
R
ETE W
ALL
OVER-
HANG
B
ELEC BOX
CO
CO
SIGN
0.2% ANNUAL CHANCE
FLOOD HAZARD
FFE=698.34
FFE=698.35 FFE=
698.32
FFE=
698.46
FFE=
698.46
FFE=698.39
FFE=698.34
B
B B B B
B B B
B
BBBBB
B B B B B B B B
CO
WM
FH
EM
STORY
BRICK
BUILDING
STORY
BRICK
BUILDING
METAL
SHED
WOODSHED
WOODSHED
WOODSHED
WOODSHED
PUMPHOUSE
CARPORT
WOOD
SHED
CONEXCONTAINER CONEX
CONTAINER
GRAVEL
CONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
C O
N C
R
ET
E
CONC. PAD
W/ TRANS
CONC. PAD
W/ HOTBOX
CONC. PAD
W/ SIGN
CONC. PAD
W/ TRANS
WMCO
ASPHALT
ASPHALT
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
YARD
HYDRANT
IP
IP
IP
IP
IP MATCHLINE - SEE SHEET CG-102
MATCHLINE - SEE SHEET CG-101
STABILIZE DISTURBED AREA
WITH SOD IMMEDIATELY
AFTER GRADING HAS BEEN
COMPLETED
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
ASPH
ALT
GRAVEL
GRAVEL
CONC PAD
W/TRASH &
HOSE BIB
6' CHAIN LINK FENCE
6' C H
AIN
LIN
K FEN
C
E
4' P
IC
KE
T
FE
NC
E
O N
BL
O
CK
W
AL
L
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
(TEMPORARY)
6' CHAIN LINK FENCE
1 STORYBLOCKBUILDING
1 STORYBLOCKBUILDING
1 STORYBRICKBUILDING
ALUMINUMCARPORT
WOODSHED WOODSHED
8' CHAIN LINK FENCE
6' C
H
AI
N L
IN
K
FE
N
C E
2 STORYMULTI-FAMILYBRICKBUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
2 STORY
MULTI-FAMILY
BRICK
BUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX ON
CONCRETE
SIGN
SIGN
SIGN
SIGN
4' P
IC
KE
T
FE
NC
E
O N
BL
O
C K
W
AL
L
4' PICKET FENCE ON
BLOCK WALL
CONC PAD
5 STORYBRICKBUILDING
5 STORYBRICKBUILDING
CONC PAD
W/TRASH &
HOSE BIB
HOTBOX
C O
N C
R
ET
E
CONC PAD
W/TRASH &
HOSE BIB
6' C
H
AI
N L
IN
K
FE
N
C E
6'
CHAIN
LI
NK FE
NCE
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
WATER
SPIGOT
MONUMENT
SHED
COVEREDDOCK
CO
NC
RE
TE
CO
NC
RE
TE
4' CHAIN LINK FENCE
4' CHAIN LINK FENCE
4' PICKET FENCE
4'
PI
CK
ET
F
EN
CE
WATERVAULT
4' PICKET FENCE
1.5 STORY
BRICK
BUILDING
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
BRICK WALL
FISHFEEDER
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
SHED
TRANSFORMER
4' CHAIN LINK FENCE
4'
CH
AI
N
LI
NK
F
EN
CE
4' PICKET FENCE
4'
PIC
KET
FE
NCE
4'
PIC
KET F
ENCE
CONC PAD
W/TRASH
1.5 STORY
BRICK
BUILDING
4' PICKET FENCE
CONCRETE
S
ID
EW
ALK
BRICK WALL
4'
PI
CK
ET
F
EN
CE
6'
CHAIN
LI
NK FE
NCE
TRANSFORMER
TRANSFORMER
AS
PH
AL
T
AS
PH
AL
T
EMERGENCY
CALL BOX
DOG WASTE
STATION
6'
CHAIN
LI
NK FE
NCE
6'
CHAIN
LI
NK FE
NCE
1 STORYBRICKBUILDING
SHED
4' PICKET FENCE
4' PICKET
FENCE
RIPRAP
G
RA
VE
L
D R
IV
E
G R
AV
EL
D R
IV
E
G R
AV
EL
D R
IV
E
1 STORY
WOOD FRAMEBUILDING
6' C
HA
IN
L
IN
K
FE
NC
E
COVERED WALK
WAY
SHELTER
BRICK WALL
BRICK WALL
BR
IC
K W
AL
L
BRICK W
ALL
FUEL
AREA
EM
ER
G
EN
C Y
FU
EL
SH
UT
O
FF
CONC. PAD
W/ TRANS
C O
N C
R
ETE W
ALL
OVER-
HANG
ELEC BOX
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGNSIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD
1% ANNUAL CHANCE
FLOOD HAZARD
FFE=698.34
FFE=698.35 FFE=
698.32
FFE=
698.46
FFE=
698.46
FFE=698.39
FFE=698.34
5 67
STORY
BRICK
BUILDING
STORY
BRICK
BUILDING
METAL
SHED
WOODSHED
WOODSHED
WOODSHED
WOODSHED
PUMPHOUSE
CARPORT
WOOD
SHED
CONEX
CONTAINER CONEX
CONTAINER
CONEX
CONTAINER
CONEXCONTAINER
CONEX
CONTAINER
CONEX
CONTAINER
OVERHANG
GRAVEL
GRAVEL
CONCRETE
CONCRETE CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
C O
N C
R
ET
E
CONC. PAD
W/ TRANS
CONC. PAD
W/ HOTBOX
CONC. PAD
W/ SIGN
CONC. PAD
W/ TRANS
ASPHALT
ASPHALT
ASPHALT
GRAVEL
GRAVEL
GRAVEL
GRAVEL
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
GRAVEL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPH
ALT
ASPHALT
ASPHALT
AS
PH
AL
T
AS
PH
AL
T
AS
PH
AL
T
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE SIDEW
ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
C O
N C
R
ET
E
SI
D
EW
AL
K
CONCRETE SIDEWALK
RIPRAP
CO
NC
RE
TE
S
ID
EW
AL
K
CONCRETE SIDEWALK
POND
CONCRETE WALL
CONCRETE WALL
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE
CONCRETE
CO
NCRETE SIDEW
ALK
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
SHED
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
MATCHLINE SHEET 13
MATCHLINE SHEET 8
30' SANITARYSEWER EASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
141' DUKE POWEREASEMENT
STATESVILLE BLVD
N70°37'53"W
366.38'
S87°49'35"E 124.05'
S1 6°
'5
1" W
0.
S1 2°
'3
1" W
1.
S0 6°
'5
3" W
0.
S1 1°
'0
5" W
.9
2'
S0 1°
'3
3" E
2.
S0 7°
'4
5" E
.8
3'
S1 8°
'1
6" E
9.
S0 5°
'4
5" E
8.
S0 4°
'2
3" W
.3
3'
S0 6°
'3
4" W
S2 6°
'43
"W
0.
YARD
HYDRANT
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
STABILIZE DISTURBED AREA
WITH SOD IMMEDIATELY
AFTER GRADING HAS BEEN
COMPLETED
STABILIZE DISTURBED AREA
WITH SOD IMMEDIATELY
AFTER GRADING HAS BEEN
COMPLETED
CG-101
2024-08-16 MD
EROSION AND SEDIMENT CONTROL
PLAN - ANNEX
PG
SURVEY NOTE
SURVEY INFORMATION WAS PROVIDED BY KCI ASSOCIATES OF
NORTH CAROLINA, INC., 4505 FALLS OF NEUSE, FLOOR 4, RALEIGH,
NC 27607, 919-783-9214, FROM AERIAL SURVEY FLOWN ON MARCH 8,
2023.
HORIZONTAL DATUM: NAD 83
VERTICAL DATUM: NAVD 88
STATE PLANE ZONE: NORTH CAROLINA
KEY PLAN NOT TO SCALEKEY PLAN NOT TO SCALE
LAYOUT NOTES
1. VERIFY LAYOUT WITH COR PRIOR TO CONSTRUCTION AND
ADJUST AS REQUIRED.
2. DETERMINE THAT LOCATION OF UNDERGROUND UTILITIES OR
FEATURES TO REMAIN DO NOT INTERFERE WITH PROPOSED
IMPROVEMENTS. IMMEDIATELY NOTIFY COR OF ANY
DISCREPANCIES OR CONFLICTS.
3. CONSTRUCTION NOTES AND TYPICALS MAY APPEAR ONLY ONCE
ON DRAWINGS, BUT APPLY TO ALL SIMILAR CONDITIONS WHERE
NEW CONSTRUCTION OCCURS TO FULFILL THE INTENT OF THE
DRAWINGS.
LEGEND
CONTOUR LINE
EXISTING SYMBOL
PROPOSED
INLET PROTECTION (IP)
INDEX CONTOUR LINE
CURB
GRAVESTONES
TREE
NORTH
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
Project Director
Revisions: Date:
Location:
STAMP Office of Construction and Facilities ManagementCIVIL/STRUCTURAL ENGINEER
KCI Technologies Inc.
(302) 731-9176
LANDSCAPE ARCHITECT
Pashek + MTR, Ltd.
412-321-6362
MEP ENGINEER
Arium AE 410-730-2300
IRRIGATION DESIGNER
Aqua Engineering, Inc.
(970) 372-6104
PUBLIC RESTROOM RENOVATION,
REPAIRS AND IMPROVEMENTS
Salisbury National Cemetery 501 Statesville Blvd, Salisbury NC 28144
BID SET
876CM3024
CONTOUR LINE 695
1. MAINTAIN INLET PROTECTION AS REQUIRED.
E&S NOTES
SILT FENCE
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
CO
ZONE AE
COCO
SIGN
SIGN
SIGN
SIGN
SIGN
SIGNSIGN
SHED
ASPHALT
ASPHALT
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
MATCHLINE - SEE SHEET CG-102
MATCHLINE - SEE SHEET CG-101
M
EE
T
EX
IS
TI
N G
G R
AD
E
FL
U
SH
4 67
7 67
M
EE
T
EX
IS
TI
N G
G R
AD
E
FL
U
SH
STABILIZE DISTURBED AREA
WITH SOD IMMEDIATELY
AFTER GRADING HAS BEEN
COMPLETED
CONC PAD
W/TRASH &
HOSE BIB
CONC PAD
W/TRASH &
HOSE BIB
ASPH
ALT
GRAVEL
GRAVEL
CONC PAD
W/TRASH &
HOSE BIB
6' CHAIN LINK FENCE
6' C H
AIN
LIN
K FEN
C
E
4' P
IC
KE
T
FE
NC
E
O N
BL
O
CK
W
AL
L
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
(TEMPORARY)
6' CHAIN LINK FENCE
1 STORYBLOCKBUILDING
1 STORYBLOCKBUILDING
1 STORYBRICKBUILDING
ALUMINUMCARPORT
WOODSHED WOODSHED
8' CHAIN LINK FENCE
6' C
H
AI
N L
IN
K
FE
N
C E
2 STORYMULTI-FAMILYBRICKBUILDING
2 STORY
MULT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .