2-SRP YEAR 2 Contract 1 Bid Contract Documents and Specifications.pdf
PDF 5 MB Posted
- Solicitation number
- US.194939
- Issued by
- Lehigh County, Wolfdale CDP, Pennsylvania
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-SRP YEAR 2 Contract 1 Attachments To Bid Form.pdf | ||
| 4-C1 Addendum No. 1.pdf | ||
| 3-SRP YEAR 2 Contract 1 Bid Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEHIGH COUNTY AUTHORITY
www.lehighcountyauthority.org
PROJECT MANUAL
FOR
I&I Source Reduction Program – Year 2
Contract 1: CIPP Lining
LCA Project # AD-S-25-1
August 2025
Bid Documents
Prepared by:
Phone: (610) 398-2503 Fax: (610) 398-8413
MAILING ADDRESS
P.O. BOX 3348
ALLENTOWN, PA 18106
PHYSICAL OFFICE ADDRESS
1053 SPRUCE STREET
ALLENTOWN, PA 18106
KLEINFELDER
150 College Road West
Suite 100 Princeton, New Jersey 08540
609.924.8821 www.lehighcountyauthority.org
PROJECT MANUAL
FOR
I&I Source Reduction Program – Year 2
Contract 1: CIPP Lining
LCA Project # AD-S-25-1
August 2025
Bid Documents
Prepared by:
Timothy D. Bradley, P.E.
PA P.E. Lic. No. PE035163E
TOC-1
TABLE OF CONTENTS
Page No.
BIDDING REQUIREMENTS
Invitation to Bid ................................................................................................. ITB-1 to ITB-2
Instructions to Bidders ......................................................................... 00200 I-1 to 00200 I-19
Bid Form ......................................................................................... 00410 BF-1 to 00410 BF-6
Bid Bond ........................................................................................ 00430 BB-1 to 00430 BB-3
Additional Document 1: Certificate as to Corporate Principal ....................................... AD1-1
Additional Document 2: Consent of Surety Company to Final Payment ....... AD2-1 to AD2-2
Additional Document 3: Agreement of Surety ............................................................... AD3-1
Additional Document 4: Affidavit of Non-Collusion ..................................................... AD4-1
Additional Document 5: Experience Form ..................................................... AD5-1 to AD5-3
Additional Document 6: List of Proposed Major Equipment or Material Supplies
....................................................................................................................... AD6-1 to AD6-2
Agreement ......................................................................................... 00520 A-1 to 00520 A-11
Performance Bond ..................................................................................... 00610-1 to 00610-3
Payment Bond ............................................................................................ 00615-1 to 00615-3
Certificate of Completion .......................................................................... 00625-1 to 00625-2
General and Supplementary Conditions ................................................... 00700-1 to 00700-60
GENERAL REQUIREMENTS
Special Conditions ....................................................................................... 00115-1 to 00115-4
General Specifications ............................................................................... 01000-1 to 01000-17
Maintenance of Sanitary Sewer Operations ................................................. 01005-1 to 01005-2
Summary of Work...................................................................................... 01010-1 to 01010-34
Environmental Resource Protection/Restoration ....................................... 01014-1 to 01014-12
Measurement and Payment .......................................................................... 01151-1 to 01151-5
Submittals .................................................................................................... 01300-1 to 01300-8
Construction Photographs .............................................................................................. 01380-1
Quality Assurance ........................................................................................ 01400-1 to 01400-4
Mobilization/Demobilization ......................................................................................... 01505-1
Noise Control ............................................................................................... 01561-1 to 01561-2
Delivery, Storage and Handling ................................................................... 01610-1 to 01610-3
Contract Closeout......................................................................................... 01700-1 to 01700-2
Cleaning and Restoration ............................................................................. 01710-1 to 01710-2
TECHNICAL SPECIFICATIONS
Site Preparation and Restoration .................................................................. 02100-1 to 02100-6
Erosion and Sedimentation Control ............................................................. 02130-1 to 02130-6
Traffic Control ............................................................................................. 02670-1 to 02670-3
Pipeline Cleaning, Preparation and Internal Inspection ............................. 02760-1 to 02760-17
TOC-2
Bypass Flow Handling ................................................................................. 02761-1 to 02761-6
Chemical Root Control of Sanitary Sewer System ...................................... 02763-1 to 02763-8
CIPP – Full and Sectional Liners ............................................................... 02767-1 to 02767-21
Joint Testing and Grout Sealing of Sewers ................................................ 02790-1 to 02790-11
APPENDIX
Pennsylvania Prevailing Wage Act & Predetermination
Form SOC-1 Steel Origin Certification: Prime Contractor
Form SOC-2 Steel Origin Certification: Non-Identifiable Steel
Form SOC-3 Steel Origin Certification: U.S. and Foreign Steel-75% U.S. Manufactured
Form SOC-4 Steel Origin Certification: Not Domestically Manufactured: Contractor
Form SOC-5 Steel Origin Certification: Item Contains Insignificant Amounts of Steel
Addendum No. 1
I&I Source Reduction Program – Year 2 – Contract 1: CIPP Lining August 15, 2025
INVITATION TO BID
ITB-1
DOCUMENT 00010
Project: I&I Source Reduction Program – Year 2 – Contract 1: CIPP Lining
The Base Bid scope of work for this project includes rehabilitation of approximately 36,093 linear feet (LF) of sanitary sewer pipelines varying from 8-inch, 10-inch, 12-inch and 15-inch diameter, located in the Trout Creek Park Basin in the City of Allentown, PA.
The scope of work includes, but is not limited to, cleaning and inspecting sanitary sewer pipelines and sewer laterals, disposal of material from cleaning, and full length cured-in-place pipe lining.
The project includes bypassing of flows and traffic control, as necessary, to complete the work.
Owner: Lehigh County Authority 1053 Spruce Road, PO Box 3348 Allentown, PA 18106 Telephone: (610) 398-2503 Fax: (610) 398-8413
Engineer: Timothy D. Bradley
Kleinfelder, Inc.
150 College Road West, Suite 100 Princeton, NJ 08450 Telephone: (609) 924-8821 Fax: (609) 924-8831
Sealed Bids will be received by the LEHIGH COUNTY AUTHORITY via the PennBid Program until 10:00 AM, EST on Thursday, September 18, 2025, at which time they will be publicly opened on PennBid.
All Bidding Documents are available at no cost at PennBid (www.PennBid.net). Successful bidders may have certain fees assessed by PennBid, which relationship and responsibilities are outside of this contract. After the Bid opening, Bids may be withdrawn only by complying with Commonwealth of Pennsylvania laws and regulations. A summary of such laws and regulations is given in the Instructions to Bidders.
Direct inquiries concerning the Bidding Documents to Kara Pho at Kleinfelder at 609-924-8821 or E-mail at KPho@kleinfelder.com.
ITB-2
A virtual (via Zoom platform) pre-bid meeting will be held at 10:00 AM, EST, on Friday, August 22, 2025. Site visits can be scheduled upon request with the Engineer. The pre-bid meeting is mandatory. Non-attendees will not be permitted to bid. Please contact Kara Pho (KPho@kleinfelder.com) for the Zoom link and for scheduling site visits.
Questions from Bidders present at the pre-bid conference will be accepted until 4:00 P.M., EST, on Monday, September 8, 2025. Questions shall be submitted to the Engineer online via PennBid (see Instructions to Bidders for more detail).
It is a requirement of this Contract that at least 50% of the Work be performed by prime Bidder’s own work force, not by subcontractors(s).
It is a requirement of this Contract that Bidder shall have a minimum (5) year, (10) project documented experience in the type of Work required by this Project.
Each Bid must be accompanied by Bid security in the form of a Bid bond (in the required form), or certified check, for ten percent of the Bid total.
After the Bid opening, Bids may be withdrawn only by complying with Commonwealth of Pennsylvania laws and regulations. A summary of such laws and regulations is given in the Instructions to Bidders.
Bids shall remain open for a period of sixty days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids.
The Contract will be subject to the prevailing minimum wage determination established by the Department of Labor and Industry of the Commonwealth of Pennsylvania.
The LEHIGH COUNTY AUTHORITY hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, or irregularities in any Bid.
Liesel M. Gross, CEO
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
ARTICLE 1 - DEFINED TERMS ................................................................................................................................... 00200 I-1
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS .................................................................................................. 00200 I-1
ARTICLE 3 - QUALIFICATIONS OF BIDDERS ........................................................................................................ 00200 I-1
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE .............. 00200 I-2
ARTICLE 5 - PRE-BID CONFERENCE ....................................................................................................................... 00200 I-4
ARTICLE 6 - SITE AND OTHER AREAS ................................................................................................................... 00200 I-4
ARTICLE 7 - INTERPRETATIONS AND ADDENDA............................................................................................... 00200 I-4
ARTICLE 8 - BID SECURITY ....................................................................................................................................... 00200 I-5
ARTICLE 9 - CONTRACT TIMES ............................................................................................................................... 00200 I-5
ARTICLE 10 - LIQUIDATED DAMAGES .................................................................................................................. 00200 I-5
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS ....................................................................................... 00200 I-5
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS ........................................................................ 00200 I-6
ARTICLE 13 - PREPARATION OF BID ...................................................................................................................... 00200 I-6
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS ......................................................................................... 00200 I-7
ARTICLE 15 - SUBMITTAL OF BID ........................................................................................................................... 00200 I-8
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID ............................................................................. 00200 I-8
ARTICLE 17 - OPENING OF BIDS .............................................................................................................................. 00200 I-9
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE ........................................................................... 00200 I-9
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT ............................................................. 00200 I-9
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE ................................................................................... 00200 I-10
ARTICLE 21 - SIGNING OF AGREEMENT ............................................................................................................... 00200 I-10
ARTICLE 22 - SALES AND USE TAXES ................................................................................................................... 00200 I-10
ARTICLE 23 – NONDISCRIMINATION IN EMPLOYMENT .................................................................................. 00200 I-11
ARTICLE 24 – LAWS AND REGULATIONS ............................................................................................................. 00200 I-12
TABLE OF ARTICLES (Alphabetical by Subject)
Subject Article
Award of Contract
Basis of Bid; Comparison of Bids
Bid Security
Bids to Remain Subject to Acceptance
Contract Security and Insurance
Contract Times
Copies of Bidding Documents
Defined Terms
Evaluation of Bids and Award of Contract
Examination of Bidding Documents, Other Related Data, and Site
Interpretations and Addenda
Laws and Regulations
Liquidated Damages
Modification and Withdrawal of Bid
Nondiscrimination in Employment
Opening of Bids
Pre-Bid Conference
Preparation of Bid
Qualifications of Bidders
Sales and Use Taxes
Signing of Agreement
Site and Other Areas
Subcontractors, Suppliers and Others
Submittal of Bid
Substitute and “Or-Equal” Items
EJCDC C-200 Suggested Instructions to Bidders for Construction Contract
With Amendments by Lehigh County Authority as Indicated 00200 I-1
Supplemental Provisions, which are revisions by Lehigh County Authority to the original EJCDC form, are included herein.
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office--The Owner’s office/operations center is located at 1053 Spruce Road, Wescosville, Pennsylvania, with a postal address of P.O. Box 3348, Allentown, PA 18106-0348. However, this project will utilize the services of PennBid (www.PennBid.net) for bidding, through which Bidding Documents will be issued and the bidding procedures are to be administered.
ARTICLE 2 - COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents are available at no cost via the PennBid program.
Successful bidders may have certain fees assessed by PennBid, which relationship and responsibilities are outside of this contract.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. Bidder is responsible to make sure that its set of Bidding Documents is complete.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
2.04 All bids must be submitted on the official forms on the PennBid website. No alternatives or alterations will be accepted.
ARTICLE 3 - QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, within five (5) days of Owner’s request, Bidder shall submit written evidence such as financial data, previous experience, present commitments, and such other data as may be called for below, which documents shall be uploaded to the PennBid website as PDF files.
A. Financial Data
B. Previous Experience with name of contact and project name.
C. Project Superintendent Resume.
D. Current Contacts.
00200 I-2
ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA,
AND SITE
4.01 Subsurface and Physical Conditions
A. The Project Manual identifies:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents.
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that Engineer has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.01.A will be made available via the PennBid website by Owner to any Bidder. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the General Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.02 Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
4.03 Hazardous Environmental Condition
A. The Project Manual identifies those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that Engineer has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.03.A will be made available via the PennBid website by Owner to any Bidder. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.06 of the General Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in
00200 I-3 the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions.
4.05 On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.06 Following is a list of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.
A. not applicable
4.07 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any Addenda;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in §4.02 of the General Conditions, and (2) reports and drawings of Hazardous Environmental Conditions at the Site which have been identified in §4.06 of the General Conditions;
E. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
00200 I-4
H. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;
I. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder; and
J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 - PRE-BID CONFERENCE
5.01 A pre-bid conference will be held at 10:00 AM, EST, on Friday, August 22, 2025, via a virtual Zoom meeting. Please contact Kara Pho (KPho@kleinfelder.com) for the Zoom meeting link.
Representatives of Owner and Engineer will be present to discuss the Project. Bidders are required to attend and participate in the conference. Engineer will transmit to all prospective Bidders present at the conference such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 6 - SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 - INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing through PennBid. Interpretations or clarifications considered necessary by Engineer in response to such questions will be answered through PennBid and may also result in the issuance of an addenda, available to all parties registered on the PennBid website. Parties who bid will be required to
00200 I-5 acknowledge receipt and reading of answers and addendum on the PennBid website as part of the bid process. Questions received after 4:00 P.M. EST on Friday, September 12, 2025, may not be answered.
Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.
ARTICLE 8 - BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10%) percent of Bidder’s maximum Bid price and in the form of a cashier’s check or a Bid bond (on the form attached) issued by a surety meeting the requirements of §§5.01 and 5.02 of the General Conditions. A copy of the Bid security will be uploaded to the PennBid website with the hardcopy to be timely provided upon request by the Owner or Engineer.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within fifteen (15) days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of the three apparent lowest Bidders will be returned upon the signing of the Agreement and furnishing of acceptable bonds and other documents by the successful Bidder.
8.03 Bid security of all Bidders except the three apparent lowest Bidders will be returned within thirty (30) days after the Bid opening
ARTICLE 9 - CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 - LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such
00200 I-6 acceptance will not be considered by Engineer until after the Effective Date of the Agreement. Refer to General Conditions Paragraph 6.05 for requirements on substitute and “or equal”.
Bidders shall not rely upon approvals made in any other manner.
ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 A list of proposed Subcontractors and Suppliers is required to be submitted to Owner with the bid.
Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor and Suppliers. Contractor shall also submit evidence that Subcontractors and Suppliers are qualified to do business in the Commonwealth of Pennsylvania or covenant to obtain such qualification prior to and as a condition of award of a Contract. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.
No substitutions for Subcontractors shown on the list shall be made by Contractor without prior written approval of Owner or Engineer.
12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors or Suppliers. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder.
Any Subcontractor or Supplier so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions.
12.03 Contractor shall not be required to employ any Subcontractor or Supplier against whom Contractor has reasonable objection.
12.04 Note that Contractor is responsible to assure compliance by its subcontractors with various provisions within the Contract Documents and may have to present certifications and documents from the subcontractors to show compliance.
ARTICLE 13 - PREPARATION OF BID
13.01 The Bid Form and required supplements are included with the Bidding Documents. Bids must be submitted through PennBid using the electronic forms provided. All additional documents required of the Bidder shall be uploaded as completed and signed documents, when applicable, to the PennBid website as PDF files. Only the electronic copy of the bid form will be considered a valid bidding document; written variations are only for the Bidder’s convenience and should not be submitted. Owner or Engineer may ask for hardcopies of all other documents at any time.
13.02 All blanks on the Bid Form shall be completed prior to electronic submission of the Bid. A Bid price shall be indicated for each Bid item listed therein, or the words “No Bid,” “No Change,” or “Not Applicable” entered.
00200 I-7
13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign, and the signature attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.
13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown below the signature.
13.06 A Bid by an individual shall show the Bidder’s name and official address.
13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown below the signature.
13.08 All names shall be shown below the signatures. Proof of a partner’s, or agent’s, authority to obligate the Contractor must be attached to the Bid.
13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.10 The address and telephone number for communications regarding the Bid shall be shown.
13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the Commonwealth of Pennsylvania or covenant to obtain such qualification prior to award of the Contract.
Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
13.12 Unless specifically provided in the Contract Documents, bids containing substitutions or combinations of alternates will not be considered unless such substitutions or combinations are specifically authorized by the Owner.
13.13 Within (2) business days after the Bid opening, upon notification by the Engineer, and prior to issuance of a Notice of Intent to Award, the apparent low Bidder shall submit all Bidding Documents in hard copy, showing original signatures and seals; all names shall be typed or printed in ink below the signatures. Bidder shall attach a copy of the PennBid results to the Bid Form in lieu of duplicating the figures manually.
ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in
00200 I-8 the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Paragraph 11.02 of the General Conditions.
ARTICLE 15 - SUBMITTAL OF BID
15.01 All Bid Documents are to be acquired through the PennBid service.
15.02 A Bid shall be submitted no later than the date and time prescribed using the PennBid service as indicated on the Invitation to Bid, and shall be accompanied by the Bid security and other required documents.
15.03 The “Bid” tab contains the electronic Bid Form.
A. For Lump Sum line items, enter the lump sum amount to perform all of the Work as described in the Contract Documents.
B. For Unit Price line items, enter the per Unit price in the appropriate field; PennBid will automatically calculate the extended price for the listed units of Work.
C. A unit or lump sum price must be provided for all items and alternates listed on the Bid Form.
15.04 All questions located in the “Bid” section of PennBid must be answered.
15.05 To attach the electronic file containing documents described in Paragraph 12.10, click on the “Bid” tab and “browse” (middle of the screen). Locate and click on the file. The electronic file will be attached to your bid submission when the “Submit Bid” button is clicked.
15.06 Bidder shall use forms available from the “Documents” section of PennBid.
15.07 Each Bidder is solely responsible for submitting its Bid via PennBid by the time and date of the Bid Closing designated in the Invitation to Bid.
15.08 Verifying Bid Was Submitted: If submitted correctly, an acknowledgement will appear in the middle of the computer screen stating “Your bid has been submitted.”
00200 I-9
ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bidder may withdraw his Bid from consideration after the Bid opening without forfeiture of the cashier's check, surety bid bond or other security filed with the Bid if the price bid was submitted in good faith, and the Bidder submits credible evidence that the reason for the price bid being substantially lower was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional and substantial arithmetical error or an unintentional omission of a substantial quantity of work, labor, material or services made directly in the compilation of the Bid. Withdrawal is allowed only if (i) notice of a claim of the right to withdraw such Bid is made in writing with the Owner within two (2) business days after the opening of Bids; and (ii) the withdrawal of the Bid would not result in the awarding of the contract on another Bid of the same Bidder, his partner, or to a corporation or business venture owned by or in which he has a substantial interest. No Bidder who is permitted to withdraw a Bid shall supply any material or labor to, or perform any subcontract or other work agreement for any person to whom a contract or subcontract is awarded in the performance of the contract for which the withdrawn Bid was submitted, without the written approval of the Owner.
16.02 If a Bid is withdrawn in accordance with the provisions of §16.01, the Owner may award the contract to the next lowest Bidder or reject all Bids and resubmit the project for bidding. In the event the Owner resubmits the project for bidding the withdrawing Bidder shall pay the costs, in connection with the resubmission, of printing new contract document, required advertising, and printing and mailing notices to prospective Bidders, if the Owner finds that such costs would not have been incurred but for such withdrawal. In no event shall the withdrawing Bidder be permitted to resubmit a Bid for the Project.
ARTICLE 17 - OPENING OF BIDS
17.01 Bids will be opened at the time indicated in the Advertisement or Invitation to Bid via the PennBid website program. A tabulation of the bids will be made available to Bidders after the opening of Bids on the PennBid website.
ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible or responsive. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
00200 I-10
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in §12.01.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors and Suppliers to perform the Work in accordance with the Contract Documents.
19.06 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.
19.07 Owner reserves the right to cancel the award of any Contract at any time prior to its execution of the Agreement by Owner without incurring any liability to any of the Bidders.
ARTICLE 20 - CONTRACT SECURITY AND INSURANCE
20.01 Article 5 of the General Conditions, as modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds and appropriate insurance certificates.
ARTICLE 21 - SIGNING OF AGREEMENT
21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within fifteen (15) days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner.
Within ten (10) days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.
00200 I-11
ARTICLE 22 - SALES AND USE TAXES
22.01 Owner, as a municipal authority, is exempt from the Pennsylvania Sales and Use Tax. Certificates of Exemption will be furnished to the Contractor for its purchase of materials for which the Authority’s exemption is transferable, upon Contractor’s request; however, it is Contractor's responsibility to determine for which materials the tax exemption is applicable prior to submitting its Bid. Said taxes shall not be included in the Bid. Contractor shall pay all other sales, consumer, use and other similar taxes required to be paid by Contractor in accordance with the Laws and Regulations of the Commonwealth of Pennsylvania which are applicable during the performance of the Work. Said taxes shall not be included in the Bid. Refer to Paragraph 6.10 of the General Conditions for additional information, if any.
ARTICLE 23 - NONDISCRIMINATION IN EMPLOYMENT
23.01 Contractor agrees that:
A. Neither it nor any subcontractor that Contractor uses for the Contract will discriminate against any employee or applicant for employment because of race, color, religion, sex, gender identity, sexual orientation, veteran’s status, political opinions or affiliations, lawful activity in any employee organization, national origin, age, disability, or marital status. Contractor and subcontractors will take affirmative action to ensure that applicants and employees are treated fairly during employment without regard to race, color, religion, sex, gender identity, sexual orientation, veteran's status, political opinions or affiliations, lawful activity in any employee organization, national origin, age, disability, or marital status. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer, recruitment, or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
(1) Contractor/subcontractor shall comply with all applicable federal, state and local laws regarding non-discrimination, including: (a) the Civil Rights Act of 1964, 42 U.S.C. §2000 et seq. (1981); (b) the Civil Rights Act of 1991, P.L. 102-166; (c) Executive Order Number 11246, 30 Fed. Reg.
12,319 (1965), reprinted in 42 U.S.C. §2000(e) note, as amended by Executive Order Number 11375, 32 Fed. Reg. 14,303 (1967) and by Executive Order Number 12086, 43 Fed. Reg. 46,501 (1978); (d) the Age Discrimination Act, 42 U.S.C. §§6101-6106 (1981); (e) the Age Discrimination in Employment Act, 29 U.S.C. §§621-34 (1967); (f) the Rehabilitation Act of 1973, 29 U.S.C.
§§793-794 (1981); (g) the Americans with Disabilities Act, 42 U.S.C. §12101 et seq. (1990); and
(h) the Pennsylvania Human Relations Act, Act of October 27, 1955 (P.L. 744, No. 222) as amended, 43 P.S. §§951-963.
(2) Contractor/subcontractor shall establish and maintain a written sexual harassment policy and shall inform its employees of the policy. The policy must contain a notice that sexual harassment will not be tolerated and employees who practice it will be disciplined.
(3) Contractor/subcontractor shall not discriminate for any of the reasons set forth above against any subcontractor or supplier who is qualified to perform the work to which the contract relates.
B. The Contract may be canceled or terminated by the Owner, and all money due or to become due under the Contract may be forfeited, for a violation of the terms or conditions of these nondiscrimination provisions.
00200 I-12
23.02 Contracts for Work under this Bid will obligate the Contractor and Subcontractor to be non-discriminatory in employment practices. Bidders, if requested, must submit with their Bid any information or documents required by state, federal or local statutes or regulations applicable to non-discrimination in employment; including, if necessary, a compliance report concerning their employment practices and policies in order to maintain their eligibility to receive the award of the Contract.
A. To the extent allowed by law the Contractor/subcontractor shall furnish all necessary employment documents and records to and permit access to its books, records, and accounts by Owner or its agents for purposes of investigation to ascertain compliance with these equal opportunity and non-discrimination provisions. If the Contractor does not possess documents or records reflecting the necessary information requested, it shall furnish such information on reporting forms supplied by Owner.
23.03 Bidders must submit a list of all Subcontractors who will perform work on the Project and written signed statements from authorized agents of the labor pools with which it will or may deal for employees on this Work, together with supporting information to the effect that these labor pools will affirmatively cooperate in or offer no hindrance to the recruitment, employment and equal treatment of employees who are seeking employment and are performing work under the Contract. If such agents or labor pools have failed or refused to furnish the necessary statements prior to the award of the Contract, Bidder shall provide certification as to what efforts have been made to secure such statements.
ARTICLE 24 - LAWS AND REGULATIONS
24.01 The Bidder’s attention is directed to the fact that all applicable laws, ordinances, and rules and regulations having jurisdiction over construction of the Project shall apply to the Contract throughout; are the Bidder’s/Contractor’s responsibility to ascertain; and will be deemed to be included in the Contract the same as though herein written in full, whether or not specified in the Contract Documents.
24.02 PREVAILING WAGE ACT. The Pennsylvania Prevailing Wage Act applies to the work to be performed under the Contract; therefore, the Contractor must pay to its workers the minimum wage rate established by the Secretary of Labor and Industry and specified in the Contract Document - Prevailing Wage Act and Predetermination - and further the Contractor must assure that its Subcontractors also pay the Subcontractor’s workers these same minimum wage rates.
00200 I-13
24.03 STEEL PRODUCTS PROCUREMENT ACT. Special attention is drawn to the provisions of Pennsylvania’s Steel Products Procurement Act, which includes cast iron in the definition of steel products. The Contractor is advised that only steel products as defined in said Act shall be used or supplied in the performance of the Contract The Act defines Steel Products as "Products rolled, formed, shaped, drawn, extruded, forged, cast, fabricated or otherwise similarly processed, or processed by a combination of two or more of such operations, from steel made in the United States by the open hearth, basic oxygen, electric furnace, Bessemer or other steel making process and shall include cast iron products and shall include machinery and equipment listed in United States Department of Commerce Standard Industrial Classification 25 (furniture and fixture), 35 (machinery, except electrical) and 37 (transportation equipment) and made of, fabricated from, or containing steel components. If a product contains both foreign and United States steel, such product shall be determined to be a United States steel product only if at least seventy-five (75%) percent of the cost of the articles, materials and supplies have been mined, produced or manufactured, as the case may be, in the United States. Transportation equipment shall be determined to be a United States steel product if it complies with section 165 of Public Law 97-424 (96 Stat. 2136)".
Contractor shall provide steel origin certifications of compliance in conjunction with shop drawing submittals, which certification shall be on forms to be provided by the Owner.
24.04 PUBLIC WORKS EMPLOYMENT ACT. Pennsylvania’s Public Works Employment Act requires contractors and subcontractors performing work on public works projects in this Commonwealth to comply with the Federal E-Verify program (the EVP) to ensure employees are authorized to work in the United States. The EVP is a free Internet-based program operated by the United States Department of Homeland Security that compares information from an employee's Form I-9, Employment Eligibility Verification, to data from the United States Department of Homeland Security and Social Security Administration records to confirm employment eligibility.