tech_eval_factors.docx

DOCX document 25 KB Posted

Attached to
HUD field phone telecom
Solicitation number
86543J18Q00002
Issued by

About this file

Technical Evaluation Factors

View the file

Other files

File Type Posted
PROPOSAL_SUBMISSION_INSTRUCTIONS.docx DOCX document
86543J18Q00002.rtf RTF text file
sample_call_order.docx DOCX document
SF-1449.pdf PDF
PWS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EVALUATION FACTORS

HUD Field Phone Telecom Services

The following provides the minimum requirements for an offer to be determined acceptable:

· Offerors shall break down their total price to reflect labor categories, labor rates, number of hours, materials and any other costs that make up the bottom line price.

· The contractor shall provide a feasible method that addresses the requirements of the Performance Work Statement. The approach for executing the requirements is specific and thoroughly explained.

· The contractor’s technical plan demonstrates a clear understanding of the requirements for coordinating and completing a telephone installation project.

· The contractor’s proposed timeframes are realistic and feasible for the work to be performed using contractor’s stated approach.

· The contractor’s proposal demonstrates all subcontractors have HSPD12 clearance or can obtain it.

· All subcontractors have provided documentation of Avaya equipment certification.

· Prime contractor and subcontractor responsibilities are clearly defined and delineated.

· The proposed labor mix is sufficient to ensure that enough installers are assigned to each project for completion in a timely manner as outlined in the contractor’s technical approach.

· The contractor shall include the terms and conditions of the warranty required by the Performance Work Statement.

File details come from the government source that posted it.