tech_eval_factors.docx
DOCX document 25 KB Posted
- Attached to
- HUD field phone telecom
- Solicitation number
- 86543J18Q00002
About this file
Technical Evaluation Factors
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PROPOSAL_SUBMISSION_INSTRUCTIONS.docx | DOCX document | |
| 86543J18Q00002.rtf | RTF text file | |
| sample_call_order.docx | DOCX document | |
| SF-1449.pdf | ||
| PWS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EVALUATION FACTORS
HUD Field Phone Telecom Services
The following provides the minimum requirements for an offer to be determined acceptable:
· Offerors shall break down their total price to reflect labor categories, labor rates, number of hours, materials and any other costs that make up the bottom line price.
· The contractor shall provide a feasible method that addresses the requirements of the Performance Work Statement. The approach for executing the requirements is specific and thoroughly explained.
· The contractor’s technical plan demonstrates a clear understanding of the requirements for coordinating and completing a telephone installation project.
· The contractor’s proposed timeframes are realistic and feasible for the work to be performed using contractor’s stated approach.
· The contractor’s proposal demonstrates all subcontractors have HSPD12 clearance or can obtain it.
· All subcontractors have provided documentation of Avaya equipment certification.
· Prime contractor and subcontractor responsibilities are clearly defined and delineated.
· The proposed labor mix is sufficient to ensure that enough installers are assigned to each project for completion in a timely manner as outlined in the contractor’s technical approach.
· The contractor shall include the terms and conditions of the warranty required by the Performance Work Statement.
File details come from the government source that posted it.