843706vadotA54B_119192.pdf
PDF 3 MB Posted
- Attached to
- Smart Scale - Safety Improvements, Rt 76
- Solicitation number
- 119192
- Issued by
- Chesterfield County, Chatham Town, Virginia
About this file
This is a Bid Proposal and Contract document issued by the Virginia Department of Transportation for Smart Scale safety improvements on Route 76 in Chesterfield County and the City of Richmond. The project extends from 0.787 miles south of Powhite Creek to 0.311 miles north of Powhite Creek and encompasses 126 line items including site clearing and grubbing, drainage infrastructure installation (storm sewer pipes, box culverts, and related structures), asphalt concrete placement across multiple specifications, guardrail installation and removal, pavement markings and markers, lighting modifications, retaining wall construction, and landscape restoration. Bids were due October 28, 2026, at 10:00 a.m., submitted electronically through Bidx, with prequalification required prior to submission. The contract completion date is December 1, 2028. Major work items include 13,323 cubic yards of regular excavation, 10,729 cubic yards of borrow excavation, 2,264 tons of asphalt concrete (SM-9.5E), 6,008 linear feet of guardrail installation, and extensive temporary traffic control measures including portable changeable message signs, temporary pavement markings, and truck-mounted attenuators.
The bid bond requirement is five percent of the bid dollar value, with award made to the lowest responsive and responsible bidder within 60 days of bid opening. The project is federally funded under FHWA number STP-5A27(883) and subject to Davis-Bacon prevailing wage requirements, with rates established for Chesterfield County including electricians at $36.85 per hour, carpenters at $19.22 per hour, laborers ranging from $14.88 to $19.71 per hour, and equipment operators from $16.64 to $24.66 per hour as of January 2, 2026. The contract includes optional price adjustment provisions for fuel, steel, and asphalt materials that contractors may elect. Minimum Disadvantaged Business Enterprise (DBE) participation is required with specified goals, and contractors must submit DBE participation plans, certification of binding agreements with DBE subcontractors, and vendor survey forms. The project is subject to federal and state nondiscrimination requirements, Equal Employment Opportunity standards, drug-free workplace provisions, and a tree removal time-of-year restriction prohibiting removal from May 15 through July 31. Contractors must maintain a drug-free workplace, provide sexual harassment training for supervisors and employees, and comply with security requirements for portable changeable message signs including password protection and firmware updates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 827193vadotA54_119192.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER NO.: A54
CONTRACT ID. NO.: C0000119192C01B
Form C-6a
Rev. 3-22-05
CNSP (F) 1-9-06
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL AND CONTRACT
ROUTE NUMBER: 76
FHWA NUMBER: STP-5A27(883)
PROJECT NUMBER: 0076-964-121, C501
COUNTY: CHESTERFIELD, CITY OF RICHMOND
DISTRICT: RICHMOND
DESCRIPTION: SMART SCALE - SAFETY IMPROVEMENTS
FROM:
TO:
0.787 MI. S. OF POWHITE CREEK
0.311 MI. N. OF POWHITE CREEK
DATE BID SUBMITTED: 10:00 AM WEDNESDAY, OCTOBER 28, 2026
Form C-118
Rev. 8-10-2026
COMMONWEALTH OF VIRGINIA
NOTICE TO BIDDERS
As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.
1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)
2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.
3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.
4. A bid total shall be shown in each space provided.
5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative, you may complete the bottom line of Form C-24. The form may be emailed to the Construction Division at VDOTContracts@vdot.virginia.gov and must be received prior to the opening of bids.
6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.
https://bidx.com/site/home http://cabb.virginiadot.org/
Form C-24
Rev. 7-6-05
PROPOSAL GUARANTY
KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the
Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE
BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.
SIGNED, sealed and dated this Day of , 20
WHEREAS, the above said principal is herewith submitting its proposal for:
PROJECT NUMBER: 0076-964-121, C501
NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.
(Principal*) (Surety Company)
By: By:
(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)
(Principal*) (Address)
(Officer, Partner or Owner) (Seal) (Surety Company)
(Principal*) (Attorney-in-Fact**) (Seal)
(Officer, Partner or Owner) (Seal) (Address)
*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.
Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.
Electronic Bid Bond ID# Company/Bidder Name Signature and Title
**Attach copy of Power of Attorney
Form C-48 Rev. 10-03-25
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION,
AND VENDOR SURVEY FORM (ALL VENDORS)
PROJECT NO. 0076-964-121, C501 CONTRACT I.D. NO. C0000119192C01B
FHWA NO. STP-5A27(883) DATE SUBMITTED
All vendors submitting a bid as a Prime Contractor shall complete and submit with their bids the following information as requested for (1) Subcontractor/Supplier Solicitation, and Utilization, and (2) for Vendor Survey.
The vendor certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The vendor also certifies he/she has had direct contact with the named firms regarding participation on this project.
Vendor Signature:
Vendor ID No. Title:
Vendor’s Address: ____________________________________
City: __________________
State: __________________ Zip Code: _________
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)
VENDOR
NUMBER
NAME OF SUBCONTRACTOR/SUPPLIER TELEPHONE
NUMBER
UTILIZED
(Y/N)
NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.
BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.
FEDERAL LAW REQUIRES ALL VENDORS SUBMITTING BIDS OR OFFERS PROVIDE THE INFORMATION
REQUESTED IN THIS FORM.
Form C-48 Rev. 10-03-25
VENDOR SURVEY
WHEN SUBMITTING A BID OR OFFER AS A PRIME CONTRACTOR, THE BIDDER MUST SUBMIT A
VENDOR SURVEY FOR THEMSELVES AND A VENDOR SURVEY FOR EACH SUBCONTRACTOR
AND SUPPLIER WHO SUBMITTED A BID OR QUOTE TO THE BIDDER.
VENDOR’S FULL LEGAL NAME: ________________________________________
VENDOR ID NO.: __________________
ADDRESS: ____________________________________
CITY: ____________________________________
STATE: _______________ ZIP CODE: _________
VENDOR’S YEARS IN BUSINESS: _____________
VENDOR’S ANNUAL GROSS RECEIPTS: ____ $ 0 - 25 million ____ $ 25 - 50 million ____ $ 50 - 75 million ____ More than $75 million
THE UNDERSIGNED, ON BEHALF OF VENDOR IDENTIFIED ABOVE, ACKNOWLEDGES AND CERTIFIES THAT THIS FORM ACCURATELY STATES THE INFORMATION CONTAINED HEREIN TO THE BEST OF VENDOR’S
KNOWLEDGE.
Printed Full Legal Name of Person Signing for Vendor
Signature: ____________________________________________
Form C-7
Rev. 2-2-24
SHEET 1
TERMS OF THE PROPOSAL\CONTRACT
SUBMITTED: 10:00 AM WEDNESDAY, OCTOBER 28, 2026
ROUTE NUMBER: 76
FHWA NUMBER: STP-5A27(883)
DESCRIPTION: SMART SCALE - SAFETY IMPROVEMENTS
FROM:
TO:
0.787 MI. S. OF POWHITE CREEK
0.311 MI. N. OF POWHITE CREEK
DISTRICT: RICHMOND COUNTY: CHESTERFIELD, CITY OF RICHMOND
I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;
that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.
COMPLETION DATE: DECEMBER 1, 2028
BID TOTAL $
Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.
(Names of Individual(S),Firm(S) Or Corporation)
Street Address City State Zip Code Vendor#/Fin#
Print Name Signature Title
In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.
Contract Execution Date By
CHIEF ENGINEER
VIRGINIA DEPARTMENT OF TRANSPORTATION
Virginia Department of Transportation 09/03/2026Date Printed:
Schedule of Items Page: 2
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0010 108SP20-0001
BASELINE PROGRESS
SCHEDULE
LUMP SUM _________._____LUMP SUM
ATTD
0020 108SP20-0002
PROGRESS SCHEDULE
UPDATES
EA
23.000
ATTD
0030 301SD20-0001
CLEARING AND GRUBBING LUMP SUM _________._____LUMP SUM
0040 302SD20-0002
BEDDING MATL. AGGR. NO.
TON
39.000
ATTD
0050 302SD20-0004
CONCRETE CLASS A4 BOX
CULVERT
CY
33.300
0060 302SD20-0005
REINF. STEEL LB
3,551.800
302, 406
0070 302SD20-0013
ENDWALL EW-12 EA
9.000
0080 302SD20-0027
15" STORM SEWER PIPE LF
159.000
0090 302SD20-0064
42" CONC. PIPE LF
14.000
0100 302SD20-0069
48" CONC. PIPE LF
31.000
0110 302SD20-0198
15" END SECTION ES-1 OR 2 EA
1.000
0120 302SD20-0212
42" END SECTION ES-1 OR 2 EA
1.000
0130 302SD20-0243
DROP INLET DI-2B,L=8' EA
4.000
0140 302SD20-0662
MANHOLE MH-1 OR 2 LF
31.200
Schedule of Items Page: 3
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0150 302SD20-0663
FRAME & COVER MH-1 EA
4.000
0160 303SD20-0001
REGULAR EXCAVATION CY
13,323.000
0170 303SD20-0007
BORROW EXCAVATION CY
10,729.000
0180 303SD20-0016
MINOR STR. EXCAV. PIPE
CULVERT
CY
74.000
0190 303SD20-0017
MINOR STR. EXCAV. BOX
CULVERT
CY
188.000
0200 303SD20-0022
CHECK DAM ROCK TY. I EA
7.000
0210 303SD20-0023
CHECK DAM ROCK TY. II EA
42.000
0220 303SD20-0028
DEWATERING BASIN EC-8 EA
2.000
0230 303SD20-0029
SILTATION CONTROL
EXCAVATION
CY
4,448.000
0240 303SD20-0030
INLET PROTECTION TYPE A EA
3.000
0250 303SD20-0031
INLET PROTECTION TYPE B EA
6.000
0260 303SD20-0034
TEMP. SILT FENCE TYPE A LF
25,414.000
0270 305SD20-0011
AGGR. MATL. NO. 25 OR 26 TON
12.000
0280 308SD20-0012
AGGR. BASE MATL. TY. I NO.
21B
TON
2,567.000
Schedule of Items Page: 4
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0290 315SD20-0001
ASPHALT CONCRETE TY. SM-
12.5A CONST
TON
365.000
0300 315SD20-0005
ASPHALT CONCRETE TY. IM-
19.0D CONST
TON
1,630.000
0310 315SD20-0009
ASPHALT CONCRETE TY. SM-
9.5E CONST
TON
2,264.000
0320 315SD20-0010
ASPHALT CONCRETE BM-25.0 TON
731.000
0330 315SD20-0015
RUMBLE STRIP CYLINDRICAL
ASPHALT
LF
5,666.000
0340 315SD20-0016
LIQUID ASPHALT COATING
(RUMBLE STRIP)
SY
532.000
0350 315SD20-0018
ASPH.CONC.CURB BACKUP
MATL. CONST
TON
17.000
0360 315SD20-0104
SAW-CUT ASPHALT
CONCRETE FULL DEPTH
LF
11,896.000
0370 315SX20-0004
PAVEMENT LIQUID ASPHALT
COATING (PAVEMENT
MARKER GROOVE)
SY
86.000
ATTD
0380 315SX20-0007
ASPHALT CONCRETE
PAVEMENT TY. BM-25.0A
TON
2,304.000
ATTD
0390 410SD20-0056
CONCRETE PARAPET BPB-4 LF
454.000
0400 414SD20-0001
EROSION CTRL. STONE CL.
A1, EC-1
TON
34.500
Schedule of Items Page: 5
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0410 501SD20-0004
UNDERDRAIN UD-4 LF
2,768.000
0420 501SD20-0009
OUTLET PIPE LF
96.000
0430 502SD20-0020
CURB, ASPHALT MC-3B LF
395.000
0440 502SD20-0038
MEDIAN BARRIER MB-7F LF
30.000
0450 504SD20-0001
CONCRETE CLASS A3 MISC. CY
10.100
302, 504
0460 505SD20-0013
GUARDRAIL GR-MGS1, 9'
POST
LF
6,008.000
0470 505SD20-0017
GUARDRAIL TERMINAL GR-
MGS2
EA
4.000
0480 505SD20-0018
GUARDRAIL END
ANCHORAGE GR-MGS3
EA
2.000
0490 505SD20-0019
GUARDRAIL HEIGHT
TRANSITION GR-MGS4
EA
10.000
0500 505SD20-0047
FIXED OBJECT ATTACH. GR-
FOA-3 TY. I
EA
3.000
0510 505SD20-0048
FIXED OBJECT ATTACH. GR-
FOA-3 TY.II
EA
4.000
0520 505SD20-0073
REMOVE EXISTING
GUARDRAIL
LF
5,969.000
0530 506SX20-0007
RETAINING STRUCTURE
(MSE WALL)
SF
3,185.000
ATTD
Schedule of Items Page: 6
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0540 508SD20-0003
DEMO. OF PAVEMENT RIGID SY
112.000
0550 508SD20-0004
DEMO. OF PAVEMENT
FLEXIBLE
SY
4,302.000
0560 510SX20-0028
REMOVE EXIST. ENDWALL
(DRAINAGE)
EA
3.000
0570 510SX20-0031
MODIFY EXIST. DRAINAGE
STRUCTURES
EA
1.000
0580 510SX20-0039
REMOVE EXIST. CONCRETE
JERSEY WALL
LF
82.000
0590 510SX20-0039
REMOVE EXIST. CONDUIT LF
444.000
0600 510SX20-0046
ADJUST EXIST. DRAINAGE
STRUCTURES
EA
1.000
0610 512SD20-0007
IMPACT ATTEN.SER. TY. 1 TL-
3, >=40 MPH
EA
3.000
0620 512SD20-0013
TYPE 3 BARRICADE 8' EA
2.000
0630 512SD20-0014
TEMPORARY SIGN SF
2,110.000
0640 512SD20-0023
TRUCK MOUNTED
ATTENUATOR
HR
4,910.000
0650 512SD20-0024
GROUP 2 CHANNELIZING
DEVICES
DAY
15,175.000
Schedule of Items Page: 7
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0660 512SD20-0025
PORT.CHANGEABLE MESS.
SIGN
HR
10,675.000
0670 512SD20-0026
ELECTRONIC ARROW BOARD HR
4,240.000
0680 512SD20-0031
TRAFFIC BARRIER SER.
CONC. MB-7D PC
LF
4,265.000
0690 512SD20-0042
ERADICATE LINEAR PVMT
MRKG
LF
23,130.000
0700 512SD20-0043
ERADICATE NONLINEAR
PVMT MRKG
SF
190.000
0710 512SD20-0044
TEMP. PAVE. MARKER 1 WAY EA
547.000
0720 512SD20-0046
TEMP. PVMT MRKG TY. A, 4" LF
14,350.000
0730 512SD20-0048
TEMP. PVMT MRKG TY. A, 8" LF
990.000
0740 512SD20-0062
TEMP. PVMT MRKG TY. D, CL.
III, 6"
LF
14,415.000
0750 512SD20-0063
TEMP. PVMT MRKG TY. D, CL.
III, 8"
LF
5,815.000
0760 512SD20-0064
TEMP. PVMT MRKG TY. D, CL.
III, 12"
LF
3,745.000
0770 513SD20-0001
MOBILIZATION LUMP SUM _________._____LUMP SUM
0780 514SD20-0001
FIELD OFFICE TY.I MO
18.000
Schedule of Items Page: 8
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0790 515SD20-0004
FLEXIBLE PAVE.PLANING 0"-
2"
SY
16,187.000
0800 517SD20-0001
CONSTRUCTION SURVEYING
CONSTR.
LUMP SUM _________._____LUMP SUM
0810 602SD20-0005
TOPSOIL CLASS B 2" ACRE
1.640
0820 603SD20-0002
TEMPORARY SEED LB
164.000
0830 603SD20-0003
REGULAR SEED LB
236.000
0840 603SD20-0004
OVERSEEDING LB
189.000
0850 603SD20-0005
LEGUME SEED LB
1.000
0860 603SD20-0006
LEGUME OVERSEEDING LB
1.000
0870 603SD20-0014
FERTILIZER NITROGEN - N LB
157.000
0880 603SD20-0015
FERTILIZER PHOSPHOROUS
- P
LB
215.000
0890 603SD20-0016
FERTILIZER POTASSIUM - K LB
108.000
0900 603SD20-0017
LIME TON
7.380
0910 606SD20-0004
ROLLED EROSION CTRL
PRODUCT EC-2 TYPE 4
SY
94.000
Schedule of Items Page: 9
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0920 606SD20-0005
ROLLED EROSION CTRL
PRODUCT EC-3 TYPE 1
SY
269.000
0930 700SD20-0003
REMOVE EXISTING 1 POST
SIGN STRUCTURE
EA
11.000
0940 700SD20-0004
REMOVE EXISTING 2 POST
SIGN STRUCTURE
EA
1.000
0950 700SD20-0013
RELOCATE EX. 2 POST GRND
MOUNT SGN PANEL
EA
1.000
0960 700SD20-0035
SIGN POST STP-1, 2 3/16", 10
GAUGE
LF
12.000
0970 700SD20-0036
SIGN POST STP-1, 2 1/2", 10
GAUGE
LF
30.000
0980 700SD20-0037
SIGN POST STP-1, 2 1/2", 12
GAUGE
LF
300.000
0990 700SD20-0038
CONC. FOUND. STP-1, TY. A EA
12.000
1000 700SD20-0039
CONC. FOUND. STP-1, TY. B EA
2.000
1010 700SD20-0056
CONC. FOUND. O/H SIGN
STRUCTURE
CY
25.000
1020 700SD20-0149
CONC. FOUND. LF-1, TY. A EA
2.000
1030 700SD20-0177
JUNCTION BOX JB-S1 EA
2.000
1040 700SD20-0178
JUNCTION BOX JB-S2 EA
1.000
Schedule of Items Page: 10
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1050 700SD20-0195
CONDUIT PVC 3" LF
211.000
1060 700SD20-0197
TRENCH EXCAVATION ECI-1 LF
211.000
1070 700SD20-0199
TEST BORE EA
1.000
1080 700SX20-0003
SIGN STRUCTURE,
OVERHEAD CANT. 36' ARM
EA
1.000
1090 700SX20-0013
LIGHTING #1/0 BARE
COPPER EGC
LF
230.000
ATTD
1100 700SX20-0013
LIGHTING #1/0 COPPER
XHHW CONDUCTOR
LF
500.000
ATTD
1110 700SX20-0014
LIGHTING MODIFY LIGHTING
CIRCUIT
LUMP SUM _________._____LUMP SUM
ATTD
1120 700SX20-0017
REMOVE EXIST. OVERHEAD
SIGN STRUCTURE EXISTING
EA
1.000
1130 701SD20-0001
SIGN PANEL SF
477.000
1140 704SD20-0027
TYPE B CLASS VI PVMT LINE
MRKG 6"
LF
13,555.000
1150 704SD20-0029
TYPE B CLASS VI PVMT LINE
MRKG 12"
LF
990.000
1160 704SD20-0031
TYPE B CLASS VI CONTRAST
PVMT LINE MRKG 6"
LF
1,070.000
Schedule of Items Page: 11
Proposal ID: C0000119192C01B 0076-964-121, C501
Order No.: A54
Oversight/State Project No.:
Federal Project No.: STP-5A27(883)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
1170 704SD20-0032
INLAID PAVEMENT MARKER
ASPHALT
EA
249.000
ATTD
1180 704SD20-0060
SYMB MRKG LANE
REDUCTION ARR TY B CL II
EA
3.000
1190 704SD20-0108
PVMT MSG. MARK. “ONLY” TY
B, CL II, 8’
EA
13.000
1200 704SX20-0004
PAVEMENT MARKING MSG.
"EZ-PASS" TY B, CL II
EA
13.000
ATTD
1210 705SX20-0002
LIGHTING #1/0 IN LINE
SPLICES
EA
12.000
ATTD
1220 705SX20-0002
LIGHTING 250W HPS LAMP EA
2.000
1230 705SX20-0002
LIGHTING TAPE AND LABELS EA
24.000
ATTD
Section: 0001 _________._____Total:
Total Bid: _________._____
Page
Bid Items Eligible For Fuel Adjustment
C0000119192C01B
A54
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
FORM C-21B
Rev 12-21-05
0001 REGULAR BID ITEMSSECTION:
ltem Description Fuel Factor gal/unit Option Item
Number
_______BEDDING MATL. AGGR. NO. 57 0.400302SD20-0002
_______CONCRETE CLASS A4 BOX CULVERT 1.892302SD20-0004
_______REGULAR EXCAVATION 0.290303SD20-0001
_______BORROW EXCAVATION 0.290303SD20-0007
_______MINOR STR. EXCAV. PIPE CULVERT 0.290303SD20-0016
_______MINOR STR. EXCAV. BOX CULVERT 0.290303SD20-0017
_______SILTATION CONTROL EXCAVATION 0.290303SD20-0029
_______AGGR. MATL. NO. 25 OR 26 0.600305SD20-0011
_______AGGR. BASE MATL. TY. I NO. 21B 0.600308SD20-0012
_______ASPHALT CONCRETE TY. SM-12.5A CONST 3.500315SD20-0001
_______ASPHALT CONCRETE TY. IM-19.0D CONST 3.500315SD20-0005
_______ASPHALT CONCRETE TY. SM-9.5E CONST 3.500315SD20-0009
_______ASPHALT CONCRETE BM-25.0 3.500315SD20-0010
_______ASPHALT CONCRETE PAVEMENT TY. BM-25.0A 3.500315SX20-0007
_______EROSION CTRL. STONE CL. A1, EC-1 0.600414SD20-0001
_______CONCRETE CLASS A3 MISC. 1.892504SD20-0001
_______DEMO. OF PAVEMENT RIGID 0.200508SD20-0003
_______DEMO. OF PAVEMENT FLEXIBLE 0.200508SD20-0004
_______FLEXIBLE PAVE.PLANING 0"-2" 0.071515SD20-0004
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Steel Price Adjustment
C0000119192C01B
A54
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
Rev 12-21-08
FORM C-21C
0001 REGULAR BID ITEMSSECTION:
ltem Description Option Item
Number
_______REINF. STEEL302SD20-0005
_______GUARDRAIL GR-MGS1, 9' POST505SD20-0013
_______GUARDRAIL TERMINAL GR-MGS2505SD20-0017
_______GUARDRAIL END ANCHORAGE GR-MGS3505SD20-0018
_______GUARDRAIL HEIGHT TRANSITION GR-MGS4505SD20-0019
_______SIGN POST STP-1, 2 3/16", 10 GAUGE700SD20-0035
_______SIGN POST STP-1, 2 1/2", 10 GAUGE700SD20-0036
_______SIGN POST STP-1, 2 1/2", 12 GAUGE700SD20-0037
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Asphalt Adjustment within this Project
C0000119192C01B
A54
Contract ID:
Order No.:
0001 REGULAR BID ITEMSSECTION:
ltem Description Item
Number
ASPHALT CONCRETE TY. SM-12.5A CONST315SD20-0001
ASPHALT CONCRETE TY. IM-19.0D CONST315SD20-0005
ASPHALT CONCRETE TY. SM-9.5E CONST315SD20-0009
ASPHALT CONCRETE BM-25.0315SD20-0010
LIQUID ASPHALT COATING (RUMBLE STRIP)315SD20-0016
ASPH.CONC.CURB BACKUP MATL. CONST315SD20-0018
ASPHALT CONCRETE PAVEMENT TY. BM-25.0A315SX20-0007
Determination of Major Items
1C0000119192C01BContract ID:
ltem Description Item
Number
REGULAR EXCAVATION303SD20-0001
RETAINING STRUCTURE (MSE WALL)506SX20-0007
BORROW EXCAVATION303SD20-0007
ASPHALT CONCRETE TY. SM-9.5E CONST315SD20-0009
Form C-110
Rev. 07-31-24
COMMONWEALTH OF VIRGINIA
DBE REGULAR DEALER/DISTRIBUTOR AFFIRMATION FORM
Bidder / Contractor Name:
Project No. 0076-964-121, C501
FHWA No.: STP-5A27(883)
Contract ID: C0000119192C01B
Date Submitted:
*** INSTRUCTIONS ***
Submit this DBE Regular Dealer / Distributor Affirmation Form for each DBE listed as a regular dealer or distributor, on the Bidder’s Form C-111 within 5 days after the bid opening, along with Form C-112 - Certification of Binding Agreement. In the questions below, “you and “your” refer to the DBE.
Section 26.53(c)(1) of Title 49 Code of Federal Regulations requires the Virginia Department of Transportation to make a preliminary counting determination for each DBE listed as a regular dealer or distributor to assess its eligibility for 60 or 40 percent credit, respectively, of the cost of materials and supplies based on its demonstrated capacity and intent to perform as a regular dealer or distributor, as defined in 49 CFR § 26.55(e)(2)(iv)(A),(B),(C), and (3) under the contract at issue. The preliminary determination will be based on the DBE’s written responses to relevant questions and its affirmation that its subsequent performance of a commercially useful function will be consistent with the preliminary counting of such participation.
DBE Name:
DBE Authorized Representative:
Total Amount of DBE Subcontract / Purchase Order:
NAICS Codes Applicable to Items Sold / Leased:
1. Will all items sold or leased be provided from the on-hand inventory at your establishment?
☐ YES (If "YES," you have indicated that your performance will satisfy the regular dealer requirements and may be counted at 60%. STOP here. Read and sign the affirmation below.)
☐ NO (If "NO" Continue.)
(a) Are you selling bulk items (e.g., petroleum products, steel, concrete, concrete products, sand, gravel, asphalt, etc.) or items not typically stocked due to their unique characteristics (aka specialty items)?
☐ YES (If "YES," Go to Question 2.)
☐ NO (If "NO" Continue.)
(b) Will at least 51% of the items you are selling be provided from the inventory maintained at your establishment, and will the minor quantities of items delivered from and by other sources be of the general character as those provided from your inventory?
☐ YES (If "YES," you have indicated that your performance will satisfy the regular dealer requirements and may be counted at 60%. STOP here. Read and sign the affirmation below.
☐ NO * (*If 1,1(a), and 1(b) above are "NO," your performance on the whole will not satisfy the regular dealer requirements; therefore, only the value of items to be sold or leased from inventory can be counted at 60%. Go to Question 3, below, to determine if the items delivered from and by other sources are eligible for Distributor credit.)
Form C-110
2. Will you deliver all bulk or specialty items using distribution equipment you own (or under a long-term lease) and operate?
☐ YES (If "YES," you have indicated that your performance will satisfy the requirements for a regular dealer of bulk items and may be counted at 60%. STOP here. Read and sign the affirmation below.)
☐ NO (If "NO," your performance will not satisfy the requirements for a regular dealer of bulk items; the value of items to be sold or leased cannot be counted at 60%. Go to Question 3.)
3. Will the written terms of your purchase order or bill of lading from a third party transfer responsibility, including risk for loss or damage, to your company at the point of origin (e.g. a manufacture's facility)?
☐ YES ☐ NO
(a) Will you be using sources other than the manufacturer (or other seller) to deliver or arrange delivery of the items sold or leased?
☐ YES ☐NO
(If you responded "YES" to both 3 and 3(a), you have indicated that your performance will satisfy the requirements of a Distributor; therefore, the value of items sold or leased may be counted at 40%.)
(If you responded "NO" to either 3 or 3(a), your performance will not satisfy the requirements for a regular dealer and counting of your participation is limited to the reasonable cost of fees or commissions charged, including transportation charges for the delivery of materials or supplies;
the cost of materials or supplies may not be counted.)
For DBE:
I affirm that the information that I provided above is true and correct and that my company's subsequent performance of a commercially useful function will be consistent with the above responses. I further affirm that my company will independently negotiate price, order specified quantities, and pay for the items listed in the Bidder's Forms C-111 and C-112. This includes my company's responsibility for the quality of such items in terms of necessary repairs, exchanges, or processing of any warranty claims for damaged or defective materials.
Printed Name of DBE Owner/Authorized Representative Signature
For Bidder:
The Bidder acknowledges its responsibility for verifying the information provided by the DBE named above and ensuring that the counting of the DBE's participation is accurate. Any shortfall in DBE participation caused by errors in counting are the responsibility of the Bidder.
Printed Name of Bidder Owner/Authorized Representative Signature
Form C-111
MINIMUM DBE REQUIREMENTS
PROJECT NO. 0076-964-121, C501 CONTRACT ID. NO. C0000119192C01B
FHWA NO. STP-5A27(883) ORDER NO. A54
* * * I N S T R U C T I O N S * * *
LIST THE DBE(S) WHO WILL PARTICIPATE IN THE CONTRACT, INDICATE THE WORK THEY WILL PERFORM, THEIR VENDOR ID AND DBE CERTIFICATION NUMBERS, AND THE DOLLAR AMOUNT OF PARTICIPATION, REDUCED AS NEEDED FOR REGULAR DEALERS (60%), DISTRIBUTORS (40%), AND BROKERS (FEES/COMMISSIONS). COUNT 100% FOR SUBCONTRACTORS AND MANUFACTURERS, AND FOR HAULERS THAT DELIVER MATERIALS AND SUPPLIES TO THE PROJECT SITE (EXCLUDING COST
OF THE MATERIALS AND SUPPLIES.
0 % X $ = $
DBE GOAL
TOTAL CONTRACT VALUE
MINIMUM DBE PARTICIPATION
DBE SUMMARY
DBE PARTICIPATION ATTAINED TOTAL: $__________
DBE PARTICIPATION ATTAINED PERCENTAGE: ___________%
I/WE CERTIFY THAT THE LISTED DBES WILL BE USED ON THIS CONTRACT AS STATED HEREIN AND THAT IN THE PERFORMANCE OF THE CONTRACT I/WE WILL MAKE GOOD FAITH EFFORTS TO MEET OR EXCEED THE
DBE GOAL ESTABLISHED FOR THE CONTRACT.
BY:
BIDDER'S NAME
SIGNATURE
DATE
Title:
NAME OF DBE
SUBCONTRACTOR
VENDOR
ID NO.
DBE
CERTIFICATION
NO.
SUBCONTRACT
VALUE
DBE USED AS
DOLLAR AMT
DBE CREDIT
SUBCONTR. (S)
MNFR. (M)
HAULER (H)
REG. DLR. (R)
DISTR. (D)
BROKER (B)
100%
100%
100%
60%
40%
Fees/Com
Form C-111
DBE ITEMS ENTRY
Instructions: For each DBE listed in the Summary on page 1, complete a DBE Item Entry form.
NOTE: To count toward the DBE goal, DBEs must be certified in NAICS codes applicable to kind of work they perform. A DBE's Certification number and NAICS Codes are shown in the DBE's listing in the DSBD DBE Directory at: https://directory.sbsd.virginia.gov/#/executiveExport
Full DBE Name: ______________________________________________
DBE Vendor ID No.: ___________ (DBE's number can be found on VDOT's List of Prequalified Vendors)
DBE Certification. No.: ____________________
DBE NAICS Code(s): _____________________________________________________________________
DBE Used As:
_______ Subcontractor (S) Eligible for 100% of Subcontract Value
_______ Manufacturer (M) Eligible for 100% of Subcontract Value
_______ Hauler (H) Eligible for 100% of Subcontract Value Excluding Materials
________ Regular Dealer (R) Eligible for 60%of Subcontract or PO Value
________ Distributor (D) Eligible for 40% of Subcontract or PO Value
________ Broker (B) Eligible for Fees / Commissions Only
WORK ASSIGNED TO DBE
Contract Bid Items Description Of Work QTY Unit DBE's Price Applicable
Dollar Amt
DBE Credit
DBE Credit Total: $ _______________________
BY:
BIDDER'S NAME
SIGNATURE
DATE
Title:
[ATTACH ADDITIONAL SHEETS AS NECESSARY, EACH OF WHICH MUST BE SIGNED AND DATED.]
https://directory.sbsd.virginia.gov/#/executiveExport
Form C-112 Rev. 3-1-11
CERTIFICATION OF BINDING AGREEMENT WITH
DISADVANTAGED BUSINESS ENTERPRISE FIRMS
FHWA NUMBER: STP-5A27(883)
This form is to be submitted in accordance with the Department’s Special Provision for Section 107.15.
It is hereby certified by the below signed Contractors that there exists a written quote, acceptable to the parties involved preliminary to a binding subcontract agreement stating the details concerning the work to be performed and the price which will be paid for the aforementioned work. This document is not intended to, nor should it be construed to, contain the entire text of the agreement between the contracting parties.
This document does not take the place of, nor may it be substituted for, an official subcontracting agreement in those situations that may require such an agreement. A copy of the fully executed subcontract agreement shall be submitted to the Engineer within fourteen (14) working days after contract execution.
It is further certified that the aforementioned mutually acceptable quote and fully executed subcontract agreement represent the entire agreement between the two parties involved and that no conversations, verbal agreements, or other forms of non-written representations shall serve to add to, delete, or modify the terms as stated.
The prime Contractor further represents that the aforementioned mutually acceptable quote and fully executed subcontract agreement shall remain on file for a period of not less than one year following completion of the prime's contract with the Department or for such longer period as provisions of governing Federal or State law or regulations may require. For purposes of this form, the term Prime Contractor shall refer to any Contractor utilizing a DBE subcontractor, regardless of tier, in which they are claiming DBE credit toward the contract goal.
Contractors further jointly and severally represent that said binding agreement is for the performance of a "commercially useful function" as that term is employed in 49 C.F.R. Part 26.55 (c), (d).
TO BE SIGNED BY THE SUBCONTRACTOR TO THE PRIME CONTRACTOR, AND ANY LOWER TIER
SUBCONTRACTORS HAVING A CONTRACT WITH THE BELOW NAMED DBE FIRM
Prime Contractor:
By:
Signature Title
Date:
Form C-112 Rev. 3-1-11
First Tier Subcontractor If Applicable:
Second Tier
If Applicable:
Third Tier
If Applicable
DBE Contractor
FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.
CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1
CN103-000100-01 SEC 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1
CN105-000140-00 SEC 105.14—MAINTENANCE DURING CONSTRUCTION 12-20-24 (SPCN) 1
CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 2
CN221-000100-00 SEC 221.02—DETAIL REQUIREMENTS 1-15-25 (SPCN) 3
CN245-000100-01 SEC 245.03—TESTING & DOCUMENTATION 1-10-24 (SPCN) 3
CN404-000100-00 EXPOSED AGGREGATE FINISH 7-12-16 (SPCN) 5
CN512-000120-00 SEC 512—MAINTAINING TRAFFIC (IMPACT ATTEN. SER.) 7-13-16 (SPCN) 5
CN512-000310-00 POLICE PATROLS R-7-12-16 (SPCN) 5
CN704-000200-00 INLAID PAVE. MARKER LOC. AND SPACING 8-11-21 (SPCN) 5
CQ107-000130-00 DRUG-FREE WORKPLACE 7-3-19 (SPCN) 6
CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 6
CQ512-000130-00 REMOVAL OF SRPMS DURING LANE SHIFTS 3-3-20 (SPCN) 7
CQ512-000321-00 CONTRACTOR MAINT. OF TEMP. MARKINGS 6-13-17 (SPCN) 7
ASPHALT CONCRETE PAVEMENT TY. BM-25.0A 1/11/26 (SPCN) 7
BEDDING MATL. AGGR. NO. 57 3-4-26 (SPCN) 7
LIGHTING #1/0 BARE COPPER EGC 3-4-26 (SPCN) 8
LIGHTING #1/0 COPPER XHHW CONDUCTOR 3-4-26 (SPCN) 8
MODIFY LIGHTING CIRCUIT 3-4-26 (SPCN) 8
INLAID PAVEMENT MARKER ASPHALT 1/11/26(SPCN) 8
PVMT MSG. MARK. "EZ-PASS" TY B, CL II 3-4-26 (SPCN) 9
LIGHTING #1/0 IN LINE SPLICES 3-4-26 (SPCN) 9
LIGHTING TAPE AND LABELS 1/11/26(SPCN) 9
PAVEMENT LIQUID ASHPALT COATING (PAVEMENT MARKER GROOVE) 8/31/26 SPCN 10
SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 11
SP0F0-000130-03 FHWA 1273—CONTRACT PROVISIONS, FED-AID 7-9-26 19
SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 42
SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 48
SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 49
SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1/21/20 50
SP107-001510-06 INTERIM DBE REQUIREMENTS 1-26-26 52
SP107-003100-00 MADE IN THE USA REQUIREMENTS 10-03-25 56
SP108-000110-01 PROG. SCHED. FOR CAT. II PROJECTS 3-21-22 63
SP109-000100-05 ASPHALT MATERIAL PRICE ADJUSTMENT 7-8-24 81
SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 83
SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 85
SP109-000130-01 ELECTRONIC OR PRINTED WEIGH TICKETS 3-10-25 90
SP512-000140-00 WORK ZONE NO CELL PHONE SIGNS 3-18-20 96
SP515-000100-00 COLD PLANE (MILL) ASPHALT CONC. OPERATIONS 7-12-16 98
SP700-000180-03 MODIFICATIONS TO AASHTO’S SIGN STRUCT. SPEC. 9-29-20 103
SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 108
SQ105-000611-02 SEC 105.06 — SUBCONTRACTING (FED FUNDED PROJECTS) 9-1-26 110
SQ107-001300-00 PREVAILING WAGE RATES 10-12-2023 111
SS109-002020-01 SEC 109 — MEASUREMENT AND PAYMENT 5-1-23 115
SS211-002020-03 SEC 211 – ASPHALT CONCRETE 3-18-24 118
SS220-002020-01 SEC 220 – CONCRETE CURING MATERIALS 8-28-20 123
SS223-002020-02 SEC 223 – STEEL REINFORCEMENT 4-4-23 124
SS234-002020-01 SEC 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 125
SS235-002020-01 SEC 235 – RETROREFLECTORS 5-6-22 126
SS236-002020-01 SEC 236 – WOOD PRODUCTS 5-14-21 127
TABLE OF CONTENTS FOR PROVISIONS
SS246-002020-02 SEC 246 – PAVEMENT MARKING 5-6-22 131
SS248-002020-02 SEC 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 139
SS305-002020-02 SEC 305 – SUBGRADE AND SHOULDERS 12-20-23 141
SS308-002020-01 SEC 308 - SUBBASE COURSE 7-13-21 143
SS309-002020-01 SEC 309 - AGGREGATE BASE COURSE 7-13-21 144
SS315-002020-05 SEC 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 145
SS317-002020-01 SEC 317— STONE MATRIX ASPHALT CONCRETE PLACEMENT 6-21-24 164
SS318-002020-01 SEC 318 — PAVEMENT INTERLAYERS 8-2-23 166
SS319-002020-02 SEC 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 167
SS321-002020-02 SEC 321 – TRENCH WIDENING 5-4-23 171
SS407-002020-02 SEC 407 – STEEL & METAL STRUCT 11-01-22 173
SS411-002020-01 SEC 411 – PROT. COAT. OF METAL 11-01-22 175
SS512-002020-03 SEC 512 – MAINTAINING TRAFFIC 7-1-22 176
SS704-002020-02 SEC 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 189
SP522-000130-02 TREE REMOVAL TIME OF YEAR RESTRICTION 6-6-22 195
MSE WALLS (CONCRETE PANEL FACING) 7/8/25 (SPCN) 196
SECTION 108.02 LIMITATION OF OPERATIONS 3/4/26 (SPCN) 204
RW-11/ NATIONWIDE PERMIT 209
CONSTRUCTION GENERAL PERMIT 211
cn100-000026-09 December 11, 2025 (SPCN)
GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS (SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)
This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0;
the Virginia MUTCD version 11.0; and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.
Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.
The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.
cn103-000100-01 June 17, 2025 (SPCN)
SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:
103.02 – Award of Contract
The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law. In the event of a tie bid, the tie will be decided by lot.
The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner where authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.
After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.
cn105-000140-00 December 20, 2024 (SPCN)
SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:
Section 105.14(a)3 – Flagging Traffic is replaced with the following:
3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.
All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.
Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.
The following constitutes a valid flagger certification card:
• Cards issued by VDOT following completion of the Basic Work Zone course;
• Cards issued by VDOT following completion of the Intermediate Work Zone course;
• Cards issued by ATSSA following completion of a Flagger course;
• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date
(two years after date of issuance).
Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.
cn105-000150-00 January 30, 2026 (SPCN)
SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS — The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.
A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:
• At least one special character
• At least one alphabetical character
• At least one numerical character
• A combination of upper-case and lower-case letters
Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.
Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.
For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.
Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.
The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:
1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.
2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.
3. Connected signs shall only be posted with messages from the Department’s ATMS systems or designated backup systems.
4. Community strings (both public and private strings) shall be changed from default settings.
5. All vendor cloud connections shall be removed from the connected sign. TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.
6. All connected electronic signs shall adhere to the Cabinet Security Standards found in the
Department’s OT Cybersecurity Program Manual.
cn221-000100-00 January 15, 2025 (SPCN)
SECTION 221.02—DETAIL REQUIREMENTS of the Specifications is amended by replacing the first paragraph with the following:
Guardrail shall consist of rail or cable elements and fastenings fabricated to develop continuous beam or cable strength when installed. Guardrail materials shall conform to AASHTO M180-18 and M30 specification requirements supplied by manufacturers included on the Department’s Approved List 12.
cn245-000100-01 January 10, 2024 (SPCN)
SECTION 245.03—TESTING AND DOCUMENTATION of the Specifications is amended by the following:
Section 245.03(e) – Prefabricated Geocomposite Pavement Underdrain is replaced by the following:
Prefabricated Geocomposite Pavement Underdrain: Prefabricated geocomposite pavement underdrain shall consist of a polymeric drainage core allowing water inflow from both sides, encased in a nonwoven filter fabric envelope having sufficient flexibility to withstand bending and handling without damage.
Prefabricated geocomposite pavement underdrain shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the pavement environment and shall have a thickness of not less than 3/4 inch. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Properties Test Method Requirements
Compressive strength ASTM D1621, D2412, and
D6364
Min. 40 psi at 20% max.
deflection immediately after
24 hrs of specimen conditioning at 0 deg F and at
125 deg F https://covgov.sharepoint.com/:w:/r/sites/TM-VDOT-SC-Specifications-External/_layouts/15/Doc.aspx?sourcedoc=%7BF1622882-4C64-446A-AE11-E07A4F78D1F2%7D&file=cn221-000100-00.docx&action=default&mobileredirect=true
Physical Properties Test Method Requirements
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 0.1)
ASTM D4716 Min. 15 gal/min/ft width for
12-in specimen length
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over both sides of the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(f) – Geocomposite Wall Drains is replaced by the following:
Geocomposite Wall Drains: Prefabricated geocomposite wall drain shall consist of a polymeric drainage core with a nonwoven filter fabric (single sided or double sided) having sufficient flexibility to withstand bending and handling without damage. Geocomposite wall drains shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the roadway. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Property Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 degree F and at 125 degree F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 1.0)
ASTM D4716 Min. 15 gal/min/ft width (for 12-in specimen length)
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(g) – Geomembrane Moisture Barrier is replaced by the following:
Geomembrane Moisture Barrier: Geomembrane moisture barrier shall be resistant to biological attack.
Geomembrane shall be constructed of PVC and shall conform to the requirements of ASTM D7176 for PVC 30 or higher grades. In addition, geomembrane shall comply with the requirements of ASTM D7408 for bond seam strength and peel strength.
cn404-000100-00 July 12, 2016 (SPCN)
EXPOSED AGGREGATE FINISH shall be performed by wirebrushing, blasting or surface retarder unless another method is approved by the Engineer.
Concrete for exposed aggregate finish shall conform to Section 217 of the Specifications for the class specified, except gravel shall be tan or light brown in color.
The Contractor shall provide a sample of the exposed aggregate finish for approval by the Engineer prior to beginning work. The sample shall be at least 12 inches by 12 inches and approximately 2 inches in depth. The approved sample shall be kept at the work site for comparison to completed work.
cn512-000120-00 July 13, 2016 (SPCN)
SECTION 512—MAINTAINING TRAFFIC of the Specifications is amended as follows:
Section 512.03(i)—Impact Attenuator Service is amended to replace the second paragraph with the following:
Only Type 1 re-directive low-maintenance impact attenuators in accordance with Section 505 shall be used on highways with posted speed limits greater than 50 mph or with an ADT greater than 25,000 vehicles per day.
cn512-000310-00 July 12, 2016 (SPCN)
POLICE PATROLS — The Contractor is advised that the Department will use Police patrols in construction work zones when traffic flow problems are anticipated, to enhance the safety of both the public and construction personnel, during the life of this contract.
cn704-000200-00 August 11, 2021 (SPCN)
INLAID PAVEMENT MARKER LOCATION AND SPACING — The Contractor shall not install markers on existing bridge decks Inlaid Pavement Markers shall be installed on new bridge decks where required by the Plans. Inlaid Pavement Markers shall be placed in relation to pavement joints and cracks as follows:
• In existing Asphalt Concrete pavement, new or existing Hydraulic Cement Concrete pavement, and bridge decks, the edge of the groove shall be at least 2 inches from pavement joints and cracks, ensuring that the finished line of markers is straight in accordance with the tolerance for pavement markings specified in Section 704.03 of the Specifications.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .