Fire Station #7 Partial Roof Replacement – Invitation for Bids
This Invitation for Bids (IFB No. B126103-EY) is issued by the County of York, Virginia, Central Purchasing office, for a partial roof replacement project at York County Fire Station #7 Administrative Building located at 5684 Mooretown Road, Williamsburg, Virginia. The scope of work includes removal and disposal of the existing asphalt shingle roof system down to the plywood surface, removal of existing gutters and downspouts, installation of a new architectural shingle roof system on synthetic underlayment with ice and water shields, new flashing for penetrations and ridge vents, new aluminum sheet metal gutters and downspouts, permanent fall protection anchors, utility disconnects and reconnects as needed, recertification of the lightning rod system, and provision of one-year contractor and 40-year manufacturer warranties. Work is limited to the larger shingled section of the structure; the bay roof will only receive ice guards, and no work will be performed on the middle vestibule section. A pre-bid meeting is scheduled for September 14, 2026, at 10:00 AM at the project site, with attendance optional. Bids are due by September 30, 2026, at 2:30 PM EST and must be submitted as sealed paper copies to Central Purchasing or via email to bid@yorkcounty.gov. Bid opening will occur on October 1, 2026, at 2:45 PM and may be observed in person or via Microsoft Teams. The project schedule requires substantial completion within 30 calendar days of the Notice to Proceed and final completion within 45 calendar days, with liquidated damages assessed at $200 per calendar day for delays beyond these milestones.
Contractors must hold a current Virginia Class A Contractors License with a minimum of four years of roofing experience and must provide references demonstrating successful completion of at least two similar projects within the past four years. A bid bond equal to five percent of the total bid amount is required with bid submission. Upon contract award, the successful bidder must provide performance and payment bonds equal to 100 percent of the accepted bid amount, along with proof of comprehensive liability insurance protecting the County. The County reserves the right to reject any and all bids, cancel the solicitation, or negotiate with the lowest responsive bidder if bid prices exceed available funds. York County building permits will be waived; however, the contractor is responsible for all other permits and associated fees. Award is anticipated within 60 days of bid opening. The contract will be awarded to the single lowest responsive and responsible bidder based on total combined bid price. All bids must acknowledge receipt of any addenda and comply with Virginia Code provisions regarding procurement, collusive bidding, and contractor integrity. Contractors must provide their own temporary site facilities, including portable sanitation, maintain site security and clean conditions throughout the project, and are responsible for all debris removal and site restoration upon completion.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANCcp v: 01-07-2026
INVITATION FOR BIDS
IFB No. B126103-EY
Issue Date: August 26, 2026
County of York, Virginia
CENTRAL PURCHASING
120 Alexander Hamilton Blvd.
Yorktown, VA 23690
Phone: (757) 890-3680 https://www.yorkcounty.gov/571/Central-Purchasing
The Central Purchasing office of the County of York, Virginia, as agent for The County of York, Virginia (“Owner”), will receive sealed bids for the below described goods/services, subject to the conditions and instructions specified herein.
Title/Project:
Fire Station # 7 Partial Roof Replacement
Pre-Bid Meeting Date: September 14, 2026 Time: 10:00 AM Location: 5684 Mooretown Rd Williamsburg, VA 23188 Attendance is Optional
Bids Due: September 30, 2026 through 2:30 PM EST
Method of Bid Submittal
Submittal requirements shall be as specified in Section B.2.b. to the Central Purchasing Office. No exceptions.
DO NOT SUBMIT YOUR RESPONSE THROUGH eVA.
Only paper responses submitted directly to Central Purchasing will be considered.
Bid Reading: Bids will be opened and announced by Central Purchasing staff office as specified in Section B.4. The bid opening may be observed in person or via TEAMS.
Questions: Questions or comments related to this solicitation shall be directed to the Contract Officer not later than 3:00 p.m. EST on September 17, 2026. All questions shall be submitted in writing (email is preferred). Telephone inquiries will not be accepted.
Contract Officer: Evan Young, VCA, Buyer evan.young@yorkcounty.gov
The County of York, Virginia (the “County”) is seeking bids from qualified firms (the “Bidder”, “Vendor” or “Contractor”) to furnish the goods and/or services described herein, for submittal to the County as specified above. This solicitation is posted on eVA, Virginia’s eProcurement Portal (www.eva.virginia.gov) and is available for free download.
A direct link to all York County solicitations on eVA is available on Central Purchasing webpage (https://www.yorkcounty.gov/571/Central-Purchasing) by selecting “Solicitations” from the left side bar. Bidders and potential subcontractors may communicate and collaborate using the B2B Connect tab on the eVA solicitation webpage.
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
For purposes of this solicitation, the following definitions shall apply:
“Board”: The Board of Supervisors County of York Yorktown, Virginia, or where applicable The County School Board of York County, Virginia.
“County”: County; County of York, Virginia; or any of its departments, agencies or its officials, officers, employees, agents and volunteers, including specifically, but not limited to, the York County School Board, the York-Poquoson Department of Social Services, Constitutional Officers, the York County Library, or any other governmental entity for which the County is acting as agent.
“Contractor”: The legal entity to whom an award is made as a result of this solicitation.
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
Table of Contents
REQUIREMENTS
Section A – Specifications/Scope of Work Section B – Bid Process Section C – Contract Specific Terms and Conditions
Supplement 101 – Definition of Terms Supplement 102 – Additional Instructions to Bidders Supplement 103 – [Supplement is not applicable in this Section] Supplement 104 – [Supplement is not applicable in this Section] Supplement 105 – Control of Work Supplement 106 – Control of Material Supplement 107 – Legal Relations and Responsibilities to the Public Supplement 108 – Prosecution and Progress of Work Supplement 109 – Measurement and Payment Supplement 110 – Special Provisions
Section D – General Terms and Conditions
EXHIBITS
Exhibits are provided for reference; do not complete or return them with your bid.
A Sample Contract is provided as an Exhibit. Exhibits within the Sample Contract may be referenced in other sections of the IFB.
Exhibits within the Contract shall include:
A. Bidder’s Bid B. Certification of Compliance with Immigration Laws and Regulations C. Insurance Requirements D. Bonds (Performance, Payment) E. Plan Set and Project Manual (Incorporated by Reference)
SUBMITTAL DOCUMENTS
Form A: Bid Form (Include responses to all sections)
Form B: SWAM Information Form C: References Form D: Proprietary Information Form E: Insurance Carrier Acknowledgement Form F: Bid Bond Form G: Questionnaire
APPENDIX
Appendix I: Mailing Label
ATTACHMENTS (PUBLISHED SEPARATELY TO eVA)
PLAN SET
PROJECT MANUAL
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
REQUIREMENTS
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
SECTION A
SCOPE OF WORK/ SPECIFICATIONS
1. PURPOSE: The County of York, Virginia (Owner) is seeking the services of a professional contractor to furnish/provide all labor, materials, tools, and equipment required to complete a partial roof replacement at York County’s Fire Station 7 Administrative Building in strict accordance with the Drawings and Specifications, including any and all Addenda, and in strict compliance with the Contract Documents, the terms of which are incorporated herein by reference. Work will only be performed on the larger shingled section of the overall structure. The bay roof will only be receiving ice guards, and no work will be done on the middle vestibule section.
2. SCOPE OF WORK:
The partial roof replacement of Fire Station 7 shall include, but not be limited to, the following Scope of Work, as described in the Drawings and other Contract Documents:
o Remove and dispose of the existing asphalt shingle roof system down to the existing plywood surface.
o Remove and dispose of the existing gutters and downspouts.
o Provide a new architectural shingle roof system on synthetic underlayment. The work will include providing new ice and water shields at valleys, eaves, rakes, ridges, transitions, and penetrations as shown in the Drawings.
o Provide new flashing for the penetrations and new ridge vents as shown in the Drawings.
o Provide new aluminum sheet metal gutters, downspouts, roof edge metal, drip edge, step flashing, ice guards, and other sheet metal flashings shown in the Drawings.
o Provide new permanent fall protection anchors.
o Provide all necessary utility disconnects, reconnects, and utility extensions needed to complete the work.
o Recertify the lightning rod system upon completion of work.
o Provide a one-year contractor’s warranty for all work.
o Provide a new 40-year manufacturer’s roof system warranty for the asphalt shingle roof systems.
See all Sections, including Supplements, Attachments and all other referenced documentation for complete Scope of Work and Specifications.
3. PERMITS: The Contractor is responsible for obtaining all necessary permits and agency approvals, and shall adhere to all Federal, State and Local regulations. Fees for York County Building permits will be waived; Contractor is responsible for payment of all other permits and related expenses. The Contractor shall provide all labor, materials and supplies required and necessary for the proper completion of the work whether each necessary item is mentioned herein or not.
The Contractor shall provide all services for the work and the removal of rubble and debris to an appropriate disposal area.
4. SUPERVISION: The Contractor shall supervise and direct the work, and shall be solely responsible for the means, methods, techniques, sequences and procedures of the work. The Contractor shall employ and maintain throughout the Project a qualified supervisor and he or she shall have been designated in writing by the Contractor as the Contractor’s representative for the site. The supervisor shall have full authority to act on behalf of the Contractor and all communications given to the supervisor shall be the same as if given to the Contractor. The supervisor or a designated representative shall be present on the site at all times as required to perform adequate supervision and coordination of the Work. The Contractor shall notify the Owner in writing prior to any change of supervisor.
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
5. INTENT: The intent of the Agreement is to provide for completion of the Work specified herein. The Contractor shall furnish all materials, labor, tools, equipment, protection, testing and inspections, construction site protection, construction waste management, and project supervision services, to complete the Project in accordance with this Invitation for Bids document, all referenced contract drawings and specifications, including all other subsequent issued addenda and related documents.
If, during the performance of the Work, the Contractor finds a conflict, error or discrepancy in the Contract Documents, the Contractor shall so report to the Owner in writing at once and before proceeding with the Work affected thereby, except in the case of emergency or public safety, shall obtain a written interpretation or clarification from the Owner however, the Contractor shall not be liable to the Owner for failure to report any conflict, error or discrepancy in the Contract Documents unless the Contractor has actual knowledge thereof or should reasonably have known thereof.
The Contract Documents may be amended to provide for modifications in the Work by a Change or Field Order pursuant to Section C, Supplement #109, Subsection II.
6. PRE-BID MEETING: The Contractor shall visit the site of the proposed Work and make such explorations as the
Contractor determines to be necessary at the time of the Pre-Bid Meeting.
7. SITE SECURITY: The Contractor shall be responsible for the security and safety of all project facilities including, but not limited to, all equipment, materials, site structures, and construction thereon. All security measures deemed necessary by the Contractor to comply with this requirement shall be at the Contractor’s expense at no additional cost to the Owner.
The Contractor shall be responsible for all site security until final acceptance of the Work by the Owner.
8. CLEAN-UP, DISPOSAL AND RESTORATION: The Contractor shall maintain the site of the project in an orderly and clean condition and shall at its expense, remove and legally dispose of accumulations of rubbish or refuse materials.
The Contractor shall confine all equipment, the storage of materials and equipment, and the operations of workmen to areas permitted by law, ordinances, permits, or the requirements of the Contract Documents, and shall not unreasonably encumber the premises with materials or equipment.
The Contractor shall not load nor permit any part of any structure to be loaded with weights, stresses or pressures that will endanger the structure.
Upon completion and before final acceptance of the Work performed under the Agreement, the Contractor shall remove and legally dispose of all rubbish, surplus or discarded materials, false work, forms, temporary structures, field offices, signs, temporary erosion and siltation control measures, and equipment and machinery, and shall leave the site and ground occupied in connection with the performance of the Work in the conditions existing before the Work was started, to the satisfaction of the Owner.
9. PROJECT SCHEDULE / LIQUIDATED DAMAGES:
Substantial Completion: 30 calendar days from the date of Notice to Proceed for construction.
Liquidated Damages: $200 per calendar day after time for Substantial Completion has expired.
Final Completion: 45 calendar days from the date of Notice to Proceed for construction.
Liquidated Damages: $200 per calendar day after time for Final Completion has expired.
End of Section A
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
SECTION B
BID PROCESS
1. eVA REGISTRATION
a. In order to participate in County of York solicitation opportunities, Bidders are not required to be registered in eVA.
However, because the County uses eVA to post awards, eVA registration by the selected firm(s) may become necessary. Award of a County of York contract as a result of this solicitation will not result in the assessment of a fee from eVA.
b. eVA registration provides access to many free services and tools including automated placement on bidders lists and email/fax notifications for business opportunities with Virginia State Agencies, Colleges and Universities, as well as many Local Governments.
c. DO NOT SUBMIT YOUR RESPONSE THROUGH eVA. Only paper responses submitted directly to Central
Purchasing, or emailed responses sent to bid@yorkcounty.gov, will be considered. Do not email your response to the Contract Officer.
2. BID PREPARATION AND SUBMISSION REQUIREMENTS
a. Direct contact with anyone other than the County of York, Virginia Central Purchasing, including the Owner’s departments or the Owner’s contractors, regarding this Invitation for Bids is expressly forbidden except with the permission of the Contract Officer. Violation of this directive may result in a determination that the Bidder is ineligible for award.
b. Bids shall be submitted as specified below, other methods are not allowed.
1. Sealed Bids shall be delivered to the Central Purchasing office, located on the second floor of the Finance Building, 120 Alexander Hamilton Blvd., Yorktown, VA 23690, between the hours of 8:15 am and 5:00 pm, Monday through Friday.
The following information should be written on the outside of the submittal envelope or package:
Bid Number Title of Bid Submittal Deadline Date and Time Bidder’s Name
2. If the building is closed to visitors, call 757-890-3882 and Purchasing staff will meet you at the building’s front door (Fire Exit) to receive your bid.
3. If the building is closed to both visitors and Central Purchasing staff (i.e.: snow closing), then bids shall be accepted on the next business day of Central Purchasing at the originally scheduled time.
4. In addition to delivery by the Bidder as described above, bids may be delivered by USPS, UPS, FedEx, etc., however the County assumes no responsibility for misrouted documents, and will not consider them if they are received in the Central Purchasing office after the specified date and time deadline.
NOTE: Direct contact with anyone other than the County of York, Virginia Central Purchasing, including other County departments or the County’s consultants, regarding this Invitation For Bids (IFB) is expressly forbidden except with the permission of Central Purchasing’s Contract Officer.
Violation of this directive may result in a determination that the Firm is ineligible for award.
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
5. Alternatively, bids may be submitted electronically to bid@yorkcounty.gov, using the Bid Number as the
“Subject Line”. File size is restricted to 25MB. A “paper” copy is not required.
Do not email your response directly to the Contract Officer. The County shall not be responsible for misrouted email (ie: mail delivered as SPAM; sent to an alternative email account; undeliverable due to file size; etc.).
c. Bids will not be accepted if submitted by any other method than as specified in “b” above.
d. All bids shall be submitted on and in accordance with this form. Failure to return required documents and information specified herein may result in a determination that the bid is non-responsive. All costs associated with preparing a bid are the Bidder’s responsibility.
e. The solicitation document as posted by Central Purchasing shall be considered the official copy. In the case of any inconsistency between bid documents submitted to the County, but not clearly listed on the exception page of the document as an exception by the Bidder, the language of the official copy shall prevail. Furthermore, any exception or changes to the specifications made by the Bidder may be cause to disqualify the bid from award consideration.
If this solicitation requests information in an electronic format, all electronic files uploaded must be in a common format accessible by software programs the County uses. Those common formats are generally described as Microsoft Word (.doc or .docx), Microsoft Excel (.xls or .xlsx), Microsoft Power Point (.ppt or pptx), or Adobe Portable Document Format (.pdf.). Bidders will not secure, password protect or lock uploaded files; the County must be able to open and view the contents of the file. Bidders will not disable or restrict the ability of the County to print the contents of an uploaded file. Scanned documents or images must be of sufficient quality, no less than 150 dpi, to allow for reading or interpreting the words, drawings, images or sketches. The County may disqualify any Submittal Response that does not meet the criteria stated in this paragraph.
f. Bids must be received by Central Purchasing as specified on page one of the IFB [or as adjusted per Section B.2.b.3, or by addendum]. It is the responsibility of the Bidder to see that his bid is received by Central Purchasing staff by the specified time and date. Date of postmark will not be considered. If no timely bids are received by the specified date/time, the County’s Purchasing Agent may, at its sole discretion, consider a late submittal.
g. The County’s receipt of a bid document is not to be construed as a determination that the bid document is responsive, nor shall receipt of a bid document be construed as an award or an order to provide goods or services.
h. All bids must be signed by an officer or employee having the authority to sign on behalf of the firm.
i. Prices shall be stated in units of quantity specified. No additional charges shall be passed on to the Owner, including any applicable taxes, delivery, or surcharges. Prices quoted shall be the final cost to the Owner.
j. All prices and notations should be in ink or typewritten. Mistakes may be crossed out and corrections made in ink and must be initialed and dated in ink by the person signing the bid.
k. Prices shall be entered on and in accordance with the bid form. In case of an error in the calculation of cost based on multiple units of the same item, the unit price shall govern and the correct amount will be calculated by the County.
In case of an error in the total cost, the individual line items shall govern and the summation will be calculated by the County. When included on the bid form, failure to provide unit pricing may result in a determination of non-responsiveness.
l. The Terms and Conditions in this Invitation For Bids shall supersede any terms and conditions of the Bidder’s bid.
Any additional conditions a Bidder intends to be considered must be submitted as part of the bid and be indicated on the Exceptions section of the Bid Form. Such exceptions may result in the bid being determined non-responsive.
m. The Specifications, Scope of Work, Item Descriptions, etc. shall supersede any additional writings submitted by the Bidder. Such writings shall be clearly marked and noted by the Bidder on the exception page.
n. All materials specified shall have been determined to have characteristics appropriate for the purposes of this Project.
Where any item of equipment or material is specified by proprietary name, trade name, catalog reference, or name of one or more manufacturers, without the addition of such expressions as "or equal," it is to be understood that those items are so specified for reasons of standardization in maintenance and operation, or for reasons of obtaining desirable features best suited to the requirements of the Specifications. This specific equipment shall form the basis of the Bid and be furnished under the Agreement. When the drawings or specifications specify one or more manufacturers' brand names or makes of materials, devices or equipment as indicating a quality, style, appearance or performance, the Bidder shall base their bid on either one of the specified brands, and only the specified items shall be used (No Substitute).
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
However, in the event that the clause “or equal” is used in the specifications pertaining to the material or article, the proposed use of an article other than that specified may be considered, but must be approved by the Owner. The burden of proof as to the comparative quality and suitability of the proposed substitute equipment, articles or materials shall be upon the Bidder, and they shall furnish at their own expense, such information relating thereto as may be required by the Owner.
Requests for approval of products other than as specified shall be submitted in writing to Central Purchasing no later than the time and date indicated on page one as the deadline for questions, and shall include manufacturers samples(s).
Consideration will be given to bids submitted on commodities other than as specified to the extent that such action is deemed to serve best the interests of the Owner. The Owner shall be the sole judge as to the comparative quality and suitability of proposed substitute equipment, articles or materials and their decisions shall be final and unreviewable.
If the Bidder does not indicate that the commodity they propose to furnish is other than specified, it will be construed to mean that the Bidder proposes to furnish the exact commodity described.
Post-award proposed substitutes: After contract award, a Contractor may propose a substitute item. The Contractor shall furnish the Owner any such information as the Owner may request to evaluate the substitute item to include estimates of costs or credits, redesign, claims or schedule impacts, warranty or maintenance issues or payment of any license or royalty that could directly or indirectly result from acceptance of the substitute. Any cost or time impacts to the project schedule caused by the Contractor’s submission of a substitute shall be borne by the Contractor. Any costs incurred by the Owner or by the Owner’s Architect/Engineer in reviewing the suitability of the substitute item shall be borne by the Contractor. At i t s sole di scret ion, the Owner may accept and allow use of the proposed substitute item, or may reject the proposed item and require the use of the originally specified item.
o. The apparent silence of these specifications and any supplemental specifications as to any detail or the omission from the specifications of a detailed description concerning any point shall be regarded as meaning only the best commercial practices are to prevail and correct type, size and design are to be used. All interpretations of these specifications shall be made on the basis of this statement.
p. Bidders may request withdrawal of their bids from consideration.
Prior to the deadline designated for the receipt of Bids, a Bidder may request withdrawal of its Bids. The withdrawal of a paper bid shall only be made by a representative of the firm submitting the Bid, who shall appear in person prior to the deadline designated for receipt of Bids. Such representative shall furnish satisfactory identification and proof that they are authorized to withdraw the Bid. Telephone, e-mail, or facsimile notices will not be considered.
Additions and/or deletions marked on the outside of the Bid envelope will not be considered. The request for withdrawal of a bid submitted by email must be made by email from the same email account as was used to submit the original emailed bid. The email shall be identified in the same manner that the bid was initially submitted.
After bids are opened, a bidder may request withdrawal of its bid due to error by giving notice to the Contract Officer in Central Purchasing not later than two business days after bids are publicly opened. Work papers showing evidence of error(s) may be required. Upon request, administrative withdrawal procedures will be provided that shall be used for that purpose. No Bid may be withdrawn under this section when the result would be the awarding of the Agreement on another Bid to the same Bidder or to another Bidder in which the ownership of the withdrawing Bidder is more than five percent. If a Bid is withdrawn under the authority of this section, the remaining Bids shall be evaluated to determine the lowest responsive and responsible Bidder. No Bidder who is permitted to withdraw a Bid shall, for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person or firm to whom awarded, or otherwise benefit, directly or indirectly, from the performance of the Project for which the withdrawn Bid was submitted.
q. A bid by a Bidder certifies that they are not currently debarred or suspended by a local, state or federal government entity from doing business with that entity, nor are they an agent of any person or entity that is now so debarred. If a debarment or suspension exists, supporting information shall be provided with the response. Suspension or debarment may disqualify the Bidder from award of a contract.
r. Bid submittals (including all documents, schedules, reports, plans and other attachments) shall become the property of the County of York, VA and/or any agency of the County, and/or any political subdivision for whom the County of York, VA issues this solicitation, and documents will not be returned to the Bidder.
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
s. DO NOT SUBMIT YOUR RESPONSE THROUGH eVA. Only paper responses submitted directly to Central Purchasing, or emailed responses sent to bid@yorkcounty.gov, will be considered. Do not email your response to the Contract Officer.
3. ADDENDA: Changes or supplemental instructions to this Invitation For Bids will be in the form of written Addenda. All
Addenda will be posted online with this solicitation. It is the Bidder’s responsibility to check for Addenda prior to the bid due date and time to ensure that all addenda are received.
The County posts all solicitations and related addenda on eVA, Virginia’s eProcurement Portal (www.eva.virginia.gov).
A direct link to all York County solicitations on eVA is available on Central Purchasing webpage (https://www.yorkcounty.gov/571/Central-Purchasing) by selecting Solicitations from the left side bar.
All Bidders shall acknowledge receipt of Addenda with the Bid. Acknowledgement of all Addenda shall be in the space provided on the Bid Form or by returning a copy of each signed Addendum. If all Addenda are not acknowledged, the Bid may be determined non-responsive.
4. PUBLIC OPENING: Bids must be received by Central Purchasing by the time specified on page one of the IFB [or as adjusted per Section B.2.b.3, or by addendum]. Fifteen minutes after that time, bids will be opened and announced by Central Purchasing staff in the Finance Building’s second-floor Conference Room. The bid opening may be observed in person or via TEAMS.
The Owner's Representative whose duty it is to open Bids will decide when the specified time has arrived. No responsibility will be attached to any such person for the premature opening of a Bid not properly addressed and identified.
As soon as practical, the County posts bid tabulations on eVA, Virginia’s eProcurement Portal. A direct link to all York County solicitations on eVA is available on Central Purchasing’ webpage (https://www.yorkcounty.gov/571/Central- Purchasing).
5. RIGHT TO CANCEL: The County reserves the right to cancel this solicitation in its entirety at any time, to reject any and all bids, and to refrain from making an award if it is determined to be in the best interest of the County. In the event of such cancellation, rejection, or decision not to award, Bidders shall have no claim or entitlement to any costs, reimbursements, or compensation of any kind arising from or related to this solicitation. Submission of a bid confers no right to an award or to any expectation thereof.
6. EVALUATION OF BIDS: In evaluating Bids, the County shall consider the qualifications and experience of the Bidders, whether or not the Bids comply with the prescribed requirements, unit and lump sum prices, and additive/alternate bid items if requested in the Bid Form.
The County may consider the qualifications and experience of subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for those portions of the Work
Microsoft Teams meeting Join:
https://teams.microsoft.com/meet/241210660486645?p=kOqUG9UKtHChynm4Ls Meeting ID: 241 210 660 486 645 Passcode: p5fv3mk6
Need help? | System reference Dial in by phone +1 929-352-1542,,516658802# United States, New York City Find a local number Phone conference ID: 516 658 802# For organizers: Meeting options | Reset dial-in PIN https://teams.microsoft.com/meet/241210660486645?p=kOqUG9UKtHChynm4Ls
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement for which the identity of Subcontractors and other persons and organizations shall be submitted as specified in the Bid Documents.
The County may conduct such investigations as deemed necessary to establish the responsibility, qualifications and financial ability of the Bidders, proposed Subcontractors and other persons and organizations to do the Work in accordance with the Bid Documents to the County’s satisfaction within the prescribed time.
The Bids of any Bidder or Bidders who engage in collusive bidding shall be rejected. Any Bidder who submits more than one Bid in such a manner as to make it appear that the Bids submitted are on a competitive basis from different parties shall be considered a collusive Bidder. The provisions contained in § 2.2-4367 through § 2.2-4377, Code of Virginia, as amended, shall be applicable to all contracts solicited or entered into by the County. By submitting their Bids, all Bidders certify that their Bids are made without collusion or fraud, and that they have not offered or received any kickbacks or inducements from any other Bidder, Supplier, manufacturer or subcontractor in connection with their Bid, and they have not conferred with any public employee having official responsibility for this procurement transaction, any payment, loan, subscription, advance, deposit of money, services or anything of more than nominal value, present or promised, unless consideration of substantially equal or greater value was exchanged.
7. AWARD AND EXECUTION OF CONTRACT:
A. Award of Contract:
The Contract will be awarded or the bids rejected as soon as reasonably possible, but not later than sixty (60) days after the date of opening bids, unless the period for acceptance is otherwise extended at request of Owner and agreed to in writing by the Bidder, or Bidders.
A single award will be made to the lowest responsive and responsible Bidder, and shall be based on the TOTAL COMBINED BID PRICE indicated on Form A.10.C of IFB No. B126103-EY, which shall be a summation of the Lump Sum Bid Price indicated on Form A.10.A and the Extended Price indicated on Form A.10.B of IFB No. B126103-EY.
If in the event only one bid is received and the Purchasing Agent in consultation with the using agency makes a determination that it would not be in the best interest of the Owner to re-bid the procurement, such determination shall be in writing and shall be provided to the approving authority when approval by other than the Purchasing Agent is required.
In case of a tie bid, preference shall be given to goods, services, and construction produced in Virginia or provided by Virginia persons, firms, or corporations (with Bidders situated within the County of York given first preference) if such a choice is available; otherwise the tie bid shall be decided by lot. Where all Bidders are Virginia persons, firms, or corporations (or alternatively, if all Bidders are non-Virginia persons, firms, or corporations), the tie shall also be decided by lot. See York County Code Chapter 2.1.
A notice of award will be posted with the original solicitation on eVA, Virginia’s eProcurement Portal (www.eva.virginia.gov). A direct link to all York County solicitations on eVA is available on Central Purchasing webpage (https://www.yorkcounty.gov/571/Central-Purchasing) by selecting Solicitations from the left side bar.
The County reserves the right to reject any and all bids, including if the County determines any of the bid prices are significantly unbalanced to the potential detriment of the County, and to waive any informality, if it is determined to be in the best interest of the County. Unless canceled or rejected, a responsive bid from the lowest responsible Bidder shall be accepted as submitted; except if the bid from the lowest responsible Bidder exceeds available funds, the Purchasing Agent may negotiate with the apparent low Bidder to obtain a contract price within available funds.
A Bidder may protest the award or decision to award by submitting such protest in writing to the Purchasing Agent no later than ten (10) days after the award of the announcement of the decision to award. No protest shall lie for a claim that the selected Bidder is not a responsible Bidder. The written protest shall include the basis for the protest and the relief sought.
B. Entering Contract:
Upon award of the solicitation to a Bidder, such Bidder shall enter into the Contract by signing the Contract and by furnishing the Bond(s) for faithful performance as prescribed herein and the Certificate of Insurance with Endorsement(s)
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement within ten (10) calendar days after the date of the award. Failure to provide the Certificate and endorsement(s) within this period may be cause for the County to award a contract to the next responsive and responsible Bidder, and hold the original Contractor liable for excess costs.
No contract shall result from the submission of any bid and no liability shall accrue with respect thereto until a written contract and accompanying documents have been fully and completely executed on the part of the successful Bidder and the Owner. However, failure by the successful Bidder to enter into a written contract shall cause the successful Bidder to forfeit the full amount of the bid guarantee to the Owner.
8. DEBRIEFING
Bid and proposal records shall be open to public inspection only after award of the Contract. Unless the Owner decides not to accept any bids or not to accept any of the proposals and reopen the solicitation, any Bidder may be allowed to inspect the bid records after bid opening, and any Bidder may be allowed to inspect the proposal records after the evaluation and negotiation of proposals are completed, and prior to award.
Inspection of the records shall be made available in the office of Central Purchasing for public review. Interested parties may request a review time during normal business hours, 8:15 a.m. – 5:00 p.m., Monday -Friday. The Purchasing Agent reserves the right to limit the duration of inspection reviews to not more than sixty minutes per review; multiple reviews are allowed. Until available to the public, no copy, photograph, or any other facsimile of a procurement record shall be allowed.
A notice of decision to award or award will be posted with the original solicitation on eVA, Virginia’s eProcurement Portal (www.eva.virginia.gov). A direct link to all York County solicitations on eVA is available on Central Purchasing’s webpage (https://www.yorkcounty.gov/571/Central-Purchasing) by selecting Solicitations from the left side bar.
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
SECTION C
CONTRACT SPECIFIC TERMS AND CONDITIONS
1. QUESTIONS: Questions regarding this Invitation for Bids (IFB) must be received prior to the date and time posted on the cover page.
2. PRE-BID CONFERENCE: A pre-bid conference is scheduled related to this IFB on the date, time and location posted on the cover page. Attendance at the pre-bid conference is not mandatory in order for a bid to be considered for award.
3. CONTRACTOR QUALIFICATIONS: Contractor shall have the capability in all respects to fully perform the services or provide the goods specified and have the experience necessary to assure good faith performance of the contract.
In order to qualify for the work of this project, Contractor’s primary business shall be roofing and Contractor must have been in this business for a minimum of four (4) full years. Contractor shall have a current Virginia Class A Contractors License. Contractor must have successfully performed a minimum of two (2) projects of similar scope and scale to this project within the past four (4) years, and these projects shall be listed on Form C (References), to be included with the Bidder’s bid response.
To demonstrate their qualification to perform the Work, each Bidder shall be prepared to submit further written satisfactory evidence that the Bidder has sufficient experience, necessary capital, materials, machinery and skilled workers to complete the Work. If financial statements are required they shall be of such date as the Owner shall determine and shall be prepared on forms acceptable to the Owner. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the Work. The Owner's decision or judgment on these matters shall be final, conclusive and binding.
Bidders shall list on the Questionnaire (Form G, #6) the Subcontractors who will be performing work on the Agreement, and this shall be included in the bid package. Such list shall be accompanied by an experience statement with pertinent information as to similar projects and other evidence of experience and qualification for each such Subcontractor, person and organization.
If the Owner, after due investigation, has reasonable objection to any proposed subcontractor, other person or organization, the Owner may request the apparent low Bidder to submit an acceptable substitute without an increase in Bid price. If the apparent low Bidder declines to make any such substitution, the contract shall not be awarded to such Bidder, but his declining to make any such substitution will not constitute grounds for sacrificing his Bid Security. For any subcontractors, other person or organization so listed and to whom Owner does not make written objection prior to the giving of the Notice of Award, it will be deemed the Owner has no objection.
4. METHOD OF AWARD: A single award will be made to the lowest responsive and responsible Bidder, and shall be based on the TOTAL COMBINED BID PRICE indicated on Form A.10.C of IFB No. B126103-EY, which shall be a summation of the Lump Sum Bid Price indicated on Form A.10.A and the Extended Price indicated on Form A.10.B of IFB No. B126103-EY.
5. PURCHASE ORDER: Upon award of Contract, a Purchase Order, if issued, shall initially be for the amount indicated by the lowest responsive and responsible bidder for ITEM A: Lump Sum Bid Price, as it appears on Form A.10.A. This amount may be modified under authorized Change Order by the unit price indicated on Form A.10.B (Unit Price 1), should damaged/rotted roof deck be encountered during the project.
6. BONDING REQUIREMENTS:
a. Bid Bond: Each bid shall be accompanied by a Bidder’s bond issued by a company authorized and licensed to transact business as surety in the Commonwealth of Virginia, a certified check, or cash escrow, in an amount equal to not less than five (5) percent of the total amount of the bid, made payable to Treasurer, County of York, Virginia. Upon approval of the Owner’s attorney, in accordance with Section 2.2-4338, Code of Virginia, 1950, as amended, a Bidder may furnish a personal bond, property bond, or bank or savings and loan association’s letter of credit on certain designated funds for the amount required for the Bid Security. The Bid
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
Security shall be accompanied by a certified copy of the power of attorney for the surety attorney-in-fact.
Said bid security shall be left with the Owner, subject to the conditions specified herein, as a guarantee of good faith on the part of the Bidder that it shall guarantee that the Bidder will not withdraw his bid for a period of sixty (60) days; and, that if his/her bid is accepted, he/she will enter into a formal contract with the Owner, and the required bonds and Insurance Certificate/Endorsement(s) will be given within the allotted time period.
Upon request, the Bid Security shall be returned bidders within five (5) days after the execution of an Agreement and Performance and Payment Bonds and Certificates of Insurance have been approved by the County.
b. Performance and Labor and Material Payment Bonds: The Successful Bidder shall execute and provide to the Owner, following Notice of Award, Performance and Payment Bonds with surety in an amount equal to 100% of the accepted Bid. The sureties of all Bonds shall be of such surety company or companies as are approved by the Owner and are authorized to transact business in the Commonwealth of Virginia. If the execution is by an attorney-in-fact, a power of attorney evidencing the authority of such attorney shall be attached to the Bond. Such power of attorney shall bear the same date as the Bond to which it is attached.
All Bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws and Regulations and shall be executed by such sureties as are named in the current list of “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Audit Staff, Bureau of Government Financial Operations, U. S. Treasury Department and licensed to do business in Virginia.
The Contractor shall notify his Surety of any change affecting the general scope of the Work or change in the Contract Price and/or Contract Time and the amount of the applicable Bonds shall be adjusted accordingly. The Contractor shall furnish proof of such adjustment to the Owner.
Performance and Payment Bonds shall remain in full force during the warranty period defined in Section C, Supplement #107-VI.
7. CONTRACT/AGREEMENT: Award shall be made by issuance of a contract executed between the Bidder and the
County. A sample contract is included in this Invitation for Bids. Do not return the sample contract with the bid; it is provided for informational purposes only.
8. CONTRACT MODIFICATIONS: Any modifications made to the Contract must be approved by the Central Purchasing office in advance.
9. LUMP SUM CONTRACT: It is agreed and understood that the Contract is awarded as a Lump Sum, and that the
Contract scope is inclusive of all materials, labor and equipment necessary to complete the Work in accordance with the Contract documents. Prior to submitting a bid, the Bidder shall field verify the actual linear footage of the project, and shall make its own determination as to the quantity of material, labor and equipment needed.
10. SCHEDULE OF VALUES: Within fourteen (14) Days after the Effective Date of the Agreement, the Contractor shall submit a schedule of values for all of the Work included under ITEM A: LUMP SUM BID PRICE, as it appears on Form A.10.A of this IFB, which shall include quantities and prices of items aggregating this price, and shall subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices shall include an appropriate amount of overhead and profit applicable to each item of Work. Except for actual authorized changes in the scope of work, as described in Section C.11, unit pricing included on the Schedule of Values shall not be used to make adjustments to any prices submitted by the Bidder in their bid response.
11. CHANGES IN THE WORK: The Owner may at any time, as the need arises, order changes within the scope of the
Work without invalidating the Agreement. If such changes increase or decrease the amount due under the Contract Documents, or in the time required for performance of the Work, an equitable adjustment must be authorized by an approved Change Order. No change in the scope of work or quality of materials will be accepted unless authorized
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement by a change order approved and signed by the County Administrator/Purchasing Agent and the Contractor, and processed through County Central Purchasing. Any extra work done without such written authority shall be considered unauthorized work done at the expense of the Contractor.
A. The Contract Price and Contract Time may be changed only by a Change Order, approved by the Owner prior to the performance of the Work by the Contractor or granted by the Owner upon written Notice by Contractor. The value of any Work covered by a Change Order or of any claim for increase or decrease in the Contract Price or Contract Time shall be accordingly based on the Schedule of Values, or the Unit Price indicated by the Bidder on Form A.10.B in the event that damaged/rotted roof decking is encountered. Except for actual authorized changes in the scope of work, unit pricing included on the Schedule of Values shall not be used to make adjustments to the amount indicated by the Bidder on Form A.10.A.
B. It is the Contractor's responsibility to notify his Surety of any change affecting the general scope of the Work or change in the Contract Price and/or Contract Time so that the amount of the applicable Bonds shall be adjusted accordingly. The Contractor shall furnish proof of such adjustment to the Owner.
C. Whenever changes, alterations, additions, omissions, or revisions are called for by the Owner for which the necessary Drawings and details have been completed and submitted to the Contractor, or when changes, alterations, additions or omissions are clearly given in writing to the Contractor, the Contractor is to submit an itemized statement of quantities and prices incidental to such revisions, changes, additions and omissions.
D. The Owner may at any time order minor changes within the scope of Work by issuing a Field Order. The
Contractor shall proceed with the performance of any changes in the Work so ordered by the Owner unless the Contractor believes that such Field Order entitles the Contractor to a change in Contract Price or Time or both, in which event the Contractor shall give the Owner Notice thereof The Contractor shall not execute such changes pending the receipt of approval from the Owner.
E. If any item in the Agreement is determined to be unnecessary for the proper completion of the Work contracted, the Owner may, upon written Notice to the Contractor, eliminate such item from the Agreement. Payment will not be made for such item except that the Contractor shall be compensated for the actual cost of any Work performed for the installation of such item and the net cost of materials purchased, including freight and tax costs, as evidenced by invoice. No additional compensation will be made for overhead or anticipated profit.
F. The Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time due to any condition or alleged condition if:
1. The Contractor knew of the existence of such conditions at the time the Contractor made a final commitment to the Owner in respect of Contract Price and Contract Time by the submission of a Bid; or
2. The existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation, exploration, test or study of the site and contiguous areas required by the Contract Documents to be conducted by or for the Contractor prior to the Contractor making such final commitment.
12. DELIVERY OF GOODS/SERVICES: Bidder acknowledges that time is of the essence. Requirements include but are not limited to those specified in Section A of this Invitation For Bids.
13. TIME IS OF THE ESSENCE/LIQUIDATED DAMAGES:
Liquidated Damages: TIME IS OF THE ESSENCE ON THIS CONTRACT. Because time is of the essence and because the consequences of untimely completion of the Work cannot be quantified as of the date of this Agreement, the parties agree that the Contractor and the Contractor’s surety, if any, shall be liable for and shall pay the County the sums hereinafter stipulated as liquidated damages, and not as a penalty, for each calendar day of delay until the Work is completed:
IFB No. B126103-EY Fire Station # 7 Partial Roof Replacement
Substantial Completion: 30 calendar days from the date of Notice to Proceed for construction.
Liquidated Damages: $200 per calendar day after time for Substantial Completion has expired.
Final Completion: 45 calendar days from the date of Notice to Proceed for construction.
Liquidated Damages: $200 per calendar day after time for Final Completion has expired.
Execution of the contract under these specifications shall constitute agreement by the Owner and Contractor that this amount per day is the minimum value of the costs and actual damage caused by failure of the Contractor to complete the work within the allotted time, that such sum is liquidated damages and shall not be construed as a penalty, and that such sum may be deducted from payments due the Contractor if such delay occurs.
Permitting the Contractor to continue and finish the work or any part thereof after the contract time or adjusted contract time, as pertinent, has expired shall in no way operate as a waiver on the part of the Owner or any of its rights under the contract. Payment of liquidated damages shall not release the Contractor from obligations in respect to the fulfillment of the entire contract, nor shall the payment of such liquidated damages constitute a waiver of the Owner’s right to collect any additional damages which may be sustained by failure of the Contractor to carry out the terms of the contract, it being the intent of the parties that said liquidated damages be full and complete payment only for failure of the Contractor to complete the work on time.
14. HAZARDOUS MATERIAL: Contractor shall immediately stop work and notify the County if during the course of the work any suspicious and/or potentially hazardous material is encountered.