Heat Treat System with Integral Quench Furnace (IQF)
Solicitation number
25-40-1013
Issued by

About this file

This document is a Purchase Description for the acquisition of one (1) Integral Quench Furnace (IQF) for the Fleet Readiness Center Southwest (FRCSW) at North Island, Building 472. The comprehensive specification details a complete Heat Treat System requiring an electrically powered furnace with specific technical requirements, including a parts washing station, tempering furnace, and conveyor system. The system must be capable of processing carbon and alloy steels, corrosion-resistant steels, and high-speed tool steels up to 1850°F, with a work chamber measuring 24-inches × 24-inches × 36-inches and a minimum load capacity of 400 pounds.

The procurement includes extensive requirements for system components, such as an atmosphere gas system using methane, nitrogen, and ammonia, a ceramic-insulated chamber with temperature uniformity, and comprehensive electrical and control systems. The contractor must provide technical documentation, training for operators and maintenance personnel, and perform detailed testing including Temperature Uniformity Survey (TUS) and System Accuracy Tests (SAT). Additional contractor responsibilities include installation, rigging, performance testing, and providing a laptop with specific software configurations. The system must meet various federal standards including OSHA, NFPA, SAE, and ISO requirements, with precise specifications for electrical systems, safety features, noise levels, and operational performance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25-14-1013 26 June 2025

PURCHASE DESCRIPTION FOR THE ACQUISITION OF ONE (1)

INTEGRAL QUENCH FURNACE

SCOPE.

Scope. The content of this specification describes the minimum requirements for the procurement, delivery, installation, and commissioning of a new Heat Treat System including an Integral Quench Furnace (IQF), Parts washing station, Tempering furnace and Conveyor system for the Fleet Readiness Center Southwest (FRCSW) North Island, Building 472.

APPLICABLE DOCUMENTS. The documents listed in this section are cited in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all requirements of documents cited in sections 3 and 4 of this specification, whether or not they are listed in section 2.

Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.

Government Documents.

Specifications, Standards, and Handbooks. The following specifications, standards and handbooks form a part of this document to the extent specified herein.

STANDARDS – FEDERAL

FED-STD-H28B: Screw Thread Standards for Federal Service

U.S Department of Labor, Occupational Safety and Health Administration

(OSHA)

29 CFR 1910: General Industry, OSHA Safety and Health Standards

29 CFR 1910.147: The Control of Hazardous Energy (Lockout/Tagout)

(Application for copies should be addressed to the OSHA Publications Superintendent of Documents P.O. Box 37535 Washington, D.C. 20013-7535)

DEPARTMENT OF DEFENSE

U.S. NAVY

OPNAV 5100.23G w/change 1: Navy Safety and Occupational Health Program Manual

(Application for copies of the OPNAVINST should be addressed to Office of the Chief of Naval Operations, The Pentagon, Washington, DC 20350-2000 or to

Commander, Naval Safety Center 375 A Street Norfolk, VA 23511 or on the internet at http://www.public.navy.mil/navsafecen)

MILITARY STANDARDS

MIL-STD-130N w/Change 1: Identification Marking of U.S. Military Property Item Unique Identification Marking (IUID)

(Application for copies should be addressed to Air Force Product Data Systems Modernization Standards (TMSS) Office, 554 ELSG/SBP, 4375 Chidlaw Road, Bldg. 262, Room S008, Wright-Patterson AFB, OH 45433-5006, Phone (937) 257- 0870 or 0853 or http://quicksearch.dla.mil/qsSearch.aspx)

Non-Government Publications, Specifications, Standards, and Handbooks. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.

American Society for Testing and Materials (ASTM)

ASTM E18: Standard Test Methods for Rockwell Hardness of Metallic Materials

ASTM A255: Standard Test Methods for Determining Hardenability of Steel

(Application for copies should be addressed to the ASTM International Organization, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959)

American Society of Mechanical Engineers (ASME)

ASME A13.1: Scheme for the Identification of Piping Systems

(Applications for copies should be addressed to ASME International Three Park Avenue New York, NY 10016-5990 or www.asme.org) http://www.public.navy.mil/navsafecen http://quicksearch.dla.mil/qsSearch.aspx http://www.asme.org/

International Organization for Standardization (ISO)

ISO 4413: Hydraulic fluid power-General rules and safety requirements for systems and their components

ISO 4414: Pneumatic Power-General rules and safety requirements for systems and their components

(Application for copies should be addressed to the International Organization for Standardization (ISO) 1 rue de Varembé, Casepostale56, CH211Geneva 20, Switzerland)

National Electrical Manufacturers Association (NEMA)

NEMA 250: Enclosures for Electrical Equipment (1000 V Maximum)

NEMA ICS 1: Industrial Control and Systems General Requirements

NEMA ICS 6: Industrial Control and Systems: Enclosures

NEMA MG 1: Motors and Generators

(Application for copies should be addressed to the National Electrical Manufacturers Association, 1300 N 17th Street, Rosslyn, VA 22209)

National Fire Protection Association (NFPA)

NFPA 70: National Electrical Code

NFPA 79: Electrical Standard for Industrial Machinery

NFPA 86: Standard for Ovens and Furnaces

(Applications for copies should be addressed to the National Fire Protection Association, ATTN: Support Services, 11 Tracy Drive, Avon, MA 02322)

Society of Automotive Engineers (SAE)

SAE AMS2750: (R) Pyrometry

SAE AMS2759: Heat Treatment of Steel Parts General Requirements (Application for copies should be addressed to: Society of Automotive Engineers 400 Commonwealth Drive, Warrendale PA 15096)

Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

2.4 Acronym Definitions Not Explicitly Listed in Text. The following acronyms not explicitly listed in each section text are defined as follows:

a. JIS- Japanese Industrial Standards

b. DIN- German Institute for Standardization

c. EN- European Standard

Numerical Definitions. The government will follow the following mathematical conventions:

a. Whole numbers will be expressed where one thousand is written as 1,000.

b. Decimals will be expressed where one ten-thousandths is written as 0.0001.

REQUIREMENTS.

Design. The item offered shall be new and a current commercially available model. A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold or is being offered for sale through advertisements or manufacturer’s published catalogue or brochures. Products such as a prototype unit, pre-production model, or experimental unit do not qualify as meeting the requirements specified herein. The machine shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to wear, breakage or distortion shall be accessible for adjustment, replacement, and repair.

Measuring and Indicating Device Graduations. All measuring and indicating devices on the machine shall be graduated in the United States customary units. An electronic control system that demonstrates switching between manufacturer standard units to United States customary units will be found acceptable.

Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's workstation(s). Controls shall be within reach and located such that the operator, when in the normal operating position, is not required to reach past moving parts, which may cause injury.

Safety and Health Requirements. All machine parts, components, mechanisms, and assemblies furnished on the machine, whether or not specifically required herein, shall comply with all of the requirements of OSHA 29 CFR 1910 and OPNAV 5100.23 or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.

Safety Devices/Guarding. Covers, guards or other safety devices shall be provided for the point of operation and all other parts of the machine that present safety hazards. The safety devices shall not interfere with the operation of the machine. All automatic powered doors shall have a mechanical device to keep them open and or close position during maintenance procedure and or inspections. All safety devices shall prevent unintentional contact during normal operations, shall be removable to facilitate the inspection, maintenance, repair of the equipment and shall be LOTO (Lock Out/Tag Out) compliant in accordance with OSHA 29 CFR 1910.147.

Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the “A” weighted scale of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3) feet from the equipment. Noise generated by the work piece shall be excluded in determining compliance of the equipment with the 84 dB requirements.

Hazardous Material Exclusions. Supplies or materials being provided as part of the equipment shall be free of known hazardous materials. These materials shall not be brought on site without prior approval from the Government. Radioactive materials or instruments capable of producing ionizing radiation as well as materials which contain asbestos, mercury, lithium, methylene chloride, lead (= or >0.06%), or polychlorinated biphenyls (PCB’s) are prohibited. Definitions of hazardous materials are specified in the latest version, including revisions adopted during the term of the contract, of FED-STD-313F.

Nickel Metal Hydride and lithium batteries are permissible for memory backup. Class I Ozone Depleting Substances as defined in 40 CFR 82 shall not be used in the performance of this contract or be provided as part of the equipment. Exceptions to the prohibition of these materials must be referred to the Contracting Officer in writing, for consideration, not later than 60 calendar days after effective date of contract and prior to any work being performed.

Environmental Protection. Under the operating, service, transportation, and storage conditions described herein, the machine shall not emit materials hazardous to the ecological system as prohibited by Federal, state, or local statutes in effect at the point of installation.

Lubrication. Means shall be provided to ensure proper lubrication for all moving parts in accordance with manufacturer requirements. All oil holes, grease fittings, and filler caps shall be easily accessible.

Lubrication Data. The Contractor shall provide the following information on all liquid or grease lubricants contained within equipment/system or in bulk (5 gallons or more) supplied under this procurement.

a. Liquid Lubricants

i. Viscosity grade in ISO units

ii. Viscosity Index

iii. AGMA and/or SAE classification as applicable

iv. Mil Spec and/or NATO Code as applicable

v. Viscosity in Centistokes (cst) @ 40° C and 100° C

vi. Type Additive package. Example: ZDDP, Rust inhibitors, Foam inhibitors.

vii. Neutralization, the TBN (alkalinity) and/or TAN (acidity).

viii. Flash point

ix. Pour point

b. Grease Lubricants

i. National Lubrication and Grease Institute (NLGI) Number

ii. Type and percent of thickener

iii. Dropping point

iv. Maximum Service Temperature

v. Base oil viscosity range in SUS or centipoise

Recirculating Lubrication. When the machine is equipped with a recirculating lubrication system, it shall include a filter that is cleanable or replaceable. Each lubricant reservoir shall have at least a 24-hour capacity. Means shall be provided to indicate a low lubrication condition. When a low lubrication condition occurs, the machine shall complete the current operation and come to a complete stop. The machine shall indicate that lubrication is required.

Replacement Parts. All parts subject to replacement shall be manufactured to definite dimensions and tolerances. Replacement parts shall be interchangeable without requiring modification. Replacement parts are those that are subject to wear or failure such as gears, bearings, shafts, feed screws, drive belts, pumps, and seals. Electrical replacement parts shall include but not be limited to, motors, relays, fuses, switches, magnetics, pushbuttons, light bulbs, braking mechanisms, and solid-state devices. Tooling and accessories normally supplied as standard items shall also be considered replacement parts.

Foreign-sourced replacement parts shall either be interchangeable with domestically supplied components or be readily available from a domestic source.

Construction. The machine shall be constructed of parts that are new, without defects, and free of repairs. The structure shall withstand all forces encountered during operation of the machine to its maximum rating and capacity without distortion.

Castings and Forgings. All castings and forgings shall be free of defects, scale, and mismatching. No processes such as welding, peening, plugging, filling with solder or paste shall be used for reclaiming any defective part.

Fastening Devices. All screws, pins, bolts, and other fasteners shall be installed to prevent unintentional loosening. Fastening devices subject to removal or adjustment shall not be permanently installed.

Threads. All threaded parts used on the machine and its related attachments and accessories shall conform to FED-STD-H28B and the applicable “Detailed Standard” section referenced therein or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.

Hydraulic System. Under the condition that a machine has a hydraulic system, the system shall conform to ISO 4413. The system shall be complete, including all pumps, valves, piping, cylinders, and pressure controls.

Pneumatic System. Under the condition that a machine has a pneumatic system, the system shall conform to ISO 4414. The system shall be complete, including all pumps, valves, piping, cylinders, and pressure controls.

Gears. All gears shall be of proper width and size to transmit full-rated torque and horsepower throughout the speed ranges without failure for the expected service life of the machine. Gears in drive trains shall be hardened and ground steel.

Surfaces. All surfaces shall be clean and free of harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. The condition and finish of all surfaces shall be in accordance with the manufacturer's commercial practice.

Welding, Brazing, or Soldering. Welding, brazing, or soldering shall be employed only where specified in the original design. None of these operations shall be employed as a repair measure for any defective part.

Painting. The machine shall be painted in accordance with the manufacturer’s commercial practice. All paint shall be of the lead-free type.

Workmanship. Workmanship of the machine shall meet all requirements specified herein and shall be of a quality equal to that prevailing among manufacturers producing equipment of the type covered by this purchase description.

Components. The machine shall consist of not less than the following components:

Atmosphere Gas System. The system shall be an electric powered furnace, shall operate using Methane (CH4) Nitrogen (N2) and Ammonia (NH3) in the heating chamber, and shall meet the Class B atmosphere requirements of SAE AMS2759. The system shall utilize an automatic carbon control system with oxygen probe and safety nitrogen gas purge system.

Chamber Assembly. Low maintenance ceramic board and blanket insulation shall provide temperature uniformity throughout the entire chamber per SAE AMS2750 and

NFPA 86.

Piping. All process piping shall be labeled per ASME A13.1 for flow direction and fluid.

Electrical System. The machine shall conform to NFPA 79 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. The existing source power available at the facility is four hundred and eighty volts (480 V), three (3) phase, sixty Hertz (60 Hz) and five hundred (500) amperes . The machine’s electrical system shall be tolerant of fluctuation of plus/minus ten percent (±10%). The electrical system shall be complete, including any electrical transformer(s) that may be required to modify the existing source voltage to the proper operating voltage of the equipment. A properly rated, and fused, single disconnect device shall be utilized on the machine with means of lockout in the off position only.

Electrical Enclosures. Construction of the electrical enclosures shall be in accordance with NEMA 250 type 12 or current equivalent ISO/EN/DIN/JIS/IEC standards and shall provide for ventilation of components and shall be designed for an indoor non-hazardous location. All electrical components shall conform to NFPA 79 or equivalent ISO/EN/DIN/JIS standards. The machine shall be provided with interlocks on its electronic cabinet that shall instantly remove power from the equipment when the door is opened in accordance with NFPA 79 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.

Disconnect. Each piece of equipment shall have a main power disconnect, fused as required. Main power disconnect shall demonstrate lockout capability. All equipment shall be new and conform to latest industry standards and practices. Switch ratings of voltage, amperage, horsepower and inductive ratings shall comply with power source voltage and characteristics of load controlled. Mechanisms shall be heavy duty, quick-make, quick-break with voidable interlock to prevent opening enclosure in the "ON" position. External-lockable handle operation with provisions for not less than two (2) padlocks. Poles and fusing shall comply with load requirements. Provide fused switches in compliance with NFPA 70 requirements.

Electrical Data. Contractor shall provide electrical current requirements, recommended feeder and circuit breaker size information in proposal submittal data for review and approval by the Government.

Arc Flash Protection. The machine enclosures shall be marked for arc flash in accordance with NFPA 79 Paragraph 16.2.3 “Safety Signs for Electrical Enclosures” or current equivalent ISO/EN/DIN/JIS/IEC standards for arc flash safety. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.

Solid-State Components. Electrical devices used to power electrical servo and spindle motors of control voltage delivered to solid-state electrical components shall be solid-state devices. Such devices shall be equipped to handle the electrical load imposed by operation of the machine to its maximum potential. The use of selenium in solid-state components shall be restricted to those devices that protect other solid-state components from voltage surge.

Pilot Lights and Controls. Contractor shall provide pilot lights and control devices operable at front of enclosure without opening enclosure. Devices shall be rated NEMA 250, dust-tight/oil-tight in compliance with NEMA ICS 6.

Labels/Markings. All wires and cables shall be labeled with heat-shrink, pre-printed labels at all connection points in agreement with manufacturer’s drawings and in compliance with NFPA 79.

Controller Features. A PLC controller shall be provided. following minimum components & features shall determine equivalency are as follows:

a. Programmable Logic Controller (PLC).

b. Honeywell MiniTrend digital Chart recorders with ability to export files in PDF or MS Excel format onto stand-alone computer that has a storage capacity up to one Terabyte (1TB).

c. The human interface shall have industrial-rated touch screen(s) with integral protection from liquid and or physical damage. In additional, a wireless keyboard and mouse for programing recipes and for maintenance shall be provided.

d. The system shall provide all the necessary outputs to control all buzzers, fans, motors, pumps, valves, gas, sensors, of necessary parts that support the system.

e. The system shall use clock/recipe/program settings to heat the appropriate materials automatically prior to use.

f. The system software shall be off-the-shelf, user friendly, and commercially available. All software systems shall provide following configuration and use of recipes/part programs. See paragraph 3.3.7.1 for additional system specifications.

3.3.5.1 Laptop/Computer System. The contractor shall provide a laptop with the minimum of, but not limited to, the following characteristics:

a. A Microsoft Windows-based (same OS version as on system PC) Version 11

b. Honeywell Trend Manager Pro software installed

c. A DVD-RW

d. Input/Output (I/O) slots required to communicate with the control system

e. Laptop shall have the following programs:

1. Part Program Editor,

2. Ladder Logic Development Editor,

3. Ladder Logic,

4. Drive & Valve Calibration,

5. Configuration, and Control software;

6. System diagnostic & maintenance software,

f. One (1) copy of all software back-up DVD.

g. All necessary configuration / diagnostic / programming communication / interface cables shall be provided after they are functionally tested.

h. Sixteen gigabytes (16 GB) random access memory (RAM)

i. One (1) TB of storage space

j. External Hard drive with one (1) TB storage capacity to back-up the system

k. One (1) all-in-one desktop color LaserJet printer, print letter size (8.5-inches ×

11-inches) prints only.

l. Microsoft Office, Excel Program to enable the export of reports into an excel file.

Motors. Motors shall be rated for continuous duty. Alternating-current (AC) motors shall be designed to operate on 60-Hz and each motor enclosure shall meet the requirements for a drip-proof enclosure. All motors shall meet the requirements of NEMA MG 1 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.

Each motor shall have an identification plate in accordance with paragraph 3.7 to identify manufacturer, model number, serial number, voltage, amperage, horsepower, phase, frequency, and frame number. Motor horsepower shall be the manufacturer’s standard or standard optional horsepower as indicated on the manufacturer's design and construction drawing(s).

Facility Connections. Electrical connections made to the facility electrical system shall conform to NFPA 70.

Hour Meter. The machine shall be equipped with a non-resetting type, hour meter to display accumulated operating time of the drive motor(s), mounted on the main electrical panel visible from the outside, sealed to prevent the entrance of dust and moisture, and shall be mounted to withstand shock and vibration generated by the machine.

The meter shall have a range of 0 to 99,999.9 hours in increments of one (1) tenth of one

(1) hour. A CNC control that tracks and displays total machine on time (a non-resetting type), controller on, program runtime, and run time of the servo motor(s) shall be considered to meet this requirement. The meter shall be sealed to prevent the entrance of dust and moisture and shall be mounted to withstand shock and vibration generated by the machine.

Integral Quench Furnace (IQF). The new Integral Quench Furnace shall be electrically powered and shall quench parts of up to 24-inches × 24-inches × 36-inches (W x H x D) with a minimum gross load of 400 lbs. The system shall be fully automatic with automation achieved by utilizing a PLC. The oil quench tank size shall be compatible with the maximum part size and shall include a matching air-to-oil temperature cooling system with variable quench speed agitation with oil filtration system. The quench tank oil shall be air cooled or electrically heated to maintain oil quench temperature between 140-150°F.

The IQF shall include the following:

a. Air-to-oil quench cooling heat exchanger.

b. Emergency nitrogen gas purge circuit.

c. A Flow meters for endothermic gas, natural gas additions, ammonia gas additions, and air for carbon burnout.

d. Front door flame curtain.

e. Fully automatic load movement with manual override option in case of failure

f. Preheat oil quench with immersion heaters, temperature and excess temperature controllers, oil level sight gauge, and level alarm

g. Programmable logic controller

h. Recuperative vertical radiant tubes

i. Temperature and atmosphere carbon potential automatically controlled

j. Variable speed circulation fan and quench agitation

k. Upper atmosphere cooling: An oil-cooled double walled chamber above the quench cools the workload under a protective atmosphere and features and atmosphere cool/oil quench selector switch.

Endothermic Atmospheric Generator. The Contractor shall provide and install a new electric heated atmosphere generator with a gas flow rate output of 1500 Cubic Feet per Hour (CFH) using natural gas and ammonia reaction for nitriding, carburizing and carbonitriding process on steel alloys using a nickel catalyst in a chamber maintained at 1850°F-1950°F. The system must have an electrical supply of 480V/3PH/60Hz and 110 Volts of control power.

Parts Washer. The Contractor shall provide a new electric-powered power washer station featuring a minimum of 650-gallon tank made of stainless steel. The tank dimensions shall be at least 40 inches deep, 45 inches wide, and 55 inches long. The cleaning solution should maintain a temperature between 140°F and 170°F and include an oil removal system to preserve the solution's concentration.

Tempering Furnace. The Contractor shall provide and install a new electric powered Batch Tempering Oven (BTO) with a minimum work area of 24in wide, 36in long and 24in high with a weight capacity of no less than 400 lbs. This unit must be capable of passing a system accuracy test and temperature uniformity survey per AMS2750 of 1250°F, to a Class 2 furnace.

Conveyer System. The Contractor shall provide and install a new electric powered traveling loader system with a load capacity of no less than 400 lbs. This new transfer system shall be connected with all 3ea stations of the heat-treat system with a transfer speed between stations of 20ft/min with option to operate in automatic and manual modes if necessary

Baskets. The Contractor shall provide four (4) baskets. Two (2) baskets shall be the size of the working chamber dimension of the system. The other two (2) baskets shall be half size of the working chamber dimension of the system.

Fixture. The fixture shall be designed to perform a System Accuracy Test (SAT) and a Temperature Uniformity Survey (TUS) to be conducted per SAE AMS2750. The fixture shall be designed to be used at max temperature of paragraph 3.4, Table I.

Exhaust. The Contractor shall provide and install hoods, exhaust stacks, regulator vent lines, and ducts as required for the proper removal of gases, fumes, and vapors generated during the operation of the IQF and associated systems. The exhaust system shall be designed to safely handle the thermal load and air volumes generated, while maintaining compliance with NFPA 86.

Quench Oil. The Contractor shall provide quench oil per SAE AMS2759 for initial start-up that meets the requirements herein.

Size and Capacity. The size and capacity of the furnace shall be not less than specified in Table I below and be in conformance with SAE AMS2750.

Table I - Size and Capacity

Size/Capacity Description Values Instrumentation Type D Maximum operating temperature 1850° Work chamber dimensions (W × H × D) 24-inches × 24-inches × 36-inches Load capacity Minimum: 400 pounds gross load Materials to be treated Carbon and Alloy Steel Up to 1800°F Corrosion-Resistant Steels Up to 1850°F High Speed Tool Steels (T-Series) Up to 1850°F Facility Floor Space

Maximum floor space (installed complete) 35 feet wide (facing chamber door)

17 feet deep 15 feet high (maximum)

Performance Criteria. The furnace shall meet the performance criteria listed in Table

II.

Table II - Performance Criteria

Description Values Ramp up from Ambient to 1500 degrees Fahrenheit Within 2 hours after startup Recovery Temperature after open door to 1500 degrees Fahrenheit Within 30 minutes

Cooling rate: controlled cooling for annealing process

1625°F to 1000°F @ less or equal to 200°F per hour

Standard Tooling and Equipment. All standard tooling and equipment required for proper operation of the machine (such as special tools needed for maintenance) shall be furnished by the contractor.

Marking on Instruments, Control Panels, and Plates. All words on plates shall be in the English language. Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All plates shall be corrosion resistant.

Lubrication Plate. A lubrication plate shall be permanently and securely attached to each machine. The plate shall contain the following information.

• Points of Lubricant Application

• Servicing Interval

• Type of Lubricant

• Viscosity

• Military or Federal Specification for Each Lubricant (If available)

• Size and Type of Each Lubricant Filter

Nameplate. A nameplate shall be permanently and securely attached to each machine. The nameplate data shall meet the requirements of NFPA 79 and contain the information listed below. If the machine is a special model, the model designation shall include the model number of the basic standard machine, and a suffix identified in the manufacturer's permanent records.

• Nomenclature

• CAGE Code

• Manufacturer’s Name

• Manufacturer’s Model Designation

• Manufacturer’s Serial Number

• Power Input (Volts, Total Amps, Phase, Frequency)

• Contract Number

• Date of Manufacture

• Full-load current for each supply

• Ampere rating of the largest motor or load

• Short-circuit current rating of the industrial control panel

• Max ampere rating of short-circuit and ground fault protective device, where provided

• Electrical diagram number(s) or number of the index to the electrical drawings

Identification Marking of Military Property. An Item Unique Identification Marking (IUID) shall be provided in accordance with MIL-STD-130N and all applicable documents within the standard with Machine Readable Information (MRI) for item identification marking and automatic data capture. The application of Human Readable Information (HRI) shall be used in combination with MRI and free text. At a minimum this tag shall contain the information listed in paragraph 3.7.2 Nameplate.

Technical Data. Two (2) hard copies and two (2) electronic copies of technical data, including technical, training, and maintenance manuals and drawings, shall be provided with the machine. Technical data shall contain technical information, specifications, instructions for the operation, maintenance of the machine and recommended spare parts list. All copies of technical data shall be legible and written in the English language.

Plan of Action and Milestones (POA&M). The contractor shall provide a POA&M to identify contractor performance dates of all major events from contract award to completion of all contract requirements. The initial POA&M shall be delivered thirty (30) calendar days After Contract Award (ACA). The milestones shall be prepared using a recognized project management technique (preferably Microsoft Project). The Government and the contractor shall review the report on a monthly basis. The contractor shall notify the Government prior to making any changes to the POA&M. All changes to the POA&M shall be approved in advance by the Government. The POA&M shall detail such items as system design concept, system development, software design concept, software development, engineering, procurement of major hardware, assembly, operational debug, factory acceptance, shipment, installation, training, and final acceptance test.

Manuals/Drawings. The manuals shall provide the data necessary for the programming, operation, and maintenance of the machine and ancillary equipment. The Contractor shall also furnish one digital copy of the above technical manuals and drawings in Adobe's Postscript (PDF) file format or Excel on CD-ROM(S). The digital manuals and drawings shall be organized, indexed and referenced similar to the equivalent hardcopy format (i.e. volume, manual, section, etc.). Drawings shall show all electrical, mechanical, pneumatic, and any other data required for personnel to identify circuits within the console, locate utilities and connections. The machine layout shall be furnished in AUTOCAD and PDF format. Manuals shall be provided at the time of delivery and/or before acceptance of equipment.

Training Manuals. The training manuals shall cover in detail all phases and cycles of operation such as start-up, maintenance, idle, shut down, trouble shooting, programming, running programs, printing, re-starting systems, etc. Manuals shall include the Contractor’s contact information, parts list, preventive maintenance cycles, information and documentation necessary to properly service, operate, maintain, adjust, and perform all functions within the equipment.

Maintenance Manual. The maintenance manuals shall properly identify in detail the extent of preventive maintenance, materials, liquids, substances, parts, and chemicals, used during preventive maintenance, repair, and/or troubleshooting of equipment. A complete list of all materials, chemicals, substances, and parts used for the maintenance and operation of the equipment shall be provided to the Government.

Calibration Manual. The calibration manual shall properly identify in detail the extent of calibration, part numbers, model numbers, and manufacturer used. A complete list of all materials, chemicals, substances, and parts used for the calibration, or that need to be calibrated within the equipment shall be provided to the Government one hundred and twenty (120) days prior to installation of equipment.

Test Procedures. Two copies of the manufacturer's standard performance and operational test procedures as outlined in paragraph 4.7.1 shall be submitted with the Contractors’ proposal for Government review within sixty (60) calendar days ACA for Government review and approval. The accepted test procedures shall become part of this contract. The Government shall inform the Contractor of the acceptance or the rejection of test procedures. The procedures shall be in the English language.

Secondary Containment. Containment shall be built around the equipment to ensure no leakage, spillage, or contamination extends to the floor or rest of the equipment. This secondary containment shall meet all OSHA and EPA guidelines. A design/drawing for secondary containment shall be delivered to the Government after contract award (ACA).

The secondary containment system shall hold one hundred and ten percent (110%) of all liquids within the equipment in the event of a spill, leakage, release, or malfunction of the equipment where liquids are released on to the floor. The industrial lining shall be strong enough to contain all liquids and prevent any spillage onto the ground and shall meet all EPA and OSHA guidelines and requirements.

Site Preparation Requirements. The Contractor shall be solely responsible for any necessary site inspections required for determining the specifications of work that shall be completed prior to final system installation. The Contractor shall provide detailed information of any preparation work that shall be performed prior to system installation to the Government. The Contractor shall be solely responsible for site preparation except as specifically excluded herein. This includes but is not limited to surface preparation.

Installation. The Contractor shall be responsible for the attached Installation Responsibilities Sheet. The contractor shall be responsible for all necessary certifications and permits required, for shipping, EPA, or other, by any government agency, local, state, or federal. The contractor shall be responsible for installation, anchoring, connecting machine to utilities, leveling the machines in place, testing of the furnace in order to make it operational and providing all associated tooling and components unless otherwise stated in this specification. The contractor shall provide the necessary anchor bolts, leveling screws, and related hardware to secure the machines components to a foundation. The contractor shall follow the customer’s hours of operation; 6:00am to 2:30pm, Monday through Friday excluding all federal holidays, unless informed otherwise. The contractor shall be responsible for all necessary certifications and permits required, for shipping, EPA, or other, by any government agency, local, state, or national.

Rigging. The contractor shall be responsible for all equipment (forklifts, man lifts, etc.) and qualified personnel for unloading, rigging, installation, anchoring, connecting machine to utilities, and leveling the machines in place. Contractor shall not use government equipment to accomplish this work. The Contractor or his representative shall be responsible for being present upon arrival of the equipment at FRCSW. Off-loading of the equipment from the delivery vehicle, and placement of the equipment in the specified location in accordance with Table I is the responsibility of the contractor. Off-loading and placement shall be scheduled upon receipt of the equipment at FRCSW.

Work Stoppage. For unforeseen issues that are found during installation of the equipment, the contractor shall notify the facility point of contact (POC) and DLA immediately to determine further course of action.

Training. After satisfactory completion of acceptance testing of the system, the services of a qualified representative(s), who is an American citizen of good standing and repute and proficient in the English language, shall be provided for specialized training to familiarize Government personnel with the equipment and to help ensure reliable performance and maximum service life, during normal usage. The training shall be for a minimum of ten (10) government personnel. Training shall include operation, maintenance, support, and programming of the machine. Training shall be performed at the Government facility (FRCSW) and shall not be less than five (5) consecutive eight (8) hour workdays, between 6:00 am and 2:30 pm excluding weekends and federal holidays. The course shall utilize as-built drawings and manuals provided under this contract and shall include both classroom and hands on portions. All printed training aids shall be supplied for the course, be in the English language, and become the property of the Government.

3.10.1 Operator Training. The Contractor shall provide training for three (3) operators for five (5) consecutive eight (8) hour workdays as cited in paragraph 3.10. This shall include instruction on the safe, efficient operation of the equipment delivered. The trainees supplied by FRCSW shall be familiar with machine operation, but not necessarily with the style or type of controls provided with the equipment.

3.10.2 Maintenance Training. The Contractor shall provide mechanical and electrical control and diagnostic maintenance training. This shall include information on troubleshooting and preventive maintenance procedures. This shall be provided for two (2) personnel for five (5) consecutive eight (8) hour workdays as cited in paragraph 3.10.

QUALITY ASSURANCE.

Responsibility for Inspection. The contractor shall be responsible for the performance of all inspection requirements specified herein and in accordance with the attached Quality Assurance Provision (QAP). Except as otherwise specified in the contract or purchase order, the contractor may use his own facility for the performance of the inspection requirements specified herein, unless disapproved by the Government . The Government reserves the right to witness any inspections set forth in the purchase description where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

Responsibility for Compliance. The Contractor shall be responsible for ensuring all items meet all requirements of sections 3 and 4.

Classification of Inspections. The inspection requirements specified herein are classified as follows:

a. Contract quality assurance inspection (Origin) (see 4.4).

b. Final Inspection/Acceptance test (Destination) (see 4.5).

Inspection Conditions. All inspections, tests, and examinations shall be performed in an indoor facility with ambient temperature conditions in the range of 64° F to 90° F and 20% to 90% relative humidity.

Contract Quality Assurance Inspection (Origin). Contract quality assurance inspection shall be applied at the contractor’s facility prior to being offered for acceptance under the contract. The machine and all peripheral equipment added to the machine shall be fully assembled and perform all functions in accordance with this specification. Quality conformance inspection shall consist of the examination in 4.6 and the tests in 4.7. The machine shall pass the examination, all tests, and contract quality assurance inspection to be acceptable for shipment.

Final Inspection/Acceptance Test (Destination). Final Inspection and acceptance test shall be performed on the machine to ensure conformance with this purchase description.

The acceptance test shall be performed only after the machine is installed at its final location. The acceptance test shall consist of the examination in 4.6 and all tests in 4.7. The machine shall pass the examination and all tests to be accepted.

Examination. The equipment shall be examined for design, dimensions, construction, materials, components, electrical equipment and workmanship to determine compliance with the requirements of this specification.

Tests. Unless otherwise specified within this document, all programs, instruments, materials, material handling equipment, qualified personnel, and tools required to perform and evaluate the tests shall be furnished by the contractor. All measurement tools and indicating devices shall be calibrated in accordance with the attached QAP. If a malfunction occurs during the test, the test shall be restarted each time until all tests in 4.7 are completed without a malfunction. Three (3) consecutive failures without completion of the test may be considered cause for rejection of the system. For the purpose of this test, a “failure” is defined as any equipment malfunction which requires remedial action to restore the system to full operation in accordance with this specification

4.7.1 Operational Test. The machine shall be operated in accordance with the manufacturer's standard operating test procedure. Three (3) failures in a row to complete the run test may be cause for rejection of the entire system. After successful completion of the operational test, emergency stop devices, and accessories shall be verified during the trial period.

a. The IQF shall go through the entire start-up and shutdown process without any issues.

b. A uniformity test (temperature check) shall take place at different stages of the heating process to ensure it is balanced and reaching the appropriate temperatures, as well as the cooling system, quench tank, and atmospheric gas related alarms are functional.

c. The IQF shall meet the required quench delay time per paragraph 3.4, Table I.

d. The IQF shall reach the full temperature range outlined within paragraph 3.4, Table I herein.

4.7.2 Temperature Uniformity Survey (TUS) and System Accuracy Tests (SAT). The (TUS) and (SAT) Tests shall be performed on the temperature control and recording systems in each control zone of each piece of thermal processing equipment that is used for production heat treatments at origin and onsite at destination to demonstrate the furnace’s ability to maintain a uniformity temperature in the heating chamber. The (SAT) Tests shall be performed according to SAE AMS 2750.

4.7.3 Performance Test. A Round Bar Specimen 4130 test per AMS 2759 shall be performed. After quenching, the center of the diameter shall not be less than the hardness on the end-quench hardenability curve corresponding to the diameter of the specimen when tested in accordance with ASTM E18. The end-quench hardenability curve shall be the actual hardenability curve determined in accordance with ASTM A255 on the material used for the test specimen. The Contractor-supplied component(s) shall have valid certification submitted to the government representative (project POC) prior to performing the test. The furnace shall transport the part from the furnace work zone to the quench oil fast enough to successfully harden a 6” x 6” piece of 4130 steel, of 0.060” thickness, to a hardness of 40 HRC or higher.

4.7.4 Audible Noise Level. The equipment shall be tested for compliance with paragraph

3.1.4. “Audible Noise Level”.

INSTALLATION RESPONSIBILITIES

Government Contractor

☐ ☒ a. Furnish labor and material handling equipment for off-loading and placing item on foundation.

☐ ☒ b. Provide and install anchor bolts and nuts.

☐ ☒ c. Set and rough level the machine on its foundation ☐ ☒ d. Level and align machine.

☐ ☒ e. Connect machine to the provided utilities hook-up.

☐ ☒ f. Provide all necessary tools, gages, and instrumentation necessary to perform the required tests.

☐ ☒ g. Provide and charge all systems with fluids in accordance with manufacturer's instructions.

☐ ☒ h. Material for performance testing at Government facility ☐ ☒ i. Material for performance testing at Contractor's facility ☐ ☒ j. Material handling, Rigging equipment and Qualified

Personnel for performance testing.

GOVERNMENT RESPONSIBILITIES

☒ Provide utilities hook-up within 20 feet; line of sight of the machine within the same compartment.

☐ Government will connect utilities to the machine based on the contractor's accepted site drawings.

☒ No work shall be performed by customer personnel when the contractor's representative is not in the immediate work area during installation, verification, and initial start-up of the machine.

1.0 SCOPE.
1.1 Scope. The content of this specification describes the minimum requirements for the procurement, delivery, installation, and commissioning of a new Heat Treat System including an Integral Quench Furnace (IQF), Parts washing station, Tempering fur...
2.0 APPLICABLE DOCUMENTS. The documents listed in this section are cited in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as ...
2.1 Government Documents.
2.1.1 Specifications, Standards, and Handbooks. The following specifications, standards and handbooks form a part of this document to the extent specified herein.
2.1.2 Other Government Documents, Drawings, and Publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the so...
2.2 Non-Government Publications, Specifications, Standards, and Handbooks. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be ...
2.3 Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a ...
2.4 Acronym Definitions Not Explicitly Listed in Text. The following acronyms not explicitly listed in each section text are defined as follows:
2.5 Numerical Definitions. The government will follow the following mathematical conventions:
3.0 REQUIREMENTS.
3.1 Design. The item offered shall be new and a current commercially available model. A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold or is ...
3.1.1 Measuring and Indicating Device Graduations. All measuring and indicating devices on the machine shall be graduated in the United States customary units. An electronic control system that demonstrates switching between manufacturer standard uni...
3.1.2 Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's workstation(s). Controls shall be within reach and located such that the operator, when in the normal operating posi...
3.1.3 Safety and Health Requirements. All machine parts, components, mechanisms, and assemblies furnished on the machine, whether or not specifically required herein, shall comply with all of the requirements of OSHA 29 CFR 1910 and OPNAV 5100.23 or ...
3.1.3.1 Safety Devices/Guarding. Covers, guards or other safety devices shall be provided for the point of operation and all other parts of the machine that present safety hazards. The safety devices shall not interfere with the operation of the mach...
3.1.4 Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the “A” weighted scale of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3) f...
3.1.5 Hazardous Material Exclusions. Supplies or materials being provided as part of the equipment shall be free of known hazardous materials. These materials shall not be brought on site without prior approval from the Government. Radioactive materi...
3.1.6 Environmental Protection. Under the operating, service, transportation, and storage conditions described herein, the machine shall not emit materials hazardous to the ecological system as prohibited by Federal, state, or local statutes in effec...
3.1.7 Lubrication. Means shall be provided to ensure proper lubrication for all moving parts in accordance with manufacturer requirements. All oil holes, grease fittings, and filler caps shall be easily accessible.
3.1.7.1 Lubrication Data. The Contractor shall provide the following information on all liquid or grease lubricants contained within equipment/system or in bulk (5 gallons or more) supplied under this procurement.
3.1.7.2 Recirculating Lubrication. When the machine is equipped with a recirculating lubrication system, it shall include a filter that is cleanable or replaceable. Each lubricant reservoir shall have at least a 24-hour capacity. Means shall be provid...

3.1.8 Replacement Parts.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .