832540roadHenr.pdf
PDF 63 MB Posted
- Attached to
- Fall Line Trail Southern Sections
- Solicitation number
- 26-2970-5JL
- Issued by
- Henrico County, Hampton City, Virginia
About this file
This is a project description document for the Fall Line Trail Southern Sections project in Virginia, involving the development of shared-use trails and pedestrian infrastructure improvements across multiple phases. The project comprises three main components: Lakeside Community Trail Phase 2, which includes approximately 2,300 linear feet of shared-use path with premanufactured truss and concrete boardwalk structures crossing Upham Brook, pedestrian crosswalks, and associated drainage and stormwater management features; Lakeside Community Trail Phase 3, consisting of approximately 3,500 linear feet of shared-use path with similar bridge structures crossing Upham Brook; and Brook Road and Hilliard Road Trail, encompassing approximately 2,800 linear feet of shared-use path including a pedestrian crossing over North Run and a road diet reduction of Hilliard Road from four lanes to three lanes. All phases include drainage design, stormwater management, pavement marking, and signing components.
The document does not specify pricing terms, set-asides, response dates, or due dates within the provided content. No information regarding incumbent contractors, funding sources, project amounts, or contract renewal options is detailed in the summary section provided. The specific technical specifications indicate the use of approximately 210 linear feet of premanufactured truss structures and 900 linear feet of concrete boardwalk structures across the three project phases to address stream and water crossings.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .