832468520_CLIN Pricing Sheet_Floor Upgrade EUR.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Raised Access Floor Upgrade Federal contract opportunity
Solicitation number
HC102824R0056
Issued by
Defense Information Systems Agency

About this file

This document is an Independent Government Cost Estimate (IGCE) for a contract to replace the raised access floor at a Defense Information Systems Agency (DISA) data center site in Europe. The IGCE provides the estimated costs for materials, labor, and other direct costs associated with the floor replacement project, which has a 12-month period of performance. The key CLIN items include materials and labor for project scheduling, mobilization, IT rack lift/shift, floor cleaning, and floor panel installation. The total estimated price, including a 5% surge cost, is provided. The related federal contract opportunity is for a solicitation to provide the data center with an upgraded access floor, including replacing all panels and upgrading some of the flooring structure. The work will require lifting and lowering of existing equipment.

View the file

Other files for this federal contract opportunity

Other files attached to Raised Access Floor Upgrade, newest first.
File Type Posted
HC102824R0056_RFP_AMD0001.docx DOCX document
HC102824R0056_AMEND 0001.docx DOCX document
832468520 _ PWS _ EUR Site B Floor Replacement FINAL for Solicitation.docx DOCX document
832468520 QASP - EUR Site B Floor Replacement.docx DOCX document
Site Visit Instructions.docx DOCX document
PWS Appendix A - Concept Drawings.pdf PDF
RFP HC102824R0056 Floor Upgrade.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Defense Information Systems Agency (DISA)
Independent Government Cost Estimate (IGCE)
COMPLETE THE FOLLOWING:
Solicitation TitleFY24 EUR Site B Floor Replacement
Contract Vehicle
Funding Document Number(s)HC110424MPA0135
Date
CLIN STRUCTURE SUMMARY
CLIN NumberCLIN DescriptionContract TypeBase PeriodTotal Price
0001Materials and LaborFFP
0003TravelFFP
ADD ADDITIONAL ROWS AND FORMULAS IF NECESSARY
Subtotal:
9999Surge (Cost Reimbursable NTE)5%
TOTAL ESTIMATED PRICE:

Grand Total with Fee

IGCE-Base Period

Defense Information Systems Agency (DISA)
Independent Government Cost Estimate (IGCE)
Period of Performance - 12 months
Base Period
CLIN #PWS/SOW Task(s)
(annotate if OPTIONAL task)Government Site / Contractor SiteEstimated Labor Hr RateLabor HoursAmount
1Project ScheduleContractor470
1MobilizationGovernment40
1Lift/Shift IT RacksGovernment140
1Remove/Replace ComponentsGovernment130
1Floor CleaningGovernment65
1Install GrommetsGovernment50
Total Labor895
Materials (from below)**
Travel/Other Direct Costs (from below)**
Total Estimated Price

**Breakout of Materials and Travel/ODC costs must be provided below.

Materials
CLINPWS/SOW TaskProposed ItemUnit CostQuantityTotal Amount
1Project ScheduleOffice Materials1
1MobilizationTrailer, dumpster1
1Lift/Shift IT RacksLifting materials900
1Floor Cleaningcleaning materials3,000
1Floor Panels, Solidfloor panels800
1Floor panels, perforatedfloor panels138
1gaskets, 4-wayfloor panel gaskets841
1gaskets, 2-wayfloor panel gaskets151
1Stringersstringers140
1GrommetsGrommets132

Materials Total

Travel/ODC
CLINPWS/SOW TaskOtherTotal Amount
1Travel
ADD ADDITIONAL ROWS IF NECESSARY
Travel/Other Direct Costs Total

When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

Encl 6, IGCE 11 Sep 2018/v5

File details come from the government source that posted it. Updated .