About this file
This Invitation for Bids (IFB #26-002) issued by Botetourt County, Virginia, solicits sealed bids from qualified contractors for the demolition, debris removal, and site restoration of one condemned structure, one shed, and retaining walls located at 72 Railroad Avenue, Eagle Rock, Virginia (Tax Map #27A-70). The scope of work includes permitting, utility coordination, demolition of above-ground and below-ground components to a minimum depth of twelve inches below finished grade, material salvage, debris removal and disposal, environmental testing and abatement, and site restoration including erosion and sediment control, grading, topsoil placement, and seeding. An optional pre-bid meeting is scheduled for Wednesday, July 15, 2026 at 2:00 p.m. EST at the project site. Sealed bids must be submitted by Tuesday, August 4, 2026 at 2:00 p.m. EST either electronically through the Botetourt County Vendor Portal (Bonfire) or in hard copy to the Botetourt County Purchasing Department at 57 S. Center Drive, Daleville, Virginia 24083. A public bid opening will follow immediately at the same location. All work shall be completed no later than Sunday, September 20, 2026. Construction hours are restricted to 7:00 a.m. to 7:00 p.m. Monday through Friday and 8:00 a.m. to 6:00 p.m. on Saturday, with no work on Sundays. An optional Alternate #1 includes nature-based surface water management plantings and access barriers contingent on funding availability.
The contract will be awarded to the lowest responsive and responsible bidder on a firm-fixed-price basis, with payment made NET 45 upon completion of work. No cost-plus-percentage-of-cost submissions are permitted. This project is funded in part by the Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) and the Commonwealth of Virginia through the Virginia Department of Emergency Management (VDEM), with local match provided by the Botetourt County Board of Supervisors. The contractor must obtain all required local, state, and federal permits with permit fees paid by the contractor. Davis-Bacon prevailing wage rates do not apply to this HMGP-funded demolition project. The contractor must comply with all applicable federal requirements including domestic preference for U.S.-produced materials, prohibition on covered telecommunications equipment, and FEMA Environmental and Historic Preservation (EHP) requirements. A Construction Manager retained by the County will provide project administration and coordination. Contractors must submit proof of Virginia contractor licensing, complete the required certifications including debarment and suspension verification, provide a certificate of insurance, and demonstrate past performance on similar demolition and site restoration projects completed within the past five years.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BIDS
IFB #26-002
STRUCTURE DEMOLITION AND SITE RESTORATION
FEMA Disaster No.: FEMA-4674-DR-VA-0002
Funding Source: FEMA Hazard Mitigation Grant Program (HMGP) and the Commonwealth of Virginia, as administered by the Virginia Department of
Emergency Management (VDEM)
RELEASE DATE
July 7th, 2026
OPTIONAL PRE-BID MEETING
Wednesday, July 15th, 2026
2:00 P.M. EST.
72 Railroad Ave, Eagle Rock, VA 24085
SUBMISSION DEADLINE
Tuesday, August 4th, 2026
2:00 P.M. EST.
Public Bid Opening to immediately follow.
Bids may be submitted either electronically or in hard copy. Bidders are responsible for ensuring their submission is received by the deadline, regardless of the method selected.
Electronic submissions shall be made to the Botetourt County Vendor Portal. The portal requires a quick registration and can be accessed at the link below or on the County website's Purchasing page. Fax or email submissions will not be accepted.
BOCO VENDOR PORTAL (BONFIRE)
It is the full responsibility of the Bidder to ensure that it can access and submit its bid in a technically compliant manner before the deadline. Any technical assistance shall be requested via the Bonfire Help site. It is the Bidder’s responsibility to allow sufficient time for any issues to be resolved.
All comments and questions concerning this solicitation shall be received no later than July 21st, 2026, 5:00 p.m. EST, and should be submitted through the Botetourt County Vendor
Portal or emailed to: purchasing@botetourtva.gov.
Individuals with disabilities who require assistance or special arrangements in order to participate in this process should call (540) 928-2106. We request that you provide at least 48 hours ' notice so that reasonable efforts may be made to provide the proper assistance. Botetourt County reserves the right to accept or reject any or all bids, to waive any informalities or irregularities, and to accept a bid, which is deemed in its best interest.
IFB # 26-002
STRUCTURE DEMOLITION AND SITE RESTORATION
https://botetourtva.bonfirehub.com/portal/?tab=pastOpportunities mailto:purchasing@botetourtva.gov
Table of Contents
AUTHORITY & GENERAL INFORMATION
SCOPE OF WORK
Permitting
Work Timeline and Hours
Site Safety
Utility Coordination
Demolition
Material Salvage
Debris Removal and Disposal
Environmental Testing and Abatement
Site Restoration and Preservation
Alternate # 1
CONSTRUCTION MANAGER (CM AGENCY)
ENVIRONMENTAL & SPECIAL CONDITIONS
OPTIONAL PRE-BID MEETING
BID SUBMISSION REQUIREMENTS
Option 1 – Electronic Submission
Option 2 – Hard Copy Submission
Additional Requirements
Submission Deadline
QUESTIONS
EVALUATION & AWARD
CONTRACT TYPE & PRICING
FEDERAL CONTRACT REQUIREMENTS
FEMA COMPLIANCE CLAUSES
PERIOD OF PERFORMANCE
FUNDING
PAYMENT TERMS
EAGLE ROCK SURVEY – EXISTING CONDITIONS
EAGLE ROCK ESC PLAN
PHASE I ESA
SURVEY REPORT
GENERAL CONDITIONS AND INSTRUCTIONS TO BIDDERS
CONTRACTOR’S CERTIFICATION AND BID SHEET
AUTHORIZATION TO TRANSACT BUSINESS FORM
NON-COLLUSION STATEMENT
VIRGINIA PUBLIC PROCUREMENT ACT FORM
IFB # 26-002
STRUCTURE DEMOLITION AND SITE RESTORATION
AUTHORITY & GENERAL INFORMATION
Botetourt County, Virginia, is soliciting sealed bids from qualified contractors for the demolition, debris removal, and site restoration of one (1) condemned structure, one (1) shed, and the retaining walls located at 72 Railroad Avenue, Eagle Rock, Virginia, identified as tax number 27A-70. This Invitation for Bids is issued pursuant to the Virginia Public Procurement Act (VPPA), the Botetourt County Purchasing Policy and Procedures Manual, and applicable federal procurement requirements under 44 CFR Part 80. This project is funded in part by a Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) and by the State of Virginia through the Virginia Emergency Management Agency (VDEM).
This bid includes demolition and site work only. Any future permeable parking or improvements will be bid separately after approval of the open space use.
Botetourt County has retained a Construction Management Agency to provide construction administration and project management services for the Project. The successful Contractor will coordinate all Work through the County’s designated Construction Manager (CM).
SCOPE OF WORK
The successful bidder shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete the following tasks:
Permitting
• Obtain and successfully complete the requirements of all required local, state, and federal permits necessary for demolition, erosion and sediment controls / stormwater management, contamination abatement, material disposal, and site restoration.
• Permits shall be posted as required by the issuing organization.
• Permit fees shall not be waived by the County.
Work Timeline and Hours
• Work to complete the demolition components of this project and clear all debris from the site shall specifically be completed as soon as possible from the transfer of ownership of the property to Botetourt County to comply with specific FEMA requirements. Ownership transferred to Botetourt County on April 22nd, 2026.
• The Notice to Proceed will establish the official start of the contract time.
• Construction hours are contractually restricted as follows: Work involving heavy equipment, or other construction activities that generate noise exceeding the standards of the currently adopted noise ordinance, shall be performed only during the hours of 7:00 a.m. to 7:00 p.m. Monday through Friday and 8:00 a.m. to 6:00 p.m.
on Saturday. No work is to occur at the site on Sundays. Other, less impactful construction activities are not otherwise restricted.
• Exceptions to these hours may be granted for urgent site safety work or by written approval of Botetourt County, or by extension, its construction project manager.
• All work related to any submitted bid shall be completed no later than Sunday, September 20, 2026.
Site Safety
• Contractor shall post two (2) no trespassing signs, no smaller than 8”x10”, along each side of the property, no closer than 25 feet to another sign along the perimeter, until
IFB # 26-002
the Botetourt County demolition permit associated with the project is deemed successfully complete by Botetourt County Development Services and finalized.
Utility Coordination
• Coordinate utility locating and disconnection for all public and private utilities serving the site while preserving future access.
• Provide the Community Development Office with written verification from each applicable utility provider confirming proper disconnection prior to the commencement of demolition or land disturbing activities.
Demolition
• Demolish the condemned structure, associated shed, and all other man-made improvements on the site.
i) All above-ground components of the condemned structure, the shed, and the masonry retaining walls located behind the condemned structure shall be completely removed from the site following the approved site plan.
ii) All below-ground components of the condemned structure, the shed, and the masonry retaining walls on the property shall be removed to a minimum depth of twelve (12) inches below finished grade.
iii) Horizontal concrete or other masonry surfaces, including but not limited to remaining basement floors, shall be penetrated with a continuous through-hole having a minimum diameter of twelve (12) inches. No maximum hole size is specified. The through-hole shall be located approximately at the center of the remaining concrete with one hole per area if divided by walls that will remain as dividers below grade.
(1) If the opening is made by a method other than boring a round hole, an area equivalent to one (1) square foot, with no side shorter than six (6) inches, cleared completely through, may be accepted with Botetourt County’s prior approval.
• During removal of any manmade component, any existing trees or brush that are damaged or unhealthy, at Botetourt County’s or its construction manager’s discretion, are to be cleared from the site.
• No deviation from these demolition requirements shall be permitted without prior written approval from Botetourt County’s Building Official.
Material Salvage
• Identify, remove, and set aside one (1) steel I-beam measuring between approximately twenty (20) feet in length, that is straight and in good condition, or as close to these requirements as possible, in accordance with FEMA requirements for the environmentally sound repurposing of building materials. Contractor shall place the beam at the Church Avenue edge of the lot, clear of the right of way, for pickup and removal by others. If not picked up by the end of the project's demolition phase, the contractor is to properly dispose of the beam along with all other materials.
• All other materials salvaged from the site are the property and responsibility of the contractor to remove in their entirety. Any disposal costs are the responsibility of the contractor.
IFB # 26-002
Debris Removal and Disposal
• Remove and lawfully dispose of all demolition debris, plant/tree remains, trash, and litter from the entire parcel prior to completion of the contract.
• All disposals shall occur at properly licensed and permitted facilities.
i) Bidder shall provide complete, legible landfill receipts and disposal documents with invoicing.
ii) Landfill receipts shall be included as part of the grant records.
Environmental Testing and Abatement
• Utilize Botetourt County provided site evaluation documentation
i) The Contractor shall comply with all findings, restrictions, required practices, material handling procedures, and mitigation measures identified in the Botetourt County provided Pre-Development Site Assessment Package.
ii) The Contractor shall fully comply with the Resource Conservation and Recovery Act (RCRA). No work shall proceed contrary to this requirement.
iii) Documentation sufficient to support compliance with all requirements of:
(1) FEMA HMGP Environmental and Historic Preservation (EHP)
(2) Virginia Department of Environmental Quality (DEQ)
(3) Resource Conservation and Recovery Act (RCRA)
• The Contractor shall perform all abatement, remediation, disposal, and confirmatory testing necessary to address any hazardous materials or contaminants identified at concentrations exceeding applicable regulatory thresholds.
i) Contractor to provide documentation of any abatement, remediation, disposal, or confirmatory testing completed as a part of this contract.
Site Restoration and Preservation
• Restore the site in accordance with FEMA grant requirements, DEQ guidelines, the approved erosion and sediment control plan, the approved site plan, and in the Botetourt County provided Pre-Development Site Assessment Package.
• Return the site to a natural, stable condition, following the approved site plan, including:
i) Install and maintain erosion and sediment control measures according to the approved plan
ii) Removal of surface gravel and remaining debris
iii) Site grading
iv) Leveling and compaction in specified areas
v) Placement of clean topsoil fill, outside of the 1-percent annual chance (100-year) floodplain, as necessary
(1) See approved site plan for topsoil depth and target finished grades
vi) Removal of construction entrance materials
vii) Removal of erosion and sediment controls
viii) Stabilization and seeding
(1) See approved site plan for seeding specifications
Alternate # 1 Contingent on the availability of funding, and at the option of Botetourt County prior to beginning construction, the project shall include the following nature-based surface water
IFB # 26-002
management plantings and access barriers as specified on sheet L101 of the approved site plan:
i) Planting of trees
ii) Plantings shall be Taylor Juniper (Juniperus virginiana 'Taylor' aka Eastern
Redcedar) trees, or similar, as market availability dictates.
iii) All trees planted are to be:
(1) A preference given to Virginia native trees if specified trees are unavailable
(2) A minimum height of at least four (4) feet tall at planting with a maximum of seven (7) feet tall
(3) Nursery of origin shall be provided
(4) Only verifiably container-grown plants, excluding all ball and burlap-grown plants, are to be used unless written approval from Botetourt County is given prior to installation
(5) Plantings shall be healthy, and free of pests, noxious weeds, and disease
(6) Planted according to established industry best practices, to include
(a) Root preparation
(b) Trees are to be vertical and plumb
(c) Stake as necessary depending on slope of surrounding ground
iv) Provide water and watering service
(1) Complete a total of four (4) post-restoration waterings
(2) Water a maximum of two (2) times a week, with a minimum of two (2) days between waterings
(3) Where rainfall would make watering detrimental to the site watering shall be postponed until the next appropriate date
(4) Apply water to the entire site of appropriate water quality, volume, and rate of application based on site conditions for all grass and trees present
(5) Watering shall only occur during the hours of 6:00 a.m. to 8:00 p.m. Monday through Saturday.
(6) Provide log of watering performance dates, times, and estimated gallons to
Botetourt County at end of watering period
• Site preservation
i) Two existing drive entrances along Railroad Ave are to have vehicular traffic limited by the Contractor by the installation of natural stone barriers (rock bollards) to restrict post-project access
ii) Rocks shall be placed outside the 1-percent annual chance (100-year) floodplain as indicated on the approved site plan
iii) Each rock shall meet the minimum specifications shown on the site plan.
iv) Rock is to be placed directly on the surface of the ground, be stable, plumb, not pose a hazard of injury due to settling, shifting, or movement, and be deemed temporary as related to the site.
• All work to follow the approved site plan.
Bidder shall not disturb or alter the site in a way that conflicts with FEMA open space deed restrictions.
IFB # 26-002
CONSTRUCTION MANAGER (CM AGENCY)
The County has retained a Construction Manager (CM) to provide construction management agency services for this Project. The CM serves as the County’s representative and will assist the County with the administration and coordination of the Project.
The Contractor shall coordinate all work with the CM and shall provide timely responses to requests for information, schedules, submittals, applications for payment, and other project documentation as requested by the CM.
The CM is not a party to the Contract between the County and the Contractor and has no authority to modify the Contract Documents, authorize additional compensation, increase or decrease the Contract Time, or otherwise bind the County contractually. Only the County, acting through its authorized representatives, may approve changes to the Contract by written Change Order or other written contract modifications.
The Contractor shall promptly comply with written directives issued by the County and shall cooperate fully with the CM in the administration of the Project.
ENVIRONMENTAL & SPECIAL CONDITIONS
Executive Order 11988: Floodplain Restrictions: debris may not be staged, stored, stockpiled, burned, or disposed of in the floodplain without the Contractor/bidder obtaining an approval letter/permit from the Virginia Department of Environmental Quality (DEQ). Documentation of the request, which includes accurate site conditions and the approval/permit from the permitting official, must be forwarded by the County to FEMA for inclusion in the administrative record to document compliance with this condition. Contractor/bidder must provide a copy of the DEQ approval to Botetourt County prior to any staging.
Clean fill must be compacted according to the site plan and may not be staged or stockpiled in the floodplain. All fill material must be free of debris, contaminants, or unsuitable material.
Open burning of debris is prohibited anywhere on the site.
Endangered Species Act (ESA): The project location is within the range of federally listed bat species. No standing tree removal is permitted under this IFB without prior County, VDEM, and FEMA approval. No deviation from the approved scope of work or environmental condition is permitted without prior written authorization from the County, VDEM, and FEMA.
National Historic Preservation Act (NHPA): In the event that archaeological resources are discovered during ground-disturbing activities, work shall cease immediately, and the County shall be notified.
If human remains are encountered, the Contractor shall immediately stop work, secure the site, and notify the County. Work shall not resume until cleared by DHR and FEMA.
Resource Conservation and Recovery Act (RCRA): The Bidder is responsible for determining whether hazardous or toxic materials are present. This may include, but is not limited to, propane cylinders, sandblasting residue, discarded paint and solvents, cleaning chemicals, pesticide containers, lead-acid batteries, items containing chlorofluorocarbons (CFCs), used oil filters and motor oil, and unlabeled tanks or containers. The Bidder is responsible for handling, managing, and disposing of hazardous or toxic materials in accordance with state and federal requirements.
State Hazardous Materials and Solid Waste Laws: The Bidder is responsible for determining whether asbestos-containing materials (ACM) are present. This may include, but is not limited to, cementitious siding, caulking compound, roof felt and shingles, roofing mastic, pipe
IFB # 26-002
insulation, furnaces and related elements, sheet vinyl, floor tiles, floor underlayment, and associated mastics. Bidder is responsible for identifying, abating, and disposing of ACMs in accordance with local, state, and federal requirements.
Environmental Compliance, General All work shall comply with:
1. FEMA Environmental and Historic Preservation (EHP) requirements
2. 44 CFR Part 9 (Floodplain Management)
3. 44 CFR Part 10 (Environmental Considerations)
4. Applicable Virginia Department of Environmental Quality (DEQ) regulations
5. Applicable Virginia Administrative Code (VAC) provisions
6. Generally accepted environmental, demolition, and site remediation practices
OPTIONAL PRE-BID MEETING
An optional pre-bid meeting will be held on the date, time, and location indicated below.
Attendance at this meeting is not required to submit a responsive bid.
• Date: Wednesday, July 15th, 2026
• Time: 2:00 PM – 2:30 P.M. EST.
• Location: 72 Railroad Avenue, Eagle Rock, Virginia, 24085-3348
All prospective bidders attending the pre-bid meeting must sign the attendance sheet.
Bidders arriving after the scheduled start time may not be permitted to participate in the meeting.
The purpose of this meeting is to review the scope of work, discuss project requirements, and provide opportunities for questions. All questions and responses will be documented and issued in a written addendum, which will be made available to those not in attendance or who arrived after the scheduled start. Verbal responses provided at the meeting shall not be considered binding unless confirmed in writing by an addendum. Bidders are encouraged to familiarize themselves with the solicitation documents prior to attending.
BID SUBMISSION REQUIREMENTS
Bids may be submitted either electronically or in hard copy, as described below. Bidders are responsible for ensuring their submission is received by the deadline, regardless of the method selected.
Option 1 – Electronic Submission Bids may be submitted electronically through the County’s e-procurement portal: BOCO
VENDOR PORTAL (BONFIRE)
Electronic submissions must be fully uploaded and finalized in the system prior to the deadline stated in this Invitation for Bids. Late submissions will not be accepted. The County is not responsible for incomplete electronic submissions.
Option 2 – Hard Copy Submission Bids shall be sealed and clearly marked to prevent accidental opening prior to the official bid opening. Hard copy bids shall be delivered to:
Botetourt County Purchasing Department 57 S. Center Drive Daleville, VA 24083
The outside of the envelope shall be clearly labeled with:
• IFB Number
• Project Title
• Bidder’s Name
IFB # 26-002
STRUCTURE DEMOLITION AND SITE RESTORATION
https://botetourtva.bonfirehub.com/portal/?tab=openOpportunities
Bids may be received by designated County staff, including the main reception desk;
however, all bids must be delivered to and date/time stamped by the Purchasing Office.
The official time of receipt shall be the date and time the bid is received and stamped by the Purchasing Office. Delivery to any other County personnel or location does not constitute official receipt.
Bids must be received and time-stamped prior to the submission deadline. Bids received after the deadline will not be accepted.
Bids submitted by mail or courier must be received at the designated location prior to the submission deadline. Postmarks, shipping dates, or other evidence of mailing shall not be considered in determining timeliness.
The County is not responsible for delays in delivery, including mail, courier, or internal routing delays.
Additional Requirements
• Bidders shall submit only one bid using one method of delivery (electronic or hard copy, not both). In the event of a conflict between an electronic submission and a hard copy submission from the same bidder, the County reserves the right to deem the bid non-responsive.
• The official time for receipt of bids shall be determined by:
o The timestamp in Bonfire for electronic submissions; or o The date/time stamp at the receiving office for hard copy submissions.
• The County is not responsible for delays in delivery, including technical assistance or courier delays.
Submission Deadline: all submissions shall be made no later than Tuesday, August 4th, 2026, 2:00 PM EST—public bid opening to follow, located at 57 S. Center Drive, Daleville, VA 24083.
The following items shall be submitted with each bid:
• Completed Contractor Certification & Bid Form
• Addenda acknowledgment (if applicable)
• Virginia State Contractor’s license information
• Authorization to Transact Business Form
• Non-Collusion Statement
• Virginia Public Procurement Act Form
The total lump sum price shall include all costs necessary to deliver a complete, compliant, and FEMA-eligible project, whether or not each item is expressly listed, provided such work is reasonably inferable from the IFB documents, applicable regulations, and approved site plan Bidders are encouraged to submit examples of similar demolition and site restoration projects completed within the past five (5) years with their bid. Examples may include project descriptions, photographs, references, or other documentation demonstrating experience with comparable work.
The County reserves the right to request additional information from the apparent low bidder, including examples of similar projects and supporting documentation, for the purpose of determining bidder responsibility in accordance with the Virginia Public Procurmenet Act.
QUESTIONS
All questions regarding this IFB shall be submitted through the Botetourt County Vendor portal, Bonfire, or in writing to: purchasing@botetourtva.gov.
Questions shall be submitted no later than Tuesday, July 21st, 2026, 5:00 PM EST.
During the solicitation process, all communications shall be directed exclusively to the Purchasing Office. Bidders shall not contact Community Development or the Construction Manager regarding this IFB, unless specifically authorized by the County.
IFB # 26-002
STRUCTURE DEMOLITION AND SITE RESTORATION
mailto:purchasing@botetourtva.gov
EVALUATION & AWARD
A public bid opening will be held on Tuesday, August 4th, 2026, at 2:00 PM EST at the Botetourt County Administration Center, 57 S. Center Drive, Daleville, VA 24083.
Award will be made to the lowest responsive and responsible bidder based on the Base Bid.
The County reserves the right to remove landscaping (Alternate #1) from the scope based on funding availability. Responsibility will be determined in accordance with the Virginia Public Procurement Act, including evaluation of the Bidder’s ability, capacity, and past performance.
Botetourt County reserves the right to accept or reject any or all bids, to waive any informalities or irregularities, and to accept a bid, which is deemed in its best interest.
The awarded Bidder must provide a certificate of insurance and federal certifications, such as Debarment & Suspension, Lobbying, Covered Telecom, and Domestic Preference.
The Bidder shall not enter into any subcontract with a debarred or suspended party and must verify subcontractor status via SAM.gov.
No deviation from the approved scope of work or environmental condition is permitted without prior written authorization from the County, VDEM, and FEMA.
CONTRACT TYPE & PRICING
The County intends to award a firm-fixed-price contract to the lowest responsive and responsible bidder. Cost-plus-percentage-of-cost submissions are prohibited.
FEDERAL CONTRACT REQUIREMENTS
This procurement is funded in whole or in part by federal funds from the Federal Emergency Management Agency (FEMA). As such, the successful bidder shall comply with all applicable federal laws, regulations, and executive orders, including but not limited to those set forth in 2 C.F.R. Part 200.
Domestic Preference In accordance with 2 C.F.R. § 200.322, to the greatest extent practicable, the Bidder shall provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States. For purposes of this requirement, “produced in the United States” means that all manufacturing processes occurred in the United States and that all components of the product are of U.S. origin, unless a waiver applies.
Prohibition on Covered Telecommunications Equipment or Services In accordance with 2 C.F.R. § 200.216, the Contractor is prohibited from using FEMA award funds to procure or obtain equipment, services, or systems that use covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Covered telecommunications equipment or services include those produced or provided by entities identified in 2 C.F.R. §
200.216 and related federal guidance.
The successful bidder shall be required to certify compliance with these requirements as part of contract execution.
Required Federal Contract Provisions (2 C.F.R. Part 200, Appendix II) The provisions set forth in 2 C.F.R. Part 200, Appendix II are hereby incorporated by reference and shall apply to this contract as applicable.
Davis-Bacon Act The Davis-Bacon Act (40 U.S.C. § 3141 et seq.) does not apply to this acquisition and demolition project funded under the FEMA Hazard Mitigation Grant Program (HMGP). FEMA’s Hazard Mitigation Assistance Guidance and 44 C.F.R. Part 206 confirm that Davis-Bacon labor standards apply only to FEMA’s Public Assistance (PA) permanent construction projects, and do not apply to HMGP-funded activities such as acquisition, demolition, or open space conversion. Accordingly, no federal prevailing wage rates are required or applicable for this
IFB.
IFB # 26-002
FEMA COMPLIANCE CLAUSES
FEMA/VDEM Funding Limitation This project is funded in part through a Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant. This grant is supported by funding from the State of Virginia through the Virginia Emergency Management Agency (VDEM).
Award of any contract resulting from this Invitation for Bids is expressly contingent upon the availability of grant funding and the required local match. The County reserves the right to reject any and all bids, in whole or in part, including any bid that exceeds available funding or otherwise renders the project ineligible for reimbursement.
Environmental and Historic Preservation (EHP) Requirements Work under this contract shall not commence until all applicable FEMA Environmental and Historic Preservation (EHP) requirements have been satisfied and written authorization to proceed has been issued by the County. The Contractor shall comply with all EHP conditions applicable to the project, including, but not limited to, environmental testing, hazardous materials handling, and any required work sequencing. No costs incurred prior to written authorization shall be eligible for payment.
Federal Grant Compliance and Records The Contractor shall maintain all records related to this project in accordance with applicable FEMA grant requirements and shall make such records available for inspection, audit, or reproduction by the County, the Commonwealth of Virginia, FEMA, or their authorized representatives.
PERIOD OF PERFORMANCE
No work shall begin until issuance of a written Notice to Proceed (NTP) by Botetourt County.
The Notice to Proceed will establish the official start date for the contract performance.
Completed shall be defined as all physical work being finished, all required documentation submitted, all inspections passed, all permits closed, all contractor-owned property removed from the site, and all required County approvals issued.
FUNDING
This project will be funded in whole or in part by the FEMA Hazard Mitigation Grant Program (HMGP), the Commonwealth of Virginia, as administered by the Virginia Department of Emergency Management (VDEM), and the Botetourt County Board of Supervisors.
PAYMENT TERMS
Payment shall be made NET 45 upon completion of the work. Completed is defined as the physical condition of work, permit closeout, final inspections, and County acceptance.
Invoices submitted prior to final acceptance or permit closeout will not be eligible for payment.
IFB # 26-002
EAGLE ROCK SURVEY – EXISTING CONDITIONS
Following page
IFB # 26-002
L3
L4
L1 L2
LINE TABLE
LINE
L1
L2
L3
L4
BEARING
N52°46'10"W
N35°00'00"E
S50°46'05"E
S34°52'46"W
DISTANCE
139.46
183.50
139.36
178.64
DRAWN
APPROVED
CHECKED
PROJECT:JSC
JSC
LCM SCALE: 1" = 30'
03/13/2026
26012
NA
D8
(2
1)
VI
RG
IN
IA
S
OU
TH
Z
ON
E
GR
ID
N
OR
TH
N/F
CHARLES G. SMITH
TM# 27A-70
INST# 120004371
B-2 ZONING
0.578 ACRES (BY SURVEY)
DN/F
BOTETOURT FUNERAL
SERVICES INC
TM# 27A-71A
INST# 050003814
B-2 ZONING
0.100 ACRES (BY GIS)
A N/F
MARK A. SLOAN
TM# 27A-71
INST#
B-2 ZONING
0.240 ACRES (BY GIS)
B N/F
WANDA M. HUFF
TM# 27A-72
INST#
B-2 ZONING
0.310 ACRES (BY GIS)
C N/F
BANK OF BOTETOURT
TM# 27A-69
INST#
B-2 ZONING
0.237 ACRES (BY GIS)
E N/F
BANK OF BOTETOURT
TM# 27A-68
INST#
B-2 ZONING
0.058 ACRES (BY GIS)
F
EX. SSCO
EL: 936.73'
EXISTING LIGHT POLE TYPICAL
EX. SSMH
RIM: 935.38'
EX. STORM GRATE
EL: 934.39'
8" INV OUT: 933.29'
EX. 8" SANITARY LINE
EX. SSMH
RIM: 934.45'
EX. OVERHEAD
UTILITY LINE TYPICAL
EX. ABOVE
GROUND POOL
ENCROACHING
EX. POOL DECK
ENCROACHING
EXISTING BANK
OF BOTETOURT
EX. 2" PVC
WATERLINE
EX. CONC
WALL
EX. FENCE
TYPICAL
EX. CONC
WALL
EX. 15" CMP STORM CULVERT
INV OUT: 943.81'
EX. CONTROL VALVE
EL: 942.57'EX. SHED
EX. CONCRETE WALL
EX. SSMH
RIM: 941.32'
EX. WM
RIM: 943.43'
EX. WM
RIM: 941.28'
EX. WM
RIM: 939.99'
EX. BOLLARDS
D E
F
A
B
C
EDGE OF PAVEMENT
EDGE OF PAVEMENT
EDGE OF
PAVEMENT
EXISTING GRAVEL ROAD
FLOODWAY
ZONE AE
ZONE AE
ZONE AE
ZONE X (0.2% CHANCE)
ZONE AE
ZONE X (0.2% CHANCE)
ZONE X (0.2% CHANCE)ZONE XZONE X
ZONE X (0.2% CHANCE)
EX. GRAVEL
AREA
EX. RUBBLE
AREA
1" REBAR BEARS 0.55'
S39°13'55"W TO LINE
REBAR FOUND
1" REBAR BEARS 0.21'
N39°13'55"E TO LINE
EXISTING CONDITIONS PLAN EAGLE ROCK
03/13/26
THIS EXISTING CONDITIONS TOPOGRAPHIC SURVEY WAS
COMPLETED UNDER THE DIRECT AND RESPONSIBLE CHARGE
OF JASON SCOTT CALDWELL, L.S. FROM AN ACTUAL GROUND
SURVEY MADE UNDER MY SUPERVISION; THAT THE ORIGINAL
DATA WAS OBTAINED ON MARCH 6TH, 2026; AND THAT THIS
PLAT, MAP, OR DIGITAL GEOSPATIAL DATA INCLUDING
METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS
OTHERWISE NOTED.
12" BURIED
CULVERT
RAILROAD AVE
STATE ROUTE 734
UNSPECIFIED WIDTH
DB 502 PG 484
CHURCH STREETSTATE ROUTE 43
IN
D
IA
N
L
AN
E
ST
AT
E
R O
U
TE
40' R/W
DB 502 PG 484
EX. REMNANTS OF
CONSTRUCTION FENCE
EX. SIDEWALK
EX. ENTRANCE
EX. ENTRANCE
EX. CONC
STRUCTURE
EX. UTILITY POLE
EX. SWING SET
EX. WOODEN
FENCE
LEGEND
R/W
PLAT BOOKPB
PAGEPG
LIGHT POLE
SANITARY SEWERSS
LP
SANITARY SEWER CLEANOUTSSCO
SANITARY SEWER MANHOLESSMH
W WATER LINE
REINFORCED CONCRETE PIPERCP
CORRUGATED METAL PIPECMP
OVERHEAD UTILITY LINEOHU
INVERTINV
STORM DRAIN
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUT
LIGHT POLE
ENTRANCES
ST
RIGHT OF WAY
NOW OR FORMERN/F
INSTRUMENTINST
UTILITY POLE
WATER VALVE
WATER VALVEWV
FENCELINEX
DEED BOOKDB
PARCEL LINE
CONTOUR-EXISTING1000
STATE ROUTESR
IRON PIN SET W/ CAPIPS
IRON PIN FOUNDIPF
MONUMENT FOUND
MONUMENT SET
CALCULATED POINT
UTILITY POLEUP
CONCRETE
EXISTINGEX.
PAVEMENT
IFB # 26-002
STRUCTURE DEMOLITION AND SITE RESTORATION
AutoCAD SHX Text C
AutoCAD SHX Text 540.473.1253
AutoCAD SHX Text
94 GREENFIELD STREET
AutoCAD SHX Text
DALEVILLE, VIRGINIA 24083
AutoCAD SHX Text of
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Y
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text Lic. No.002744
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text
JASON SCOTT CALDWELL
AutoCAD SHX Text NOTES: 1. OWNER OF RECORD: CHARLES G. SMITH OWNER OF RECORD: CHARLES G. SMITH 2. LEGAL REFERENCE: INST# 120004371 LEGAL REFERENCE: INST# 120004371 3. TAX MAP NUMBER: 27A-70 TAX MAP NUMBER: 27A-70 4. REFERENCE PLATS: REFERENCE PLATS: 5. NO TITLE REPORT FURNISHED, THEREFORE ENCUMBRANCES MAY EXIST OTHER THAN THOSE NO TITLE REPORT FURNISHED, THEREFORE ENCUMBRANCES MAY EXIST OTHER THAN THOSE SHOWN HEREON. 6. BY GRAPHIC PLOTTING ONLY, THE SUBJECT PROPERTY LIES WITHIN F.E.M.A. DEFINED ZONE BY GRAPHIC PLOTTING ONLY, THE SUBJECT PROPERTY LIES WITHIN F.E.M.A. DEFINED ZONE AE, ZONE X (0.2% ANNUAL CHANCE), AND ZONE X-UNSHADED. SEE MAP NUMBER 51023C0120C, EFFECTIVE DATE OF DECEMBER 17, 2010. THIS OPINION IS BASED ON THE AFORESAID MAP AND HAS NOT BEEN VERIFIED BY THE ACTUAL FIELD EVALUATIONS. 7. THIS PLAT IS BASED RECORD AND A PARTIAL FIELD SURVEY IN ACCORDANCE WITH THIS PLAT IS BASED RECORD AND A PARTIAL FIELD SURVEY IN ACCORDANCE WITH "MINIMUM STANDARDS AND PROCEDURES FOR LAND BOUNDARY SURVEY PRACTICE" AS DEFINED IN VA DPOR STANDARDS.
AutoCAD SHX Text EXISTING CONDITIONS FOR CHARLES G. SMITH TM# 27A-70 (0.578 ACRES BY SURVEY) AS RECORDED IN INST# 120004371 SITUATED BETWEEN RAILROAD AVE & CHURCH STREET, EAGLE ROCK VIRGINIA FINCASTLE MAGISTERIAL DISTRICT BOTETOURT COUNTY, VIRGINIA MARCH 13, 2026
AutoCAD SHX Text
SITE
AutoCAD SHX Text
VICINITY MAP NO SCALE
AutoCAD SHX Text
CHURCH ST
AutoCAD SHX Text
RAILROAD AVE
AutoCAD SHX Text
HIGH ST
AutoCAD SHX Text
HIGH ST
AutoCAD SHX Text
INDIAN LN
AutoCAD SHX Text
JAMES ST
AutoCAD SHX Text
BOTETOURT RD
AutoCAD SHX Text
RIVERSIDE DR
AutoCAD SHX Text
JAMES RIVER
AutoCAD SHX Text S
AutoCAD SHX Text C
EAGLE ROCK ESC PLAN
Following five (5) pages
IFB # 26-002
PR
O
JE
C
T N
UM
BE
R : 2
C O
N
ST
RU
C
TIO
N
D O
C
UM
EN
TS
SP
EC
TR
UM
D
ES
IG
N
.1
7.
26004
SPECTRUM PROJECT NUMBER:
CONSTRUCTION DOCUMENTS
04.17.2026
72 RAILROAD AVE|EAGLE ROCK, VA 24085
PROJECT PHASE:
PROJECT DATE:
INDEX OF DRAWINGS:
C001 COVER SHEET
C101 EXISTING CONDITIONS & DEMOLITION PLAN
C102 GRADING AND EROSION & SEDIMENT CONTROL PLAN
C501 NOTES & DETAILS
L101 LANDSCAPE PLAN
GENERAL PROJECT INFORMATION
SCALE: N.T.S.
PROJECT VICINITY
SCALE: N.T.S.
PROJECT LOCATION
N
N
C:
\T em p
Dr aw ing Fi les \A cP ub lish _1
\2 c ba se
.d wg
, P lo tte d
By : t ka ise n, P lo tte d:
A pr
, 2
6 - 2:
pm
72 RAILROAD AVE
PROJECT SITE TAX MAP NO. ZONING FLOOD ZONE PERMIT AUTHORITY
27A-70 B-2 X, AE BOTETOURT COUNTY
72 RAILROAD AVE
72 RAILROAD AVE
EROSION & SEDIMENT CONTROL PLAN
R
A
IL
RO
A
D A
VE
ER
O
SI
O N
S
ED
IM
EN
T C
O N
TR
O
L
PL
A N
PROPERTY OWNER IDENTIFICATION
OWNER/AUTHORIZED AGENT: BOTETOURT COUNTY
PHONE: (540) 928-2000
OWNER'S ADDRESS: 57 S. CENTER DR
DALEVILLE, VA 24083
SUBMITTING ENGINEER: SPECTRUM DESIGN PC
PHONE: (540) 342-6001
ENGINEER'S ADDRESS: 10 CHURCH AVE SE
ROANOKE, VA 24011
PID
0.57818259
SHEET NUMBER:
C001
Plaza Suite 1 10 Church Avenue, SE Roanoke, VA 24011
540.342.6001 spectrumpc.com
72 RAILROAD AVE
ACREAGE
IFB # 26-002
STRUCTURE DEMOLITION AND SITE RESTORATION
AutoCAD SHX Text
RAILROAD AVE
AutoCAD SHX Text
CHURCH ST
AutoCAD SHX Text
JAMES RIVER
AutoCAD SHX Text
BOTETOURT RD
AutoCAD SHX Text
CRAIG CRK RD
AutoCAD SHX Text
JAMES RIVER
NARROW PASSAGE RD
NOT FOR
CONSTRUCTION
SHEET NUMBER:
SHEET REVISIONS:
SHEET ISSUE DATE:
SHEET NAME:
DRAWN BY:CHECKED BY:
Spectrum Design Project No.:
PROJ. MGR.:
PROJECT PHASE:
C
Te m p D ra w in g
Fi le s\ A cP ub lis h_
2\ cb as e.
d w g, P lo tte d
B y:
tk ai se n, P lo tte d
: A pr
3,
- 2
:1 0p m
26004
CONSTRUCTION DOCUMENTS
4.17.2026
RENOVATIONS TO
72 RAILROAD AVE
EAGLE ROCK, VIRGINIA
AHJ APPROVAL STAMP
4.17.2026
MAR MAR TGK
Plaza Suite 1 10 Church Avenue, SE Roanoke, VA 24011
540.342.6001 spectrumpc.com
SCALE
C101
EXISTING CONDITIONS
& DEMOLITION PLAN
1" = 10'
IFB # 26-002
STRUCTURE DEMOLITION AND SITE RESTORATION
AutoCAD SHX Text N/F BOTETOURT FUNERAL SERVICES INC TM# 27A-71A INST# 050003814 ZONING: B-2 AREA=0.100 AC. (GIS)
AutoCAD SHX Text
N/F MARK A. SLOAN TM# 27A-71 ZONING: B-2 AREA=0.240 AC. (GIS)
AutoCAD SHX Text
N/F WANDA M. HUFF TM# 27A-72 ZONING: B-2 AREA=0.310 AC. (GIS)
AutoCAD SHX Text N/F CHARLES G. SMITH TM# 27A-70 INST# 120004371 ZONING: B-2 AREA=0.578 AC. (BY SURVEY)
AutoCAD SHX Text
N/F BANK OF BOTETOURT TM# 27A-69 ZONING: B-2 AREA=0.237 AC. (GIS)
AutoCAD SHX Text
N/F BANK OF BOTETOURT TM# 27A-68 ZONING: B-2 AREA=0.058 AC. (GIS)
AutoCAD SHX Text
RAILROAD AVENUE STATE RTE. 734 D.B. 502 PG. 484
AutoCAD SHX Text
CHURCH STREET STATE RTE 43 40' R.O.W. D.B. 502 PG. 484
AutoCAD SHX Text
RUBBLE/ EXTENTS OF DEMOLISHED BUILDING DEBRIS TO BE REMOVED. SEE NOTE #6
AutoCAD SHX Text
STORM GRATE TOP=934.39 8" INV. OUT=933.29
AutoCAD SHX Text
SAN. MANHOLE TOP=935.38
AutoCAD SHX Text
CONC. ENTRANCE
AutoCAD SHX Text
UTILITY POLE (TYP.)
AutoCAD SHX Text
REMNANTS OF CONSTRUCTION FENCE TO BE REMOVED
AutoCAD SHX Text
WOODEN FENCE TO BE REMOVED
AutoCAD SHX Text
CONC. WALL TO BE REMOVED TO PROPERTY LINE. SEE NOTE #7
AutoCAD SHX Text
CONC. WALL TO BE REMOVED TO PROPERTY LINE. SEE NOTE #7
AutoCAD SHX Text
SIDEWALK (TYP.)
AutoCAD SHX Text
OVERHEAD UTILITY (TYP.)
AutoCAD SHX Text
8" SANITARY SEWER(TYP.)
AutoCAD SHX Text
REBAR FOUND
AutoCAD SHX Text
CONC. WALL & STAIRS TO BE REMOVED
AutoCAD SHX Text
CONTROL VALVE ELE.=942.57 SEE NOTE #11
AutoCAD SHX Text
12" BURIED CULVERT TO BE REMOVED
AutoCAD SHX Text
2" PVC WATERLINE
AutoCAD SHX Text
INV. OUT=943.81
AutoCAD SHX Text
15" CMP
AutoCAD SHX Text
SWING SET SEE NOTE #8
AutoCAD SHX Text
ABOVE GROUND POOL & POOL DECK (ENCROACHING) SEE NOTE #8.
AutoCAD SHX Text
FENCE (TYP.)
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
LIGHT POLE (TYP.) TO REMAIN
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
ZONE X ZONE X (0.2% CHANCE)
AutoCAD SHX Text
ZONE X (0.2% CHANCE) ZONE AE
AutoCAD SHX Text
RUBBLE/ EXTENTS OF DEMOLISHED BUILDING DEBRIS TO BE REMOVED. SEE NOTE #6
AutoCAD SHX Text
CONC. STRUCTURE TO BE REMOVED TO PROPERTY LINE. SEE NOTE #7
AutoCAD SHX Text
CONC. WALL TO REMAIN
AutoCAD SHX Text
CONC. WALL TO BE REMOVED TO PROPERTY LINE. SEE NOTE #7
AutoCAD SHX Text
LIMITS OF DISTURBANCE =0.51 AC.
AutoCAD SHX Text
CO
AutoCAD SHX Text S
AutoCAD SHX Text
CONC. ENTRANCE
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
1" REBAR BEARS 0.21' N39°13'55"E TO LINE
AutoCAD SHX Text
1" REBAR BEARS 0.55' N39°13'55"E TO LINE
AutoCAD SHX Text
100-YR FLPL
AutoCAD SHX Text
500-YR FLPL
AutoCAD SHX Text
APPROXIMATE EXTENTS OF FOUNDATION (THREE WYTHE BRICK EXPECTED)
AutoCAD SHX Text SANITARY CLEANOUT TOP=936.73 TO BE ABANDONED. SEE WVWA DETAIL S-6A ON SHEET C501.
AutoCAD SHX Text
GRAVEL TO BE REMOVED
AutoCAD SHX Text
SHED TO BE REMOVED
AutoCAD SHX Text
APPROXIMATE PARTIAL BASEMENT LOCATION. SEE SEQUENCE NOTE 4 ON SHEET C102.
AutoCAD SHX Text
TREE TO BE REMOVED
AutoCAD SHX Text
LIMITS OF DISTURBANCE =0.51 AC.
AutoCAD SHX Text
SOIL BOUNDARY: 58C (HSG B) SOIL BOUNDARY: 64B (HSG B)
AutoCAD SHX Text
AutoCAD SHX Text 1" = 10'-0"
AutoCAD SHX Text 20'
AutoCAD SHX Text 10'
AutoCAD SHX Text 10'
AutoCAD SHX Text 5'
AutoCAD SHX Text EXISTING CONDITIONS & DEMOLITION NOTES 1. WHERE INDICATED OR WHERE IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL WHERE INDICATED OR WHERE IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL INDICATED OR WHERE IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL INDICATED OR WHERE IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL OR WHERE IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL OR WHERE IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL WHERE IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL WHERE IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL IN CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL CONFLICT WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL WITH NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL NEW CONSTRUCTION, EXISTING TOPOGRAPHICAL CONSTRUCTION, EXISTING TOPOGRAPHICAL CONSTRUCTION, EXISTING TOPOGRAPHICAL EXISTING TOPOGRAPHICAL EXISTING TOPOGRAPHICAL TOPOGRAPHICAL TOPOGRAPHICAL AND PLANIMETRIC FEATURES ARE TO BE REMOVED. 2. PERMITS, FEES AND LICENSES SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR PERMITS, FEES AND LICENSES SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR FEES AND LICENSES SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR FEES AND LICENSES SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR AND LICENSES SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR AND LICENSES SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR LICENSES SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR LICENSES SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR SHALL BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR BE SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR SECURED AND PAID BY THE CONTRACTOR. CONTRACTOR AND PAID BY THE CONTRACTOR. CONTRACTOR AND PAID BY THE CONTRACTOR. CONTRACTOR PAID BY THE CONTRACTOR. CONTRACTOR PAID BY THE CONTRACTOR. CONTRACTOR BY THE CONTRACTOR. CONTRACTOR BY THE CONTRACTOR. CONTRACTOR THE CONTRACTOR. CONTRACTOR THE CONTRACTOR. CONTRACTOR CONTRACTOR. CONTRACTOR CONTRACTOR. CONTRACTOR CONTRACTOR CONTRACTOR IS RESPONSIBLE FOR PROPER DISPOSAL OF ALL MATERIALS. 3. LOCATION OF EXISTING UTILITIES SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE LOCATION OF EXISTING UTILITIES SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE OF EXISTING UTILITIES SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE OF EXISTING UTILITIES SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE EXISTING UTILITIES SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE EXISTING UTILITIES SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE UTILITIES SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE UTILITIES SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE SHOWN ON THESE PLANS ARE BASED ON BEST AVAILABLE ON THESE PLANS ARE BASED ON BEST AVAILABLE ON THESE PLANS ARE BASED ON BEST AVAILABLE THESE PLANS ARE BASED ON BEST AVAILABLE THESE PLANS ARE BASED ON BEST AVAILABLE PLANS ARE BASED ON BEST AVAILABLE PLANS ARE BASED ON BEST AVAILABLE ARE BASED ON BEST AVAILABLE ARE BASED ON BEST AVAILABLE BASED ON BEST AVAILABLE BASED ON BEST AVAILABLE ON BEST AVAILABLE ON BEST AVAILABLE BEST AVAILABLE BEST AVAILABLE AVAILABLE AVAILABLE INFORMATION. NOTHING IN THESE CONTRACT DOCUMENTS SHALL BE CONSTRUCTED AS A NOTHING IN THESE CONTRACT DOCUMENTS SHALL BE CONSTRUCTED AS A NOTHING IN THESE CONTRACT DOCUMENTS SHALL BE CONSTRUCTED AS A IN THESE CONTRACT DOCUMENTS SHALL BE CONSTRUCTED AS A IN THESE CONTRACT DOCUMENTS SHALL BE CONSTRUCTED AS A THESE CONTRACT DOCUMENTS SHALL BE CONSTRUCTED AS A THESE CONTRACT DOCUMENTS SHALL BE CONSTRUCTED AS A CONTRACT DOCUMENTS SHALL BE CONSTRUCTED AS A CONTRACT DOCUMENTS SHALL BE CONSTRUCTED AS A DOCUMENTS SHALL BE CONSTRUCTED AS A DOCUMENTS SHALL BE CONSTRUCTED AS A SHALL BE CONSTRUCTED AS A SHALL BE CONSTRUCTED AS A BE CONSTRUCTED AS A BE CONSTRUCTED AS A CONSTRUCTED AS A CONSTRUCTED AS A AS A AS A A A GUARANTEE THAT SUCH UTILITIES EXIST IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO THAT SUCH UTILITIES EXIST IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO THAT SUCH UTILITIES EXIST IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO SUCH UTILITIES EXIST IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO SUCH UTILITIES EXIST IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO UTILITIES EXIST IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO UTILITIES EXIST IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO EXIST IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO EXIST IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO IN THE LOCATION INDICATED OR THAT OTHER UTILITIES DO THE LOCATION INDICATED OR THAT OTHER UTILITIES DO THE LOCATION INDICATED OR THAT OTHER UTILITIES DO LOCATION INDICATED OR THAT OTHER UTILITIES DO LOCATION INDICATED OR THAT OTHER UTILITIES DO INDICATED OR THAT OTHER UTILITIES DO INDICATED OR THAT OTHER UTILITIES DO OR THAT OTHER UTILITIES DO OR THAT OTHER UTILITIES DO THAT OTHER UTILITIES DO THAT OTHER UTILITIES DO OTHER UTILITIES DO OTHER UTILITIES DO UTILITIES DO UTILITIES DO DO DO NOT EXIST WITHIN THE AREA OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR EXIST WITHIN THE AREA OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR EXIST WITHIN THE AREA OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR WITHIN THE AREA OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR WITHIN THE AREA OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR THE AREA OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR THE AREA OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR AREA OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR AREA OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR OF CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR OPERATIONS. CONTRACTOR IS RESPONSIBLE FOR CONTRACTOR IS RESPONSIBLE FOR CONTRACTOR IS RESPONSIBLE FOR IS RESPONSIBLE FOR IS RESPONSIBLE FOR RESPONSIBLE FOR RESPONSIBLE FOR FOR FOR SUBSURFACE UTILITY EXPLORATION TO VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY UTILITY EXPLORATION TO VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY UTILITY EXPLORATION TO VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY EXPLORATION TO VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY EXPLORATION TO VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY TO VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY TO VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY LOCATIONS AND DEPTHS. CONTRACTOR TO VERIFY AND DEPTHS. CONTRACTOR TO VERIFY AND DEPTHS. CONTRACTOR TO VERIFY DEPTHS. CONTRACTOR TO VERIFY DEPTHS. CONTRACTOR TO VERIFY CONTRACTOR TO VERIFY CONTRACTOR TO VERIFY TO VERIFY TO VERIFY VERIFY VERIFY LOCATIONS AND SIZES OF ALL EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. AND SIZES OF ALL EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. AND SIZES OF ALL EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. SIZES OF ALL EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. SIZES OF ALL EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. OF ALL EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. OF ALL EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. ALL EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. ALL EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. EXISTING FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION. PRIOR TO COMMENCEMENT OF CONSTRUCTION. PRIOR TO COMMENCEMENT OF CONSTRUCTION. TO COMMENCEMENT OF CONSTRUCTION. TO COMMENCEMENT OF CONSTRUCTION. COMMENCEMENT OF CONSTRUCTION. COMMENCEMENT OF CONSTRUCTION. OF CONSTRUCTION. OF CONSTRUCTION. CONSTRUCTION. CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ANY DAMAGES TO EXISTING IS RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ANY DAMAGES TO EXISTING IS RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ANY DAMAGES TO EXISTING RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ANY DAMAGES TO EXISTING RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ANY DAMAGES TO EXISTING FOR REPAIR OR REPLACEMENT OF ANY DAMAGES TO EXISTING FOR REPAIR OR REPLACEMENT OF ANY DAMAGES TO EXISTING REPAIR OR REPLACEMENT OF ANY DAMAGES TO EXISTING REPAIR OR REPLACEMENT OF ANY DAMAGES TO EXISTING OR REPLACEMENT OF ANY DAMAGES TO EXISTING OR REPLACEMENT OF ANY DAMAGES TO EXISTING REPLACEMENT OF ANY DAMAGES TO EXISTING REPLACEMENT OF ANY DAMAGES TO EXISTING OF ANY DAMAGES TO EXISTING OF ANY DAMAGES TO EXISTING ANY DAMAGES TO EXISTING ANY DAMAGES TO EXISTING DAMAGES TO EXISTING DAMAGES TO EXISTING TO EXISTING TO EXISTING EXISTING EXISTING UTILITIES INTENDED TO REMAIN RESULTING FROM CONSTRUCTION. 4.