829758sewBalt.pdf

PDF 6 MB Posted

Attached to
Burton Avenue Low Pressure Sewer Health Project
Solicitation number
25171 SX0
Issued by
Baltimore County, Maryland

About this file

This is a proposal form and technical specifications document issued by the Baltimore County Department of Public Works & Transportation for Contract Number 25171 SX0, a Low Pressure Sewer (LPS) System construction project located in Parkville, Maryland (District 11c) along Burton Avenue. The project involves construction of approximately 309 linear feet of 2-inch and 127 linear feet of 1.5-inch low pressure sewer main, installation of six simplex grinder pumps with electrical service connections, one terminal flushing connection valve and vault, and associated excavation, shoring, dewatering, backfill, and surface restoration work. The pre-bid meeting was scheduled for Wednesday, July 8, 2026 at 10:00 a.m. EST via WebEx, with the last day for questions on Thursday, July 16, 2026 at 4:00 p.m. EST. Bids must be submitted electronically to dpwbid@baltimorecountymd.gov by the deadline specified in the bid documents, with an auto-receipt confirmation required. The contract must be completed within 95 work days of the Notice to Proceed, and only contractors formally prequalified as F7 Contractors within 10 calendar days prior to bid opening are eligible to submit bids.

The bid must include a Bid Bond equal to 5 percent of the bid amount, and the successful bidder will be required to provide a Performance Bond and Payment Bond equal to 100 percent of the contract amount for projects exceeding $25,000. Baltimore County prevailing wage rates effective at the time of contract solicitation will apply throughout the project duration. MBE/WBE participation requirements and forms must be completed and submitted with the bid, or the bid may be deemed non-responsive. The contractor shall guarantee all materials and work for two years from the date of final acceptance and must maintain a Maintenance Bond or 5 percent retainage for the same period. Materials must be new and of specified quality, including PVC or HDPE pressure pipe options for the contractor's selection, Schedule 40 or 80 fittings, and ductile iron or polyvinyl chloride components. The contract documents incorporate the Baltimore County Department of Public Works and Transportation September 2023 Standard Specifications for Construction and Materials, Standard Details for Construction, 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control, and Maryland Department of Transportation State Highway Administration Standard Specifications dated July 2025.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL FORM

BALTIMORE COUNTY

DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION

TOWSON, MARYLAND

Division of Construction Contracts Administration

Contract Number 25171 SX0

SEWER DESIGN SECTION

Burton Avenue Low Pressure Sewer – Health Project (9500, 9501, 9503, 9508, 9510, 9519 Burton Avenue, Parkville, MD 21234)

Parkville – District 11c5 Workday Number PROJ-10000825

CONTRACT BASED ON SEPTEMBER 2023

STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS

AND STANDARD DETAILS FOR CONSTRUCTION

Bidders Information

A pre-bid meeting will be held on Wednesday, July 8, 2026 at 10:00 a.m. EST via WebEx.

Phone-In (Audio Only) 1-415-655-0001, Meeting Number 2300 231 4246##.

Video Conference go to https://signin.webex.com/join Meeting Number 2300 231 4246, Password PGqaSPMk723, for Webex link go to:

www.baltimorecountymd.gov/departments/public-works/engineering/contracts/current-solicitations

Last day for questions will be Thursday, July 16, 2026 at 4:00 p.m. EST. All questions should be emailed to Barb Wentworth bwentworth@baltimorecountymd.gov and Karen McCormick kmccormick@baltimorecountymd.gov.

Baltimore County Prevailing Wage and Local Hiring Affidavit, Wage Rates & Requirements see pages 136-143 (Contract Disclosure): “Wage rates that are in effect as of the contract solicitation date will be the wage rates through the duration of the project”

MBE/WBE Requirements & Forms see pages 144-158 https://signin.webex.com/join http://www.baltimorecountymd.gov/departments/public-works/engineering/contracts/current-solicitations mailto:bwentworth@baltimorecountymd.gov mailto:kmccormick@baltimorecountymd.gov

Revised 9/2024

THIS PROPOSAL FORM INCLUDES AND INCORPORATES ALL DOCUMENTS AND

INFORMATION REFLECTED, LISTED, AND/OR REFERENCED IN THIS

TABLE OF CONTENTS, AND ALL SUCH DOCUMENTS AND INFORMATION ARE PART

OF AND INCORPORATED INTO THE CONTRACT DOCUMENTS.

TABLE OF CONTENTS

Section Page Number SECTION NAME Number

Title Page (cover) ……………………………………………………………….. 1 Table of Contents ……………………………………………………………….. 2

I. INFORMATION FOR BIDDERS ………………………………………. 3-6

II. SPECIAL PROVISIONS ……………………………………………….. 7-92

III. PERMITS…………………………………………………...................… 93

Right-of-Way Agreements……………………………………………. 94-124

IV. PROPOSAL (This section to be completed at time of bid) …………. 125

Description of Work …………………………………………….. 126 Description of Items & Schedule of Prices …………………… 127-128 Proposal Affidavit ……………………………………………….. 129-134 Bid Bond …………………………………………………………. 135 Baltimore County Prevailing Wage and Local Hiring Rates and Requirements……………………………………….. 136-143 MBE/WBE Requirements and Forms ………………………… 144-158

V. POST AWARD DOCUMENTS (This Section to be completed by successful bidder after award) ….………………………... 159

Contract Agreement …………………………………………….. 160-162 Performance Bond ……………………………………………… 163 Payment Bond …………………………………………………… 164 Insurance Documents ………………………………………….. 165

S E C T I O N I

INFORMATION FOR BIDDERS

ELECTRONIC SUBMITTAL PROCESS

To be considered, Bids (Section IV – Proposal) shall be received by the bid closing date and time to the following email address dpwbid@baltimorecountymd.gov. The contract number and company name should be referenced in the Subject Line of the email. Bids may not be submitted by any other means. Bids that are mailed or otherwise delivered to the Purchasing Division (including emails which indicate links to locations where the bid may be downloaded) and/or emails sent to any other Baltimore County email address will not be accepted.

Late Bids will not be considered. Bidders are strongly encouraged not to wait until the last minute to submit bids. The time stated on the auto-receipt (described below) will be definitive of the time of receipt. Bids received after the deadline will not be accepted. Bidders are advised that the County cannot receive email attachments greater in size than twenty-five (25) megabytes and this size limitation may be further reduced by requirements of the Bidder’s email provider which are beyond the control of the County. Bidder should consider separating any large bid attachment into multiple parts and emailing each part separately. In such case, Bidder will note that each email is 1 of 2, 2 of 2, etc.

Multiple part bids will not be considered unless all parts are received by the bid closing date and time.

After submitting a Bid to dpwbid@baltimorecountymd.gov, and upon successful receipt by the County thereof, Bidder will receive an auto-receipt email. This receipt is proof that the bid has been received by the Division of Construction Contracts Administration and should be retained for Bidder’s records. In the case of a bid submitted in multiple parts as described above, an auto-receipt email will be generated for each part. The County has no obligation to consider any Bid for which an auto-receipt was not generated.

As with any system, power outages or technology problems may arise that are outside of the County’s control and could affect your submission. The County will not be held accountable for such issues that may delay the transmission of any Bid.

NOTE: Electronic copy of the Bid Bond will be accepted at bid opening. The apparent low bidder is required to submit the original Bid Bond within ten (10) days after the bid opening to the Division of Construction Contracts Administration, 111 West Chesapeake Avenue, Room 300B, Towson, Maryland 21204.

INSTRUCTIONS AND SPECIFICATIONS

Refer to the enclosed proposal sheets for quantities to be bid upon. All proposals submitted on the attached form must give the price in clear figures for each item of the proposed work and be signed by the bidder with his name and address. Bidders must not change any item in the proposal for which a price has been stipulated by the County. Any change will cause rejection of the proposal.

NOTE: STATEMENT UNDER OATH FORM TO ACCOMPANY BID as per Baltimore County Purchasing Act 65-98, Section 15-94 and 15-95 which requires that the enclosed affidavit (see Proposal Affidavit pages in Section IV) be completed and submitted as part of the sealed bid.

Proposals made on any other than the attached form will not be considered. All papers included in, bound thereto, or attached to the Proposal Form are necessary parts thereof and shall not be detached, separated, or altered in their intent.

Changes in the phraseology of the proposal, additions, or limiting provisions will render the proposal informal or void and may cause its rejection.

All right is hereby reserved by the Purchasing Agent to reject any or all proposals and to waive formalities and technicalities as the interest of the County may require.

No successful bidder may withdraw his bid within One Hundred and Twenty (120) days after the opening thereof.

The successful bidder will be required to be bonded to Baltimore County, Maryland to the sum of One Hundred per Cent (100%) of the amount of his proposal or proposals according to the form of bond hereto attached for projects in excess of $25,000.00.

This Proposal must be accompanied by a Bid Bond in an amount of 5% of the bid, the exact amount to be determined by the difference between the low bid and the next lowest bid if two or more bids are received, or 5% of the bid if one bid is received. This guarantees payment of the amount thus determined in case of a default in any matter specified as required before award or in any matter resulting in failure to execute and deliver an Agreement, together with Payment and Performance Bonds, after award. The Bid Bond must be in the form accompanying the Proposal executed by a Surety licensed in the State of Maryland. The Surety must be currently rated “B” or better by the A. M.

Best Company, and the bid must be in an amount less than, or equal to, the underwriting limitation contained in Department of Treasury Circular 570 as amended at the time of the underwriting.

All work to be performed under this contract shall be done under strict compliance with Baltimore County Department of Public Works and Transportation September 2023 Standard Specifications for Construction and Materials and Standard Details for Construction and any and all proposed revisions thereto as of the date of advertisement and copies of which are available on the County’s website at www.baltimorecountymd.gov/departments/public-works/standards, and all of which are made a part hereof and incorporated herein (collectively, the “Specifications”).

If the bidder to whom an award is made shall fail to execute the contract and bond hereto attached and as herein provided, the award may be annulled and the contract awarded to the lowest responsible bidder who has consented to a time extension, and such bidder shall fulfill every stipulation embraced herein as if he were the original party to whom the award was made, or the Purchasing Agent may reject all of the bids as the interest of the County may require.

The Bid Bond of the three lowest bidders is deemed to be effective until the execution and delivery of the Contract Agreement, together with Payment and Performance Bonds for projects in excess of $25,000.00 or until rejection of all bids, whereupon Surety is deemed relieved of all further obligations under the bid bonds provided.

Bidders must examine the drawings and specifications carefully and must make a personal examination of the location and nature of the proposed work. In case doubt shall arise as to the meaning or intent of anything shown on the drawings or comprised in the specification, inquiry shall be made of the Director of Public Works and Transportation at least five (5) days prior to the date of http://www.baltimorecountymd.gov/departments/public-works/standards bid opening. The submission of the Proposal shall indicate that the bidder thoroughly understands the drawings and the terms of the Specifications.

To better ensure fair competition and to permit a determination of the lowest bidder, unresponsive bids or bids obviously unbalanced may be rejected by the Purchasing Agent.

Bidders are required to fill out the total price column and total their proposals so that the result of the bidding, barring possible arithmetical errors, will be known at once. Any errors in computations will be corrected by the Engineer when the proposals are canvassed. Where the unit price and the total price are at variance, the unit price will prevail.

Bidders must be prepared to complete the work within the time stated in the proposal.

NOTE: ONLY CONTRACTORS FORMALLY PRE-QUALIFIED WITHIN THE

ADVERTISED WORK CLASSIFICATION BY THE DIRECTOR OF PUBLIC WORKS AND

TRANSPORTATON OF BALTIMORE COUNTY 10 CALENDAR DAYS PRIOR TO BID

OPENING WILL BE ELIGIBLE TO SUBMIT BIDS.

Contracts for work under this proposal will obligate the contractors and subcontractors not to discriminate in employment practices. Bidders must, if requested, submit a compliance report concerning their employment practices and policies in order to maintain their eligibility to receive the award of the contract. Successful bidders must be prepared to comply in all respects with the Contract Provisions regarding nondiscrimination.

Baltimore County has adopted a Minority Business Enterprise (MBE) program and Women’s Business Enterprise (WBE) Program. The percentage of participation applies to the contract amount awarded to the Contractor. Qualified minority subcontractors are those certified as being a Minority Business Enterprise by the following:

1. Maryland Department of Transportation Certification Committee (MDOT)

2. City of Baltimore, Minority Business Certification Council

Projects funded by the Federal Highway Administration are limited to the certification listed under #1

(MDOT).

More detailed information regarding the County’s MBE/WBE Program can be obtained from the County MBE Office, telephone (410) 887-3407. See Executive Order dated December 6, 2022.

MBE/WBE Participation Summary and Forms A, B, C, D and E enclosed in this proposal booklet.

NOTE: If you do not complete and submit the enclosed forms with your bid or offer to the County, the County may, in its sole discretion, deem your bid or offer NON-RESPONSIVE and accordingly the COUNTY WILL NOT CONSIDER YOU FOR CONTRACT AWARD.

The County reserves the right to require the low bidder to produce evidence indicating that the company’s financial condition is equal to, or better than, that enjoyed by the company at the time of prequalification. This additional information may be in the form of a financial statement or other evidence satisfactory to the Office of Budget and Finance.

Bidders’ attention is directed to the requirement that a permit must be obtained from the Baltimore County Bureau of Highways and Bureau of Traffic Engineering prior to cutting any County road for the purpose of obtaining sub-surface soils information, and permission must be obtained from the State Highways Administration prior to making any openings in a State road.

Under no circumstances shall a bidder enter upon any property outside a County or State road for the purpose of securing sub-surface soils information until permission is received from the property owner. The fact that the County has obtained a utility easement does not give the bidder the right to enter upon the property.

Prevailing index price of asphalt cement/ton $807.50.

INCLEMENT WEATHER POLICY: If Baltimore County General Government Offices are open or open with liberal leave the day the bids are due, the bids are due as stated in the bid documents (date and time).

ONLY when the Baltimore County General Government Offices are OFFICIALLY CLOSED the day the bids are due, the bid date will be postponed and an Addendum will be issued the next business (or next day buildings are officially open) day the county offices are open with the new bid date and time.

BID TABULATIONS: All bid tabulations will be confidential until after final award, at which time the total bid amounts for all bidders, as well as the complete bid tabulations for the top three (3) bidders, can be inspected by others when requested in writing pursuant to the Maryland Public Information Act.

ALTERNATIVE SOURCES OF CONTRACT BONDS: In the event your company is unable to qualify for bonding through a traditional commercial surety company, you may qualify for the required bonds through the State of Maryland, Department of Commerce (DOC). The Maryland Small Business Development Financing Authority (MSBDFA, pronounced Mis-Bid-Fa), an agency of DOC, operates a Surety Bond Program designed to assist small businesses, based in Maryland, that are unable to obtain adequate bonding on reasonable terms in the commercial marketplace. MSBDFA provides bid, payment and performance bonds for contracts funded by government agencies, regulated utilities and private entities. The penal sums of the bonds are limited to the aggregate amount of $2,500,000 and companies may pre-qualify for multiple bonds within pre-approved terms and conditions. MSBDFA also provides lines of credit, term loans and loan guarantees to help qualified businesses purchase equipment and real property, make improvements to leased property, refinance existing debt and assist them with their working capital needs. For more information on how to apply, you may contact:

Meridian Management Group, Inc. (MMG), (the Program’s Manager), 826 E. Baltimore Street, Baltimore, Maryland 21202, Telephone: (410) 333-4270. Or visit their website at www.mmgcapitalgroup.com for information, applications and a checklist of required documents and reports that must accompany the application.

http://www.mmgcapitalgroup.com/

Rev. 01/13 VI-6

S E C T I O N I I

SPECIAL PROVISIONS

GP-SECTION 4.10(C) REVISED

09/2024

MAINTENANCE BOND

Per the Baltimore County Department of Public Works and Transportation September 2023 Standard Specifications for Construction and Materials, Section GP – 4.10 (C) states, the contractor is required to post a maintenance bond in the amount of five (5) percent of the total cost of the contract or withhold five (5) percent retainage for two (2) years from the date of Final Acceptance.

BALTIMORE COUNTY, MARYLAND

BOND NO. _______________________

CONTRACT NO. __________________

MAINTENANCE BOND

THIS MAINTENANCE BOND is entered into on this _______________ day of __________________, 20____, by and between ______________________________________ as principal (“Principal”) and _____________________________________, a business entity that is authorized to transact business in the State of Maryland and is organized and existing under the laws of the State of __________________________, as surety ("Surety"), are held and firmly bound unto Baltimore County, Maryland, a body corporate and politic of the State of Maryland (“County”), as Obligee.

WHEREAS, the above-named Principal has entered into a written contract known as Contract Number _______________________ dated ______________________, 20___ with Obligee for (the "Agreement"), the terms of which are hereby incorporated by reference; and

WHEREAS, Principal has completed construction under the Agreement; and

WHEREAS, the Agreement includes a warranty on the quality of the Work performed that runs for a period of two (2) years from the date of the County’s final acceptance and that runs for two

(2) additional years beyond the repair date if any repair is done during the warranty period; and

WHEREAS, Principal is required to cause this instrument to be executed and delivered to Obligee as security for maintenance during the warranty period in an amount equal to 5% of the total value of the Contract.

NOW, THEREFORE, the Principal and Surety are held and firmly bound unto the Obligee in the sum of $________________________________________________________________ Dollars ($ _________________), lawful money of the United States of America, for the payment of which sum of money the Principal and Surety do bind themselves and their personal representatives, legal representatives, successors, and assigns, jointly and severally, firmly by this maintenance bond.

The conditions of this bond are as follows:

1. The Principal shall, for a period of two (2) years from and after the date of completion and acceptance of same by Obligee, replace all defects arising in the Work, whether resulting from defective materials, equipment, design furnished or workmanship. After such period, this obligation shall be null and void; otherwise it shall remain in full force and effect.

2. In the event of a default on the part of the Principal that may be the subject of a claim under this bond, Obligee shall mail, by certified mail, to Surety at the address listed below, a written statement that a claim is being made under the bond and, with substantial accuracy, the amount of the claim. Surety shall have no obligation to Obligee under this bond until the notice of claim is mailed.

3. When the Obligee has satisfied the condition of Paragraph 2 that a notice of claim be mailed, the Surety shall promptly and at the Surety's expense send an answer to Obligee within 30 days after the date of the claim. The answer shall state the amounts that are undisputed and the basis for challenging any amounts that are disputed. The answer shall be accompanied by payment (or arrangements for immediate payment) of any undisputed amounts.

4. Surety expressly waives any right to receive notice of extensions of time or alterations or modifications to the Agreement that may be granted by Obligee and agreed upon by Principal, and any such extensions, alterations, or modifications shall not affect the obligation of the Surety under this bond.

5. This bond is a specialty governed by the twelve-year statute of limitations period set forth in the Annotated Code of Maryland Courts and Judicial Proceedings §5-102.

WITNESS OR ATTEST: (Principal – Contractor Name)

_________________________ By:

Type Name:_____________________

Type Title: ______________________

Date: ___________________________

(Surety)

___________________________ By:_____________________________

Type Name:_____________________

Type Title:______________________

Type Address:____________________

Date:____________________________

SPECIAL PROVISIONS – TECHNICAL SPECIFICATIONS CONTRACT No. 25171 SX0

SUMMARY Page 1 of 3

May 27, 2026

SUMMARY

1. GENERAL

A. RELATED DOCUMENTS

1) These Technical Specifications include project Special Conditions:

a. The Special Conditions modify Baltimore County Department of Public Works and Transportation “Standard Specifications for Construction and Materials”, dated September 2023, and all associated Errata, Addenda, and Supplemental Specifications and the Baltimore County Standard Details for Construction, dated September 2023, and all associated Errata and Addenda, and Supplemental Specifications

b. The Special Conditions contain general and specific information concerning the control of work and limits on the methods of construction.

2) These Technical Specifications will supplement and/or amend the Standard Specifications as defined below in Paragraph 4. In the event of conflict, the Technical Specifications of the Special Provisions, including the Special Conditions, shall prevail.

2. DESCRIPTION OF WORK

The Work to be completed under this Contract shall include all labor, supervision, materials, and equipment necessary and incidental for the construction of a Low Pressure Sewer (LPS) System. Work includes, but is not limited to: mobilization; construction of approximately 309 LF of 2-inch and 127 LF of 1-½-inch low pressure sewer main;

construction of one (1) terminal flushing connection valve and vault; furnishing and installing 6 simplex grinders with corresponding electrical service connection;

maintenance of traffic; all related excavation, shoring, dewatering, backfill; and restoration of disturbed surfaces; testing; demobilization; and all other work shown on the Contract Drawings and specified in the Contract Documents, all applicable laws, rules, ordinances, standards, and specifications of regulatory agencies and as required to complete the Project in its entirety.

The Contract Drawings and written Contract Documents are intended to indicate as clearly as is practicable the work to be performed. The Contractor must realize, however, that construction cannot always be accurately anticipated and that in executing the work, field conditions may require reasonable modifications to the details of the Contract Documents and the work involved. Work under the Contract shall be carried out to meet these field conditions to the satisfaction of the Engineer and in strict conformance to his/her instructions, the Contract Drawings, the Special Provisions, the Standard Specifications, SUMMARY Page 2 of 3

May 27, 2026 conditions and covenants of the Contract Documents in accordance with their true intent and full meaning.

The prime contractor must be a prequalified F7 Contractor and meet the experience requirements detailed in these special provisions for directional drilling should this be the selected method of installation of the low pressure sewer main.

3. LOCATION

A. The work to be performed is located in the Parkville, Baltimore County, Maryland.

The proposed low pressure sewer system will be installed primarily within the paved roadway along Burton Avenue. The proposed low pressure sewer main installation will generally be parallel to the existing 8-inch water main and 2-inch gas line that run along the roads mentioned above. Contractor shall make a connection to existing manhole #55729, as the point of discharge for the proposed low pressure system.

B. The Contractor shall make arrangements to provide staging and storage areas as required. Contractor shall coordinate with other property owners for any additional work space that may be required at no additional compensation by the County. At no point in time will any street be blocked, and access to homeowners must be maintained at all times.

4. CONTRACT DOCUMENTS

The Contract Documents for this project shall consist of, but not be limited to, the following items, including any addenda, errata, modifications, or supplemental drawings subsequently furnished by the Owner:

A. CONTRACT DRAWINGS:

The Plans referred to in the Contract Drawings are part of the set named

SANITARY SEWER SYSTEM EXTENSION HEALTH PROJECT – BURTON

AVENUE LOW PRESSURE SEWER (LPS), JOB ORDER NUMBER PROJ-

10000825, CONTRACT No. 25171 SX0. This set contains drawings numbered 2025-3126 through 2025-3131 inclusive, totaling 6 sheets.

B. CONTRACT BOOK AND TECHNICAL SPECIFICATIONS

This Contract Book containing the Technical Specifications and titled PROPOSAL FORM – JOB ORDER NUMBER PROJ-10000825, CONTRACT No. 25171 SX0

– SANITARY SEWER SYSTEM EXTENSION HEALTH PROJECT – BURTON

AVENUE LOW PRESSURE SEWER (LPS).

C. STANDARD SPECIFICATIONS

The following documents, along with the latest revision thereto, are hereby made part of the Contract Documents. These documents will be collectively referred to as the Standard Specifications.

SUMMARY Page 3 of 3

May 27, 2026

1) Baltimore County Department of Public Works and Transportation, “Standard Specifications for Construction and Materials”, dated September 2023 and all associated Errata, Addenda, and Supplemental Specifications.

2) Baltimore County Department of Public Works and Transportation, “Standard Details for Construction”, dated September 2023 and all associated Errata, Addenda, and Supplemental Details.

3) “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control”, dated December 2011 and all associated revisions.

4) Maryland Department of Transportation, State Highway Administration, “Standard Specifications for Construction and Materials”, dated July 2025, and subsequent revisions thereto.

5. CONTRACT TIME

A. The work in this Contract shall be completed within 95 work days of the Notice to Proceed.

B. Contract time is defined in Section GP-1.05 of the Standard Specifications.

SPECIAL PROVISIONS – PART A CONTRACT No. 25171 SX0

GENERAL REQUIREMENTS Page 1 of 22

May 27, 2026

SPECIAL PROVISIONS

PART A – GENERAL REQUIREMENTS

1. GENERAL

All work under this Contract shall be performed in strict compliance with the Baltimore County “Standard Specifications for Construction and Materials,” dated September 2023 and “Standard Details for Construction,” dated September 2023 and all associated Errata, Addenda, and Supplemental Details; the “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control”, dated December 2011 and all associated revisions;

and the Maryland Department of Transportation, State Highway Administration, Book of Standard Specifications for Construction and Materials, dated July 2025, and subsequent revisions thereto.

The Special Conditions of these Technical Specifications are hereby made a part of the Contract. In case of any conflict with the Baltimore County “Standard Specifications for Construction and Materials,” dated September 2023, “Standard Details for Construction,” dated September 2023, all associated Errata, Addenda, and Supplemental Details or other sections of the Contract, these Special Conditions shall govern.

2. CONTRACT DOCUMENTS – DESIGN INTENT

Contract Drawings to be followed for this Contract shall be those approved drawings on file at the office of the Engineer. The Contract Drawings contain information as to amount, location, dimension and detail of the work to be performed in accordance with the Specifications. No deviation shall be permitted from the Contract Drawings and Specifications unless authorized in writing by the Engineer. Deviation by the Contractor from the Contract Documents without the Engineer’s prior written approval shall be at the Contractor’s risk and expense, including the expense of removal and restoration if so ordered.

Any discrepancies found between the Drawings and Specifications or any inconsistencies in the Drawings or Specifications shall be immediately reported to the Engineer, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Work done by the Contractor after his/her discovery of such discrepancies, inconsistencies or ambiguities prior to corrections directed by the Engineer shall be done at the Contractor’s risk. In the case of discrepancy or omission, the Engineer will determine the intent of the design in issuing clarifying or corrective instructions.

In order to fulfill the requirements of the Contract, conformance is required with both the Contract Drawings and Specifications. The Contractor is not released from responsibility for performing work called for in the Contract Drawings but not in the Specifications or vice versa; mention of work in either part is sufficient to include it under the Contract. In all cases, the decision of the Engineer will be final.

GENERAL REQUIREMENTS Page 2 of 22

May 27, 2026

The work under this Contract shall be built of the materials, sizes, dimensions, on the lines and slopes, at the depths, with the connections, and in a manner called for by the Specifications and as shown on the Contract Drawings. All materials and equipment installed as part of the permanent installation shall be new.

3. EXISTING UTILITY FACILITIES

Existing utilities shown in the Contract Drawings are from available records and are shown for the Contractor’s convenience only. The County expressly disclaims any responsibility for accuracy or completeness of information shown. Existing utilities and services shall be carefully investigated and protected by the Contractor. The Contractor shall test pit existing underground utilities with caution to verify information to his/her satisfaction prior to beginning work. The Contractor is responsible for locating, protecting and maintaining uninterrupted service on all existing utilities. Any damage to utilities caused by the Contractor’s work shall be immediately repaired by the Contractor to the satisfaction of the Engineer, using materials of the kinds damaged. The Contractor shall be liable for any damages to existing utilities caused by his/her operations as stipulated in Section GP-5.05.

4. SUBMITTALS

Within 10 days after notice to proceed, the Contractor shall submit a submittal schedule listing as near as practicable by specification section number, all submittals required and approximate date submittal will be forwarded. No submittals will be reviewed by the Engineer until the submittal schedule has been submitted and approved.

Submittals are generally defined as all drawings, diagrams, illustrations, catalog cut sheets, product data sheets, brochures, schedules, bills of material, and other data, certified correct for construction, which are prepared by the Contractor, his/her subcontractors, suppliers or distributors, or equipment fabricators or manufacturers, and which illustrate the manufacture, fabrication, construction, installation of the work, or a portion thereof.

The Contractor's attention is specifically directed to the fact that shop drawing submittal drawings are required in advance, and shall be submitted for each and every element of the work including, but not limited to: grinder equipment, air and vacuum release valves, gate valves, vaults, pipe material, pipe layout, pipe coatings, pipe fittings, pipe closures, pipe supports, all piping regardless of size or whether fabricated on or off the project site, pipe restraints, tapping sleeve, and all other shop drawings which may be necessary, in the opinion of the Engineer, to comply with the all-inclusive intent of this requirement. Each submittal shall be assigned a sequential number; Submittal No. 1, 2, 3, 4, etc. for purposes of easy identification, and shall retain its assigned number, with appropriate subscript, on all required resubmissions. Changing manufacturers or models during the course of the submittal process shall not be cause for assigning a new submittal number. Once an item of work has been assigned a submittal number, that item of work shall retain the same number, for the duration of the project. The following stamp shall be affixed to each submittal and appropriately completed.

GENERAL REQUIREMENTS Page 3 of 22

May 27, 2026

Resubmittals shall be labeled with the letter "R" followed by the number of the resubmission. Example: The Contractor's tenth submittal, being resubmitted for the first time shall be numbered Submittal No. 10R1, resubmitted for the second time shall be numbered Submittal No. 10R2, etc.

All shop drawings shall be in conformity with the Contract Drawings and Special Provisions. All shop drawings except diagrams, illustrations, brochures, and schedules shall be to appropriate scale, but in no case smaller than 1/4-inch equals 1 foot, and shall give all dimensions required for manufacture, fabrication, assembly, installation, and incorporation in the work. All shop drawings shall be complete, accurate, and distinct, and shall show outline and section views, details, kinds of materials to be used, the kind of machine work and finish to be applied, and the installed locations of the said materials, equipment, accessories, appurtenances, and related items.

Where applicable, shop drawings shall be 24 inches by 36 inches in size with a 1 1/2-inch binding margin on left hand side of sheet. The Contractor may incorporate one (1) or more small drawings on prints 24 inches by 36 inches in size. Diagrams, illustrations, brochures, schedules, and other data may be prepared and executed, complete, on sheets measuring 8 1/2 inches by 11 inches. Shop drawings submitted other than as specified herein will be returned for resubmittal without being reviewed.

After checking and verifying all field measurements, the Contractor shall submit to the Engineer, for approval, a digital copy of all submittals, which shall have been checked by and stamped with the approval of the Contractor and identified as shown herein. The information shown on the submittals shall be complete with respect to dimensions, design criteria, materials of construction, and other requirements as specified or shown in the Contract Documents to enable the Engineer to review the information as required.

Machinery outline drawings alone are not acceptable. At the time of each submission, the Contractor shall call to the Engineer's attention, in writing, any deviations that the submittals may have from the requirements of the Contract Documents.

CHECKED AND APPROVED FOR SUBMISSION

(CONTRACTOR’S NAME)

JOB

CONTRACT NO.

DATE BY

SUBMITTAL NUMBER

ITEM

CONTRACT REFERENCES:

SPECIFICATION

DRAWINGS

GENERAL REQUIREMENTS Page 4 of 22

May 27, 2026

The Engineer will check submittals with reasonable promptness, but his/her checking and approval shall be only for conformance with the design concept of the project and for compliance with the information given in the Contract Documents. The approval of a separate item as such shall not indicate approval of the assembly in which the item functions. The Contractor shall make any corrections required by the Engineer and shall resubmit the required number of corrected copies of each submittal until approved. The Contractor shall direct specific attention to revisions called for by the Engineer on previous submissions.

The Engineer's approval of submittals shall not relieve the Contractor from his/her responsibility for any deviations from the requirements of the Contract Documents unless the Contractor has in writing called the Engineer's attention to such deviations at the time of submission and the Engineer has given written approval to the specific deviation, nor shall any approval by the Engineer relieve the Contractor from responsibility for errors or omissions in the submittals. Submittals shall be submitted with sufficient time provided for checking, return to the Contractor, and/or resubmission as required. The words "APPROVED" or "APPROVED AS NOTED" or words of similar import placed by the Engineer on a submittal means that all items and details of the submittal are fully approved with the exception of those items or details that are specifically marked for further action.

When the submission is marked "RESUBMIT" it means that the material or product can probably fulfill the intent of the Contract Documents but that enough questions or comments have arisen to require a corrected or updated submission. If the material submitted represents a product that is totally unsatisfactory and probably will not under any circumstances meet Contract requirements, it will be marked "REJECTED" and will not be reconsidered by the Engineer. The withholding of an approval by the Engineer of any submittal in its entirety, including required certifications, shall under no circumstances constitute a basis for delay in arranging for and proceeding with the manufacturing, fabricating, delivering, and installing, in accordance with the Contract, of those items or details in such submittals which may have been approved.

The Contractor's attention is specifically directed to the fact that no work shall be fabricated, nor materials ordered, nor any construction performed, prior to approval by the Engineer of submittals applicable thereto.

Construction performed in violation of this requirement will be neither approved nor certified for payment until applicable submittals have been approved. If the Engineer so directs, the Contractor shall disassemble, raze, and remove any such construction performed prior to approval by the Engineer of submittals applicable thereto, and the Contractor will be allowed neither additional compensation nor extension of Contract time thereto.

If the Contractor orders or causes to be ordered or delivered any material in violations of this requirement, he/she does so at his/her own risk, and such equipment, machinery or materials shall neither be installed in the work nor stored on the site of the work. If, after submission and review of applicable submittals, the Engineer determines that any such

GENERAL REQUIREMENTS Page 5 of 22

May 27, 2026 materials do not meet the requirements of the Contract Documents, such materials will be rejected, and the Contractor shall be allowed neither additional compensation nor extension of time therefore.

The Contractor's attention is specifically and especially directed to the fact that because manufacturer's standards and procedures are subject to unilateral changes over which the County has no control, the stipulations herein are applicable, and will be enforced, even for those elements of materials which may be specified by manufacturer and model or catalog number in these Contract Documents.

5. CONTRACT AS-BUILT DRAWINGS

A. Contract and As-Built Drawings. The Contractor shall have Contract Drawings showing the location, dimensions and sizes of the materials, on the lines and slopes, at the depths, with the connections and the manner in which they are to be placed as called for by the Specifications. The Contractor shall also maintain a complete set of these Contract Drawings showing As-Built construction changes for use in maintaining a permanent record of the completed construction that shall become the property of Baltimore County at the completion of the Contract.

The Contractor shall provide the Engineer with “As-Built” survey data for new items installed per Contract and for existing items directly impacted by the Contract work. These items include but are not limited to the following:

(1) direct-buried: horizontal bends, vertical bends, crosses, horizontal tees, vertical tees, caps/plugs, horizontal wyes, vertical wyes/precast sanitary sewer wye blocks, pipeline closure pieces, corporation stops, sleeves/couplings, tapping sleeves (if not directly coupled to tapping valves), pipe anchors/thrust blocks, reducers, line stops (permanent or temporary), insertion valves, valves left direct buried, pipe connections, pipe boots, insulating flanges, anode bed limits, cathodic protection electrical separators, clay trench plugs, steel sheet piling left in place, pile ends/caps, casing/tunnel terminus points, storm drain inverts, sanitary sewer inverts, underdrain inverts, anti-seep collars, lateral seals, siphons, grease interceptors, bend structures, junction chambers, top of water mains along with their material(s) of construction, and top of sanitary sewer force mains along with their material(s) of construction.

(2) frames and covers, caps, lids, or hatches for: main valves, tapping valves, bypass valves, water meters, blow-off valves, dewatering valves, air release/relief valves, air/vacuum valves, grinder pumps, isolation valves, check valves, backflow preventers, curb stops, wells, special purpose corporation stops, sump pumps/pits, manway accesses/manholes, hand holes, clean-outs, dismantling joints, electric/fiber optic/communication junction boxes, and cathodic protection test stations.

GENERAL REQUIREMENTS Page 6 of 22

May 27, 2026

(3) at grade, above-grade, or otherwise exposed appurtenances: fire hydrants (top of operating nut), sign posts, guard rail terminus points, traffic calming devices, bollards/guard posts, crash barriers, headwalls, end support walls, endwalls, end sections, inlets/combination inlets, grates, surface trench drains, inlet caps, gabion velocity breakers, check dams, trash rack/anti-vortex devices, and horizontal draw-down devices.

(4) items removed/replaced or removed/relocated as a direct result of utility construction: property corners, survey markers, utility poles, transformer pads, card reader/communication pedestals, rectifier/electric panelboards, fence corner posts, gate posts, bike racks, monuments, and septic tanks.

Survey data shall consist of horizontal positions based upon the Contract Drawing datum, or as directed by the Department of Public Works and Transportation, and shall be accurate to 0.1 feet. Vertical datum shall be based upon the Contract drawing datum, or as directed by the Department of Public Works and Transportation, and shall be accurate to 0.1 feet. As-Built positions and elevations shall be certified and sealed by a Maryland Licensed Property Line Surveyor or Professional Land Surveyor.

At the Contractor’s option, the required “As-Built” survey data, as described above, may be provided on either individual sketches or on the “red-lined” As-Built drawings that he/she is to supply to the Engineer at the completion of the Contract.

Items to be verified and included on the As-Built drawings shall be based on As- Built checklists to be provided by Baltimore County.

Final payment shall not be made and/or Contract acceptance shall not be given until the Contractor provides an acceptable As-Built plan and survey.

B. Digital As-Built Submission.

Final As-Built drawings shall be submitted in a digital format approved by Baltimore County. The drawings shall consist of the original Contract Drawing in black with all As-Built changes clearly noted in red. In addition to the digital As- Built drawings, a digital text file indicating the horizontal and vertical positions and the descriptions of the items indicated in paragraphs A.(1) through A.(4) shall be provided. The digital text file shall be in a format approved by Baltimore County.

C. Ground Profiles.

The ground profiles shown on the drawings represent the finished grade elevations along the centerline of the trenches, unless otherwise noted in the Contract Documents. Existing grades along utility trenches also shall be shown, if changes are proposed to the existing ground. No additional payment is made on lump sum bids where the actual elevations of the ground or surface over the structure differ from those shown on the profiles for pipe trenches.

GENERAL REQUIREMENTS Page 7 of 22

May 27, 2026

6. SUBSTITUTION OF EQUIPMENT OR MATERIALS

Whenever a material, article or process is specified or described by using the name of a proprietary product or the name of a particular vendor or manufacturer followed by the phrase “or equal,” the specific item mentioned shall be understood as establishing type, function, dimension, appearance and quality desired and is to be the basis upon which bids are prepared.

Equipment or materials, other than those specified, will be permitted provided that, in the opinion of the Engineer, such equipment is equal to or better than that specified. Any such decision of the Engineer with respect to approval or disapproval of any equipment or material proposed to be substituted as an “or equal” is final, and the Contractor shall have no claim of any sort by reason of such decision.

If the Contractor proposes to provide equipment or materials as “or equal” to those specified, it shall be his/her responsibility to furnish complete, specific, detailed information from the manufacturer or supplier of such equipment or material establishing conformance with the requirements of the Contract Specifications. This shall consist of an item-by-item comparison of the Contract Specification requirements with the equipment or material proposed to be furnished. In the event the Contract Specifications mention a model number or other designated manufacturer in lieu of the detailed description and manufacturer, an item-by-item comparison shall be furnished of the equipment specified under the Contract and that proposed to be substituted. The Contractor shall bear the burden of responsibility of demonstrating that the equipment or material to be substituted is equal to, or of higher quality than, that specified. Submission of incomplete, insufficient or irrelevant data as evidence of compliance with this provision shall be grounds for denial of the Contractor’s request.

All requests for approval of equipment and materials other than specified shall be submitted by the bidders to the Baltimore County Department of Public Works and Transportation, Contract Division, in writing no less than fourteen (14) calendar days prior to the opening of bids for approval. If approved by the Department of Public Works and Transportation, all bidders will be notified through an addendum to these Specifications no less than seven

(7) days prior to the opening of bids. Upon extension of the opening date of the bids, the deadline for approval of equal or substitute equipment shall not be extended but shall remain fixed relative to the original date of the bid opening. Requests for changes to equipment or material must be made by the prime bidders, and requests for such changes by manufacturers or suppliers will neither be considered nor approved.

After the opening of bids, any request by the Contractor to substitute equipment or materials for those specified herein will be presumed to be for the purpose of saving money.

If such a request is approved, the Contractor shall provide the County with a credit equal to the difference between the net cost to the Contractor of the article submitted and the lowest cost to the Contractor of the article specified. The Contractor shall submit these

GENERAL REQUIREMENTS Page 8 of 22

May 27, 2026 figures accompanying each substitute submittal; no request for substitution of equipment or materials will be considered without such figures.

The Engineer may, at his/her discretion, authorize use of substitute items or materials at greater, less or equal cost to those specified when required due to the Contractor’s inability to obtain specified equipment or materials in a timely manner where unreasonable delays to the progress of the work may result.

In the case of the two aforementioned paragraphs, the Contractor shall submit a written request for permission to use substitute equipment or materials, furnishing full information as to the costs of the items or materials specified and the substitute item or material. Such information shall be of sufficient detail to permit verification by the Engineer of the costs submitted. If approved by the Engineer, written authorization for credit to the County or payment to the Contractor will be made based on the cost difference between the specified item and the substitute item.

All decisions of the Engineer with regard to credits to the County, payments to the Contractor or equipment and materials to be substituted, shall be final.

7. CERTIFICATION OF MATERIALS AND INSTALLATIONS

A. The Contractor shall furnish certificates from each manufacturer or from approved testing laboratories that all material used in the work is in accordance with these and all reference specifications. Upon completion of the work, and before acceptance by the County, the Contractor shall furnish the County with a certificate from each of the manufacturers of the equipment and mechanisms used in the work that such equipment and mechanisms furnished by him/her has been erected and installed in a satisfactory manner and is ready for continuous service and operation.

B. A statement originating from the Contractor, or any of his/her subcontractors, suppliers, or any other agent which merely indicates that a particular product, or component of a product, meets the requirements of the standard specified in the Contract Documents shall not be considered a certificate. Any such submittal made in this manner will not be approved and the corresponding product, or component of the product, shall not be incorporated into the work.

8. GUARANTEE

The Contractor shall guarantee all materials and equipment furnished and work performed for a period of two (2) years from the date of the Division of Construction Contracts Administration (DCCA) acceptance letter for that work. The Contractor warrants and guarantees that the completed work is free from all defects due to faulty materials, equipment and workmanship and is in every way fit for the use intended, including but not necessarily limited to, the following:

GENERAL REQUIREMENTS Page 9 of 22

May 27, 2026

Against all faulty or imperfect materials and equipment, subsidence of fill, backfill and embankment, vegetative stabilization and against all imperfect, careless and/or unskilled workmanship.

That work performed under this Contract, including all mechanical and electrical equipment, appurtenances and every part thereof, shall operate, with due care and maintenance, in a satisfactory and efficient manner in accordance with the requirements of…