This is a Performance Work Statement (PWS) dated May 20, 2026, for repair and fabrication of a chemical storage tank liner at Robins Air Force Base, Georgia.
The Contractor shall repair the existing Polyvinylidene Fluoride (PVDF) L7-090 Liner on Tank 120 in Building 20128 and supply one new L7-090 Liner for the Commodities Maintenance Group (CMXG). The repair work will be performed by one GOAD technician and includes testing the PVDF liner via AC and DC spark testers, surface preparation, and PVDF fusion welding of all visible cracks in the floor and walls. The new liner specifications require fabrication from ¼-inch thick Kynar 2850 Flex sidewalls and rim with 3/8-inch thick Kynar 2850 Flex bottom, incorporating patented N-FUZE lining technology with pressure butt-welded vertical joints and extrusion welded construction. The liner dimensions are approximately 48 inches by 48 inches by 72 inches deep with one 45-degree corner for reinstallation of the existing TANKeye Plus Leak Detection System. The repair is scheduled for four weeks after contract award and will be a one-day on-site visit. The new liner shall be delivered 10 weeks after approval drawing approval and is subject to change based on shop workload. Delivery will be FOB Destination to Building 20128, Robins AFB, GA 31098. The Contractor shall provide a standard one-year warranty for the new liner only; no warranty is offered for the repair work. CMXG is responsible for draining and neutralizing the tank, providing a clean and dry liner, removing auxiliary equipment, disposing of waste materials, providing clear site access, and removing and reinstalling all equipment and piping. An approval drawing must be submitted electronically within two business days of contract award for Government review and approval within two days. Government Representatives are Thomas Decker (Primary, 478-960-9884) and Kyle Hathaway (Alternate, 478-222-4087).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
L7-090 Repair and Liner for Chemical Storage Tank – Building 20128
20 May 2026
1.0 DESCRIPTION. The Contractor shall provide all the tools, parts, materials, equipment, labor, repairs, and travel necessary to perform repairs on the existing Polyvinylidene Flouride (PVDF) L7-090 Liner for the Chemical Storage Tank in Building 20128 and supply one (1) new L7-090 Liner for the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. The Contractor shall repair the existing liner in the facility inside of L7-090. The additional spare liner shall be identical in contruction, material, and instrumentation to the existing liner and be stored by CMXG for future use.
1.1 The Contractor shall provide the following:
• Repair of L7-090 Liner on Tank 120 at Building 20128. This will include one
(1) technician to facilitate repairs.
• 1 each (PVDF) Kynar® Rigid Box Liner to fit CMXG’s existing tank
• Approximately 48” x 48” x 72” deep, fabricated from ¼” thick Kynar 2850
Flex sidewalls and rim and 3/8” thick Kynar 2850 Flex bottom. Liner will be fabricated incorporating Patented (#8,133,345) N-FUZE lining technology, utilizing pressure butt-welded vertical joints and extrusion welded sidewall to bottom contruction. The tank shall have one (1) 45 degree corner where CMXG can re-install existing TANKeye Plus Leak Dectection System.
1.1.1 Government Personnel Responsibilites.
• CMXG personnel will drain and neutralize the tank prior to Contractor arrival.
The liner shall be clean, dry, and all auxiliary equipment removal prior to GOAD Company personnel arrival. CMXG is responsible for disposal of all removed materials and waste generated during repair. Clear, unrestricted access to job site must be provided during working hours. This access shall be free of any obstruction for purposes of loading/unloading equipment and with adequate area for any rigging or scaffolding equipment, installation materials, and supplies.
CMXG is responsible for removal and reinstallation of all equipment, accessories, piping and responsible for providing a ladder for tank entry and access to the liner (see attached estimate for “Critical Notes” regarding CMXG’s responsibilities).
1.2 Over & Above Work. During the course of the contract, there may be times when services or other system support not forecasted may be required.
1.2.1 Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request. Upon request the Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work.
1.3 Drawings. The Contractor shall electronically send an approval drawing for the L7-090 Liner for the Government to review within 2 (two) business days after contract award. The Government shall review and approve the drawing within 2 (two) days after receiving the drawing. (CDRL A001, DI-SESS-80776B, NOT 1 (Technical Data Package (TPD) Drawing).
2.0 Service Support.
2.1 Delivery.
2.1.1 Government Representatives. The following individuals will serve as the Primary and Alternate Government Representatives as the points of contact through which all contractor-provided services will be requested and accomplished for CMXG.
Government Representatives will not supervise the Contractor, and they are not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The following individuals will serve as Government Representatives for CMXG.
2.2 Shipping/Delivery/Period of Performance. The Contractor shall contact the Government Representative in paragraph in 2.1.1 to coordinate and schedule the repair of the existing liner. The repair of the L7-090 Liner will consist of one (1) GOAD technician to facilitate repairs and shall be 4 weeks ARO after contract award. The repair will be a one day on-site visit in Building 20128 at the address in paragraph 2.3. The GOAD technician will test the PVDF liner via AC and DC spark testers, prep surface, and PVDF fusion weld all visible cracks in PVDF floor and walls. After repair, the L7-090 will be spark tested for any additional leakage.The Contractor shall deliver the L7-090 Liner 10 weeks ARO after approval drawings and is subject to change based on the shop workload at the time of order placement. The delivery will be FOB Destination.
2.3 Ship To Address.
Attention: Thomas Decker
Unit: 402 CMXG/MXDEA
DODAAC: F3QCCM
Address: 123 Eagle Street Building 20128
Primary Government Representative Alternate Government Representative Name: Thomas Decker Name: Kyle Hathaway Unit: 402 CMXG/MXDEA Unit: 402 CMXG/MXDEA Phone: 478-960-9884 Phone: 478-222-4087 Email: thomas.decker.6@us.af.mil Email: kyle.hathaway.3@us.af.mil mailto:thomas.decker.6@us.af.mil mailto:kyle.hathaway.3@us.af.mil
Robins AFB, GA 31098
2.4 Warranty. The Contractor shall provide a standard one year warranty for the L7-090
Liner. There is no warranty offered for the repair.
2.5 Options. None
3.0 Government Furnished Equipment and Services or Government Furnished Property (GFP) and services. There is no GFP included in this contract.
4.0 General Information.
4.1 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building 20128 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 8:00 am to 4:00 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel, and will provide a 48-hour notice prior to changing any work hours.
4.2 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
4.3 Security Requirements.
4.3.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Department of the Air Force Instruction (DAFI) 31-101, Base Defense Operations.
4.3.2 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 32 CFR Part 117.21, National Industrial Security Program Operating Manual (NISPOM).
4.3.3 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security (OPSEC) Program”, DoD Manual 5205.02 “DoD Operations Security (OPSEC) Program Manual” and AFI 10-701 “Operations Security (OPSEC)” to protect United
States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.
4.3.4 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.4 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with:
DoDI5000.83 DAFI 63-113, Program Protection Planning for Life Cycle
Management, SAE Aerospace Standard AS5553D, Counterfeit Electrical, Electronic, and
Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53
Rev 5, Security and Privacy Controls for Information Systems and Organizations.
4.5 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.
4.6 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry. Information may be obtained by calling the following phone number: Commercial 478-222-1972.
4.7 Agency Affirmative Procurement Program. In accordance with RFO 23.102 (Policy) and 23.103 (Procedures), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.7.1 The Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force http://www.biopreferred.gov/
Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.8 Environmental Management Systems (EMS) Awareness. Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.
4.8.1 EMS training is provided by Environmental Management. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk:
478-926-1176)
4.8.2 Option 1: Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f Search for Course ID: EMS110UHHZ00293 Directions:
1. Hover your mouse over the Courses and Transcripts tab.
2. Click on Transcripts
3. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.
4. When you are on the transcript, click on the blue “Search for Course” button.
5. When the pop up appears enter the course name or course number and press search.
6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.
(Note: TEACH may not be supported by Internet Explorer; recommend using Chrome.)
4.8.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, jessica.parker.15@us.af.mil. Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training. (CDRL A002 DI-MGMT-80368A/T, Status Report/EMS Training)
4.9 ISO 50001-Energy Management System. Due to the WR-ALC being ISO 50001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.
https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f mailto:jessica.parker.15@us.af.mil
4.9.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
4.9.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.
4.9.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract. (CDRL A003 DI- MGMT-80368A/T, Status Report/EnMS Training)
4.10 Contractor’s Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP).
All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.
4.10.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil. The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A004, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).
4.10.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.
mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil http://www.osha.gov/dcsp/vpp/index.html mailto:402mxw.se.wf@us.af.mil
4.11 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)327-4862 during duty hours and (478)926- 3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO), Contract Surveillance Management Office (CSMO) Representative (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident
h. Corrective actions (taken or proposed)
i. Other pertinent information
(CDRL A005, DI-SAFT-81563 NOT 2, Accident/Incident Report)
4.12 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
4.13 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:
https://piee.eb.mil/
4.14 Essential Services During Crisis. The Services Acquisition Lead (SAL) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 252.237-7023, Continuation of Essential Contractor Services.
4.15 Marking Requirement: Unique Item Identification (UID) is required for all items to be delivered to the Department of defense (DoD) that meet the criteria established by the DFARS Clause 252.211-7003.
5.0 Appendices - None