8201_OQ_Vegetation_Management_Consulting_and_Inspections_FINAL.pdf
PDF 791 KB Posted
- Attached to
- Materials Natural Gas Distribution Infrastructure Project State and local contract opportunity
- Solicitation number
- ITB-2025-03
- Issued by
- Santa Rosa County, Florida
About this file
This is a Request for Proposal (RFP) 8201 OQ issued by the Orlando Utilities Commission (OUC) for Professional Vegetation Inspection and Consulting Services. The solicitation seeks a qualified consultant to provide comprehensive vegetation management services, including annual electrical utility vegetation inspections of approximately 200 corridor miles, developing a Strategic Integrated Vegetation Management Plan for transmission rights-of-way, and offering additional as-needed services such as tree risk assessments, expert witness testimony, and educational workshops. The contract term is 3 years with two potential 1-year renewal options, with proposals due on March 20, 2025 by 2:00 PM EST.
The RFP requires bidders to submit hourly rates for various professional roles, including Arborists, Certified Arborists, and Urban Foresters, with the understanding that OUC may request not-to-exceed cost estimates for specific scopes of work. Minimum bidder qualifications include a four-year degree in a related field, at least five years of utility vegetation management experience, and industry certifications such as ISA Certified Arborist or ASCA Registered Consulting Arborist. The solicitation also includes a Minority/Women Business Enterprise (M/WBE) goal of 8% and requires bidders to provide detailed information about their organization, key personnel, past experience, and capabilities in utility vegetation management.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| ITB-2025-03_Materials_Natural_Gas_Distribution_Infrastructure_Project_-_Main_Doc.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective 10/2023
RFP 8201 OQ
For
Vegetation Management Consulting and Inspections
Issue Date: February 13 2025
Questions/Comments Due Date: February 25, 2025
Addendum Due Date:
Proposal Due Date:
March 6, 2025
March 20, 2025 by 2:00 PM EST
Direct all inquiries to Buyer of Record:
Cindy Luttfring, CPPB, NIGP-CPP
407-325-6311 cluttfring@ouc.com
Orlando Utilities Commission RFP 8201 OQ – Vegetation Management Consulting and Inspections
SCM-RFP-T-01 – Request for Proposal Template v4.2 – 10/21/19
Orlando Utilities Commission Orlando, Florida
RFP 8201 OQ for Vegetation Management Consulting and Inspections
Table of Contents 1 Introduction
1.1 Scope of Work Summary
1.2 Pre-Response Conference
1.3 Term of Contract
1.4 Minimum Bidder Qualifications
1.5 Price and Costs
1.6 Terms and Conditions
1.7 Contract Sample
1.8 Proposal Evaluation Criteria
2 Bidder Requirements and Qualifications
2.1 Detailed Scope, Requirements, & Drawings
2.2 Bidder Information & Required Bidder Qualifications
2.2.1 Bidder Information
2.2.2 Required Bidder Qualifications
3 Instructions to Bidders
3.1 Legal and Public Record Statement
3.2 Confidentiality Notice to Bidders
3.2.1 Exemptions
3.3 Acknowledgement
3.3.1 Statement of No Bid
3.4 General Information
3.4.1 Common Terms
3.4.2 Submittal
3.4.2.1 Alternate Proposals
3.4.3 Signatures
3.4.4 Withdrawal
3.5 Electronic Submittal of the Proposal
3.6 Compliance Forms
SCM-RFP-T-01 – Request for Proposal Template v4.2 – 10/21/19
3.6.1 Public Entity Crimes
3.6.2 Dispute Disclosure
3.7 Supplier Diversity
3.7.1 Minority/Women Business Enterprises (M/WBE)
3.8 Proposal Preparation Costs
3.9 Exceptions
3.10 Clarifications
3.11 Local Conditions
3.12 Opening
3.13 Solicitation Selection Schedule
3.14 Proposal Acceptance and Rejection
3.15 Proposal Evaluation Criteria
3.16 Cancelation
3.17 Freight (If Applicable)
3.18 Bid Bond (If Applicable)
3.19 Payment and Performance Bond (If Applicable)
3.20 Contract Execution
3.21 Award
3.22 Taxes, Permits, and Licenses
3.23 Error and Omissions
3.24 Proposal Submittal Format
3.24.1 OUC Policies and Procedures for Bidders
3.25 Signatures
4 Proposal Submittal Format & Checklist
5 Attachments
SCM-RFP-T-01 – Request for Proposal Template v4.2– 10/21/19
Re qu es t f or P ro po sa l (
RF
P)
Orlando Utilities Commission Orlando, Florida
RFP 8201 OQ for Vegetation Management Consulting and Inspections
Direct all inquiries to the Buyer of Record:
Cindy Luttfring, CPPB, NIGP-CPP
407-325-6311 cluttfring@ouc.com
1. Instructions are located in the Instruction to Bidders section of this document; or, may be provided during a Pre-Conference Meeting.
2. Electronic proposal submittals, described in the Electronic Submittal of the Proposal section of this document, will be accepted and are highly encouraged. Hard copy proposal submittals may be used when necessary and must adhere to the hardcopy proposal submission instructions. Do not submit both electronic and hard copies unless otherwise instructed. Email or other means will not be accepted.
3. VendorLink help can be accessed by calling 407-222-1885, or by emailing support@evendorlink.com.
http://www.ouc.com/docs/procurement/hard-copy-proposal-submission-instructions.pdf?sfvrsn=0 mailto:support@evendorlink.com
SCM-RFP-T-01 – Request for Proposal Template v4.2– 10/21/19
1 INTRODUCTION
The Orlando Utilities Commission (OUC) is an electric and water municipal utility serving Orlando, Florida and portions of surrounding Orange County. OUC also has an Inter-local agreement with the City of St.
Cloud, Florida for the management of its electric utility. Currently, OUC serves more than 380,000 customers. To obtain general information about OUC, access www.ouc.com.
1.1 SCOPE OF WORK SUMMARY
OUC is currently seeking qualified Professional Vegetation Inspection and Consulting Services specializing in utility vegetation management. These services will assist the Commission with trimming inspection/verification and developing an integrated vegetation management plan, as well as tree risk assessment, expert-witness testimony, and educational workshops as needed.
Refer to Section 2.1, Detailed Scope, Requirements, & Drawings for more information.
1.2 PRE-RESPONSE CONFERENCE
Not Applicable
1.3 TERM OF CONTRACT
1.4 The term of the Contract will be for 3 years with 2 (1) year options to renew
1.5 MINIMUM BIDDER QUALIFICATIONS
Refer to Attachment C
1.6 PRICE AND COSTS
Prices documented in the submitted Proposal must remain firm throughout the contract period (including additional extensions, if applicable). Refer to Attachment B: Price Schedule.
1.7 TERMS AND CONDITIONS
1.8 https://www.ouc.com/docs/procurement/general_terms_cond_goods_services.pdf?sfvrsn =b1238550_8
1.9 CONTRACT SAMPLE
Click here to view an OUC contract sample.
1.10 PROPOSAL EVALUATION CRITERIA
Refer to the Instructions to Bidders section of this document.
http://www.ouc.com/ https://www.ouc.com/docs/procurement/general_terms_cond_goods_services.pdf?sfvrsn=b1238550_8 https://www.ouc.com/docs/procurement/general_terms_cond_goods_services.pdf?sfvrsn=b1238550_8 http://www.ouc.com/docs/procurement/proc_contract_agreement.pdf?sfvrsn=2
SCM-RFP-T-01 – Request for Proposal Template v4.2– 10/21/19
2 BIDDER REQUIREMENTS AND QUALIFICATIONS
2.1 DETAILED SCOPE, REQUIREMENTS, & DRAWINGS
Refer to Attachment A
2.2 BIDDER INFORMATION & REQUIRED BIDDER QUALIFICATIONS
2.2.1 Bidder Information
Refer to Attachment C
2.2.2 Required Bidder Qualifications
Refer to Section 1.4 Minimum Bidder Qualifications for more information.
1. List the number of projects (with similar scope and size) that the bidding organization has completed and are in progress.
2. Provide at least three (3) references with contact information related to completed projects with the similar scope and size project.
a. If deemed pertinent, OUC will request to do site visits to customers provided as references by selected Bidder or Bidder’s affiliates.
3. Provide a complete list of all the subcontractors that may be part of the project, with the following information:
a. Company name
b. MWBE Status
c. Contact information
d. Number of years in business
e. Proof of the necessary licenses for the job (if applicable)
f. List of project that they had participated with similar scope and size to this RFP
4. Should bidder be awarded the work in this RFP, please provide information on any Economic Development Opportunities that Bidder may bring, such as the creation of new jobs or purchasing or leasing of new building space, which could benefit the local Orlando Area or the State of Florida.
3 INSTRUCTIONS TO BIDDERS
3.1 LEGAL AND PUBLIC RECORD STATEMENT
As required by Florida’s Public Records Law, information provided to OUC in the course of business will be made available for public inspection and copying unless a specific statutory exemption applies.
3.2 CONFIDENTIALITY NOTICE TO BIDDERS
By submitting a proposal to OUC, each Bidder acknowledges and understands that OUC is a public agency subject to Chapter 119 Florida Statutes (“Public Records Law”). Any Proposal document the Bidder submits will become a public record when OUC provides notice of an intended decision or 30 days after opening the bids, proposals, or final replies, whichever is earlier. Trade Secrets, certain background financial information, and other items, may constitute exemptions to disclosure under the Public Records law.
3.2.1 Exemptions
If during the Proposal or Negotiation Phase a Bidder wishes to claim an exemption on any portion of its Proposal to OUC, the Bidder must identify the specific statutory exemption and do the following:
1. Submit a redacted version. Redact (black out) only those portions of the Proposal put forward for exemption.
2. Submit an un-redacted version of the same documents marked, “Confidential –Trade Secret/ Proprietary Information”. Both versions are to be submitted at the same time.
3.3 ACKNOWLEDGEMENT
1. From the issue date of this solicitation packet until a selection decision is made, no unauthorized contact related to this solicitation will be allowed between a Bidder, their employees or subcontractors and any OUC commissioner, officer, director, or staff, with the exception of the Buyer of Record. Any unauthorized contact will disqualify the Bidder from further consideration
2. The selected Bidder agrees to obtain, prior to award, Worker's Compensation, General Liability, Automotive, and other insurance requirements in accordance to the requirements in the terms and conditions specified in section 1.7.
3. All policies shall be subject to approval by OUC, and issued by companies authorized by the State of Florida’s Department of Insurance to conduct business in the State of Florida.
4. The selected Bidder agrees that it and its subcontractors have a Drug-Free Workplace Program that complies with Florida Statute §§ 287.087 and 440.101 et. seq., the Omnibus Employee Testing Act of 1991, 49 Code of Federal Regulation § 391 and 40 (operation of commercial motor vehicles).
a. In addition, all subcontractors must implement a controlled substance and alcohol testing policy for safety sensitive positions as defined by the Commission’s Alcohol and Controlled Substance Testing Policy for Safety Sensitive Positions.
5. The selected Bidder’s employees and its subcontractors’ employees are further prohibited from being under the influence or impairment of alcohol on OUC property or work sites or at any time or place while conducting business with or on behalf of OUC.
6. The selected Bidder shall submit only one proposal/bid in response to this solicitation packet, and shall have no financial interest in other entities submitting proposals/bid responses for the same solicitation packet.
7. Neither the selected Bidder, nor its affiliates, nor anyone associated with them shall have any potential conflict of interest due to any other clients, contracts, business relationships or property interests for this solicitation packet’s scope of work.
8. The selected Bidder shall disclose to OUC the name(s) of any OUC employee, contractor, or OUC Board Member who has a direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction. A direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction exists if the OUC employee, contractor, or Board Member:
a. Presently, or in the preceding twelve (12) months, has an ownership interest in the selected Bidder’s organization (other than as owner of less than 1% of the stock of a publicly traded corporation).
b. Works for, is a partner, officer, director, trustee, or consultant to the selected Bidder.
c. Has received grant, travel, honoraria, or other similar support from the selected Bidder
d. Has a right to receive royalties from the selected Bidder.
9. No member of the selected Bidder’s ownership, management, or staff shall have a vested interest in any aspect of OUC, nor any business or other relationship with any of OUC’s employees, officers, directors, or Board Members that creates a conflict of interest or the appearance of a conflict of interest.
10. No member of the selected Bidder’s ownership or management is presently applying for an employee position or actively seeking an appointment within OUC.
11. The selected Bidder, or authorized signatory, shall provide written notice to OUC in the event that a conflict of interest is identified at any time.
3.3.1 Statement of No Bid
The OUC Procurement Department is committed to continuously improving its processes to receive maximum participation from the industry/market. OUC is requesting that organizations, who do not wish to bid on this RFP, send the Buyer of Record an email briefly explaining their “no bid” decision. This response will help to improve the solicitation process and any future communications.
3.4 GENERAL INFORMATION
Bidders shall prepare Proposals in accordance with the requirements of these Instructions to Bidders. Not preparing a Proposal, in accordance with such instructions, implies that the Bidder does not intend to comply with all of the proposed contract conditions. Such proposals will be considered irregular and may be rejected.
OUC will receive Proposals through the VendorLink system for goods, equipment, materials, and related services set forth in the included specifications and documents.
http://www.myvendorlink.com/
3.4.1 Common Terms
OUC and Bidders (the parties) agree that the following phrases each shall have the meaning provided here and may be used interchangeably:
1. “Bidder(s)”, “Supplier(s)”, and “Proposer(s)” shall mean the organization, party, person, firm, company, corporation, partnership, joint venture, or other type of entity responding to this solicitation.
2. “Solicitation” shall mean , “Request for Proposal(s)”, “RFP”, “Request for Quote”, “RFQ”, “Invitation to Bid”, “ITB”, “Solicitation Package” or, “Solicitation Packet”, to which the Bidder is responding.
3. “Bid(s)”, “Proposal(s)”, or “Quote(s)” shall mean the documents formally submitted to OUC by each of the Bidders responding to this solicitation packet.
3.4.2 Submittal
Bidders shall submit Proposals in accordance with the instructions and schedule included in the solicitation containing these specifications and documents. Refer to Section 4: Proposal Submittal Format & Checklist and submit Proposal with all applicable content.
3.4.2.1 Alternate Proposals
If the Bidder submits an alternate proposal, they shall identify clearly the proposal as an “Alternate Proposal”. OUC may consider alternate proposals a blanket exception to the solicitation and reject the Proposal.
3.4.3 Signatures
An authorized representative of each Bidder shall:
1. Sign or e-sign the Proposal, give their full name and title, and provide the Bidder’s business name and address.
2. Enter the organization’s exact legal name on the Proposal.
3. Sign or e-sign compliance forms, if applicable.
3.4.4 Withdrawal
Bidders may withdraw, alter, and resubmit their Proposals through VendorLink at any time prior to the Proposal due date and time. Proposals may not be withdrawn, altered, or resubmitted after the Proposal due date and time. OUC may request clarifications and additional information after proposal submission.
3.5 ELECTRONIC SUBMITTAL OF THE PROPOSAL
To ensure correct Proposal formatting, Bidders shall:
1. Submit Proposals electronically through VendorLink.
2. Upload files only in MS Word (.doc or .docx), Excel (.xls or .xlsx), and PowerPoint (.ppt or .pptx); Adobe Portable Document Format (.pdf); Compressed File (ZIP) formats.
3. Enable printing on files submitted.
4. Clearly identify the RFP Number, Name, Submission Date, and Bidder Name on the Response Cover Page on Bidder’s letterhead.
5. Separate and identify each part of the submission (i.e. document type, form type, content type) with a divider/separation page.
6. Contact VendorLink technical support at support@evendorlink.com, if technical difficulties arise during proposal submission.
7. Follow all instructions outlined in this RFP and provide all requested information.
OUC may ask the selected Bidder to supply one hard copy set with original, written signatures and original compliance forms, prior to the contract execution. Do not submit following both methods unless otherwise instructed.
3.6 COMPLIANCE FORMS
3.6.1 Public Entity Crimes
Each Bidder shall submit copies of an executed and notarized Sworn Statement under Section
287.133 (3)(a) and 287.135, Florida Statutes, on Public Entity Crimes and Scrutinized Companies.
3.6.2 Dispute Disclosure
Each Bidder shall submit copies of an executed Dispute Disclosure form.
3.7 SUPPLIER DIVERSITY
OUC has adopted a policy to encourage broad-based participation in all contracts with OUC. A copy of the policy can be found clicking on this link.
3.7.1 Minority/Women Business Enterprises (M/WBE)
OUC’s policy is to encourage the full and equitable participation of Minority and Women Business Enterprises (M/WBE) in the procurement of services by establishing an M/WBE goal.
The M/WBE goal on this project is 8%.
As part of the Proposal, please indicate the percentage of bid amount to be subcontracted with M/WBE subcontractors during the activities outlined in this RFP.
Describe the Bidder’s plan for utilizing small business, minority, and/or disadvantaged entrepreneurs, and local participation in pre-qualifying vendors and subcontractors, if such a plan exists.
3.8 PROPOSAL PREPARATION COSTS
OUC shall provide, without charge, one set of the specifications and documents to prospective Bidders for preparation of proposals. Addenda documents will be issued only to prospective Bidders registered in VendorLink.
This solicitation does not commit OUC to pay any costs incurred in the preparation and submission of the Proposal or to pay any other costs incurred prior to award.
3.9 EXCEPTIONS
OUC is seeking proposals that meet all technical and commercial requirements as outlined in this solicitation. If a Bidder takes exception to any solicitation requirement or condition, the exception must be specifically stated on the Exception Form provided within the solicitation document. OUC shall consider only those exceptions written on the form at the time the Proposal is submitted. The Bidder acknowledges that any exception taken to the solicitation criteria (including submitting an alternate proposal) may result in OUC determining the Proposal to be nonresponsive.
mailto:support@evendorlink.com http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2 http://www.ouc.com/doing-business-with-ouc/procurement/supplier-diversity http://www.ouc.com/docs/procurement/proc_exceptions_form.pdf?sfvrsn=2
3.10 CLARIFICATIONS
If a prospective Bidder has doubt as to the true meaning of any part of the solicitation, they may submit a written request for clarification through email to the Buyer of Record; verbal requests will not be accepted. The Bidder must reference the Solicitation Package page number and section heading on any clarification requests
Failure of the Bidder to request information or make inquiries will not relieve them of any responsibility to perform under the terms of any contract awarded for the work in accordance with subsequent clarifications.
OUC shall issue an addendum to all Bidders, via VendorLink, once an inquiry is clarified and/or answered. Verbal responses will not be provided and are not binding on OUC.
3.11 LOCAL CONDITIONS
Each Bidder shall have thorough knowledge of conditions, factors, and scope of work, which would affect the execution and completion of the requested work. If required, site visits will be held the day of the Pre-Response Conference unless otherwise arranged.
Bidders shall investigate properly and consider all such factors in the preparation of every Proposal submitted. OUC shall not permit claims for financial adjustment based on the lack of prior information or its effect on the cost of the work.
3.12 OPENING
OUC shall open Proposals on the RFP Due Date at 2:30 p.m. EST at 100 West Anderson Street, Orlando, Florida. If required, at a public opening, OUC shall read only the Bidder name and if they have provided all the required information. OUC shall not share any other information at this time, with the exception of solicitations for construction or repairs on public works projects in which the price is submitted. Proposals not meeting the requirements may be rejected.
All questions concerning this solicitation must reference the document page number, and section heading. OUC shall answer questions and post them to VendorLink as an addenda to the solicitation.
3.13 SOLICITATION SELECTION SCHEDULE
OUC shall adhere to the stated schedule during the solicitation process, unless a change notice is issued to the Bidders via a written addendum. OUC reserves the right to postpone the date and time announced for the opening of proposals at any time.
OUC expects Proposals to address all of the information requested in the solicitation and subsequent clarifications, and to reflect the capabilities of the Bidder.
Bidders shall submit any supplemental information, and list any variations on the Exceptions form, in accordance with Section 4, Proposal Submittal Format & Checklist.
3.14 PROPOSAL ACCEPTANCE AND REJECTION
OUC reserves the right to accept the Proposal which, in its judgment, is the most responsive and responsible Proposal and to reject any and all proposals; as well as waive irregularities and formalities in any proposal that is submitted.
Without limiting the generality of the foregoing, OUC may reject any proposals which are incomplete or irregular; Proposals which omit any one or more items for which the solicitation requires, any Proposals which omit unit prices if unit prices are required, any Proposals from Bidders who have previously failed to satisfactorily complete contractual obligations.
1. The following shall cause an automatic rejection of the proposal:
a. Proposals delivered/submitted after the 2:00 p.m. due date
b. Failure to submit a Bid Bond (if required)
c. Failure to attend a mandatory Pre-Response Conference and/or any mandatory presentation (if required)
d. Failure to submit a signed Payment and Performance Bond Compliance Form when (a) a Payment and Performance Bond is required or (b) alternate payment and performance security permissible under Section 255.05, Florida Statutes is required
2. The following items may cause a rejection of the proposal:
a. Failure to submit copies of any of the signed & notarized (where required) forms:
i. Statement on Public Entity Crimes form
ii. Dispute Disclosure
3.15 PROPOSAL EVALUATION CRITERIA
OUC shall evaluate the Proposals based on the information provided by each of the Bidders. OUC’s review may include, but may not be limited to the following categories:
1. Qualifications and Experience, including past performance for OUC
2. Responsiveness to Requirements
3. Safety and Quality Programs
4. Financial Soundness of Organization
5. Price
OUC reserves the right to negotiate with Bidders who submitted responsive and responsible Proposals in the best interest of the OUC Commission. This negotiation process may occur prior to OUC Commission approval. Each Bidder acknowledges that OUC shall evaluate all Proposals and may initiate clarification discussions or seek additional information from all or some of the Bidders to fully understand any unclear elements of their proposals. Following clarification, OUC may initiate negotiations with the Bidder considered to be the most responsive and responsible. If no agreement is reached with the highest ranked Bidder, OUC may reject all Proposals or continue negotiations with each subsequently ranked Bidder until an acceptable deal is reached. A final contract award may be contingent upon OUC Commission and legal approval.
OUC reserves the right to consider historic information and facts, whether gained from the Bidder’s Proposal, question and answer conferences, references, and/or other sources during the evaluation process. OUC may conduct such investigations to assist with the evaluation of any Proposal. The investigation also serves to establish the Bidders’, subcontractors’, and other related entities’ responsibility, qualifications, and financial ability to fulfill the Proposal requirements to the Commission’s satisfaction, within the prescribed time.
http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2
The Bidder solely is responsible to submit information related to the evaluation categories. OUC is under no obligation to solicit such information. Failure of the Bidder to submit information may cause an adverse impact on the Proposal’s evaluation.
3.16 CANCELATION
Prior to the final execution of a Contract or full Notice to Proceed, OUC reserves the right to rescind said award without prior notice to Bidders. In addition, OUC may reject all Proposals, reissue the solicitation packet, or re-award the contract.
3.17 FREIGHT (IF APPLICABLE)
The selected Bidder shall coordinate with OUC’s freight contractor for shipping unless OUC determines that the selected Bidder can obtain freight/shipping rates or methods that are more advantageous to OUC. The selected Bidder shall submit an alternate shipping proposal based on delivery to OUC’s Free On Board (FOB) carrier at the designated OUC facility or location. The alternate proposal must include the:
1. Carrier name
2. Insurance coverage
3. Firm price freight quote
The Bidder must include any alternate proposal in the bid response to this solicitation. OUC may accept or reject the proposed alternate shipping arrangement.
OUC’s freight/shipping supplier and contact information is:
Nexterus
1-888-867-5952 (Monday – Friday, 8:00 a.m. – 7:00 p.m. EST) dcs@nexterus.com
3.18 BID BOND (IF APPLICABLE)
Bidder may be required to submit a certified check or cashier’s check drawn on an acceptable bank, or an acceptable Bidder’s bond executed by the Bidder and a surety company authorized to do business in the State of Florida. The value of the bid bond shall be five percent (5%) of the proposal price schedule. When submitting a Proposal through VendorLink, the Bidder shall provide a copy of the check and express mail the original check to the delivery location provided on the first page of the Solicitation Packet Form.
The bid bond guarantee shall be made payable without condition to OUC. The amount of the check or bond may be retained by and forfeited to OUC as liquidated damages if the Proposal results in a contract award and the Bidder fails to honor the accepted terms.
OUC shall return the selected Bidder’s bid bond when that Bidder executes the contract and files a satisfactory payment and/or performance bond, if required. OUC may retain the bid bond of the second highest ranked Bidder for a period not to exceed thirty (30) days, pending the execution of the contract by the selected Bidder. OUC shall return the bid bond of each unsuccessful Bidder upon request, after the contract is awarded or when the Proposal is rejected.
3.19 PAYMENT AND PERFORMANCE BOND (IF APPLICABLE)
The selected Bidder may be required to furnish a Payment and Performance Bond to OUC per Florida Statutes; Section 255.05 equal to 100 percent of the contract price. The cost of such bonds shall be stated as a separate line item in the Proposal.
A surety company, authorized to do business in the State of Florida and acceptable to OUC, shall sign the bond. The Performance Bond and Payment Bond shall be dated with the actual execution date. With these bonds, the responsible party shall file certified copies of the power of attorney of such attorney-in-fact signing the bond on behalf of the surety, and such certificates shall be certified to show that such power of attorney was in effect to and including the date of the actual execution of the bonds. Any bonds submitted by a surety or its agent shall be conclusively presumed to have been authorized by and binding upon the surety company irrespective of the date shown on the power of attorney.
If bonds are required, they shall remain in full force and effect until satisfactory completion of any specified performance guarantee tests, or satisfactory completion of all other contractual requirements, whichever shall occur last. Upon recording of the performance and payment bond (if applicable) Bidder shall provide OUC three (3) copies.
OUC shall furnish a copy of the selected Bidder’s bond to any lienor demanding that bond under the provisions of Florida Statute 713.23.
3.20 CONTRACT EXECUTION
The selected Bidder shall execute the necessary contractual forms, and return the executed forms within ten (10) business days of receipt of forms for execution.
3.21 AWARD
OUC reserves the right to award a single or multiple contracts for all proposal items, or to award separate contracts for single proposal items or any combination of such items; or to make no contract award.
OUC shall be the sole judge of its own best interests, the proposals, and the resulting contract. An award may be made to the most responsive and responsible organization whose proposal is determined to be the most advantageous to OUC. The Commission’s decision shall be final and OUC’s rights include the ability to:
1. Reject any or all proposals or parts thereof
2. Issue subsequent solicitations
3. Cancel the entire solicitation
4. Remedy technical errors on the solicitation
5. Negotiate with any, all or none of the Bidders
6. Award a contract to one or more Bidders or none at all
7. Accept other than the lowest price
8. Waive informalities and irregularities in proposals http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2
3.22 TAXES, PERMITS, AND LICENSES
The Bidder's attention is directed to the General Terms and Conditions and the Florida Statutes regarding taxes, permits, and licenses. It shall be the Bidder's responsibility to determine the applicable taxes, permits, and licenses. If the Bidder has doubt as to whether or not a tax, permit, or license is applicable, they shall state in their proposal whether this item has been included in their proposal price and the amount of the applicable tax, permit, or license in question.
3.23 ERROR AND OMISSIONS
Bidders or their authorized representatives are expected to be fully informed as to the conditions, requirements and specifications before submitting proposals; failure to do so will be at the Bidder’s own risk. Neither law nor regulations make allowance for errors either of omission or commission on the part of Bidders. In case of error of extension of prices in the proposal, the unit price shall govern.
3.24 PROPOSAL SUBMITTAL FORMAT
Bidders shall complete all required forms, and include them in the proposal submittal package with any other required information. Refer to Section 4, Proposal Submittal Format & Checklist for more information.
3.24.1 OUC Policies and Procedures for Bidders
The Bidder shall read and comply with OUC’s policies and procedures before submitting this Proposal:
1. Contractor Security Policy
2. Bid Protest Guidance
3. Generic Contractor Orientation
4. Drug and Alcohol Free Workplace and Testing Policy
5. OUC Travel and Expense Guidelines
6. All policies – OUC Procurement Services Department website
These policies and any supplemental policies provided at contractor orientation are hereby fully incorporated into this contract by reference and to the extent applicable to the supplier in the performance of their work. Supplier and its subcontractors, suppliers, agents, and employees shall fully comply with all such policies as amended from time to time.
3.25 SIGNATURES
By submitting this proposal with the authorized electronic signature, the Bidder hereby declares that, in all respects for and in good faith, without collusion or fraud:
1. Only the individuals or organizations interested in this proposal/bid response as principal or principals are named in this Proposal.
2. No other individuals or organizations than mentioned in this Proposal have any interest in this Proposal/Bid Response or in the subsequent contract.
3. This Proposal/Bid Response is made without connection with any other person, company, or parties likewise submitting a Proposal/Bid Response.
http://www.ouc.com/docs/procurement/procure_contractor_sec_pol.pdf?sfvrsn=2 http://shareouc/procuretopay/Shared%20Documents/Linked%20Procedures%20and%20Artifacts/SCM-BID-G-01%20Bid%20Protest.pdf http://www.ouc.com/docs/procurement/procure_contractor_orientation_stanton.pdf?sfvrsn=4 http://www.ouc.com/docs/procurement/proc_alc_cont_subs_abuse_policy.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_travel_expense_guidelines.pdf?sfvrsn=2 http://www.ouc.com/doing-business-with-ouc/procurement
Bidders shall prepare Proposals in accordance with the Instructions to Bidder’s document. Failure to submit the necessary forms may cause a rejection of the proposal. The Bidder hereby agrees to provide the services and/or items specified in the solicitation packet at the prices quoted pursuant to the requirements of this document.
SCM-RFP-T-01 – Request for Proposal Template v4.2– 10/21/19
4 PROPOSAL SUBMITTAL FORMAT & CHECKLIST
A checkmark (✓) on the items below indicates these are applicable items and the terms and conditions stated in earlier sections are applicable. Bidders shall complete all the forms checked (✓) below, and include them in the proposal submittal package in order with any other information.
Provide a written signature on all original forms and, when required, a notary stamp. Scan & upload these forms with the Proposal.
Technical Response File (checked if applicable)
Tab 1 – Cover Page
Proposal Cover Page on Bidders Letterhead
Bidder Information Attachment C
Tab 2 – Bidder Background and Qualifications
References and Qualifications Attachment C
Tab 3 – Response to Requirements
Response to all Requirements as listed in Section 2 and any applicable Attachments
Tab 4 – Compliance Forms
Submit at time of proposal
Exceptions
Sworn Statement on Public Entity Crimes and Scrutinized Companies Under Florida Statutes, Section 287.133 (3) (a) and 287.135
Dispute Disclosure
Addenda (If Applicable)
Provided at time of award
Copy of Company’s Business License
Copy of Insurance Certificate
W-9 Form http://www.ouc.com/docs/procurement/proc_exceptions_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_addenda_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_w9_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2
SCM-RFP-T-01 – Request for Proposal Template v4.2 - 10/21/19
5 ATTACHMENTS
Attachment A:
Attachment B:
Attachment C:
Detailed Scope of Work & Requirements
Price Schedule
Bidder Information and Qualifications
SCM-RFP-T-01 – Request for Proposal Template v4.2 - 10/21/19
DETAILED SCOPE OF WORK & REQUIREMENTS
see attached
Scope of Work and Requirements
Professional Vegetation Inspection and Consulting Services
Scope
OUC is currently seeking qualified Professional Vegetation Inspection and Consulting Services specializing in utility vegetation management. These services will assist the Commission with trimming inspection/verification and developing an integrated vegetation management plan, as well as tree risk assessment, expert-witness testimony, and educational workshops as needed.
Professional Vegetation Consultants are tree experts, who advise in the most challenging situations. Their experience in the science and practice of arboriculture and their practical, ethical, and objective role of consultant are key to a successful Vegetation Management Program.
OUC is requesting hourly rates as part of this contract, but reserves the right to request a not to exceed cost for a specific scope agreed upon by OUC and the Consultant.
Annual Services:
Electrical Utility Vegetation Inspection - Consultant inspection of electric tree clearances is to be performed on an annual basis of approximately 200 corridor miles per year.
On-going Services:
Transmission Strategic Integrated Vegetation Management Plan –
Consultant shall carefully review the video in the link below, and provide a detailed response that not only demonstrates a full comprehension of the material, but also the ability and experience with developing and implementing an IVMP similar to the one described in the video.
https://rowstewardship.org/ivm.php
Consultant may conduct an assessment of the current Transmission Vegetation Management program, as well as a Site Assessment Inventory of the Transmission ROWs. The Consultant will utilize this information to develop a Strategic Integrated Vegetation Management Plan. This plan shall address the use of cultural, biological, physical and chemical procedures for controlling undesirable species while at the same time promoting desirable low growing plant species such as shrubs, herbs, grasses, https://rowstewardship.org/ivm.php forbs and ferns, which enhance wildlife and pollinator habitat. The Plan shall include the elements required to fulfill the following Criterion of the Right-of-Way Stewardship Council’s Accreditation Standards for becoming a “Right-of-Way Steward Utility”:
• Criterion 4.1 Strategic Integrated Vegetation Management Plan
• Criterion 6.1 Setting Tolerance Levels
• Criterion 7.1 Variety of Vegetation Maintenance Methods
• Criterion 8.2 Environmental Viability
• Criterion 9.1 Land Management Units
• Criterion 9.2 Site-Specific Maintenance Prescriptions
As-Needed Services:
Assessment of Standards – Consultant may be asked to provide field verification of electric utility distribution and transmission tree trimming clearance standards, and to provide examples of their past deliverables.
Clearance Mitigation and Site Plan Reviews – Consultant may be asked to assist OUC personnel with customer mitigation of vegetation clearances cases, or to review customer site plans for accurate information regarding proposed trees, or to conduct site visits to review existing conditions.
Tree Risk Assessment –Tree risk assessment is a broad area of expertise that combines many disciplines. A qualified arborist should stay current on utility vegetation management practices related to tree risk assessment, and use that knowledge to help make sound professional judgments. The successful Consultant should be able to develop and recommend a good tree risk assessment, and be able to explain what methodology should be used to manage vegetation. Consultant shall assist OUC personnel with customer mitigation of vegetation clearances cases, on an as needed basis.
Educational Workshops –Consultant should be able to provide direction for educational programs regarding vegetation management, ranging from arboricultural to urban forestry related topics. These educational workshops could be utilized for OUC's internal employees, its customers, or its vegetation management or tree trimming contractors.
Expert Testimony – Consultant should be able to provide expert testimony in demonstrating effective, integrated vegetation maintenance methods. Consultant should be capable of providing documentation in support of a NERC, FRCC, SERC or similar Compliance audit. Consultant should be prepared to participate in Compliance audits as a subject matter expert (SME). Consultant should provide examples of past utility experience of providing subject matter expert (SME) opinion when called upon by OUC.
Proposal/Submittal Requirements:
• A brief letter of interest.
• A statement of qualifications and relevant experience.
• A summary of hourly billing rates.
• Resumes of key personnel.
• Names and phone numbers of references.
• Examples of past work in relevant areas.
• Examples of inspection deliverables.
• Examples of past utility integrated vegetation management plans.
Minimum Qualifications:
The Supplier shall provide a Vegetation Management Consultant with the following minimum qualifications:
• Four-year degree in forestry, horticulture, arboriculture or a related field
• A minimum of five years of experience in utility vegetation management
• Industry Certification(s): International Society of Arboriculture Certified Arborist
(ISA) with Tree Risk Assessment Qualified (TRAQ) certification and/or American Society of Consulting Arborist (ASCA) Registered Consulting Arborist (RCA) certification.
Additionally, the Supplier shall have staff familiar with Utility Vegetation Management (UVM) providing practical, ethical and objective guidance, while applying industry recognized integrated vegetation management methods and practices. Examples of vegetation management personnel titles are listed below, and Supplier shall demonstrate that members of their staff meet the minimum requirements in one or more of the specified positions listed below:
• Arborist / Forestry Technician
• Certified Arborist (CA)
• Registered Consulting Arborist (RCA.)
• Certified Arborist Utility Specialist
• Urban Forester / Forester
SCM-RFP-T-01 – Request for Proposal Template v4.2 - 10/21/19
PRICE SCHEDULE
Pricing needed from Bidders is uploaded in VendorLink; in Excel Spreadsheet Format. Input your information in the spreadsheet and attach your proposed pricing in the same format (do not .pdf attachment or password protect).
Price Schedule
Hourly Rate* Overtime Rate*/**
Arborist / Forester Technician
Certified Arborist (CA)
Registered Consulting Arborist (RCA)
Certified Arborist Utility Specialist
Urban Forester/Forester
Expert Witness Testimony
Administrative
Other
Inspection Mobilization Lump Sum:
** Overtime: OUC assumes 40 hours per week as a regular crew work schedule. Any hours beyond 40 per week shall be approved in writing by OUC prior to the vendor working those additional hours in a week.
Provide per hour pricing in USD $. List any additional costing that is required for invoicing.
Inspection Mobilization fee: inclusive of crew travel to OUC system at start of project, and travel from OUC system at the end of the project. OUC shall reimburse the vendor for a single mobilization per inspection cycle.
Please note that OUC requires a 2 hour Orientation class at the Pershing office location prior to the commencement of each electric utility distribution/transmission vegetation inspection cycle. OUC shall reimburse vendor for the hours for the orientation class, but not travel to/from the class.
* Hourly Rates: Include overhead costs, background checks to become badged as an OUC contractor, per diems (inclusive of lodging), equipment, supplies, computers, mileage, and tolls.
Bidder Information and Qualificaitons
Bidder Information and Qualifications is uploaded in VendorLink; in Excel Spreadsheet Format. Input your information in the spreadsheet and attach your proposed pricing in the same format (do not .pdf attachment or password protect).
Responses 1 Supplier Name
2 Name of Parent Company (if applicable)
3 Complete Business Address
4 State of Incorporation
5 Contact Name
6 Contact Phone Number
7 Contact Email Address
8 Dun & Bradstreet number
9 Women or Minority owned business status (Y/N)
Does your firm have a minimum of five years of experience in utility vegetation management?
Does your firm have key personnel with a four-year degree in forestry, horticulture, arboriculture or a related field? Include copies in Proposal
Included in Proposal YES NO
Does your firm have key personnel with industry certifications (ie. ISA Certified Arborist, TRAQ, and/or ASCA Registered Consulting Arborist)? Invlude copies in Proposal
Included in Proposal YES NO
REQUIRED RESPONSES
Length of time your company has done business in Central Fl
How many years does your firm have in Professional Vegetation Inspection and Consulting Services?
15 Provide a brief history of your organization Included in Proposal YES NO
Provide examples of past utility experience in recommendations as a subject matter expert (SME) in the area of vegetation management
Included in Proposal YES NO
Provide examples of past deliverables for Standards assessment
Included in Proposal YES NO
18 Provide a brief description of your current work load Included in Proposal YES NO
19 Describe any of related services your firm could provide Included in Proposal YES NO
20 Provide an Organization Chart of your firm Included in Proposal YES NO
21 Provide resumes for key personnel Included in Proposal YES NO
Provide your firm's job description for each of the specified positions listed in the minimum qualification section
Included in Proposal YES NO
ATTACHMENT C: BIDDERS INFORMATION
Instructions: Each Prospective Bidder shall provide the following informaton in EXCEL with the submitted proposal
BIDDER QUALIFICATIONS
http://www.sam.gov/ http://www.sam.gov/
| 1 Introduction |
| 1.1 Scope of Work Summary |
| 1.2 Pre-Response Conference |
| 1.3 Term of Contract |
| 1.4 The term of the Contract will be for 3 years with 2 (1) year options to renew |
| 1.5 Minimum Bidder Qualifications |
| 1.6 Price and Costs |
| 1.7 Terms and Conditions |
| 1.8 https://www.ouc.com/docs/procurement/general_terms_cond_goods_services.pdf?sfvrsn=b1238550_8 |
| 1.9 Contract Sample |
| 1.10 Proposal Evaluation Criteria |
| 2 Bidder Requirements and Qualifications |
| 2.1 Detailed Scope, Requirements, & Drawings |
| 2.2 Bidder Information & Required Bidder Qualifications |
| 2.2.1 Bidder Information |
| 2.2.2 Required Bidder Qualifications |
| 3 Instructions to Bidders |
| 3.1 Legal and Public Record Statement |
| 3.2 Confidentiality Notice to Bidders |
| 3.2.1 Exemptions |
| 3.3 Acknowledgement |
| 3.3.1 Statement of No Bid |
| 3.4 General Information |
| 3.4.1 Common Terms |
| 3.4.2 Submittal |
| 3.4.2.1 Alternate Proposals |
| 3.4.3 Signatures |
| 3.4.4 Withdrawal |
| 3.5 Electronic Submittal of the Proposal |
| 3.6 Compliance Forms |
| 3.6.1 Public Entity Crimes |
| 3.6.2 Dispute Disclosure |
| 3.7 Supplier Diversity |
| 3.7.1 Minority/Women Business Enterprises (M/WBE) |
| 3.8 Proposal Preparation Costs |
| 3.9 Exceptions |
| 3.10 Clarifications |
| 3.11 Local Conditions |
| 3.12 Opening |
| 3.13 Solicitation Selection Schedule |
| 3.14 Proposal Acceptance and Rejection |
| 3.15 Proposal Evaluation Criteria |
| 3.16 Cancelation |
| 3.17 Freight (If Applicable) |
| 3.18 Bid Bond (If Applicable) |
| 3.19 Payment and Performance Bond (If Applicable) |
| 3.20 Contract Execution |
| 3.21 Award |
| 3.22 Taxes, Permits, and Licenses |
| 3.23 Error and Omissions |
| 3.24 Proposal Submittal Format |
| 3.24.1 OUC Policies and Procedures for Bidders |
3.25 Signatures
| 4 Proposal Submittal Format & Checklist |
| 5 Attachments |
| Pricing Sheet_REV1.pdf |
| Price Sheet |
| Supplier Information_Qualifications.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .