814802-event.pdf
PDF 172 KB Posted
- Attached to
- DFCM CONSTRUCTION - PRE-QUALIFIED ROOFING - UNG CEDAR CITY ARMORY ROOF REPLACEMENT - 20065470
- Solicitation number
- MP20024
- Issued by
- Iron County, Utah
About this file
This is an Invitation for Bid (IFB) issued by the Utah Division of Facilities Construction and Management (DFCM) for the Cedar City Armory Roof Replacement project, with the project number 20065470. The bid is specifically for pre-qualified roofing firms and is scheduled to be open from 12/2/2019 to 1/15/2020. The project involves removing the existing built-up roof (BUR) and modified bituminous insulation down to the sheathing, and installing a new 30-year, 90-mil PVC membrane with additional insulation to achieve an R-30 rating per DFCM standards. Additional scope includes replacing parapet caps, extending the roof hatch ladder, adding guardrails adjacent to RTUs and roof hatches, replacing the roof hatch, and removing the front RTU screen and curbs.
The construction cost estimate for the project is $295,000.00, and the bid is limited to roofing firms that have been pre-qualified during Stage I of the Request for Solicitation (RFS). Bidders are required to submit several documents, including a General Liability & Health Insurance Statement of Compliance, a Bid Bond, Subcontractor Lists, and other standard documentation. The bid is handled through the Utah Public Procurement Place, with Randy Mellor listed as the contact. Potential bidders must meet specific prerequisites, including providing details about their business organization, contractor's license, legal firm name and address, and point of contact information.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM CONSTRUCTION - PRE-QUALIFIED ROOFING - UNG CEDAR CITY
ARMORY ROOF REPLACEMENT - 20065470
DFCM CONSTRUCTION - PRE-QUALIFIED ROOFING - UTAH NATIONAL GUARD CEDAR CITY ARMORY
ROOF REPLACEMENT - 20065470
Open 12/2/2019 3:00 PM MST Type Invitation for Bid
Close 1/15/2020 3:00 PM MST Number MP20024 Currency US Dollar
Sealed Until 1/15/2020 3:00 PM MST
Contacts
Randy Mellor rmellor@utah.gov
Commodity Codes
Commodity Code Description
99901 DFCM Division Facilities and Construction and Managment
72120 Nonresidential building construction services including commercial and office building new construction services and construction services and renovation and repair services
72152 Roofing service including maintenance and repair and installation and roofing and siding and sheet metal services and gutter and downspout service and skylight installation service
07 February 202007 February 2020 mailto:rmellor@utah.gov mailto:rmellor@utah.gov mailto:rmellor@utah.gov
Description
INVITATION TO BID
ONLY ROOFING FIRMS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE ALLOWED
TO BID ON THIS PROJECT
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the following project:
CEDAR CITY ARMORY ROOF REPLACEMENT
UTAH NATIONAL GUARD – CEDAR CITY, UTAH
DFCM PROJECT #20065470
Construction Cost Estimate: $295,000.00
Project Description/Base Bid: Remove old BUR and modified bituminous and insulation down to sheathing and install new 30 year 90 mil pvc membrane and add additional insulation to achieve R30 as per DFCM standards. Replace existing parapet caps. Extend roof hatch ladder. Add guardrail adjacent to rtu and roof hatches. Replace roof hatch. Remove front rtu screen and curbs.
07 February 202007 February 2020
Required to View Event
Prerequisites Required to Enter Bid
1. General Liability & Health Insurance Statement of Compliance Requirements
2. Bid Bond
3. Subcontractor's Lists
4. Liquidated Damages
5. Completion Date
6. Mandatory Pre-bid Meeting
7. Pricing
Buyer Attachments
1. Solicitation
2. Project Schedule
3. Approved Plans
4. Approved Specifications
5. DFCM Addendum 1
6. Subcontractor's List Form & Instructions
7. Mandatory Pre-Bid Meeting Sign-In
8. Link to DFCM Pre-Qualified Contractor Lists *Scroll to step six at the bottom of the page*
9. DFCM Sample Contractors Agreement
0. Certificate of Substantial Completion & Performance Rating Form
1. DFCM Addendum 2
07 February 202007 February 2020 https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-885055738Solicitation%20-%2020065470.docx?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=N3FCRvFCGv9FP5wepny%2Fk%2Bec2tU%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-885055738Solicitation%20-%2020065470.docx?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=N3FCRvFCGv9FP5wepny%2Fk%2Bec2tU%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-885056410Project%20Schedule%20-%2020065470.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=q9hMZhyck72V8%2FVcSbuzsfUNK%2Fc%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-885056410Project%20Schedule%20-%2020065470.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=q9hMZhyck72V8%2FVcSbuzsfUNK%2Fc%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-88505588920065470-Cedar-City-Armory-Roof-Replacement-Stamped-Plans.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=kkkyQ%2Fo5tst7fqtKLavtNriiOTo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-88505588920065470-Cedar-City-Armory-Roof-Replacement-Stamped-Plans.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=kkkyQ%2Fo5tst7fqtKLavtNriiOTo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-88505653220065470-Cedar-City-Armory-Roof-Replacement-Stamped-Specs.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=wx8PLNLMQ%2FCUjhMK84iwbAt7g%2Bk%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-88505653220065470-Cedar-City-Armory-Roof-Replacement-Stamped-Specs.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=wx8PLNLMQ%2FCUjhMK84iwbAt7g%2Bk%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-894245374DFCM%20Addendum%201.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=XE4Yv5hHh3OsKLRr2bxQpkPuB8s%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-894245374DFCM%20Addendum%201.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=XE4Yv5hHh3OsKLRr2bxQpkPuB8s%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-867731214%21Subcontractors%20List%20Form%20%26%20Instructions%20-%20October%202019.docx?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=jl0RHdjkeg81WrsdDkZF%2FHiOYTA%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-867731214%21Subcontractors%20List%20Form%20%26%20Instructions%20-%20October%202019.docx?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=jl0RHdjkeg81WrsdDkZF%2FHiOYTA%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-89275850620065470%20-%20Mandatory%20Attendance%20Log.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=9eevFwX7CGEAWyGel1wbGi2NJAc%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-89275850620065470%20-%20Mandatory%20Attendance%20Log.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=9eevFwX7CGEAWyGel1wbGi2NJAc%3D https://dfcm.utah.gov/construction-management/pre-qualified-contractor/ https://dfcm.utah.gov/construction-management/pre-qualified-contractor/ https://dfcm.utah.gov/wp-content/uploads/Contractors-Agreement-071318.pdf https://dfcm.utah.gov/wp-content/uploads/Contractors-Agreement-071318.pdf https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-863498569Certificate%20of%20Substantial%20Completion%20%26%20Performance%20Rating%20Form.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=g%2BwH9AJzBCICGqHBZMELQmqB1HQ%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-863498569Certificate%20of%20Substantial%20Completion%20%26%20Performance%20Rating%20Form.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=g%2BwH9AJzBCICGqHBZMELQmqB1HQ%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-894460930DFCM%20Addendum%202%20-%2020065470.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=2tcmTZeEme3iXo%2FlkauuChoa5Fw%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/814802-894460930DFCM%20Addendum%202%20-%2020065470.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1644180375&Signature=2tcmTZeEme3iXo%2FlkauuChoa5Fw%3D
Questions Required Questions
Group 1:
1.1 # of DFCM Addendums
1.2 Business Organization Type
1.3 Contractor's License #
1.4 Firms legal name and address
1.5 Contractor Point of Contact-name, phone number and email.
Product Line Items Product Line Items
There are no Items added to this event.
Service Line Items Service Line Items
1.
# Item Name, Commodity Code, Description Allow Alternates Qty. UOM Requested Service Delivery
S1 Base Bid/Project Description 1 LS - Lump Sum
Remove old BUR and modified bituminous and insulation down to sheathing and install new 30 year 90 mil pvc membrane and add additional insulation to achieve R30 as per DFCM standards. Replace existing parapet caps. Extend roof hatch ladder. Add guardrail adjacent to rtu and roof hatches. Replace roof hatch. Remove front rtu screen and curbs.
File details come from the government source that posted it. Updated .