80SSC019R0002P00003_-_SF30.pdf

PDF 137 KB Posted

Attached to
Procurement of NASA Push Boat, Clermont II, Dry Docking, Refurbishment, and/or Repair Services
Solicitation number
80SSC019R0002
Issued by

About this file

80SSC019R0002P00003 SF30 and Q&A Attachment

View the file

Other files

File Type Posted
80SSC019R0002P00002_-_SF30.pdf PDF
80SSC019R0002P00001_-_SF30.pdf PDF
Attachment_1,_2,_3.pdf PDF
80SSC019R0002_-_Push_Boat,_Clermont_II_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(A)

ITEM NO.

(F)

AMOUNT

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED Page 2

NAME OF OFFEROR OR CONTRACTOR

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

80SSC019R0002P00003

The purpose of this amendment is to:

1. Set a new offer due date/time to address the previous furlough suspension amendment.

Change box 8 on SF 1449 of the solicitation to read as follows: Offer Due Date/ Local Time: 02/13/2019 15:00:00.

2. Respond to questions asked, see attached 80SSC019R0002P00003 RFP Questions and Answers.

3. All other terms and conditions remain unchanged.

80SSC019R0002P00003 RFP Questions and Answers January 29, 2019

Question # RFP Document Para. # Page # Question/Comment Answer

1 Attachment 1, SOW Item f 11 of 24 Are propellers removable with rudders in place?

It is not known if the propellers can be removed with rudders in place. Further inspection is required once vessel is dry docked.

2 Attachment 1, SOW Item g 11 of 24 Material spec. for bushing material The bushing material is stainless steel pin and brass bushing.

3 Attachment 1, SOW

Electrical Item W 14 of 24 Are the current generators rated at 40 KW? No, the current generators are rated at 35 kw.

4 Attachment 1, SOW

Electrical Item X 15 of 24 Will there be new control panels for the new winches?

The specified winch will integrate with the existing control panel. Contractors are required to ensure any “or equal” will integrate with the existing control panels.

5 Attachment 1, SOW

Electrical Item Z 16 of 24 Will the new Xeon light fit on existing foundation or will it have to be modified? Yes, the Xeon light will fit on existing foundation.

6 Attachment 1, SOW

Electrical Item Z 16 of 24

The search light that is to be removed from the lower pilothouse is to be installed on the roof starboard side of the upper pilothouse. Will this be a new install where we must build a foundation, put in penetrations and pull in new cable?

No, the search light that is to be removed from the lower pilothouse is to be installed on the roof starboard side of the upper pilothouse in existing location of the upper pilothouse search light.

7 Attachment 1, SOW

Item

6.2.2 –B 16 of 24 Are we to bid replacing from the through hull penetration to the threaded connection on the first valve?

Yes, the firm fixed price should include replacing from hull to first valve.

File details come from the government source that posted it.